6023 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 156
6022 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 541
6021 Time and Cost Efficiency Analysis of Quick Die Change System on Metal Stamping Industry

Authors: Rudi Kurniawan Arief

Abstract:

Manufacturing cost and setup time are the hot topics to improve in Metal Stamping industry because material and components price are always rising up while costumer requires to cut down the component price year by year. The Single Minute Exchange of Die (SMED) is one of many methods to reduce waste in stamping industry. The Japanese Quick Die Change (QDC) dies system is one of SMED systems that could reduce both of setup time and manufacturing cost. However, this system is rarely used in stamping industries. This paper will analyze how deep the QDC dies system could reduce setup time and the manufacturing cost. The research is conducted by direct observation, simulating and comparing of QDC dies system with conventional dies system. In this research, we found that the QDC dies system could save up to 35% of manufacturing cost and reduce 70% of setup times. This simulation proved that the QDC die system is effective for cost reduction but must be applied in several parallel production processes.

Keywords: press die, metal stamping, QDC system, single minute exchange die, manufacturing cost saving, SMED

Procedia PDF Downloads 170
6020 A Comparative Analysis of Residential Quality of Public and Private Estates in Lagos

Authors: S. Akinde, Jubril Olatunbosun

Abstract:

In recent years, most of the urban centers in Nigeria are fast experiencing housing problems such as unaffordable housing and environmental challenges, all of which determine the nature of housing quality. The population continues to increase and the demand for quality housing increases probably at the same rate. Several kinds of houses serve various purposes; the objectives of the low cost housing schemes as the name suggests is to make houses quality to both the middle and lower classes of people in Lagos. A casual look into the study area of Iba Low Cost Housing Estate and the Unity Low Cost Housing Estate, Ojo and Alimosho respectively in Lagos State have shown a huge demands for houses. The study area boasts of a large population all engaged in various commercial activities with income at various levels. It would be fair to say that these people are mainly of the middle class and lower class. This means the low cost housing scheme truly serves these purposes. A Low Cost Housing Scheme of Iba which is publicly owned and Low Cost Housing Scheme of Unity Estate (UE) is privately owned.  

Keywords: housing, residential quality, low cost housing scheme, public, private estates

Procedia PDF Downloads 563
6019 Impact on Cost of Equity of Accounting and Disclosures

Authors: Abhishek Ranga

Abstract:

The study examined the effect of accounting choice and level of disclosure on the firm’s implied cost of equity in Indian environment. For the study accounting choice was classified as aggressive or conservative depending upon the firm’s choice of accounting methods, accounting policies and accounting estimates. Level of disclosure is the quantum of financial and non-financial information disclosed in firm’s annual report, essentially in note to accounts section, schedules forming part of financial statements and Management Discussion and Analysis report. Regression models were developed with cost of equity as a dependent variable and accounting choice, level of disclosure as an independent variable along with selected control variables. Cost of equity was measured using Edward-Bell-Ohlson (EBO) valuation model, to measure accounting choice Modified-Jones-Model (MJM) was used and level of disclosure was measured using a disclosure index essentially drawn from Botosan study. Results indicated a negative association between the implied cost of equity and conservative accounting choice and also between level of disclosure and cost of equity.

Keywords: aggressive accounting choice, conservative accounting choice, disclosure, implied cost of equity

Procedia PDF Downloads 462
6018 The Study of Cost Accounting in S Company Based on TDABC

Authors: Heng Ma

Abstract:

Third-party warehousing logistics has an important role in the development of external logistics. At present, the third-party logistics in our country is still a new industry, the accounting system has not yet been established, the current financial accounting system of third-party warehousing logistics is mainly in the traditional way of thinking, and only able to provide the total cost information of the entire enterprise during the accounting period, unable to reflect operating indirect cost information. In order to solve the problem of third-party logistics industry cost information distortion, improve the level of logistics cost management, the paper combines theoretical research and case analysis method to reflect cost allocation by building third-party logistics costing model using Time-Driven Activity-Based Costing(TDABC), and takes S company as an example to account and control the warehousing logistics cost. Based on the idea of “Products consume activities and activities consume resources”, TDABC put time into the main cost driver and use time-consuming equation resources assigned to cost objects. In S company, the objects focuses on three warehouse, engaged with warehousing and transportation (the second warehouse, transport point) service. These three warehouse respectively including five departments, Business Unit, Production Unit, Settlement Center, Security Department and Equipment Division, the activities in these departments are classified by in-out of storage forecast, in-out of storage or transit and safekeeping work. By computing capacity cost rate, building the time-consuming equation, the paper calculates the final operation cost so as to reveal the real cost. The numerical analysis results show that the TDABC can accurately reflect the cost allocation of service customers and reveal the spare capacity cost of resource center, verifies the feasibility and validity of TDABC in third-party logistics industry cost accounting. It inspires enterprises focus on customer relationship management and reduces idle cost to strengthen the cost management of third-party logistics enterprises.

