Search results for: local construction workers
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9851

Search results for: local construction workers

9701 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 74
9700 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 70
9699 Determination of Organizational Cynicism Levels of Health Care Workers

Authors: Murat İskender Aktaş, Selma Söyük

Abstract:

The aim of this work is to specify the levels of organizational cynicism health workers. Organizational cynicism concept is evaluated in three sub-branches and these are cognitive, affective, and behavioral. The main objective of the work is to answer the questions about the relationship of demographic characteristics like sub-branches of cynicism and age, marital status, education level, total working hours, occupational groups and income levels. As works in our country are analyzed, there have been studies about cynicism in health and other sectors. However, there were no master’s thesis or organizational cynicism research found about the public health professionals. This is why the aim was chosen as to specify the levels of organizational cynicism of public health professionals. The average of the answers of the health workers to the questions about cynicism levels are 2.86. As organizational cynicism is evaluated according to the sub-branches, cognitive subscale average score is 3.21 affective subscale average score is 2.68 and behavioral subscale average score is counted as 2.67. As the results are analyzed, it is seen that the behavioral subscale has the highest average. This shows that the workers are often criticizing the internal complaints and organizational information with their friends out of the organization.

Keywords: cynicism, organizational cynicism, health care workers

Procedia PDF Downloads 323
9698 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 242
9697 Early Screening of Risk Ergonomics among Workers at Madura's Batik Industrial: Rapid Entire Body Assessment and Quick Exposure Checklist

Authors: Abdul Kadir, L. Meily Kurniawidjaja

Abstract:

Batik Madura workers are exposed to many Musculoskeletal Disorders risk factors, particularly Low Back Pain (LBP). This study was conducted as an early detection of ergonomic risk level on Workers Industrial Sentra Batik Madura in Dusun Banyumas, Klampar Subdistrict, Proppo Pamekasan, Madura, East Java. This study includes 12 workers who 11 workers had pain in the upper and lower part of the neck, back, wrist right hand, also 10 workers had pain in the right shoulder. This is a descriptive observational study with cross-sectional approach. Qualitative research by observing workers activity such as draw and putting the wax motif, fabric dyeing, fabric painting, discoloration, washing, and drying. The results are workers have identified ergonomic hazards such as awkward postures, twisting movements, repetitive, and static work postures. Using the method of REBA and QEC, the results get a very high-risk level of activity in each of Madura batik making process is the draw and putting the wax motif, coloring, painting, discoloration, washing, and drying. The level of risk can be reduced by improvement of work equipment include the provision of seats, strut fabric, high settings furnaces, drums, coloring basin, and washing tub.

Keywords: activities of Madura's batik, ergonomic risk level, equipment, QEC (Quick Exposure Checklist), REBA (Rapid Entire Body Assessment)

Procedia PDF Downloads 177
9696 Better Together: Diverging Trajectories of Local Social Work Practice and Nationally-Regulated Social Work Education in the UK

Authors: Noel Smith

Abstract:

To achieve professional registration, UK social workers need to complete a programme of education and training which meets standards set down by central government. When it comes to practice, social work in local authorities must fulfil requirements of national legislation but there is considerable local variation in the organisation and delivery of services. This presentation discusses the on-going reform of social work education by central government in the context of research of social work services in a local authority. In doing so it highlights that the ‘direction of travel’ of the national reform of social work education seems at odds with the trajectory of development of local social work services. In terms of education reform, the presentation cites key government initiatives including the knowledge and skills requirements which have been published separately for, respectively, child and family social work and adult social work. Also relevant is the Government’s new ‘teaching partnership’ pilot which focuses exclusively on social work in local government, in isolation from social work in NGOs. In terms of research, the presentation discusses two studies undertaken by Professor Smith in Suffolk County Council, a local authority in the east of England. The first is an equality impact analysis of the introduction of a new model for the delivery of adult and community services in Suffolk. This is based on qualitative research with local government representatives and NGOs involved in social work with older people and people with disabilities. The second study is an on-going, mixed method evaluation of the introduction of a new model of social care for children and young people in Suffolk. This new model is based on the international ‘Signs of Safety’ approach, which is applied in this model to a wide range of services from early intervention to child protection. While both studies are localised, the service models they examine are good illustrations of the way services are developing nationally. Analysis of these studies suggest that, if services continue to develop as they currently are, then social workers will require particular skills which are not be adequately addressed in the Government’s plans for social work education. Two issues arise. First, education reform concentrates on social work within local government while increasingly local authorities are outsourcing service provision to NGOs, expecting greater community involvement in providing care, and integrating social care with health care services. Second, education reform focuses on the different skills required for working with older and disabled adults and working with children and families, to the point where potentially the profession would be fragmented into two different classes of social worker. In contrast, the development of adult and children’s services in local authorities re-asserts the importance of common social work skills relating to personalisation, prevention and community development. The presentation highlights the importance for social work education in the UK to be forward looking, in terms of the changing design of service delivery, and outward looking, in terms of lessons to be drawn from international social work.

