Search results for: construction projects' performance
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 16651

Search results for: construction projects' performance

16471 Local Gambling Attitudes, Corporate R&D Investment and Long-Term Financial Performance

Authors: Hong Fan, Lifang Gao, Feng Zhan

Abstract:

This paper examines the influence of local gambling attitudes on a firm's long-term financial performance. Firms located in gambling-prone regions may be more willing to take risks, thus spending more on innovative projects. However, firms in such regions may also be likely to choose projects impulsively and allocate resources inefficiently. By studying Chinese publicly listed firms from 2010 to 2017, we find that firms in more gambling-prone regions invest more in R&D. Both local gambling attitudes and firms’ R&D spending are positively associated with firms’ long-term financial performance. More importantly, our study reveals that the positive impact of R&D spending on firms’ long-term financial performance is weakened by gambling-friendly attitudes, probably because firms in gambling-prone regions are more likely to overinvest in risky projects. This effect is stronger for larger firms, state-owned enterprises (SOEs), firms with more government subsidies, and firms with weaker internal control.

Keywords: regional gambling attitudes, long-term financial performance, R&D, risk, local bias

Procedia PDF Downloads 76
16470 Measuring the Level of Knowledge of Construction Contracts Procedures: A Case Study of Botswana

Authors: Babulayi B. Wilson

Abstract:

Unsatisfactory performance of construction projects in both the industrialised and developing countries indicate that there could be several defects in construction projects phases. Notwithstanding the fact that some project defects are often conceived at the initiation phase of construction projects, insufficient knowledge of contract procedures has been identified as one of the major sources of construction disputes. Contract procedures are a set of rules that outlines the primary obligations and liabilities of parties involved in the implementation of a construction project. Engineering professional bodies often codify contract procedures into standard forms of contract such as the Institution of Civil Engineers (ICE, UK) and Association of Consulting Engineers (ACE, UK) and keep them under constant review by updating any clause to reflect any change in case law or relevant piece of legislation. Even so, it is the responsibility of a professional body or conditions of contract draftsperson to introduce contract-specific clauses that may be necessary for business efficacy but not covered in the chosen standard conditions of contract. In Botswana, the use of clients’ drafted and/or un-adapted for environment of use international forms of contract in conjunction with client-drafted pricing schedules is common. The product of the latter often impact negatively upon contractors’ claims and payments, in that, tender rates and prices can only be deemed to be sufficient if the chosen conditions of contract compliment the pricing schedule (use of standardised procurement documents). In addition, client drafted and the use of borrowed forms of contract such as FIDIC often conflict with domicile law resulting in costly disputes on the part of the client. It is upon the preceding text that the object of the research is to measure the level of knowledge of contract procedures amongst key stakeholders in the Botswana construction industry by requesting a representative sample from the industry and academia to respond to tutorial questions prepared from two commonly used forms of contract for civil works, that is, FIDIC (International Form of Contract) and ICE (UK). The questions were prepared under the following captions: (a) preparation of tender documents (b) obligations of the parties (c) contract administration; and (d) claims, variations, and valuation of variations. After ascertaining that the level of knowledge of contract procedures is insufficient among most practitioners in the Botswana construction industry, major procurement entities, and engineering institutions of learning; a guide to drafting a condition of a construction contract was developed and then validated through seminars and workshops. In the present, the effectiveness of the guide is not yet measured but feedback from seminars and workshops conducted indicates an appreciation of the guide by the majority of major construction industry stakeholders.

Keywords: contract procedures, conditions of contract, professional practice, construction law, forms of contract

Procedia PDF Downloads 157
16469 Environmental Decision Making Model for Assessing On-Site Performances of Building Subcontractors

Authors: Buket Metin

Abstract:

Buildings cause a variety of loads on the environment due to activities performed at each stage of the building life cycle. Construction is the first stage that affects both the natural and built environments at different steps of the process, which can be defined as transportation of materials within the construction site, formation and preparation of materials on-site and the application of materials to realize the building subsystems. All of these steps require the use of technology, which varies based on the facilities that contractors and subcontractors have. Hence, environmental consequences of the construction process should be tackled by focusing on construction technology options used in every step of the process. This paper presents an environmental decision-making model for assessing on-site performances of subcontractors based on the construction technology options which they can supply. First, construction technologies, which constitute information, tools and methods, are classified. Then, environmental performance criteria are set forth related to resource consumption, ecosystem quality, and human health issues. Finally, the model is developed based on the relationships between the construction technology components and the environmental performance criteria. The Fuzzy Analytical Hierarchy Process (FAHP) method is used for weighting the environmental performance criteria according to environmental priorities of decision-maker(s), while the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method is used for ranking on-site environmental performances of subcontractors using quantitative data related to the construction technology components. Thus, the model aims to provide an insight to decision-maker(s) about the environmental consequences of the construction process and to provide an opportunity to improve the overall environmental performance of construction sites.

Keywords: construction process, construction technology, decision making, environmental performance, subcontractor

Procedia PDF Downloads 216
16468 Implementation of Quality Function Development to Incorporate Customer’s Value in the Conceptual Design Stage of a Construction Projects

Authors: Ayedh Alqahtani

Abstract:

Many construction firms in Saudi Arabia dedicated to building projects agree that the most important factor in the real estate market is the value that they can give to their customer. These firms understand the value of their client in different ways. Value can be defined as the size of the building project in relationship to the cost or the design quality of the materials utilized in finish work or any other features of building rooms such as the bathroom. Value can also be understood as something suitable for the money the client is investing for the new property. A quality tool is required to support companies to achieve a solution for the building project and to understand and manage the customer’s needs. Quality Function Development (QFD) method will be able to play this role since the main difference between QFD and other conventional quality management tools is QFD a valuable and very flexible tool for design and taking into the account the VOC. Currently, organizations and agencies are seeking suitable models able to deal better with uncertainty, and that is flexible and easy to use. The primary aim of this research project is to incorporate customer’s requirements in the conceptual design of construction projects. Towards this goal, QFD is selected due to its capability to integrate the design requirements to meet the customer’s needs. To develop QFD, this research focused upon the contribution of the different (significantly weighted) input factors that represent the main variables influencing QFD and subsequent analysis of the techniques used to measure them. First of all, this research will review the literature to determine the current practice of QFD in construction projects. Then, the researcher will review the literature to define the current customers of residential projects and gather information on customers’ requirements for the design of the residential building. After that, qualitative survey research will be conducted to rank customer’s needs and provide the views of stakeholder practitioners about how these needs can affect their satisfy. Moreover, a qualitative focus group with the members of the design team will be conducted to determine the improvements level and technical details for the design of residential buildings. Finally, the QFD will be developed to establish the degree of significance of the design’s solution.

Keywords: quality function development, construction projects, Saudi Arabia, quality tools

Procedia PDF Downloads 98
16467 Adverse Curing Conditions and Performance of Concrete: Bangladesh Perspective

Authors: T. Manzur

Abstract:

Concrete is the predominant construction material in Bangladesh. In large projects, stringent quality control procedures are usually followed under the supervision of experienced engineers and skilled labors. However, in the case of small projects and particularly at distant locations from major cities, proper quality control is often an issue. It has been found from experience that such quality related issues mainly arise from inappropriate proportioning of concrete mixes and improper curing conditions. In most cases external curing method is followed which requires supply of adequate quantity of water along with proper protection against evaporation. Often these conditions are found missing in the general construction sites and eventually lead to production of weaker concrete both in terms of strength and durability. In this study, an attempt has been made to investigate the performance of general concreting works of the country when subjected to several adverse curing conditions that are quite common in various small to medium construction sites. A total of six different types of adverse curing conditions were simulated in the laboratory and samples were kept under those conditions for several days. A set of samples was also submerged in normal curing condition having proper supply of curing water. Performance of concrete was evaluated in terms of compressive strength, tensile strength, chloride permeability and drying shrinkage. About 37% and 25% reduction in 28-day compressive and tensile strength were observed respectively, for samples subjected to most adverse curing condition as compared to the samples under normal curing conditions. Normal curing concrete exhibited moderate permeability (close to low permeability) whereas concrete under adverse curing conditions showed very high permeability values. Similar results were also obtained for shrinkage tests. This study, thus, will assist concerned engineers and supervisors to understand the importance of quality assurance during the curing period of concrete.