Keywords: third-party logistics enterprises, TDABC, cost management, S company

Procedia PDF Downloads 358
6017 Cost-Optimized Extra-Lateral Transshipments

Authors: Dilupa Nakandala, Henry Lau

Abstract:

Ever increasing demand for cost efficiency and customer satisfaction through reliable delivery have been a mandate for logistics practitioners to continually improve inventory management processes. With the cost optimization objectives, this study considers an extended scenario where sourcing from the same echelon of the supply chain, known as lateral transshipment which is instantaneous but more expensive than purchasing from regular suppliers, is considered by warehouses not only to re-actively fulfill the urgent outstanding retailer demand that could not be fulfilled by stock on hand but also for preventively reduce back-order cost. Such extra lateral trans-shipments as preventive responses are intended to meet the expected demand during the supplier lead time in a periodic review ordering policy setting. We develop decision rules to assist logistics practitioners to make cost optimized selection between back-ordering and combined reactive and proactive lateral transshipment options. A method for determining the optimal quantity of extra lateral transshipment is developed considering the trade-off between purchasing, holding and backorder cost components.

Keywords: lateral transshipment, warehouse inventory management, cost optimization, preventive transshipment

Procedia PDF Downloads 616
6016 Optimizing Resource Management in Cloud Computing through Blockchain-Enabled Cost Transparency

Authors: Raghava Satya SaiKrishna Dittakavi

Abstract:

Cloud computing has revolutionized how businesses and individuals store, access, and process data, increasing efficiency and reducing infrastructure costs. However, the need for more transparency in cloud service billing often raises concerns about overcharging and hidden fees, hindering the realization of the full potential of cloud computing. This research paper explores how blockchain technology can be leveraged to introduce cost transparency and accountability in cloud computing services. We present a comprehensive analysis of blockchain-enabled solutions that enhance cost visibility, facilitate auditability, and promote trust in cloud service providers. Through this study, we aim to provide insights into the potential benefits and challenges of implementing blockchain in the cloud computing domain, leading to improved cost management and customer satisfaction.

Keywords: blockchain, cloud computing, cost transparency, blockchain technology

Procedia PDF Downloads 83
6015 Cost Reduction Techniques for Provision of Shelter to Homeless

Authors: Mukul Anand

Abstract:

Quality oriented affordable shelter for all has always been the key issue in the housing sector of our country. Homelessness is the acute form of housing need. It is a paradox that in spite of innumerable government initiated programmes for affordable housing, certain section of society is still devoid of shelter. About nineteen million (18.78 million) households grapple with housing shortage in Urban India in 2012. In Indian scenario there is major mismatch between the people for whom the houses are being built and those who need them. The prime force faced by public authorities in facilitation of quality housing for all is high cost of construction. The present paper will comprehend executable techniques for dilution of cost factor in housing the homeless. The key actors responsible for delivery of cheap housing stock such as capacity building, resource optimization, innovative low cost building material and indigenous skeleton housing system will also be incorporated in developing these techniques. Time performance, which is an important angle of above actors, will also be explored so as to increase the effectiveness of low cost housing. Along with this best practices will be taken up as case studies where both conventional techniques of housing and innovative low cost housing techniques would be cited. Transportation consists of approximately 30% of total construction budget. Thus use of alternative local solutions depending upon the region would be covered so as to highlight major components of low cost housing. Government is laid back regarding base line information on use of innovative low cost method and technique of resource optimization. Therefore, the paper would be an attempt to bring to light simpler solutions for achieving low cost housing.

Keywords: construction, cost, housing, optimization, shelter

Procedia PDF Downloads 445
6014 Licensing in a Hotelling Model with Quadratic Transportation Costs

Authors: Fehmi Bouguezzi

Abstract:

This paper studies optimal licensing regimes in a linear Hotelling model where firms are located at the end points of the city and where the transportation cost is not linear but quadratic. We study for that a more general cost function and we try to compare the findings with the results of the linear cost. We find the same optimal licensing regimes. A per unit royalty is optimal when innovation is not drastic and no licensing is better when innovation is drastic. We also find that no licensing is always better than fixed fee licensing.

Keywords: Hotelling model, technology transfer, patent licensing, quadratic transportation cost

Procedia PDF Downloads 349
6013 The Cost of Innovation in Software Development Projects

Authors: Mihai Liviu Despa

Abstract:

The paper tackles the topic of determining the cost of innovation in software development projects. Innovation can be achieved either in a planned or unplanned manner. The paper approaches the scenarios were innovation is planned for. As a starting point an innovative software development project is analyzed. The project is depicted step by step as it was implemented, from inception to delivery. Costs that are proprietary to innovation in software development are isolated based on the author’s personal experience in managing the above mentioned project. Innovation costs components identified by the author are then validated using open discussions with software development professionals and projects managers on LinkedIn groups. In order to receive relevant feedback only groups that focus on software development and innovation management are targeted. Additional innovation cost components suggested by software development professionals and projects managers are also considered. Based on the identified cost components an indicator is built. The indicator is meant to formalize the process of determining the cost of innovation in a software development project. The indicator aggregates all the innovation cost components that are identified in the research process. The process of calculating each cost component is also described. Conclusions are formulated and new related research topics are submitted for debate.