Keywords: adult social work, children and families social work, European social work, social work education

Procedia PDF Downloads 291
9695 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 106
9694 Occupational Safety in Construction Projects

Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush

Abstract:

This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.

Keywords: management, safety, occupational safety, classification

Procedia PDF Downloads 88
9693 Maturity Level of Knowledge Management in Whole Life Costing in the UK Construction Industry: An Empirical Study

Authors: Ndibarefinia Tobin

Abstract:

The UK construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole life costing is considered as an economic analysis tool that takes into account the total investment cost in and ownership, operation and subsequent disposal of a product or system to which the whole life costing method is being applied. In spite of its importance, the practice is still crippled by the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice i.e. the lack of professionals with the knowledge and training on the use of the practice in construction project, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. The aforementioned problems has forced many construction organisations to adopt project enhancement initiatives to boost their performance on the use of whole life costing techniques so as to produce economical buildings which offer value for money during the construction stage also the whole life of the building/asset. The management of knowledge in whole life costing is considered as one of the many project enhancement initiative and it is becoming imperative in the performance and sustainability of an organisation. Procuring building projects using whole life costing technique is heavily reliant on the knowledge, experience, ideas and skills of workers, which comes from many sources including other individuals, electronic media and documents. Due to the diversity of knowledge, capabilities and skills of employees that vary across an organisation, it is significant that they are directed and coordinated efficiently so as to capture, retrieve and share knowledge in order to improve the performance of the organisation. The implementation of knowledge management concept has different levels in each organisation. Measuring the maturity level of knowledge management in whole life costing practice will paint a comprehensible picture of how knowledge is managed in construction organisations. Purpose: The purpose of this study is to identify knowledge management maturity in UK construction organisations adopting whole life costing in construction project. Design/methodology/approach: This study adopted a survey method and conducted by distributing questionnaires to large construction companies that implement knowledge management activities in whole life costing practice in construction project. Four level of knowledge management maturity was proposed on this study. Findings: From the results obtained in the study shows that 34 contractors at the practiced level, 26 contractors at managed level and 12 contractors at continuously improved level.

Keywords: knowledge management, whole life costing, construction industry, knowledge

Procedia PDF Downloads 237
9692 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 239
9691 Wood Dust and Nanoparticle Exposure among Workers during a New Building Construction

Authors: Atin Adhikari, Aniruddha Mitra, Abbas Rashidi, Imaobong Ekpo, Jefferson Doehling, Alexis Pawlak, Shane Lewis, Jacob Schwartz

Abstract:

Building constructions in the US involve numerous wooden structures. Woods are routinely used in walls, framing floors, framing stairs, and making of landings in building constructions. Cross-laminated timbers are currently being used as construction materials for tall buildings. Numerous workers are involved in these timber based constructions, and wood dust is one of the most common occupational exposures for them. Wood dust is a complex substance composed of cellulose, polyoses and other substances. According to US OSHA, exposure to wood dust is associated with a variety of adverse health effects among workers, including dermatitis, allergic respiratory effects, mucosal and nonallergic respiratory effects, and cancers. The amount and size of particles released as wood dust differ according to the operations performed on woods. For example, shattering of wood during sanding operations produces finer particles than does chipping in sawing and milling industries. To our knowledge, how shattering, cutting and sanding of woods and wood slabs during new building construction release fine particles and nanoparticles are largely unknown. General belief is that the dust generated during timber cutting and sanding tasks are mostly large particles. Consequently, little attention has been given to the generated submicron ultrafine and nanoparticles and their exposure levels. These data are, however, critically important because recent laboratory studies have demonstrated cytotoxicity of nanoparticles on lung epithelial cells. The above-described knowledge gaps were addressed in this study by a novel newly developed nanoparticle monitor and conventional particle counters. This study was conducted in a large new building construction site in southern Georgia primarily during the framing of wooden side walls, inner partition walls, and landings. Exposure levels of nanoparticles (n = 10) were measured by a newly developed nanoparticle counter (TSI NanoScan SMPS Model 3910) at four different distances (5, 10, 15, and 30 m) from the work location. Other airborne particles (number of particles/m3) including PM2.5 and PM10 were monitored using a 6-channel (0.3, 0.5, 1.0, 2.5, 5.0 and 10 µm) particle counter at 15 m, 30 m, and 75 m distances at both upwind and downwind directions. Mass concentration of PM2.5 and PM10 (µg/m³) were measured by using a DustTrak Aerosol Monitor. Temperature and relative humidity levels were recorded. Wind velocity was measured by a hot wire anemometer. Concentration ranges of nanoparticles of 13 particle sizes were: 11.5 nm: 221 – 816/cm³; 15.4 nm: 696 – 1735/cm³; 20.5 nm: 879 – 1957/cm³; 27.4 nm: 1164 – 2903/cm³; 36.5 nm: 1138 – 2640/cm³; 48.7 nm: 938 – 1650/cm³; 64.9 nm: 759 – 1284/cm³; 86.6 nm: 705 – 1019/cm³; 115.5 nm: 494 – 1031/cm³; 154 nm: 417 – 806/cm³; 205.4 nm: 240 – 471/cm³; 273.8 nm: 45 – 92/cm³; and 365.2 nm: Keywords: wood dust, industrial hygiene, aerosol, occupational exposure

Procedia PDF Downloads 174
9690 The Psychological Impact of Industrial Noise on Workers

Authors: Beriache Abderazik

Abstract:

It is clear that the psychological effects of noise and physiological eloquent on the workers, what will inevitably affect the performance of both productivity and efficiency in all its aspects, industrial noise became among the most prominent modern professional problems, That require study and analysis in order to arrive at solutions and ways that you can reduce the effects of industrial noise. These factors, in addition to other reasons, made us try in this research to know the real impact of industrial noise on the professional satisfaction of workers. In light of this title we have identified the following general problem: - Is the professional satisfaction factor varies depending on the noise level in the work environment? For the purpose of ascertaining the veracity of the assumptions, we have a comparative study between two samples of equal workers, the first sample is working under the influence of industrial noise severe about (100 Db), and the second sample is working under the influence of industrial noise is low (about 63 Db), and applied them test the professional satisfaction. The results support the hypotheses and confirm all sincerity.

Keywords: industrial noise, job satisfaction, the psychological effects of noise, work environment

Procedia PDF Downloads 563
9689 Formation of Self Help Groups (SHGs) Protected Human Rights and Ensured Human Security of Female Sex Workers at Brothel in Bangladesh

Authors: Md. Nurul Alom Siddikqe

Abstract:

The purpose of this intervention was to describe how the marginalized people protect their rights and increase their self-dignity and self-esteem among brothel-based sex workers in 6 cities which are the victim of trafficked who came from different periphery areas Bangladesh. Eventually the sex workers are tortured by the pimp, clients, Msahi (so called guardian of bonded sex workers), Babu (So called husband) highly discriminated, vulnerable and stigmatized due to their occupation, movement, behavior and activities, which has got social disapproval. However, stigma, discrimination and violation of human rights not only bar them to access legal services, education of their kids, health, movement of outside of brothel, deprived of funeral after death, but also make them inaccessible due to their invisibility. Conducted an assessment among brothel-based sex workers setup to know their knowledge on human rights and find out their harassment and violence in their community. Inspired them to think about to be united and also assisted them to formation of self help group (SHG). Developed capacity of the SHG and developed leadership of its members through different trainings like administrative, financial management, public speaking and resource mobilization. Developed strategy to enhance the capacity of SHG so that they can collectively claim their rights and develop strategic partnership and network with the relevant service provider’s for restoring all sorts of rights. Conducted meeting with stakeholder including duty bearers, civil society organizations, media people and local government initiatives. Developed Networking with human rights commission, local elite, religious leaders and form human right watch committees at community level. Organized rally and observed national and international days along with government counterparts. By utilizing the project resources the members of SHG became capable to raise their collective voices against violence, discrimination and stigma as well as protected them from insecurity. The members of SHG have been participating in social program/event the SHG got membership of district level NGO coordination meeting through invitation from Deputy Commissioner, Civil Surgeon and Social welfare office of Government of Bangladesh. The Law Enforcement Agency is ensuring safety and security and the education department of government enrolled their children in primary level education. The Government provided land for grave yard after death for the Muslim sex workers and same for the other religious group. The SHGs are registered with government respective authorities. The SHGs are working with support from different development partners and implementing different projects sometime as consortium leaders. Opportunity created to take the vocational training from the government reputed department. The harassment by the clients reduced remarkably, babu, Mashi and other counterparts recognized the sex workers rights and ensure security with government counterpart access increased in legal, health and education. Indications are that the brothel based sex workers understood about their rights and became capable of ensuring their security through working under the self-help groups meaningfully.