Keywords: adverse, concrete, curing, compressive strength, drying shrinkage, permeability, tensile strength

Procedia PDF Downloads 175
16466 The Impact of Structural Empowerment on Risk Management Practices: A Case Study of Saudi Arabia Construction Small and Medium-Sized Enterprises

Authors: S. Alyami, S. Mohammad

Abstract:

These Risk management practices have a significant impact on construction SMEs. The effective utilisation of these practices depends on culture change in order to optimise decision making for critical activities within construction projects. Thus, successful implementation of empowerment strategies would enhance operational employees to participate in effective decision making. However, there remain many barriers to individuals and organisations within empowerment strategies that require empirical investigation before the industry can benefit from their implementation. Gaps in understanding the relationship between employee empowerment and risk management practices still exist. This research paper aims to examine the impact of the structural empowerment on risk management practices in construction SMEs. The questionnaire has been distributed to participants (162 employees) that involve projects and civil engineers within a case study from Saudi construction SMEs. Partial least squares based structural equation modeling (PLS-SEM) was utilised to perform analysis. The results reveal a positive relationship between empowerment and risk management practices. The study shows how structural empowerment contributes to operational employees in risk management practices through involving activities such as decision making, self-efficiency, and autonomy. The findings of this study will contribute to close the current gaps in the construction SMEs context.

Keywords: construction SMEs, culture, decision making, empowerment, risk management

Procedia PDF Downloads 82
16465 Optimising GIS in Cushioning the Environmental Impact of Infrastructural Projects

Authors: Akerele Akintunde Hareef

Abstract:

GIS is an integrating tool for storing, retrieving, manipulating, and analyzing spatial data. It is a tool which defines an area with respect to features and other relevant thematic delineations. On the other hand, Environmental Impact Assessment in short is both positive and negative impact of an infrastructure on an environment. Impact of infrastructural projects on the environment is an aspect of development that barely get extensive portion of pre-project execution phase and when they do, the effects are most times not implemented to cushion the impact they have on human and the environment. In this research, infrastructural projects like road constructions, water reticulation projects, building constructions, bridge etc. have immense impact on the environment and the people that reside in location of construction. Hence, the need for this research tends to portray the relevance of Environmental Impact assessment in calculating the vulnerability of human and the environment to imbalance necessitated by this infrastructural development and how the use of GIS application can be optimally applied to annul or minimize the effect.

Keywords: environmental impact assessment (EIA), geographic information system (GIS), infrastructural projects, environment

Procedia PDF Downloads 516
16464 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 351
16463 Earthquake Effect in Micro Hydro Sector: Case Study of Dulakha District, Nepal

Authors: Keshav Raj Dhakal, Jit Bahadur Rokaya Chhetri

Abstract:

The Micro Hydro (MH) is one of the successful technology in Rural Nepal. Out of 75 district, 59 districts have installed 1287 MH projects with a total capacity of 24 Mega Watt (MW). Now, the challenge is how to sustain them. Dolakha is a prominent district for sustainable endues of power to sustain the MH projects. A total of 37 MH projects have been constructed with producing 886 Kilo Watt (KW) of energy in the district. This study traces out the impact of earthquake in MH sector in Dolakha district. It shows that 59 % of projects have been affected by devastating earthquake in April and May, 2015 where 29 % are completely damaged. Most of the damages are in civil structures like Penstock, forebay, power house, Canal, Intake. Transmission and distribution line have been partially damaged. This paper analysis failure of the civil structural component of MH projects and its financial consequence to the community. This study recommends that a disaster impact assessment is essential before construction of MH projects.

