Search results for: optimizing construction design work
26591 Applications of AFM in 4D to Optimize the Design of Genetic Nanoparticles
Authors: Hosam Abdelhady
Abstract:
Filming the behaviors of individual DNA molecules in their environment when they interact with individual medicinal nano-polymers in a molecular scale has opened the door to understand the effect of the molecular shape, size, and incubation time with nanocarriers on optimizing the design of robust genetic Nano molecules able to resist the enzymatic degradation, enter the cell, reach to the nucleus and kill individual cancer cells in their environment. To this end, we will show how we applied the 4D AFM as a guide to finetune the design of genetic nanoparticles and to film the effects of these nanoparticles on the nanomechanical and morphological profiles of individual cancer cells.Keywords: AFM, dendrimers, nanoparticles, DNA, gene therapy, imaging
Procedia PDF Downloads 7326590 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects
Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry
Abstract:
Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry
Procedia PDF Downloads 19426589 Value Engineering and Its Impact on Drainage Design Optimization for Penang International Airport Expansion
Authors: R.M. Asyraf, A. Norazah, S.M. Khairuddin, B. Noraziah
Abstract:
Designing a system at present requires a vital, challenging task; to ensure the design philosophy is maintained in economical ways. This paper perceived the value engineering (VE) approach applied in infrastructure works, namely stormwater drainage. This method is adopted in line as consultants have completed the detailed design. Function Analysis System Technique (FAST) diagram and VE job plan, information, function analysis, creative judgement, development, and recommendation phase are used to scrutinize the initial design of stormwater drainage. An estimated cost reduction using the VE approach of 2% over the initial proposal was obtained. This cost reduction is obtained from the design optimization of the drainage foundation and structural system, where the pile design and drainage base structure are optimized. Likewise, the design of the on-site detention tank (OSD) pump was revised and contribute to the cost reduction obtained. This case study shows that the VE approach can be an important tool in optimizing the design to reduce costs.Keywords: value engineering, function analysis system technique, stormwater drainage, cost reduction
Procedia PDF Downloads 14526588 Case Study; Drilled Shafts Installation in Difficult Site Conditions; Loose Sand and High Water Table
Authors: Anthony El Hachem, Hosam Salman
Abstract:
Selecting the most effective construction method for drilled shafts under the high phreatic surface can be a challenging task that requires effective communication between the design and construction teams. Slurry placement, temporary casing, and permanent casing are the three most commonly used installation techniques to ensure the stability of the drilled hole before casting the concrete. Each one of these methods has its implications on the installation and performance of the drilled piers. Drilled shafts were designed to support a fire wall for an Energy project in Central Texas. The subsurface consisted of interlayers of sands and clays of varying shear strengths. The design recommended that the shafts be installed with temporary casing or slurry displacement due to the anticipated groundwater seepage through granular soils. During the foundation construction, it was very difficult to maintain the stability of the hole, and the contractor requested to install the shafts using permanent casings. Therefore, the foundation design was modified to ensure that the cased shafts achieve the required load capacity. Effective and continuous communications between the owner, contractor and design team during field shaft installations to mitigate the unforeseen challenges helped the team to successfully complete the project.Keywords: construction challenges, deep foundations, drilled shafts, loose sands underwater table, permanent casing
Procedia PDF Downloads 19326587 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects
Authors: Saleh Alzahrani, Halim Boussabaine
Abstract:
The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price
Procedia PDF Downloads 56526586 Quantum Dot Biosensing for Advancing Precision Cancer Detection
Authors: Sourav Sarkar, Manashjit Gogoi
Abstract:
In the evolving landscape of cancer diagnostics, optical biosensing has emerged as a promising tool due to its sensitivity and specificity. This study explores the potential of CdS/ZnS core-shell quantum dots (QDs) capped with 3-Mercaptopropionic acid (3-MPA), which aids in the linking chemistry of QDs to various cancer antibodies. The QDs, with their unique optical and electronic properties, have been integrated into the biosensor design. Their high quantum yield and size-dependent emission spectra have been exploited to improve the sensor’s detection capabilities. The study presents the design of this QD-enhanced optical biosensor. The use of these QDs can also aid multiplexed detection, enabling simultaneous monitoring of different cancer biomarkers. This innovative approach holds significant potential for advancing cancer diagnostics, contributing to timely and accurate detection. Future work will focus on optimizing the biosensor design for clinical applications and exploring the potential of QDs in other biosensing applications. This study underscores the potential of integrating nanotechnology and biosensing for cancer research, paving the way for next-generation diagnostic tools. It is a step forward in our quest for achieving precision oncology.Keywords: quantum dots, biosensing, cancer, device