Keywords: brothel, discrimination, harassment, stigma

Procedia PDF Downloads 344
9688 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 374
9687 Local Religion 'Parmalim': Between Civilization and Faith

Authors: Sabrina Yulianti

Abstract:

This study aims to explain the identity struggles of local religious communities in Indonesia. Local religion in Indonesia is not recognized by the government and is not incorporated into the official religion in Indonesia. This makes the local religions in Indonesia experienced the challenges and obstacles in fulfilling their rights as citizens of Indonesia. Challenges and barriers they experience such as: difficulty in making of the birth certificate and marriage. It is as experienced by one of the local religions namely Parmalim which located in North Sumatra. Not only difficulty in taking care of the bureaucracy as a citizen, but the local religion is seen as a minority and sometimes regarded as follower of deviate religion.

Keywords: local religion, faith, struggles, civilization, discrimination

Procedia PDF Downloads 388
9686 The Impact of Floods and Typhoons on Housing Welfare: Case Study of Thua Thien Hue Province, Vietnam

Authors: Seyeon Lee, Suyeon Lee, Julia Rogers

Abstract:

This research investigates and records post-flood and typhoon conditions of low income housing in the Thua Thien Hue Province, Vietnam; area prone to extreme flooding in Central Vietnam. The cost of rebuilding houses after flood and typhoon has been always a burden for low income households. These costs often lead to the elimination of essential construction practices for disaster resistance. Despite relief efforts from international non-profit organizations and Vietnam government, the impacts of flood and typhoon damages to residential construction has been reoccurring to the same neighborhood annually. Notwithstanding its importance, this topic has not been systematically investigated. The study is limited to assistance provided to low income households documenting existing conditions of low income homes impacted by post flood and typhoon conditions in the Thua Thien Hue Province. The research identifies leading causes of the building failure from the natural disasters. Relief efforts and progress made since the last typhoon is documented. The quality of construction and repairs are assessed based on Home Builders Guide to Coastal Construction by Federal Emergency Management Agency. Focus group discussions and individual interviews with local residents from four different communities were conducted to get incites on repair effort by the non-profit organizations and Vietnam government, and their needs post flood and typhoon. The findings from the field study informed that many of the local people are now aware of the importance of improving housing conditions as one of the key coping strategies to withstand flood and typhoon events as it makes housing and community more resilient to future events. While there has been a remarkable improvement of housing and infrastructure with the support from the local government as well as the non-profit organizations, many households in the study areas are found to still live in weak and fragile housing conditions without gaining access to the aid to repair and strengthen the houses. Given that the major immediate recovery action taken by the local people tends to focus on repairing damaged houses, and on this ground, low-income households spend a considerable amount of their income on housing repair, providing proper and applicable construction practices will not only improve the housing condition, but also contribute to reducing poverty in Vietnam.

