14349 Design and Modeling of Amphibious Houses for Flood Prone Areas: The Case of Nigeria
Authors: Onyebuchi Mogbo, Abdulsalam Mohammed, Salsabila Wali
Abstract:
This research discusses the design and modeling of an amphibious building. The amphibious building is a house with the function of floating during a flood event. Over the years, houses have been built to resist flood events some of which have failed. The floating house is designed to work with nature and not against it. In the event of a flood, the house will rise with the increasing water level and protect the house from sinking. For the design and modeling of this house an estimated cost of N250, 000, approximately $700, will be needed. It is expected that the house will rise when lightweight materials are incorporated in the design, and the concrete dock (in form of a hollow box) carrying the entire house in its hollow space is well designed. When there is flooding the water will fill up the concrete dock, and the house will rise upwards with vertical guides preventing it from moving side to side or out of its boundary. Architectural and Structural designs will be used in this project.Keywords: amphibious building, flood, housing, design and modelling
Procedia PDF Downloads 18014348 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market
Authors: Negar Ganjouhaghighi, Amirali Dolatshahi
Abstract:
The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.Keywords: project marketing, risk management, tendering, project management, turn-key projects
Procedia PDF Downloads 32914347 Building Resilience to El Nino Related Flood Events in Northern Peru Using a Structured Facilitation Approach to Interdisciplinary Problem Solving
Authors: Roger M. Wall, David G. Proverbs, Yamina Silva, Danny Scipion
Abstract:
This paper critically reviews the outcomes of a 4 day workshop focused on building resilience to El Niño related Flood Events in northern Perú. The workshop was run jointly by Birmingham City University (BCU) in partnership with Instituto Geofísico del Perú (IGP) and was hosted by the Universidad de Piura (UDEP). The event took place in August 2018 and was funded by the Newton-Paulet fund administered by the British Council. The workshop was a response to the severe flooding experienced in Piura during the El Niño event of March 2017 which damaged over 100,000 homes and destroyed much local infrastructure including around 100 bridges. El Niño is a recurrent event and there is concern that its frequency and intensity may change in the future as a consequence of climate change. A group of 40 early career researchers and practitioners from the UK and Perú were challenged with working together across disciplines to identify key cross-cutting themes and make recommendations for building resilience to similar future events. Key themes identified on day 1 of the workshop were governance; communities; risk information; river management; urban planning; health; and infrastructure. A field study visit took place on day 2 so that attendees could gain first-hand experience of affected and displaced communities. Each of the themes was then investigated in depth on day 3 by small interdisciplinary teams drawing on their own expertise, local knowledge and the experiences of the previous day’s field trip. Teams were responsible for developing frameworks for analysis of their chosen theme and presenting their findings to the whole group. At this point, teams worked together to develop links between the different themes so that an integrated approach could be developed and presented on day 4. This paper describes the approaches taken by each team and the way in which these were integrated to form an holistic picture of the whole system. The findings highlighted the importance of risk-related information and the need for strong governance structures to enforce planning regulations and development. The structured facilitation approach proved to be very effective and it is recommended that the process be repeated with a broader group of stakeholders from across the region.Keywords: El Niño, integrated flood risk management, Perú, structured facilitation, systems approach, resilience
Procedia PDF Downloads 14714346 Implementation of Risk Management System to Improve the Quality of Higher Education Institutes
Authors: Muhammad Wasif, Asif Ahmed Shaikh, Sarosh Hashmat Lodi, Muhammad Aslam Bhutto, Riazuddin
Abstract:
Risk Management System is quite popular in profit- based organizations, health and safety and project management fields since the last few decades. But due to rapidly changing environment and requirement of ISO 9001:2015 standards, public-sector institution, especially higher education institutes are also performing risk assessment to monitor the performance of the institution and aligning it with the latest benchmark. In this context, NED University of Engineering and Technology performed research and developed a Standard Operating Procedure (SOP) for the risk assessment, its monitoring and control. In this research, risks are broken into the four sources, namely; Internal Academics Risks, External Academics Risks, Internal Non-academic Risks, External Non-academic Risks. Risks are identified by the management at all levels. Severity and likelihood of the risks are assigned based on the previous audit results and the customer complains. Risk Ratings are calculated to orderly arrange the risk according to the Risk Rating, and controls for the risks are designed, which are assigned to the responsible person. At the end of the article, result and analysis on the different sources of risk are discussed in details and the conclusion is drawn. Discussion on few sample risks are presented in this article. Hence it is presented in the research that the Risk Management System can be applied in a Higher Education Institute to effectively control the risks which might affect the scope and Quality Management System of an organization.Keywords: higher education, quality management system, risk assessment, risk management
Procedia PDF Downloads 31014345 Improving Flash Flood Forecasting with a Bayesian Probabilistic Approach: A Case Study on the Posina Basin in Italy
Authors: Zviad Ghadua, Biswa Bhattacharya
Abstract:
The Flash Flood Guidance (FFG) provides the rainfall amount of a given duration necessary to cause flooding. The approach is based on the development of rainfall-runoff curves, which helps us to find out the rainfall amount that would cause flooding. An alternative approach, mostly experimented with Italian Alpine catchments, is based on determining threshold discharges from past events and on finding whether or not an oncoming flood has its magnitude more than some critical discharge thresholds found beforehand. Both approaches suffer from large uncertainties in forecasting flash floods as, due to the simplistic approach followed, the same rainfall amount may or may not cause flooding. This uncertainty leads to the question whether a probabilistic model is preferable over a deterministic one in forecasting flash floods. We propose the use of a Bayesian probabilistic approach in flash flood forecasting. A prior probability of flooding is derived based on historical data. Additional information, such as antecedent moisture condition (AMC) and rainfall amount over any rainfall thresholds are used in computing the likelihood of observing these conditions given a flash flood has occurred. Finally, the posterior probability of flooding is computed using the prior probability and the likelihood. The variation of the computed posterior probability with rainfall amount and AMC presents the suitability of the approach in decision making in an uncertain environment. The methodology has been applied to the Posina basin in Italy. From the promising results obtained, we can conclude that the Bayesian approach in flash flood forecasting provides more realistic forecasting over the FFG.Keywords: flash flood, Bayesian, flash flood guidance, FFG, forecasting, Posina
Procedia PDF Downloads 13614344 Role of Support, Experience and Education in Livelihood Resilience
Authors: Madhuri, H. R. Tewari, P. K. Bhowmick
Abstract:
The study attempts to find out the role of the community and the government support, flood experience, flood education, and education of the male-headed households in their livelihood resilience. The study is based on a randomly drawn sample of 472 households from the river basins of Ganga and Kosi in the district of Bhagalpur, Bihar. Structural equation modeling (SEM) and analysis of variance (ANOVA) methods are used to analyze the data. The findings of the study reveal that the role(s) of the community support though is found to be more significant in comparison to the government supports for its stand by position in rescue and livelihood resilience of the affected households whereas the government support arrives late and in far less quantity than what is required. However, the government's support is equally vital due its control over resources, which essentially needed in rescue and rehabilitation of the affected households. The study unravels the strategic value of households' indigenous knowledge and their flood experience in livelihood resilience.Keywords: flood education, flood experience, livelihood resilience, community support, government support
Procedia PDF Downloads 50614343 Bamboo as the Frontier for Economically Sustainable Solution to Flood Control and Human Wildlife Conflict
Authors: Nirman Kumar Ojha
Abstract:
Bamboo plantation can be integrated for natural embankment against flood and live fencing against wild animals, at the same time provide economic opportunity for the poor farmers as a sustainable solution and adaptation alternative. 2010 flood in the Rui River completely inundated fields of four VDCs in Madi, Chitwan National Park with extensive bank erosion. The main aim of this action research was to identify an economically sustainable natural embankment against flood and also providing wildlife friendly fencing to reduce human-wildlife conflict. Community people especially poor farmers were trained for soil testing, land identification, plantation, and the harvesting regime, nursery set up and intercropping along with bamboo plantation on the edge of the river bank in order to reduce or minimize soil erosion. Results show that farmers are able to establish cost efficient and economically sustainable river embankment with bamboo plantation also creating a fence for wildlife which has also promoted bamboo cultivation and conservation. This action research has amalgamated flood control and wildlife control with the livelihood of the farmers which otherwise would cost huge resource. Another major impact of the bamboo plantation is its role in climate change and its adaptation process reducing degradation and improving vegetation cover contributing to landscape management. Based on this study, we conclude that bamboo plantation in Madi, Chitwan promoted the livelihood of the poor farmers providing a sustainable economic solution to reduce bank erosion, human-wildlife conflict and contributes to landscape management.Keywords: climate change and conservation, economic opportunity, flood control, national park
Procedia PDF Downloads 27814342 Designing an Agent-Based Model of SMEs to Assess Flood Response Strategies and Resilience
Authors: C. Li, G. Coates, N. Johnson, M. Mc Guinness
Abstract:
In the UK, flooding is responsible for significant losses to the economy due to the impact on businesses, the vast majority of which are Small and Medium Enterprises (SMEs). Businesses of this nature tend to lack formal plans to aid their response to and recovery from disruptive events such as flooding. This paper reports on work on how an agent-based model (ABM) is being developed based on interview data gathered from SMEs at-risk of flooding and/or have direct experience of flooding. The ABM will enable simulations to be performed allowing investigations of different response strategies which SMEs may employ to lessen the impact of flooding, thus strengthening their resilience.Keywords: ABM, flood response, SMEs, business continuity
Procedia PDF Downloads 31214341 Critical Psychosocial Risk Treatment for Engineers and Technicians
Authors: R. Berglund, T. Backström, M. Bellgran
Abstract:
This study explores how management addresses psychosocial risks in seven teams of engineers and technicians in the midst of the fourth industrial revolution. The sample is from an ongoing quasi-experiment about psychosocial risk management in a manufacturing company in Sweden. Each of the seven teams belongs to one of two clusters: a positive cluster or a negative cluster. The positive cluster reports a significantly positive change in psychosocial risk levels between two time-points and the negative cluster reports a significantly negative change. The data are collected using semi-structured interviews. The results of the computer aided thematic analysis show that there are more differences than similarities when comparing the risk treatment actions taken between the two clusters. Findings show that the managers in the positive cluster use more enabling actions that foster and support formal and informal relationship building. In contrast, managers that use less enabling actions hinder the development of positive group processes and contribute negative changes in psychosocial risk levels. This exploratory study sheds some light on how management can influence significant positive and negative changes in psychosocial risk levels during a risk management process.Keywords: group process model, risk treatment, risk management, psychosocial
Procedia PDF Downloads 16014340 Assessing Economic Losses Of 2104 Flood Disaster: A Case Study on Dabong, Kelantan, Malaysia
Authors: Ahmad Hamidi Mohamed, Jamaluddin Othman, Mashitah Suid, Mohd Zaim Mohd Shukri
Abstract:
Floods are considered an annual natural disaster in Kelantan. However, the record-setting flood of 2014 was a 'tsunami-like disaster'. A study has been conducted with the objectives to assess the economic impact of the flood to the resident of Dabong area in Kelantan Darul Naim, Malaysia. This area was selected due to the severity during the flood. The impacts of flood on local people were done by conducting structured interviews with the use of questionnaires. The questionnaire was intended to acquire information on losses faced by Dabong residence. Questionnaires covered various areas of inconveniences suffered with respect to health effects, including illnesses suffered, their intensities, duration and their associated costs. Loss of productivity and quality of life was also assessed. Inquiries were made to Government agencies to obtain relevant statistical data regarding the loss due to the flood tragedy. The data collected by giving formal request to the governmental agencies and formal meetings were done. From the study a staggering amount of losses were calculated. This figure comes from losses of property, Farmers/Agriculture, Traders/Business, Health, Insurance and Governmental losses. Flood brings hardship to the people of Dabong and these losses of home will cause inconveniences to the society. The huge amount of economic loss extracted from this study shows that federal and state government of Kelantan need to find out the cause of the major flood in 2014. Fast and effective measures have to be planned and implemented in flood prone area to prevent same tragedy happens in the future.Keywords: economic impact, flood tragedy, Malaysia, property losses
Procedia PDF Downloads 26914339 Using High Performance Computing for Online Flood Monitoring and Prediction
Authors: Stepan Kuchar, Martin Golasowski, Radim Vavrik, Michal Podhoranyi, Boris Sir, Jan Martinovic
Abstract:
The main goal of this article is to describe the online flood monitoring and prediction system Floreon+ primarily developed for the Moravian-Silesian region in the Czech Republic and the basic process it uses for running automatic rainfall-runoff and hydrodynamic simulations along with their calibration and uncertainty modeling. It takes a long time to execute such process sequentially, which is not acceptable in the online scenario, so the use of high-performance computing environment is proposed for all parts of the process to shorten their duration. Finally, a case study on the Ostravice river catchment is presented that shows actual durations and their gain from the parallel implementation.Keywords: flood prediction process, high performance computing, online flood prediction system, parallelization
Procedia PDF Downloads 49314338 Identification of Flood Prone Areas in Adigrat Town Using Boolean Logic with GIS and Remote Sensing Technique
Authors: Fikre Belay Tekulu
Abstract:
The Adigrat town lies in the Tigray region of Ethiopia. This region is mountainous and experiences a semiarid type of climate. Most of the rainfall occurs in four months of the year, which are June to September. During this season, flood is a common natural disaster, especially in urban areas. In this paper, an attempt is made to identify flood-prone areas in Adigrat town using Boolean logic with GIS and remote sensing techniques. Three parameters were incorporated as land use type, elevation, and slope. Boolean logic was used as land use equal to buildup land, elevation less than 2430 m, and slope less than 5 degrees. As a result, 0.575 km² was identified severely affected by floods during the rainy season.Keywords: flood, GIS, hydrology, Adigrat
Procedia PDF Downloads 14214337 A Study on Exploring and Prioritizing Critical Risks in Construction Project Assessment
Authors: A. Swetha
Abstract:
This study aims to prioritize and explore critical risks in construction project assessment, employing the Weighted Average Index method and Principal Component Analysis (PCA). Through extensive literature review and expert interviews, project assessment risk factors were identified across Budget and Cost Management Risk, Schedule and Time Management Risk, Scope and Planning Risk, Safety and Regulatory Compliance Risk, Resource Management Risk, Communication and Stakeholder Management Risk, and Environmental and Sustainability Risk domains. A questionnaire was distributed to stakeholders involved in construction activities in Hyderabad, India, with 180 completed responses analyzed using the Weighted Average Index method to prioritize risk factors. Subsequently, PCA was used to understand relationships between these factors and uncover underlying patterns. Results highlighted dependencies on critical resources, inadequate risk assessment, cash flow constraints, and safety concerns as top priorities, while factors like currency exchange rate fluctuations and delayed information dissemination ranked lower but remained significant. These insights offer valuable guidance for stakeholders to mitigate risks effectively and enhance project outcomes. By adopting systematic risk assessment and management approaches, construction projects in Hyderabad and beyond can navigate challenges more efficiently, ensuring long-term viability and resilience.Keywords: construction project assessment risk factor, risk prioritization, weighted average index, principal component analysis, project risk factors
Procedia PDF Downloads 4014336 Evaluation of Disease Risk Variables in the Control of Bovine Tuberculosis