Procedia PDF Downloads 5626585 Land Layout and Urban Design of New Cities in Underdeveloped Areas of China: A Case Study of Xixian New Area
Authors: Libin Ouyang
Abstract:
China has experienced a very fast urbanization process in the past two decades. Due to the uncoordinated characteristics of regional development in China, a large number of people from rural areas or small towns have flooded into regional central cities, which are building new cities around them due to the shortage of construction land or the need for urban development. However, the construction of some new cities has not achieved the expected effect, the absorption capacity of industry and population is limited, and the phenomenon of capital and land waste is obvious. This paper takes the Xixian New Area in Shaanxi Province, an inland region in Northwest China, as an example, and tries to analyse the reasons for the lack of vitality in the current situation of the Xixian New Area from the perspective of site layout and urban design, analyses the practical experience of the construction of new city cores in developed countries and regions, and studies how to optimise at the level of site layout planning and urban design to improve the vitality and attractiveness of the new city, decongest the population of large cities, effectively solve the problems of large cities, and promote The study will also examine how to optimise land use planning and urban design to enhance the vitality and attractiveness of new cities, relieve the population of large cities, effectively solve the problems of large cities and promote sustainable development of new cities. The study can serve as a reference for urban planners and policy makers, provide theoretical assistance for new city construction in other less developed regions of China, and provide some case references for urban construction in other developing countries undergoing rapid urbanisation.Keywords: new city, land use layout, urban design, attraction
Procedia PDF Downloads 12826584 Production and Recycling of Construction and Demolition Waste
Authors: Vladimira Vytlacilova
Abstract:
Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management
Procedia PDF Downloads 30326583 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns
Authors: Saidu Ibrahim, Winston M. W. Shakantu
Abstract:
The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.Keywords: conceptual framework, cost overrun, material waste, project stags
Procedia PDF Downloads 29826582 Adoption of Noise and Vibration Management Tools for Major Infrastructure Projects in Sydney, Australia
Authors: Adrian Morris, Rodney Phillips, Mattia Tabacchi
Abstract:
Minimizing construction noise and vibration impacts is a key challenge for major infrastructure projects in urban environments. Before commencing construction works, Construction Noise and Vibration Management Plan (CNVMP) and Construction Noise and Vibration Impact Statements (CNVIS) are required to be prepared and submitted to the relevant government authorities for review and approval. However, the assessment of potential impacts from work activities at pre-approval stage may be inaccurate as works methodology and scheduling are yet to be determined. In response, noise and vibration management tools have been developed to refine and supplement the CNVIS as works progress. These tools have been successfully implemented in major infrastructure projects allowing contractors to plan and assess construction works in a cost effective and timely manner. As a result, noise and vibration management tools have been incorporated into management plans and are increasingly required by regulators.Keywords: noise management, environmental noise, infrastructure projects, construction, vibration, cost effective
Procedia PDF Downloads 13126581 Approaches to Eco-Friendly Architecture: Modules Assembled Specially to Conserve
Authors: Arshleen Kaur, Sarang Barbarwar, Madhusudan Hamirwasia
Abstract:
Sustainable architecture is going to be the soul of construction in the near future, with building material as a vital link connecting sustainability to construction. The priority in Architecture has shifted from having a lesser negative footprint to having a positive footprint on Earth. The design has to be eco-centric as well as anthro-centric so as to attain its true purpose. Brick holds the same importance like a cell holds in one’s body. The study focuses on this basic building block with an experimental material and technique known as Module Assembled Specially to Conserve (MASC). The study explores the usage and construction of these modules in the construction of buildings. It also shows the impact assessment of the modules on the environment and its significance in reducing the carbon footprint of the construction industry. The aspects like cost-effectiveness, ease of working and reusability of MASC have been studied as well.Keywords: anthro-centric, carbon footprint, eco-centric, sustainable
Procedia PDF Downloads 17526580 Intercultural Intelligence: How to Turn Cultural Difference into a Key Added Value with Tree Lighting Design Project Examples