Keywords: disaster coping mechanism, housing welfare, low-income housing, recovery reduction

Procedia PDF Downloads 263
9685 Strategies for Medium Sized Construction Firms to Survive the Current Economic Conditions That Is Compounded by the Most Recent COVID-19 Pandemic in Nigeria

Authors: Aloysius Colman Chukwuemeka Ezeabasili, Chibuike Patrick Ezeabasili

Abstract:

Medium Sized Construction Companies in Nigeria are those employing 50-250 workers that are mostly involved in roads, Commercial and domestic building Construction, among others. These companies are in the majority and contribute immensely to infrastructural development in Nigeria. Despite the last eight years of economic downturn and the past years of COVID-19 pandemic, signs of these Companies recovering from the economic recession and pandemic seem bright. Nigeria has recorded 213,000 confirmed cases 3968 deaths from COVID-19 as at now. These medium sized companies are currently trying to explore various opportunities to grow their businesses to achieve competitive advantages over others by studying and improving on their bidding efficiency, Strategies for selecting businesses, bidding markup Strategies, and cash flow. These strategies were studied through the recruitment of construction experts and professionals. Many of them have acquired new technologies that have impacted positively on their strategies. The impact of these technologies like the BIM, e-tendering, conditions of contract, and claim management strategies are advantages to them and has given them good advantages over their peers. Monte Carlo solution, Swot analysis, and average bid methods have also clearly added advantages to bidding practices. New and existing strategies are Scrutinized, and training of young Nigerians in advanced countries to acquire knowledge in best practices have elevated some of these companies. The Covid-19 has not been very harsh to Nigeria, and the country is surely not as devastated as the advanced countries. Nigeria has therefore been able to cope with the combination of the downturn and the pandemic.

Keywords: medium sized construction companies, competitive advantage, new bidding technologies, Nigeria

Procedia PDF Downloads 123
9684 Male Sex Workers’ Constructions of Selling Sex in South Africa

Authors: Tara Panday, Despina Learmonth

Abstract:

Sex work is often constructed as being an interaction between male clients and female sex workers. As a result, street-based male sex workers are continuously overlooked in the South African literature. This qualitative study explored male sex workers’ subjective experiences and constructions of their male clients’ identities and the client-sex worker relationship. This research was conducted from a social-constructionist perspective, which allowed for a deeper understanding of the reasons and context driving the choices and actions of male sex workers. Semi-structured face-to-face interviews were conducted with 10 South African men working as sex workers in Cape Town. Data was analysed through thematic analysis. The findings of the study construct the client-sex worker relationship in terms of a professional relationship, constrained choice, sexual identity and need, as well as companionship for pay, potentially highlighting underlying reasons for supply and demand. The data which emerged around the client-sex worker relationship and the clients’ identities also served to illuminate the power-dynamics in the client-sex worker relationship. This data increases insight into the exploitation and disempowerment experienced by male sex workers through verbal abuse, physical and sexual violence, and unfairly enforced laws and regulations. The findings of this study suggest that, in the context of South Africa, male sex workers' experiences of the client-sex worker relationship cannot be completely understood without considering the intersectionality of the triple stigmatisation of: the criminality of sex work, race, and the lack of economic power, which systematically maintains marginalization. Motivating for the Law Reform Commission to continue to review all emerging research may assist with guiding related policy and thereby, the provision of equal human rights and adequate health and social interventions for all sex workers in South Africa.

Keywords: human rights, prostitution, power relations, sex work

Procedia PDF Downloads 472
9683 Assessment of the Work-Related Stress and Associated Factors among Sanitation Workers in Public Hospitals during COVID-19, Addis Ababa, Ethiopia

Authors: Zerubabel Mihret

Abstract:

Background: Work-related stress is a pattern of reactions to work demands unmatched by worker’s knowledge, skills, or abilities. Healthcare institutions are considered high-risk and intensive work areas for work-related stress. However, there is the nonexistence of clear and strong data about the magnitude of work-related stress on sanitation workers in hospitals in Ethiopia. The aim of this study was to determine the magnitude of work-related stress among sanitation workers in public hospitals during COVID-19 in Addis Ababa, Ethiopia. Methods: Institution-based cross-sectional study was conducted from October 2021 to February 2022 among 494 sanitation workers who were selected from 4 hospitals. HSE (Health and Safety Executive of UK) standard data collection tool was used, and an interviewer-administered questionnaire was used to collect the data using KOBO collect application. The collected data were cleaned and analyzed using SPSS version 20.0. Both binary and multivariable logistic regression analyses were done to identify important factors having an association with work-related stress. Variables with p-value ≤ 0.25 in the bivariate analysis were entered into the multivariable logistic regression model. A statistically significant level was declared at a p-value ≤ 0.05. Results: This study revealed that the magnitude of work-related stress among sanitation workers was 49.2% (95% CI 45-54). Significant proportions (72.7%) of sanitation workers were dissatisfied with their current job. Sex, age, experience, and chewing khat were significantly associated with work-related stress. Conclusion: Work-related stress is significantly high among sanitation workers. Sex, age, experience, and chewing khat were identified as factors associated with work-related stress. Intervention program focusing on the prevention and control of stress is desired by hospitals.