Authors: Berrin Şentürk
Abstract:
In this study, due to the recurrence of bovine tuberculosis, in the same areas, the risk factors for the disease were determined and evaluated at the local level. This study was carried out in 32 farms where the disease was detected in the district and center of Samsun province in 2014. Predetermined risk factors, such as farm, environmental and economic risks, were investigated with the survey method. It was predetermined that risks in the three groups are similar to the risk variables of the disease on the global scale. These risk factors that increase the susceptibility of the infection must be understood by the herd owners. The risk-based contagious disease management system approach should be applied for bovine tuberculosis by farmers, animal health professionals and public and private sector decision makers.Keywords: bovine tuberculosis, disease management, control, outbreak, risk analysis
Procedia PDF Downloads 40214335 Risk Management in an Islamic Framework
Authors: Magid Maatallah
Abstract:
The problem is, investment management in modern conditions boils down to risk management which is very underdeveloped in Islamic financial theory and practice. Add to this the fact that, in Islamic perception, this is one of the areas of conventional finance in need of drastic reforms. This need was recently underlined by the story of Long Term Capital Management (LTCM ), ( told by Roger Lowenstein in his book, When Genius Failed, Random House, 2000 ). So we face a double challenge, to develop Islamic techniques of risk management and to see that these new techniques are free from the ills with which conventional methods are suffering. This is different from the challenge faced in the middle of twentieth century, to develop a method of financial intermediation free of interest.Risk was always there, especially in business. But industrialization brought risks unknown in trade and agriculture. Industrial production often involves long periods of time .The longer the period of production the more the uncertainty. The scope of the market has expanded to cover the whole world, introducing new kinds of risk. More than a thousand years ago, when Islamic laws were being written, the nature and scope of risk and uncertainty was different. However, something can still be learnt which, in combination with the modern experience, should enable us to realize the Shariah objectives of justice, fairness and efficiency.Keywords: financial markets, Islamic framework, risk management, investment
Procedia PDF Downloads 55214334 Satellite Solutions for Koshi Floods
Authors: Sujan Tyata, Alison Shilpakar, Nayan Bakhadyo, Kushal K. C., Abhas Maskey
Abstract:
The Koshi River, acknowledged as the "Sorrow of Bihar," poses intricate challenges characterized by recurrent flooding. Within the Koshi Basin, floods have historically inflicted damage on infrastructure, agriculture, and settlements. The Koshi River exhibits a highly braided pattern across a 48 km stretch to the south of Chatara. The devastating flood from the Koshi River, which began in Nepal's Sunsari District in 2008, led to significant casualties and the destruction of agricultural areas.The catastrophe was exacerbated by a levee breach, underscoring the vulnerability of the region's flood defenses. A comprehensive understanding of environmental changes in the area is unveiled through satellite imagery analysis. This analysis facilitates the identification of high-risk zones and their contributing factors. Employing remote sensing, the analysis specifically pinpoints locations vulnerable to levee breaches. Topographical features of the area along with longitudinal and cross sectional profiles of the river and levee obtained from digital elevation model are used in the hydrological analysis for assessment of flood. To mitigate the impact of floods, the strategy involves the establishment of reservoirs upstream. Leveraging satellite data, optimal locations for water storage are identified. This approach presents a dual opportunity to not only alleviate flood risks but also catalyze the implementation of pumped storage hydropower initiatives. This holistic approach addresses environmental challenges while championing sustainable energy solutions.Keywords: flood mitigation, levee, remote sensing, satellite imagery analysis, sustainable energy solutions
Procedia PDF Downloads 6414333 Diversification and Risk Management in Non-Profit Organisations: A Case Study
Authors: Manzurul Alam, John Griffiths, David Holloway, Megan Paull, Anne Clear
Abstract:
Background: This paper investigates the nature of risk management practices in non-profit organizations. It is argued here that the risk exposure of these organizations has increased as a result of their entrepreneurial activities. This study explores how a particular non-profit organization formulates its risk strategies in the face funding restrictions. Design/Method/Approach: The study adopts a case study approach to report the results on how a non-profit organization diversifies its activities, tackles risks arising from such activities and improves performance. Results: The findings show that the organization made structural adjustments and leadership changes which helped to adjust their risk strategies. It also reports the organizational processes to deal with risks arising from both related and unrelated diversification strategies. Implications: Any generalization from this case example needs to be taken with caution as there are significant differences between non-profit organizations operating in different sectors. Originality: The paper makes a significant contribution to the non-profit literature by highlighting the diversification strategies along with risk performance.Keywords: risk management, performance management, non-profit organizations, financial management
Procedia PDF Downloads 51514332 Schedule Risk Management for Complex Projects: The Royal Research Ship: Sir David Attenborough Case Study
Authors: Chatelier Charlene, Oyegoke Adekunle, Ajayi Saheed, Jeffries Andrew
Abstract:
This study seeks to understand Schedule Risk Assessments as a priori for better performance whilst exploring the strategies employed to deliver complex projects like the New Polar research ship. This high-profile vessel was offered to Natural Environment Research Council and British Antarctic Survey (BAS) by Cammell Laird Shipbuilders. The Research Ship was designed to support science in extreme environments, with the expectancy to provide a wide range of specialist scientific facilities, instruments, and laboratories to conduct research over multiple disciplines. Aim: The focus is to understand the allocation and management of schedule risk on such a Major Project. Hypothesising that "effective management of schedule risk management" could be the most critical factor in determining whether the intended benefits mentioned are delivered within time and cost constraints. Objective 1: Firstly, the study seeks to understand the allocation and management of schedule risk in Major Projects. Objective 2: Secondly, it explores "effective management of schedule risk management" as the most critical factor determining the delivery of intended benefits. Methodology: This study takes a retrospective review of schedule risk management and how it influences project performance using a case study approach for the RRS (Royal Research Ship) Sir David Attenborough. Research Contribution: The outcomes of this study will contribute to a better understanding of project performance whilst building on its under-researched relationship to schedule risk management for complex projects. The outcomes of this paper will guide further research on project performance and enable the understanding of how risk-based estimates over time impact the overall risk management of the project.Keywords: complexity, major projects, performance management, schedule risk management, uncertainty
Procedia PDF Downloads 9714331 Identification of Outliers in Flood Frequency Analysis: Comparison of Original and Multiple Grubbs-Beck Test
Authors: Ayesha S. Rahman, Khaled Haddad, Ataur Rahman
Abstract:
At-site flood frequency analysis is used to estimate flood quantiles when at-site record length is reasonably long. In Australia, FLIKE software has been introduced for at-site flood frequency analysis. The advantage of FLIKE is that, for a given application, the user can compare a number of most commonly adopted probability distributions and parameter estimation methods relatively quickly using a windows interface. The new version of FLIKE has been incorporated with the multiple Grubbs and Beck test which can identify multiple numbers of potentially influential low flows. This paper presents a case study considering six catchments in eastern Australia which compares two outlier identification tests (original Grubbs and Beck test and multiple Grubbs and Beck test) and two commonly applied probability distributions (Generalized Extreme Value (GEV) and Log Pearson type 3 (LP3)) using FLIKE software. It has been found that the multiple Grubbs and Beck test when used with LP3 distribution provides more accurate flood quantile estimates than when LP3 distribution is used with the original Grubbs and Beck test. Between these two methods, the differences in flood quantile estimates have been found to be up to 61% for the six study catchments. It has also been found that GEV distribution (with L moments) and LP3 distribution with the multiple Grubbs and Beck test provide quite similar results in most of the cases; however, a difference up to 38% has been noted for flood quantiles for annual exceedance probability (AEP) of 1 in 100 for one catchment. These findings need to be confirmed with a greater number of stations across other Australian states.Keywords: floods, FLIKE, probability distributions, flood frequency, outlier
Procedia PDF Downloads 45014330 Risk Management in Construction Projects
Authors: Mustafa Dogru, Ruveyda Komurlu
Abstract:
Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.Keywords: construction projects, construction management, project management, risk management
Procedia PDF Downloads 31914329 Mapping and Mitigation Strategy for Flash Flood Hazards: A Case Study of Bishoftu City
Authors: Berhanu Keno Terfa
Abstract:
Flash floods are among the most dangerous natural disasters that pose a significant threat to human existence. They occur frequently and can cause extensive damage to homes, infrastructure, and ecosystems while also claiming lives. Although flash floods can happen anywhere in the world, their impact is particularly severe in developing countries due to limited financial resources, inadequate drainage systems, substandard housing options, lack of early warning systems, and insufficient preparedness. To address these challenges, a comprehensive study has been undertaken to analyze and map flood inundation using Geographic Information System (GIS) techniques by considering various factors that contribute to flash flood resilience and developing effective mitigation strategies. Key factors considered in the analysis include slope, drainage density, elevation, Curve Number, rainfall patterns, land-use/cover classes, and soil data. These variables were computed using ArcGIS software platforms, and data from the Sentinel-2 satellite image (with a 10-meter resolution) were utilized for land-use/cover classification. Additionally, slope, elevation, and drainage density data were generated from the 12.5-meter resolution of the ALOS Palsar DEM, while other relevant data were obtained from the Ethiopian Meteorological Institute. By integrating and regularizing the collected data through GIS and employing the analytic hierarchy process (AHP) technique, the study successfully delineated flash flood hazard zones (FFHs) and generated a suitable land map for urban agriculture. The FFH model identified four levels of risk in Bishoftu City: very high (2106.4 ha), high (10464.4 ha), moderate (1444.44 ha), and low (0.52 ha), accounting for 15.02%, 74.7%, 10.1%, and 0.004% of the total area, respectively. The results underscore the vulnerability of many residential areas in Bishoftu City, particularly the central areas that have been previously developed. Accurate spatial representation of flood-prone areas and potential agricultural zones is crucial for designing effective flood mitigation and agricultural production plans. The findings of this study emphasize the importance of flood risk mapping in raising public awareness, demonstrating vulnerability, strengthening financial resilience, protecting the environment, and informing policy decisions. Given the susceptibility of Bishoftu City to flash floods, it is recommended that the municipality prioritize urban agriculture adaptation, proper settlement planning, and drainage network design.Keywords: remote sensing, flush flood hazards, Bishoftu, GIS.