Authors: Fanny Soulard
Abstract:
Today work environment is more multicultural than ever: spatial limits have been blown out, encouraging people and ideas mobility all around the globe. Indeed, opportunities to design with culturally diverse team workers, clients, or end-users, have become within everyone's reach. We enjoy traveling to discover other civilizations, but when it comes to business, we often take for granted that our own work methodology will be generic enough to federate each party and cover the project needs. This paper aims to explore why, by skipping cultural awareness, we often create misunderstandings, frustration, and even counterproductive design. Tree lighting projects successively developed by a French lighting studio, a Vietnamese lighting studio, and an Australian Engineering company will be assessed from their concept stage to completion. All these study cases are based in Vietnam, where the construction market is equally led by local and international consultants. Core criteria such as lighting standard reference, service scope, communication tools, internal team organization, delivery package content, key priorities, and client relationship will help to spot and list when and how cultural diversity has impacted the design output and effectiveness. On the second hand, we will demonstrate through the same selected projects how intercultural intelligence tools and mindset can not only respond positively to previous situations and avoid major clashes but also turn cultural differences into a key added value to generate significant benefits for individuals, teams, and companies. By understanding the major importance of including a cultural factor within any design, intercultural intelligence will quickly turn out as a “must have” skill to be developed and acquired by any designer.Keywords: intercultural intelligence, lighting design, work methodology, multicultural diversity
Procedia PDF Downloads 9526579 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method
Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang
Abstract:
The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique
Procedia PDF Downloads 33226578 Building Information Modeling Acting as Protagonist and Link between the Virtual Environment and the Real-World for Efficiency in Building Production
Authors: Cristiane R. Magalhaes
Abstract:
Advances in Information and Communication Technologies (ICT) have led to changes in different sectors particularly in architecture, engineering, construction, and operation (AECO) industry. In this context, the advent of BIM (Building Information Modeling) has brought a number of opportunities in the field of the digital architectural design process bringing integrated design concepts that impact on the development, elaboration, coordination, and management of ventures. The project scope has begun to contemplate, from its original stage, the third dimension, by means of virtual environments (VEs), composed of models containing different specialties, substituting the two-dimensional products. The possibility to simulate the construction process of a venture in a VE starts at the beginning of the design process offering, through new technologies, many possibilities beyond geometrical digital modeling. This is a significant change and relates not only to form, but also to how information is appropriated in architectural and engineering models and exchanged among professionals. In order to achieve the main objective of this work, the Design Science Research Method will be adopted to elaborate an artifact containing strategies for the application and use of ICTs from BIM flows, with pre-construction cut-off to the execution of the building. This article intends to discuss and investigate how BIM can be extended to the site acting as a protagonist and link between the Virtual Environments and the Real-World, as well as its contribution to the integration of the value chain and the consequent increase of efficiency in the production of the building. The virtualization of the design process has reached high levels of development through the use of BIM. Therefore it is essential that the lessons learned with the virtual models be transposed to the actual building production increasing precision and efficiency. Thus, this paper discusses how the Fourth Industrial Revolution has impacted on property developments and how BIM could be the propellant acting as the main fuel and link between the virtual environment and the real production for the structuring of flows, information management and efficiency in this process. The results obtained are partial and not definite up to the date of this publication. This research is part of a doctoral thesis development, which focuses on the discussion of the impact of digital transformation in the construction of residential buildings in Brazil.Keywords: building information modeling, building production, digital transformation, ICT
Procedia PDF Downloads 12226577 Factors Affecting the Formation of Architectural Space and Construction Systems in the Jordanian Vernacular Architecture
Authors: Mohannad Tarrad
Abstract:
The research deals with the beginnings of the vernacular Jordanian architecture since the establishment of the Jordanian state in the early nineteenth century until now, where the Jordanian architecture was based on the interactions of the Jordanian society with the surrounding environment, where the local materials available in the construction area were used, and the construction systems inherited from previous civilizations were used. The builders in Jordan relied on exchanging knowledge and transferring it from one generation to another, where they were able to formulate a construction style capable of responding to the requirement of architectural spaces, and each region of Jordan has its own way of building, as there are various geographical areas in Jordan, including agricultural, mountainous and desert areas. Then the research touched on a historical study of the architectural space and identifying the value of the architectural space in the Jordanian social life, which is related to the customs and traditions of a society influenced by the Arab Islamic civilization, and then the construction, the structural structure, its characteristics and the constituent elements of the building were defined in the vernacular l Jordanian architecture. From the structural point of view, and then to identify the structural materials used in the structural structure and the impact of the structural structure on the design from several aspects, leading to the interior space and the factors affecting it. The research aims to explain and clarify the interconnected design and construction solutions in the vernacular Jordanian architecture in a manner that respects the environmental context, taking into account the material cost of the building, where the financial situation of the home owner plays an important role in choosing the building material and construction method. Case studies from heritage buildings from several Jordanian regions will be analyzed to illustrate the idea of the research.Keywords: construction systems, architectural space, environmental context, Jordanian architecture
Procedia PDF Downloads 20326576 Accurate Positioning Method of Indoor Plastering Robot Based on Line Laser
Authors: Guanqiao Wang, Hongyang Yu
Abstract:
There is a lot of repetitive work in the traditional construction industry. These repetitive tasks can significantly improve production efficiency by replacing manual tasks with robots. There- fore, robots appear more and more frequently in the construction industry. Navigation and positioning are very important tasks for construction robots, and the requirements for accuracy of positioning are very high. Traditional indoor robots mainly use radiofrequency or vision methods for positioning. Compared with ordinary robots, the indoor plastering robot needs to be positioned closer to the wall for wall plastering, so the requirements for construction positioning accuracy are higher, and the traditional navigation positioning method has a large error, which will cause the robot to move. Without the exact position, the wall cannot be plastered, or the error of plastering the wall is large. A new positioning method is proposed, which is assisted by line lasers and uses image processing-based positioning to perform more accurate positioning on the traditional positioning work. In actual work, filter, edge detection, Hough transform and other operations are performed on the images captured by the camera. Each time the position of the laser line is found, it is compared with the standard value, and the position of the robot is moved or rotated to complete the positioning work. The experimental results show that the actual positioning error is reduced to less than 0.5 mm by this accurate positioning method.Keywords: indoor plastering robot, navigation, precise positioning, line laser, image processing
Procedia PDF Downloads 14826575 Review of Affected Parameters on Flexural Behavior of Hollow Concrete Beams Reinforced by Steel/GFRP Rebars
Authors: Shahrad Ebrahimzadeh
Abstract:
Nowadays, the main efforts of the researchers aim to constantly evolve new, optimized and efficient construction materials and methods related to reinforced concrete beams. Due to the fewer applied materials and offering a higher structural efficiency compared to solid concrete beams with the same concrete area, hollow reinforced concrete beams (HRCB) internally reinforced with steel rebars have been employed extensively for bridge structural members and high-rise buildings. Many experimental studies have been conducted to investigate the behavior of hollow beams subjected to bending loading and found that the structural performance of HRCBs is critically affected by many design parameters. While the proper design of the HRCBs demonstrated comparable behavior to solid sections, inappropriate design leads beams to be extremely prone to brittle failure. Another potential issue that needs to be further investigated is the replacement of steel bars with suitable materials due to their susceptibility to corrosion. Hence, to develop a reliable construction system, the application of GFRP bars as a non-corroding material has been utilized. Furthermore, this study aims to critically review the different design parameters that affect the flexural performance of the HRCBs and recognize the gaps of knowledge in the better design and more effective use of this construction system.Keywords: design parameters, experimental investigations, hollow reinforced concrete beams, steel, GFRP, flexural strength
Procedia PDF Downloads 20226574 Improving the Constructability of Highway Design Plans
Authors: R. Edward Minchin Jr.