Keywords: work-related stress, sanitation workers, Likert scale, public hospitals, Ethiopia

Procedia PDF Downloads 66
9682 Assessing the Influence of Using Traditional Methods of Construction on Cost and Quality of Building Construction

Authors: Musoke Ivan, Birungi Racheal

Abstract:

The construction trend is characterized by increased use of modern methods yet traditional methods are cheaper in terms of costs, in addition to the benefits it offers to the construction sector, like providing more jobs that could have been worked with the intensive machines. The purpose of this research was to assess the influence of using Traditional methods of construction (TMC) on the costs and quality of building structures and determine the different ways. Traditional methods of construction (TMC) can be applicable and integrated into the construction trend, and propose ways how this can be a success. The study adopted a quantitative method approach targeting various construction professionals like Architects, Quantity surveyors, Engineers, and Construction Managers. Questionnaires and analyses of literature were used to obtain research data and findings. Simple random sampling was used to select 40 construction professionals to which questionnaires were administered. The data was then analyzed using Microsoft Excel. The findings of the research indicate that Traditional methods of construction (TMCs) in Uganda are cheaper in terms of costs, but the quality is still low. This is attributed to a lack of skilled labour and efficient supervision while undertaking tasks leading to low quality. The study identifies strategies that would improve Traditional methods of construction (TMC), which include the employment of skilled manpower and effective supervision. It also identifies the need by stakeholders like the government, clients, and professionals to appreciate Traditional methods of construction (TMCs) and allow for a levelled ground for Traditional Methods of Construction and Modern methods of construction (MMCs).

Keywords: traditional methods of construction, integration, cost, quality

Procedia PDF Downloads 43
9681 Evaluation of the Effects of Lead on Some Physiological and Hormonal Biomarkeurs among Workers

Authors: Mansouri Ouarda, Adbdennour Cherif, Boukarma Ziad

Abstract:

Environmental and biological monitoring are used for the evaluation of exposure to industrial chemicals, and provide a tool for assessing workers’ exposure to chemicals. The organs or tissues where the first biological effects can be observed with increasing amounts of lead toxicity. This study aims at evaluating the effect of the metal element-trace; lead, on the sex hormones in male workers, exposed to this metal on the level of the manufacturing plant of lead accumulators. The results indicate a significant reduction of the testosterone concentration in exposed workers compared to the control. However, the rate of LH was strongly increased at the individuals exposed to Pb. A significant difference concerning the rate of FSH, the hormone Prolactin and cortisol was recorded. The indicators of the lead poisoning indicate a very highly significant increase in the value of Pbs which vary between (142-796 µg/L) among which 50% of the workers present a high lead poisoning and the value of PPZ which vary between (43-554µg/L). The biochemical parameters show a significant increase in the rate of the créatinine, the urea and the acid urique. The hepatic results show no significant differentiation in the rate of TGO and TGP between both groups of study. However the rates of the enzyme phosphatase alkaline, triglyceride, and cholesterol a significant difference were registered.

Keywords: hormons, parameters, physilogical, Pbs, PPZ

Procedia PDF Downloads 369
9680 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 128
9679 Investigation and Research on Construction Technology of Tenon and Mortise in Traditional Chinese Architecture

Authors: Liang Zhang

Abstract:

Chinese traditional architecture has developed a school of its own in the world. It has a different structure and construction technology from western architecture. Tenon and mortise structure and construction technology, as the key to the construction of traditional Chinese architecture, have been inherited for thousands of years by traditional craftsmen in various regions of China. However, the traditional architecture varies greatly in different times and regional cultures in China. It is still a lack of research whether this difference extends to mortise and tenon technology. In this study, we measured the mortise and tenon of traditional buildings in Fujian province, Yunnan province, and Northern China; Interviewed some old craftsmen about their traditional construction methods, And compared the today's traditional mortise and tenon technology with that of Song and Qing Dynasties. The results showed that although Chinese traditional architecture has the same origin, the mortise and tenon construction technology systems have been developed at different times, regions, and cultures. For example, tenon and mortise technology in Yunnan Province needs to ensure the ability of buildings to resist earthquakes, while that in Fujian Province needs to ensure the ability of buildings to withstand typhoons. People in different regions, cultures, and times have a different understanding of architectural aesthetics, and the evolution of tools also has different effects on mortise and tenon technology. This study explains the manifestations and causes of these differences. At the same time, due to the impact of modern architectural technology, mortise, and tenon, traditional technology is also rapidly disappearing. As a sorting and collection of mortise and tenon techniques of traditional Chinese architecture, this paper puts forward the corresponding traditional technology protection strategy, to guide the protection and maintenance of local traditional buildings.

Keywords: tenon and mortise, traditional Chinese architecture, traditional craftsmen, construction technology

Procedia PDF Downloads 140
9678 Challenges in Self-Managing Vitality: A Qualitative Study about Staying Vital at Work among Dutch Office Workers

Authors: Violet Petit-Steeghs, Jochem J. R. Van Roon, Jacqueline E. W. Broerse

Abstract:

Last decennia the retirement age in Europe is gradually increasing. As a result, people have to continue working for a longer period of time. Health problems due to increased sedentary behavior and mental conditions like burn-out, pose a threat in fulfilling employees’ working life. In order to stimulate the ability and willingness to work in the present and future, it is important to stay vital. Vitality is regarded in literature as a sense of energy, motivation and resilience. It is assumed that by increasing their vitality, employees will stay healthier and be more satisfied with their job, leading to a more sustainable employment and less absenteeism in the future. The aim of this project is to obtain insights into the experiences and barriers of employees, and specifically office workers, with regard to their vitality. These insights are essential in order to develop appropriate measures in the future. To get more insights in the experiences of office workers on their vitality, 8 focus group discussions were organized with 6-10 office workers from 4 different employers (an university, a national construction company and a large juridical and care service organization) in the Netherlands. The discussions were transcribed and analyzed via open coding. This project is part of a larger consortium project Provita2, and conducted in collaboration with University of Technology Eindhoven. Results showed that a range of interdependent factors form a complex network that influences office workers’ vitality. These factors can be divided in three overarching groups: (1) personal (2) organizational and (3) environmental factors. Personal intrinsic factors, relating to the office worker, comprise someone’s physical health, coping style, life style, needs, and private life. Organizational factors, relating to the employer, are the workload, management style and the structure, vision and culture of the organization. Lastly, environmental factors consist of the air, light, temperature at the workplace and whether the workplace is inspiring and workable. Office workers experienced barriers to improve their own vitality due to a lack of autonomy. On the one hand, because most factors were not only intrinsic but extrinsic, like work atmosphere or the temperature in the room. On the other hand, office workers were restricted in adapting both intrinsic as well as extrinsic factors. Restrictions to for instance the flexibility of working times and the workload, can set limitations for improving vitality through personal factors like physical activity and mental relaxation. In conclusion, a large range of interdependent factors influence the vitality of office workers. Office workers are often regarded to have a responsibility to improve their vitality, but are limitedly autonomous in adapting these factors. Measures to improve vitality should therefore not only focus on increasing awareness among office workers, but also on empowering them to fulfill this responsibility. A holistic approach that takes the complex mutual dependencies between the different factors and actors (like managers, employees and HR personnel) into account is highly recommended.

Keywords: occupational health, perspectives office workers, sustainable employment, vitality at work, work & wellbeing

Procedia PDF Downloads 122
9677 Uptake of Off-Site Construction: Benefit and Future Application

Authors: Faisal Alazzaz, Andrew Whyte

Abstract:

Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.