Procedia PDF Downloads 3514328 Non-Performing Assets and Credit Risk Performance: An Evidence of Commercial Banks in India
Authors: Sirus Sharifi, Arunima Haldar, S. V. D. Nageswara Rao
Abstract:
This research analyzes the effect of credit risk management practices of commercial banks in India and the relationship with their non-performing assets (NPAs). Required data on credit risk performance was collected through a survey questionnaire from top risk officers of 38 Indian banks. NPA data (period from 2012 to 2016) was collected from Prowess database compiled by the Centre for Monitoring Indian Economy (CMIE). The model was assessed utilizing cross sectional regression method. As expected, the results indicate a negative significant relationship between credit risk management in India banks and their NPA growth. The research has implications for banks given the high level of losses in India and other economies as well, and the implementation of Basel III standards by the central banks. This research would be an evidence on credit risk performance and its relationship with the level of non-performing assets (NPAs) in Indian banks.Keywords: risk management, risk identification, banks, Non-Performing Assets (NPAs)
Procedia PDF Downloads 26414327 Flow Prediction of Boundary Shear Stress with Enlarging Flood Plains
Authors: Spandan Sahu, Amiya Kumar Pati, Kishanjit Kumar Khatua
Abstract:
River is our main source of water which is a form of open channel flow and the flow in open channel provides with many complex phenomenon of sciences that needs to be tackled such as the critical flow conditions, boundary shear stress and depth averaged velocity. During floods, part of a river is carried by the simple main channel and rest is carried by flood plains. For such compound asymmetric channels, the flow structure becomes complicated due to momentum exchange between main channel and adjoining flood plains. Distribution of boundary shear in subsections provides us with the concept of momentum transfer between the interface of main channel and the flood plains. Experimentally, to get better data with accurate results are very complex because of the complexity of the problem. Hence, CES software has been used to tackle the complex processes to determine the shear stresses at different sections of an open channel having asymmetric flood plains on both sides of the main channel and the results is compared with the symmetric flood plains for various geometrical shapes and flow conditions. Error analysis is also performed to know the degree of accuracy of the model implemented.Keywords: depth average velocity, non prismatic compound channel, relative flow depth, velocity distribution
Procedia PDF Downloads 15214326 Flash Flood in Gabes City (Tunisia): Hazard Mapping and Vulnerability Assessment
Authors: Habib Abida, Noura Dahri
Abstract:
Flash floods are among the most serious natural hazards that have disastrous environmental and human impacts. They are associated with exceptional rain events, characterized by short durations, very high intensities, rapid flows and small spatial extent. Flash floods happen very suddenly and are difficult to forecast. They generally cause damage to agricultural crops and property, infrastructures, and may even result in the loss of human lives. The city of Gabes (South-eastern Tunisia) has been exposed to numerous damaging floods because of its mild topography, clay soil, high urbanization rate and erratic rainfall distribution. The risks associated with this situation are expected to increase further in the future because of climate change, deemed responsible for the increase of the frequency and the severity of this natural hazard. Recently, exceptional events hit Gabes City causing death and major property losses. A major flooding event hit the region on June 2nd, 2014, causing human deaths and major material losses. It resulted in the stagnation of storm water in the numerous low zones of the study area, endangering thereby human health and causing disastrous environmental impacts. The characterization of flood risk in Gabes Watershed (South-eastern Tunisia) is considered an important step for flood management. Analytical Hierarchy Process (AHP) method coupled with Monte Carlo simulation and geographic information system were applied to delineate and characterize flood areas. A spatial database was developed based on geological map, digital elevation model, land use, and rainfall data in order to evaluate the different factors susceptible to affect flood analysis. Results obtained were validated by remote sensing data for the zones that showed very high flood hazard during the extreme rainfall event of June 2014 that hit the study basin. Moreover, a survey was conducted from different areas of the city in order to understand and explore the different causes of this disaster, its extent and its consequences.Keywords: analytical hierarchy process, flash floods, Gabes, remote sensing, Tunisia
Procedia PDF Downloads 10914325 Preliminary Study on Chinese Traditional Garden Making Based on Water Storage Projects
Authors: Liu Fangxin, Zhao Jijun
Abstract:
Nowadays, China and the world are facing the same problems of flooding, city waterlogging and other environment issues. Throughout history, China had many excellent experiences dealing with the flood, and can be used as a significant reference for contemporary urban construction. In view of this, the research used the method of literature analysis to find out the main water storage measures in ancient cities, including reservoir storage and pond water storage. And it used the case study method to introduce the historical evolution, engineering measures and landscape design of 4 typical ancient Chinese cities in details. Then we found the pond and the reservoir were the main infrastructures for the ancient Chinese city to avoid the waterlogging and flood. At last this paper summed up the historical experience of Chinese traditional water storage and made conclusions that the establishment of a reasonable green water storage facilities could be used to solve today's rain and flood problems, and hoped to give some enlightenment of stormwater management to our modern city.Keywords: ancient Chinese cities, water storage project, Chinese classical gardening, stormwater management, green facilities