Keywords: micro hydro, earthquake, structural failure, financial consequence

Procedia PDF Downloads 181
16462 Critical Success Factors of Information Technology Projects

Authors: Athar Imtiaz, Abduljalil S. Al-Mudhary, Taha Mirhashemi, Roslina Ibrahim

Abstract:

Information Technology (IT) is being used by almost all organizations throughout the world. However, its success at supporting and improving business is debatable. There is always the risk of IT project failure and studies have proven that a large number of IT projects indeed do fail. There are many components that further the success of IT projects; these have been studied in previous studies. Studies have found the most necessary components for success in software development projects, executive information systems etc. In this study, previous literature that has looked into these success promoting factors have been critically reviewed and analyzed. Fifteen critical Success Factors (CSF) of IT projects were enlisted and examined. These factors can be applied to all IT projects and is not specific to a particular type of IT/IS project. A hypothesis was also generated after the evaluation of the factors.

Keywords: critical success factors, CSF, IT projects, IS projects, software development projects

Procedia PDF Downloads 356
16461 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 239
16460 Digital Design and Fabrication: A Review of Trend and Its Impact in the African Context

Authors: Mohamed Al Araby, Amany Salman, Mostafa Amin, Mohamed Madbully, Dalia Keraa, Mariam Ali, Marah Abdelfatah, Mariam Ahmed, Ahmed Hassab

Abstract:

In recent years, the architecture, engineering, and construction (A.E.C.) industry have been exposed to important innovations, most notably the global integration of digital design and fabrication (D.D.F.) processes in the industry’s workflow. Despite this evolution in that sector, Africa was excluded from the examination of this development. The reason behind this exclusion is the preconceived view of it as a developing region that still employs traditional methods of construction. The primary objective of this review is to investigate the trend of digital construction (D.C.) in the African environment and the difficulties in its regular utilization of it. This objective can be attained by recognizing the notion of distributed computing in Africa and evaluating the impact of the projects deploying this technology on both the immediate and broader contexts. The paper’s methodology begins with the collection of data from 224 initiatives throughout Africa. Then, 50 of these projects were selected based on the criteria of the project's recency, typology variety, and location diversity. After that, a literature-based comparative analysis was undertaken. This study’s findings reveal a pattern of motivation for applying digital fabrication processes. Moreover, it is essential to evaluate the socio-economic effects of these projects on the population living near the analyzed subject. The last step in this study is identifying the influence on the neighboring nations.

Keywords: Africa, digital construction, digital design, fabrication

Procedia PDF Downloads 127
16459 Growth of Public Listed Construction Companies in Malaysia

Authors: M. C. Theong, F. L. Ang, G. J. Muga

Abstract:

Growth of firms is influenced by environmental changes such as the global and national economy. On the other hand, it indicates the economic situation of a country. Therefore, it is imperative for firms to be sensitive to changes and to stay competitive and remain compatible with the environment. The Malaysian construction industry is prone to environmental changes due to its complexity. In order to survive in the construction industry, focus on the development of the firms themselves to achieve long term their long term goals is vital besides maximizing profits. The objective of this paper is to measure growth of the public listed construction companies in Malaysia and to investigate the development of the companies with highest, moderate and lowest growth. Growth is measured based on the companies' sales between year 2008 and 2012 collected via secondary data collection method. Findings show that the highest average growth created is 235.20 % while the lowest average growth is -22.75%. The construction companies remained active in the construction industry by implementing different sets of strategies and involving in several types of construction projects.

Keywords: growth, Malaysian construction industry, public listed companies, sales

Procedia PDF Downloads 345
16458 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma

Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman

Abstract:

Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.

Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value

Procedia PDF Downloads 126
16457 Utility Assessment Model for Wireless Technology in Construction

Authors: Yassir AbdelRazig, Amine Ghanem

Abstract:

Construction projects are information intensive in nature and involve many activities that are related to each other. Wireless technologies can be used to improve the accuracy and timeliness of data collected from construction sites and shares it with appropriate parties. Nonetheless, the construction industry tends to be conservative and shows hesitation to adopt new technologies. A main concern for owners, contractors or any person in charge on a job site is the cost of the technology in question. Wireless technologies are not cheap. There are a lot of expenses to be taken into consideration, and a study should be completed to make sure that the importance and savings resulting from the usage of this technology is worth the expenses. This research attempts to assess the effectiveness of using the appropriate wireless technologies based on criteria such as performance, reliability, and risk. The assessment is based on a utility function model that breaks down the selection issue into alternatives attribute. Then the attributes are assigned weights and single attributes are measured. Finally, single attribute are combined to develop one single aggregate utility index for each alternative.