Keywords: building projects, employer empowerment, off-site construction benefits, productivity

Procedia PDF Downloads 419
9676 Hospital Workers’ Psychological Resilience after 2015 Middle East Respiratory Syndrome Outbreak

Authors: Myoungsoon You, Heejung Son

Abstract:

During a pandemic, hospital workers should protect not only their vulnerable patients but also themselves from the consequences of rapidly spreading infection. However, the evidence on the psychological impact of an outbreak on hospital workers is limited. In this study, we aim to assess hospital workers’ psychological well-being and function at the workplace after an outbreak, by focusing on ‘psychological resilience’. Specifically, the effects of risk appraisal, emotional experience, and coping ability on resilience indicated by the likelihood of post-traumatic syndrome disorder and willingness to work were investigated. Such role and position of each factor were analyzed using a path model, and the result was compared between the healthcare worker and non-healthcare worker groups. In the investigation, 280 hospital workers who experienced the 2015 Middle East Respiratory Syndrome outbreak in South Korea have participated. The result presented, in both groups, the role of the appraisal of risk and coping ability appeared consistent with a previous research, that was, the former interrupted resilience while the latter facilitated it. In addition, the role of emotional experience was highlighted as, in both groups, emotional disruption not only directly associated with low resilience but mediated the effect of perceived risk on resilience. The differences between the groups were also identified, which were, the role of emotional experience and coping ability was more prominent in the non-HCW group in explaining resilience. From the results, implications on how to support hospital personnel during an outbreak in a way to facilitate their resilience after the outbreak were drawn.

Keywords: hospital workers, emotions, infectious disease outbreak, psychological resilience

Procedia PDF Downloads 235
9675 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs

Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh

Abstract:

This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.

Keywords: buildability framework, buildable designs, construction, labour-saving construction

Procedia PDF Downloads 84
9674 Patients Reactions to Medical Errors in Hospitals: The Need for Social Workers in Nigeria

Authors: Emmanuel Temitope Adaranijo

Abstract:

Medical error is on the increase in many nations and like many developing nations, Nigeria is not excluded and more importantly, Lafia, Nasarawa state, where the study was carried. The study was undertaken to explore Patients' knowledge and their reactions to medical errors in hospitals in Lafia Local Government Area; therefore, five objectives were formulated to guide the study. The survey research design was employed and triangulation of quantitative and qualitative instruments was used to collect data. The total population for the study was 330,712 and the sample size was 400; however, only 343 patients and three doctors responded to the quantitative and qualitative study, respectively. Frequency distribution, simple percentage, and r test were used to analyze the data obtained from respondents. The findings revealed that medical errors are prevalent in hospitals in Lafia and the patients are neither aware nor willing to report such occurrence. The study recommends that social workers, hospital management, and governments should take up their roles in reducing the occurrence of medical errors.

Keywords: health, hospital, medical errors, social work

Procedia PDF Downloads 124
9673 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 42
9672 Factors Affecting the Formation of Architectural Space and Construction Systems in the Jordanian Vernacular Architecture

Authors: Mohannad Tarrad

Abstract:

The research deals with the beginnings of the vernacular Jordanian architecture since the establishment of the Jordanian state in the early nineteenth century until now, where the Jordanian architecture was based on the interactions of the Jordanian society with the surrounding environment, where the local materials available in the construction area were used, and the construction systems inherited from previous civilizations were used. The builders in Jordan relied on exchanging knowledge and transferring it from one generation to another, where they were able to formulate a construction style capable of responding to the requirement of architectural spaces, and each region of Jordan has its own way of building, as there are various geographical areas in Jordan, including agricultural, mountainous and desert areas. Then the research touched on a historical study of the architectural space and identifying the value of the architectural space in the Jordanian social life, which is related to the customs and traditions of a society influenced by the Arab Islamic civilization, and then the construction, the structural structure, its characteristics and the constituent elements of the building were defined in the vernacular l Jordanian architecture. From the structural point of view, and then to identify the structural materials used in the structural structure and the impact of the structural structure on the design from several aspects, leading to the interior space and the factors affecting it. The research aims to explain and clarify the interconnected design and construction solutions in the vernacular Jordanian architecture in a manner that respects the environmental context, taking into account the material cost of the building, where the financial situation of the home owner plays an important role in choosing the building material and construction method. Case studies from heritage buildings from several Jordanian regions will be analyzed to illustrate the idea of the research.

Keywords: construction systems, architectural space, environmental context, Jordanian architecture

Procedia PDF Downloads 189