Procedia PDF Downloads 33614324 Flood Risk Management in the Semi-Arid Regions of Lebanon - Case Study “Semi Arid Catchments, Ras Baalbeck and Fekha”
Authors: Essam Gooda, Chadi Abdallah, Hamdi Seif, Safaa Baydoun, Rouya Hdeib, Hilal Obeid
Abstract:
Floods are common natural disaster occurring in semi-arid regions in Lebanon. This results in damage to human life and deterioration of environment. Despite their destructive nature and their immense impact on the socio-economy of the region, flash floods have not received adequate attention from policy and decision makers. This is mainly because of poor understanding of the processes involved and measures needed to manage the problem. The current understanding of flash floods remains at the level of general concepts; most policy makers have yet to recognize that flash floods are distinctly different from normal riverine floods in term of causes, propagation, intensity, impacts, predictability, and management. Flash floods are generally not investigated as a separate class of event but are rather reported as part of the overall seasonal flood situation. As a result, Lebanon generally lacks policies, strategies, and plans relating specifically to flash floods. Main objective of this research is to improve flash flood prediction by providing new knowledge and better understanding of the hydrological processes governing flash floods in the East Catchments of El Assi River. This includes developing rainstorm time distribution curves that are unique for this type of study region; analyzing, investigating, and developing a relationship between arid watershed characteristics (including urbanization) and nearby villages flow flood frequency in Ras Baalbeck and Fekha. This paper discusses different levels of integration approach¬es between GIS and hydrological models (HEC-HMS & HEC-RAS) and presents a case study, in which all the tasks of creating model input, editing data, running the model, and displaying output results. The study area corresponds to the East Basin (Ras Baalbeck & Fakeha), comprising nearly 350 km2 and situated in the Bekaa Valley of Lebanon. The case study presented in this paper has a database which is derived from Lebanese Army topographic maps for this region. Using ArcMap to digitizing the contour lines, streams & other features from the topographic maps. The digital elevation model grid (DEM) is derived for the study area. The next steps in this research are to incorporate rainfall time series data from Arseal, Fekha and Deir El Ahmar stations to build a hydrologic data model within a GIS environment and to combine ArcGIS/ArcMap, HEC-HMS & HEC-RAS models, in order to produce a spatial-temporal model for floodplain analysis at a regional scale. In this study, HEC-HMS and SCS methods were chosen to build the hydrologic model of the watershed. The model then calibrated using flood event that occurred between 7th & 9th of May 2014 which considered exceptionally extreme because of the length of time the flows lasted (15 hours) and the fact that it covered both the watershed of Aarsal and Ras Baalbeck. The strongest reported flood in recent times lasted for only 7 hours covering only one watershed. The calibrated hydrologic model is then used to build the hydraulic model & assessing of flood hazards maps for the region. HEC-RAS Model is used in this issue & field trips were done for the catchments in order to calibrated both Hydrologic and Hydraulic models. The presented models are a kind of flexible procedures for an ungaged watershed. For some storm events it delivers good results, while for others, no parameter vectors can be found. In order to have a general methodology based on these ideas, further calibration and compromising of results on the dependence of many flood events parameters and catchment properties is required.Keywords: flood risk management, flash flood, semi arid region, El Assi River, hazard maps
Procedia PDF Downloads 47814323 Flood Control Structures in the River Göta Älv to Protect Gothenburg City (Sweden) during the 21st Century: Preliminary Evaluation
Authors: M. Irannezhad, E. H. N. Gashti, U. Moback, B. Kløve
Abstract:
Climate change because of increases in concentration level of greenhouse gases emissions to the atmosphere will result in mean sea level rise about +1 m by 2100. To prevent coastal floods resulted from the sea level rising, different flood control structures have been built, e.g. the Thames barrier on the Thames River in London (UK), with acceptable protection levels at least so far. Gothenburg located on the southwest coast of Sweden, with the River Göta älv running through it, is one of vulnerable cities to the accelerated rises in mean sea level. Developing a water level model by MATLAB, we evaluated using a sea barrage in the Göta älv River as the flood control structure for protecting the Gothenburg city during this century. Considering three operational scenarios for two barriers in upstream and downstream, the highest sea level was estimated to + 2.95 m above the current mean sea level by 2100. To verify flood protection against such high sea levels, both barriers have to be closed. To prevent high water level in the River Göta älv reservoir, the barriers would be open when the sea level is low. The suggested flood control structures would successfully protect the city from flooding events during this century.Keywords: climate change, flood control structures, gothenburg, sea level rising, water level mode
Procedia PDF Downloads 35514322 Risk Management in Islamic Banks: A Case Study of the Faisal Islamic Bank of Egypt
Authors: Mohamed Saad Ahmed Hussien
Abstract:
This paper discusses the risk management in Islamic banks and aims to determine the difference in the practices and methods of risk management in those banks compared to the conventional banks, and to make a case study of the biggest Islamic bank in Egypt (Faisal Islamic Bank of Egypt) to identify the most important financial risks faced and how to manage those risks. It was found that Islamic banks face two types of risks. The first type is similar to the risks in conventional banks; the second type is the additional risks which facing the Islamic banks only as a result of some Islamic modes of financing. With regard to the risk management, Islamic banks such as conventional banks applied the regulatory rules issued by the Central Banks and the Basel Committee; Islamic banks also applied the instructions and procedures issued by the Islamic Financial Services Board (IFSB). Also, Islamic banks are similar to the conventional banks in the practices and methods which they use to manage the risks. And there are some factors that may affect the risk management in Islamic banks, such as the size of the bank and the efficiency of the administration and the staff of the bank.Keywords: conventional banks, Faisal Islamic Bank of Egypt, Islamic banks, risk management
Procedia PDF Downloads 45914321 Design Flood Estimation in Satluj Basin-Challenges for Sunni Dam Hydro Electric Project, Himachal Pradesh-India
Authors: Navneet Kalia, Lalit Mohan Verma, Vinay Guleria
Abstract:
Introduction: Design Flood studies are essential for effective planning and functioning of water resource projects. Design flood estimation for Sunni Dam Hydro Electric Project located in State of Himachal Pradesh, India, on the river Satluj, was a big challenge in view of the river flowing in the Himalayan region from Tibet to India, having a large catchment area of varying topography, climate, and vegetation. No Discharge data was available for the part of the river in Tibet, whereas, for India, it was available only at Khab, Rampur, and Luhri. The estimation of Design Flood using standard methods was not possible. This challenge was met using two different approaches for upper (snow-fed) and lower (rainfed) catchment using Flood Frequency Approach and Hydro-metrological approach. i) For catchment up to Khab Gauging site (Sub-Catchment, C1), Flood Frequency approach was used. Around 90% of the catchment area (46300 sqkm) up to Khab is snow-fed which lies above 4200m. In view of the predominant area being snow-fed area, 1 in 10000 years return period flood estimated using Flood Frequency analysis at Khab was considered as Probable Maximum Flood (PMF). The flood peaks were taken from daily observed discharges at Khab, which were increased by 10% to make them instantaneous. Design Flood of 4184 cumec thus obtained was considered as PMF at Khab. ii) For catchment between Khab and Sunni Dam (Sub-Catchment, C2), Hydro-metrological approach was used. This method is based upon the catchment response to the rainfall pattern observed (Probable Maximum Precipitation - PMP) in a particular catchment area. The design flood computation mainly involves the estimation of a design storm hyetograph and derivation of the catchment response function. A unit hydrograph is assumed to represent the response of the entire catchment area to a unit rainfall. The main advantage of the hydro-metrological approach is that it gives a complete flood hydrograph which allows us to make a realistic determination of its moderation effect while passing through a reservoir or a river reach. These studies were carried out to derive PMF for the catchment area between Khab and Sunni Dam site using a 1-day and 2-day PMP values of 232 and 416 cm respectively. The PMF so obtained was 12920.60 cumec. Final Result: As the Catchment area up to Sunni Dam has been divided into 2 sub-catchments, the Flood Hydrograph for the Catchment C1 has been routed through the connecting channel reach (River Satluj) using Muskingum method and accordingly, the Design Flood was computed after adding the routed flood ordinates with flood ordinates of catchment C2. The total Design Flood (i.e. 2-Day PMF) with a peak of 15473 cumec was obtained. Conclusion: Even though, several factors are relevant while deciding the method to be used for design flood estimation, data availability and the purpose of study are the most important factors. Since, generally, we cannot wait for the hydrological data of adequate quality and quantity to be available, flood estimation has to be done using whatever data is available. Depending upon the type of data available for a particular catchment, the method to be used is to be selected.Keywords: design flood, design storm, flood frequency, PMF, PMP, unit hydrograph
Procedia PDF Downloads 32614320 Management Strategies for Risk Events in Construction Industries during Economic Situation and COVID-19 Pandemic in Nigeria
Authors: Ezeabasili Chibuike Patrick
Abstract:
The complex situation of construction industries in Nigeria and the risk of failures involved includes cost overrun, time overrun, Corruption, Government influence, Subcontractor challenges, Political influence and Instability, Cultural differences, Human resources deficiencies, cash flow Challenges, foreign exchange issues, inadequate design, Safety, low productivity, late payment, Quality control issues, project management issues, Environmental issues, Force majeure Competition amongst others has made the industry prone to risk and failures. Good project management remains effective in improving decision-making, which minimizes these risk events. This study was done to address these project risks and good decision-making to avert them. A mixed-method approach to research was used to do this study. Data collected by questionnaires and interviews on thirty-two (32) construction professionals was used in analyses to aid the knowledge and management of risks that were identified. The study revealed that there is no good risk management expertise in Nigeria. Also, that the economic/political situation and the recent COVID-19 pandemic has added to the risk and poor management strategies. The contingency theory and cost has therefore surfaced to be the most strategic management method used to reduce these risk issues and they seem to be very effective.Keywords: strategies, risk management, contingency theory, Nigeria
Procedia PDF Downloads 130