Abstract:
The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans
Procedia PDF Downloads 21626573 Comparative Study on Inhibiting Factors of Cost and Time Control in Nigerian Construction Practice
Authors: S. Abdulkadir, I. Y. Moh’d, S. U. Kunya, U. Nuruddeen
Abstract:
The basis of any contract formation between the client and contractor is the budgeted cost and the estimated duration of projects. These variables are paramount important to project's sponsor in a construction projects and in assessing the success or viability of construction projects. Despite the availability of various techniques of cost and time control, many projects failed to achieve their initial estimated cost and time. The paper evaluate the inhibiting factors of cost and time control in Nigerian construction practice and comparing the result with the United Kingdom practice as identified by one researcher. The populations of the study are construction professionals within Bauchi and Gombe state, Nigeria, a judgmental sampling employed in determining the size of respondents. Descriptive statistics used in analyzing the data in SPSS. Design change, project fraud and corruption, financing and payment of completed work found to be common among the top five inhibiting factors of cost and time control in the study area. Furthermore, the result had shown some comprising with slight contrast as in the case of United Kingdom practice. Study recommend the adaptation of mitigation measures developed in the UK prior to assessing its effectiveness and so also developing a mitigating measure for other top factors that are not within the one developed in United Kingdom practice. Also, it recommends a wider assessing comparison on the modify inhibiting factors of cost and time control as revealed by the study to cover almost all part of Nigeria.Keywords: comparison, cost, inhibiting factor, United Kingdom, time
Procedia PDF Downloads 44026572 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 30326571 Policies Promoting the Development of Green Buildings in Sub-Saharan Africa: A South African Case-Study
Authors: Peter Adekunle, Clinton Aigbavboa, Matthew Ikuabe, Opeoluwa Akinradewo
Abstract:
Contemporary building methods typically pay little attention to the built environment's greater economic, environmental, or social impacts or energy efficiency. Green construction aims to sever ties with these conventions. In order to provide better living and working conditions and lessen environmental consequences, green building today combines numerous building design, construction, and operation and maintenance approaches. As one of Sub-Saharan Africa's most industrialized nations, South Africa has a good number of green building projects. Therefore, this study examines the elements impacting the adoption of green buildings and regulations created to encourage the growth of green buildings using South Africa as a case study. The study has a survey-style design. A total of one hundred fifty (150) questionnaires were distributed to professionals in the construction industry in South Africa, of which one hundred and twenty-four (128) were returned and judged appropriate for investigation. The gathered data was examined using percentage, mean item scores, standard deviation, and Kruskal-Wallis. The findings show that cost and market circumstances are the two main elements impacting the adoption of green construction, while leadership advice is the most important policy. The study concluded that in order to encourage the construction of green buildings, additional Sub-Saharan nations should adopt these suggested policies.Keywords: green building, Sub-Saharan Africa, building design, environmental conditions
Procedia PDF Downloads 11126570 Barclays Bank Zambia: Considerations for Raft Foundation Design on Dolomite Land
Authors: Yashved Serhun, Kim A. Timm
Abstract:
Barclays Bank has identified the need for a head office building in Lusaka, Zambia, and construction of a 7200 m2 three-storey reinforced concrete office building with a structural steel roof is currently underway. A unique characteristic of the development is that the building footprint is positioned on dolomitic land. Dolomite rock has the tendency to react with and breakdown in the presence of slightly acidic water, including rainwater. This leads to a potential for subsidence and sinkhole formation. Subsidence and the formation of sinkholes beneath a building can be detrimental during both the construction and operational phases. This paper outlines engineering principles which were considered during the structural design of the raft foundation for the Barclays head office building. In addition, this paper includes multidisciplinary considerations and the impact of these on the structural engineering design of the raft foundation. By ensuring that the design of raft foundations on dolomitic land incorporates the requirements of all disciplines and relevant design codes during the design process, the risk associated with subsidence and sinkhole formation can be effectively mitigated during the operational phase of the building.Keywords: dolomite, dolomitic land, raft foundation, structural engineering design
Procedia PDF Downloads 12426569 Application of Value Engineering Approach for Improving the Quality and Productivity of Ready-Mixed Concrete Used in Construction and Hydraulic Projects