Keywords: analytic hierarchy process, decision theory, utility function, wireless technologies

Procedia PDF Downloads 311
16456 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 371
16455 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand

Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo

Abstract:

An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.

Keywords: accuracy, design-stage, elemental cost plan, final tender sum

Procedia PDF Downloads 237
16454 The Importance of Localization in Large Constraction Projects

Authors: Ali Mohammadi

Abstract:

The basis for the construction of any project is a map, a map where the surveyor can determine the coordinates of the points on the ground by using the coordinates and using the total station, projects such as dams, roads, tunnels and pipelines, if the base points are determined using GPS prepared can create challenges for the surveyor to control. First, we will examine some map projection on which the maps are designed, and a summary of their differences and the challenges that surveyors face in order to control them, because in order to build projects, we need real lengths and angles, so we have to use coordinates that provide us with the results of the calculations. We will examine some examples to understand the concept of localization so that the surveyor knows if he is facing a challenge or not and if he is faced with this challenge, how should he solve this problem.

Keywords: UTM, scale factor, cartesian, traverse

Procedia PDF Downloads 45
16453 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays

Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof

Abstract:

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.

Keywords: final account closing, construction project, construction delay, supply chain management

Procedia PDF Downloads 330
16452 Interactive Planning of Suburban Apartment Buildings

Authors: J. Koiso-Kanttila, A. Soikkeli, A. Aapaoja

Abstract:

Construction in Finland is focusing increasingly on renovation instead of conventional new construction, and this trend will continue to grow in the coming years and decades. Renovation of the large number of suburban residential apartment buildings built in the 1960s and 1970s poses a particular challenge. However, renovation projects are demanding for the residents of these buildings, since they usually are uninitiated in construction issues. On the other hand, renovation projects generally apply the operating models of new construction. Nevertheless, the residents of an existing residential apartment building are some of the best experts on the site. Thus, in this research project we applied a relational model in developing and testing at case sites a planning process that employs interactive planning methods. Current residents, housing company managers, the city zoning manager, the contractor’s and prefab element supplier’s representatives, professional designers and researchers all took part in the planning. The entire interactive planning process progressed phase by phase as the participants’ and designers’ concerted discussion and ideation process, so that the end result was a renovation plan desired by the residents.

Keywords: apartment building renovation, interactive planning, project alliance, user-orientedness

Procedia PDF Downloads 353
16451 Perception of Indoor Environmental Qualities in Residential Buildings: A Quantitative Case Survey for Turkey and Iran

Authors: Majid Bahramian, Kaan Yetilmezsoy

Abstract:

Environmental performance of residential buildings been a hotspot for the research community, however, the indoor environmental quality significantly overlooked in the literature. The paper is motivated by the understanding of the occupants from the indoor environmental qualities and seeks to find the satisfaction level in two high-rise green-certified residential buildings. Views of more than 250 respondents in each building were solicited on 15 Indoor Environmental Qualities (IEQ) parameters. Findings suggest that occupants are generally satisfied with five critical aspects of IEQ, but some unsatisfaction exists during operation phase. The results also indicate that the green build certification systems for new buildings have some deficiencies which affect the actual environmental performance of green buildings during operation. Some reasons were suggested by the occupants of which the design-focus construction and lack of monitoring after certification were the most critical factors. Among the crucial criteria for environmental performance assessment of green buildings, energy saving, reduction of Greenhouse Gases (GHG) emissions, environmental impacts on neighborhood area, waste reduction and IEQs, were the most critical factors dominating the performance, in a descending order. This study provides valuable information on the performance of IEQ parameters of green building and gives a deeper understanding for stakeholders and companies involved in construction sector with the relevant feedback for their decision-making on current and future projects.

Keywords: indoor environmental qualities, green buildings, occupant satisfaction, environmental performance

Procedia PDF Downloads 54
16450 A Literature Review on Sustainability Appraisal Methods for Highway Infrastructure Projects

Authors: S. Kaira, S. Mohamed, A. Rahman

Abstract:

Traditionally, highway infrastructure projects are initiated based on their economic benefits, thereafter environmental, social and governance impacts are addressed discretely for the selected project from a set of pre-determined alternatives. When opting for cost-benefit analysis (CBA), multi-criteria decision-making (MCDM) has been used as the default assessment tool. But this tool has been critiqued as it does not mimic the real-world dynamic environment. Indeed, it is because of the fact that public sector projects like highways have to experience intense exposure to dynamic environments. Therefore, it is essential to appreciate the impacts of various dynamic factors (factors that change or progress with the system) on project performance. Thus, this paper presents various sustainability assessment tools that have been globally developed to determine sustainability performance of infrastructure projects during the design, procurement and commissioning phase. Indeed, identification of the current gaps in the available assessment methods provides a potential to add prominent part of knowledge in the field of ‘road project development systems and procedures’ that are generally used by road agencies.

Keywords: dynamic impact factors, micro and macro factors, sustainability assessment framework, sustainability performance

Procedia PDF Downloads 109
16449 Labor Productivity and Organization Performance in Specialty Trade Construction: The Moderating Effect of Safety

Authors: Shalini Priyadarshini

Abstract:

The notion of performance measurement has held great appeal for the industry and research communities alike. This idea is also true for the construction sector, and some propose that performance measurement and productivity analysis are two separate management functions, where productivity is a subset of performance, the latter requiring comprehensive analysis of comparable factors. Labor productivity is considered one of the best indicators of production efficiency. The construction industry continues to account for a disproportionate share of injuries and illnesses despite adopting several technological and organizational interventions that promote worker safety. Specialty trades contractors typically complete a large fraction of work on any construction project, but insufficient body of work exists that address subcontractor safety and productivity issues. Literature review has revealed the possibility of a relation between productivity, safety and other factors and their links to project, organizational, task and industry performance. This research posits that there is an association between productivity and performance at project as well as organizational levels in the construction industry. Moreover, prior exploration of the importance of safety within the performance-productivity framework has been anecdotal at best. Using structured questionnaire survey and organization- and project level data, this study, which is a combination of cross-sectional and longitudinal research designs, addresses the identified research gap and models the relationship between productivity, safety, and performance with a focus on specialty trades in the construction sector. Statistical analysis is used to establish a correlation between the variables of interest. This research identifies the need for developing and maintaining productivity and safety logs for smaller businesses. Future studies can design and develop research to establish causal relationships between these variables.

Keywords: construction, safety, productivity, performance, specialty trades

Procedia PDF Downloads 248
16448 The Organizational Structure of the Special Purpose Vehicle in Public-Private Partnership Projects

Authors: Samuel Capintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. During the last decade, the Spanish companies have dominated the international market of PPP projects in Latin America, Western Europe and North America, particularly in the transportation sector. Arguably, one of the most influential factors has been the organizational structure of the concessionaire implemented by the Spanish consortiums. The model followed by most Spanish groups has been a bundled model, where the concessionaire integrates the functions of concessionaire, construction and operator companies. This paper examines this model and explores how it has provided the Spanish companies with a comparative advantage in the international PPP market.

Keywords: PPP, project management, concessionaire, concession, infrastructure, construction

Procedia PDF Downloads 350
16447 Managing High-Performance Virtual Teams

Authors: Mehdi Rezai, Asghar Zamani

Abstract:

Virtual teams are a reality in today’s fast-paced world. With the possibility of commonly using common resources, an increase of inter-organizational projects, cooperation, outsourcing, and the increase in the number of people who work remotely or flexitime, an extensive and active presence of high-performance teams is a must. Virtual teams are a challenge by themselves. Their members remove the barriers of cultures, time regions and organizations, and they often communicate through electronic devices over considerable distances. Firstly, we examine the management of virtual teams by considering different issues such as cultural and personal diversities, communications and arrangement issues. Then we will examine individuals, processes and the existing tools in a team. The main challenge is managing high-performance virtual teams. First of all, we must examine the concept of performance. Then, we must focus on teams and the best methods of managing them. Constant improvement of performance, together with precisely regulating every individual’s method of working, increases the levels of performance in the course of time. High-performance teams exploit every issue as an opportunity for achieving high performance. And we know that doing projects with high performance is among every organization or team’s objectives. Performance could be measured using many criteria, among which carrying out projects in time, the satisfaction of stakeholders, and not exceeding budgets could be named. Elements such as clear objectives, clearly-defined roles and responsibilities, effective communications, and commitment to collaboration are essential to a team’s effectiveness. Finally, we will examine roles, systems, processes and will carry out a cause-and-effect analysis of different criteria in improving a team’s performance.

Keywords: virtual teams, performance, management, process, improvement, effectiveness

Procedia PDF Downloads 124
16446 Identification of Factors Influencing Costs in Green Projects

Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi

Abstract:

Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.

Keywords: green project, factors influencing cost, hard cost, soft cost

Procedia PDF Downloads 314
16445 Concrete Recycling in Egypt for Construction Applications: A Technical and Financial Feasibility Model

Authors: Omar Farahat Hassanein, A. Samer Ezeldin

Abstract:

The construction industry is a very dynamic field. Every day new technologies and methods are developing to fasten the process and increase its efficiency. Hence, if a project uses fewer resources, it will be more efficient. This paper examines the recycling of concrete construction and demolition (C&D) waste to reuse it as aggregates in on-site applications for construction projects in Egypt and possibly in the Middle East. The study focuses on a stationary plant setting. The machinery set-up used in the plant is analyzed technically and financially. The findings are gathered and grouped to obtain a comprehensive cost-benefit financial model to demonstrate the feasibility of establishing and operating a concrete recycling plant. Furthermore, a detailed business plan including the time and hierarchy is proposed.

Keywords: construction wastes, recycling, sustainability, financial model, concrete recycling, concrete life cycle

Procedia PDF Downloads 384
16444 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 183
16443 RASPE: Risk Advisory Smart System for Pipeline Projects in Egypt

Authors: Nael Y. Zabel, Maged E. Georgy, Moheeb E. Ibrahim

Abstract:

A knowledge-based expert system with the acronym RASPE is developed as an application tool to help decision makers in construction companies make informed decisions about managing risks in pipeline construction projects. Choosing to use expert systems from all available artificial intelligence techniques is due to the fact that an expert system is more suited to representing a domain’s knowledge and the reasoning behind domain-specific decisions. The knowledge-based expert system can capture the knowledge in the form of conditional rules which represent various project scenarios and potential risk mitigation/response actions. The built knowledge in RASPE is utilized through the underlying inference engine that allows the firing of rules relevant to a project scenario into consideration. This paper provides an overview of the knowledge acquisition process and goes about describing the knowledge structure which is divided up into four major modules. The paper shows one module in full detail for illustration purposes and concludes with insightful remarks.

Keywords: expert system, knowledge management, pipeline projects, risk mismanagement

Procedia PDF Downloads 283
16442 Airport Investment Risk Assessment under Uncertainty

Authors: Elena M. Capitanul, Carlos A. Nunes Cosenza, Walid El Moudani, Felix Mora Camino

Abstract:

The construction of a new airport or the extension of an existing one requires massive investments and many times public private partnerships were considered in order to make feasible such projects. One characteristic of these projects is uncertainty with respect to financial and environmental impacts on the medium to long term. Another one is the multistage nature of these types of projects. While many airport development projects have been a success, some others have turned into a nightmare for their promoters. This communication puts forward a new approach for airport investment risk assessment. The approach takes explicitly into account the degree of uncertainty in activity levels prediction and proposes milestones for the different stages of the project for minimizing risk. Uncertainty is represented through fuzzy dual theory and risk management is performed using dynamic programming. An illustration of the proposed approach is provided.

Keywords: airports, fuzzy logic, risk, uncertainty

Procedia PDF Downloads 372