Authors: Adel Mohamed El-Baghdady, Walid Sayed Abdulgalil, Ahmad Asran, Ibrahim Nosier
Abstract:
This paper studies the effectiveness of applying value engineering to actual concrete mixtures. The study was conducted in the State of Qatar on a number of strategic construction projects with international engineering specifications for the 2022 World Cup projects. The study examined the concrete mixtures of Doha Metro project and the development of KAHRAMAA’s (Qatar Electricity and Water Company) Abu Funtas Strategic Desalination Plant, in order to generally improve the quality and productivity of ready-mixed concrete used in construction and hydraulic projects. The application of value engineering to such concrete mixtures resulted in the following: i) improving the quality of concrete mixtures and increasing the durability of buildings in which they are used; ii) reducing the waste of excess materials of concrete mixture, optimizing the use of resources, and enhancing sustainability; iii) reducing the use of cement, thus reducing CO₂ emissions which ensures the protection of environment and public health; iv) reducing actual costs of concrete mixtures and, in turn, reducing the costs of construction projects; and v) increasing the market share and competitiveness of concrete producers. This research shows that applying the methodology of value engineering to ready-mixed concrete is an effective way to save around 5% of the total cost of concrete mixtures supplied to construction and hydraulic projects, improve the quality according to the technical requirements and as per the standards and specifications for ready-mixed concrete, improve the environmental impact, and promote sustainability.Keywords: value management, cost of concrete, performance, optimization, sustainability, environmental impact
Procedia PDF Downloads 35326568 Applying Resilience Engineering to improve Safety Management in a Construction Site: Design and Validation of a Questionnaire
Authors: M. C. Pardo-Ferreira, J. C. Rubio-Romero, M. Martínez-Rojas
Abstract:
Resilience Engineering is a new paradigm of safety management that proposes to change the way of managing the safety to focus on the things that go well instead of the things that go wrong. Many complex and high-risk sectors such as air traffic control, health care, nuclear power plants, railways or emergencies, have applied this new vision of safety and have obtained very positive results. In the construction sector, safety management continues to be a problem as indicated by the statistics of occupational injuries worldwide. Therefore, it is important to improve safety management in this sector. For this reason, it is proposed to apply Resilience Engineering to the construction sector. The Construction Phase Health and Safety Plan emerges as a key element for the planning of safety management. One of the key tools of Resilience Engineering is the Resilience Assessment Grid that allows measuring the four essential abilities (respond, monitor, learn and anticipate) for resilient performance. The purpose of this paper is to develop a questionnaire based on the Resilience Assessment Grid, specifically on the ability to learn, to assess whether a Construction Phase Health and Safety Plans helps companies in a construction site to implement this ability. The research process was divided into four stages: (i) initial design of a questionnaire, (ii) validation of the content of the questionnaire, (iii) redesign of the questionnaire and (iii) application of the Delphi method. The questionnaire obtained could be used as a tool to help construction companies to evolve from Safety-I to Safety-II. In this way, companies could begin to develop the ability to learn, which will serve as a basis for the development of the other abilities necessary for resilient performance. The following steps in this research are intended to develop other questions that allow evaluating the rest of abilities for resilient performance such as monitoring, learning and anticipating.Keywords: resilience engineering, construction sector, resilience assessment grid, construction phase health and safety plan
Procedia PDF Downloads 13726567 Comprehensive Risk Assessment Model in Agile Construction Environment
Authors: Jolanta Tamošaitienė
Abstract:
The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.Keywords: assessment, environment, agile, model, risk
Procedia PDF Downloads 25526566 The Application of Artificial Neural Network for Bridge Structures Design Optimization
Authors: Angga S. Fajar, A. Aminullah, J. Kiyono, R. A. Safitri
Abstract:
This paper discusses about the application of ANN for optimizing of bridge structure design. ANN has been applied in various field of science concerning prediction and optimization. The structural optimization has several benefit including accelerate structural design process, saving the structural material, and minimize self-weight and mass of structure. In this paper, there are three types of bridge structure that being optimized including PSC I-girder superstructure, composite steel-concrete girder superstructure, and RC bridge pier. The different optimization strategy on each bridge structure implement back propagation method of ANN is conducted in this research. The optimal weight and easier design process of bridge structure with satisfied error are achieved.Keywords: bridge structures, ANN, optimization, back propagation
Procedia PDF Downloads 37226565 Roller Compacting Concrete “RCC” in Dams
Authors: Orod Zarrin, Mohsen Ramezan Shirazi
Abstract:
Rehabilitation of dam components such as foundations, buttresses, spillways and overtopping protection require a wide range of construction and design methodologies. Geotechnical Engineering considerations play an important role in the design and construction of foundations of new dams. Much investigation is required to assess and evaluate the existing dams. The application of roller compacting concrete (RCC) has been accepted as a new method for constructing new dams or rehabilitating old ones. In the past 40 years there have been so many changes in the usage of RCC and now it is one of most satisfactory solutions of water and hydropower resource throughout the world. The considerations of rehabilitation and construction of dams might differ due to upstream reservoir and its influence on penetrating and dewatering of downstream, operations requirements and plant layout. One of the advantages of RCC is its rapid placement which allows the dam to be operated quickly. Unlike ordinary concrete it is a drier mix, and stiffs enough for compacting by vibratory rollers. This paper evaluates some different aspects of RCC and focuses on its preparation progress.Keywords: spillway, vibrating consistency, fly ash, water tightness, foundation
Procedia PDF Downloads 60626564 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry
Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba
Abstract:
The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.Keywords: black business forums, construction mafia, emergence, implication
Procedia PDF Downloads 13426563 Improving the Training for Civil Engineers by Introducing Virtual Reality Technique
Authors: Manar Al-Ateeq
Abstract:
The building construction industry plays a major role in the economy of the word and the state of Kuwait. This paper evaluates existing new civil site engineers, describes a new system for improvement and insures the importance of prequalifying and developing for new engineers. In order to have a strong base in engineering, educational institutes and workplaces should be responsible to continuously train engineers and update them with new methods and techniques in engineering. As to achieve that, school of engineering should constantly update computational resources to be used in the professions. A survey was prepared for graduated Engineers based on stated objectives to understand the status of graduate engineers in both the public and private sector. Interviews were made with different sectors in Kuwait, and several visits were made to different training centers within different workplaces in Kuwait to evaluate training process and try to improve it. Virtual Reality (VR) technology could be applied as a complement to three-dimensional (3D) modeling, leading to better communication whether in job training, in education or in professional practice. Techniques of 3D modeling and VR can be applied to develop the models related to the construction process. The 3D models can support rehabilitation design as it can be considered as a great tool for monitoring failure and defaults in structures; also it can support decisions based on the visual analyses of alternative solutions. Therefore, teaching computer-aided design (CAD) and VR techniques in school will help engineering students in order to prepare them to site work and also will assist them to consider these technologies as important supports in their later professional practice. This teaching technique will show how the construction works developed, allow the visual simulation of progression of each type of work and help them to know more about the necessary equipment needed for tasks and how it works on site.Keywords: three dimensional modeling (3DM), civil engineers (CE), professional practice (PP), virtual reality (VR)
Procedia PDF Downloads 17626562 A Formal Approach for Instructional Design Integrated with Data Visualization for Learning Analytics
Authors: Douglas A. Menezes, Isabel D. Nunes, Ulrich Schiel
Abstract:
Most Virtual Learning Environments do not provide support mechanisms for the integrated planning, construction and follow-up of Instructional Design supported by Learning Analytic results. The present work aims to present an authoring tool that will be responsible for constructing the structure of an Instructional Design (ID), without the data being altered during the execution of the course. The visual interface aims to present the critical situations present in this ID, serving as a support tool for the course follow-up and possible improvements, which can be made during its execution or in the planning of a new edition of this course. The model for the ID is based on High-Level Petri Nets and the visualization forms are determined by the specific kind of the data generated by an e-course, a population of students generating sequentially dependent data.Keywords: educational data visualization, high-level petri nets, instructional design, learning analytics
Procedia PDF Downloads 243