Keywords: innovation cost, IT project management, software development, innovation management

Procedia PDF Downloads 460
6012 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach

Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis

Abstract:

The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.

Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company

Procedia PDF Downloads 113
6011 Studying the Effects of Conditional Conservatism and Lack of Information Asymmetry on the Cost of Capital of the Accepted Companies in Tehran Stock Exchange

Authors: Fayaz Moosavi, Saeid Moradyfard

Abstract:

One of the methods in avoiding management fraud and increasing the quality of financial information, is the notification of qualitative features of financial information, including conservatism characteristic. Although taking a conservatism approach, while boosting the quality of financial information, is able to reduce the informational risk and the cost of capital stock of commercial department, by presenting an improper image about the situation of the commercial department, raises the risk of failure in returning the main and capital interest, and consequently the cost of capital of the commercial department. In order to know if conservatism finally leads to the increase or decrease of the cost of capital or does not have any influence on it, information regarding accepted companies in Tehran stock exchange is utilized by application of pooling method from 2007 to 2012 and it included 124 companies. The results of the study revealed that there is an opposite and meaningful relationship between conditional conservatism and the cost of capital of the company. In other words, if bad and unsuitable news and signs are reflected sooner than good news in accounting profit, the cost of capital of the company increases. In addition, there is a positive and meaningful relationship between the cost of capital and lack of information asymmetry.

Keywords: conditional conservatism, lack of information asymmetry, the cost of capital, stock exchange

Procedia PDF Downloads 265
6010 Cost Analysis of Hybrid Wind Energy Generating System Considering CO2 Emissions

Authors: M. A. Badr, M. N. El Kordy, A. N. Mohib, M. M. Ibrahim

Abstract:

The basic objective of the research is to study the effect of hybrid wind energy on the cost of generated electricity considering the cost of reduction CO2 emissions. The system consists of small wind turbine(s), storage battery bank and a diesel generator (W/D/B). Using an optimization software package, different system configurations are investigated to reach optimum configuration based on the net present cost (NPC) and cost of energy (COE) as economic optimization criteria. The cost of avoided CO2 is taken into consideration. The system is intended to supply the electrical load of a small community (gathering six families) in a remote Egyptian area. The investigated system is not connected to the electricity grid and may replace an existing conventional diesel powered electric supply system to reduce fuel consumption and CO2 emissions. The simulation results showed that W/D energy system is more economic than diesel alone. The estimated COE is 0.308$/kWh and extracting the cost of avoided CO2, the COE reached 0.226 $/kWh which is an external benefit of wind turbine, as there are no pollutant emissions through operational phase.

Keywords: hybrid wind turbine systems, remote areas electrification, simulation of hybrid energy systems, techno-economic study

Procedia PDF Downloads 400
6009 Activity-Based Costing of Medical Intensive Care Unit 240

Authors: Suppawan Lertpongpakpoom, Anongnat Boonrat, Kunya BoontummoSuppawan

Abstract:

This descriptive cost analysis aimed to analyze the unit cost of patients in medical intensive care unit. Purposive sampling was used to select 20 nurses, 6 practical nurses, 5 nurses aid and select samples 30 patients. Data were collected from both primary source (activity and average time of nursing care) and secondary source Z bill of payment and patient record). Instruments were cost recording form, activity observation form, and service recording form. Content validity of all instruments were evaluated by three experts (CVI = 0.87). Descriptive statistics was employed for data analysis. The results of the Activity-Based Costing Analysis showed that total activity cost of 4 service types for the patients was 14,776.92 Bath. The highest cost was nursing record was 5,674.78 Bath, followed direct nursing activity was 5,176.18 Bath, medical treatment was 1,976.6 Bath. The lowest cost was management activity was 1,003.64 Bath per visit. The result suggested that Activity-Base Costing Analysis could be applied to give better understanding of cost structure, enabling better consideration wasted expense and non-value-added activity, and improvement of effective utilization.

Keywords: activity-based costing, medical intensive care, nursing care, cost analysis

Procedia PDF Downloads 403
6008 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 298
6007 Food Supply Chain Optimization: Achieving Cost Effectiveness Using Predictive Analytics

Authors: Jayant Kumar, Aarcha Jayachandran Sasikala, Barry Adrian Shepherd

Abstract:

Public Distribution System is a flagship welfare programme of the Government of India with both historical and political significance. Targeted at lower sections of society,it is one of the largest supply chain networks in the world. There has been several studies by academics and planning commission about the effectiveness of the system. Our study focuses on applying predictive analytics to aid the central body to keep track of the problem of breach of service level agreement between the two echelons of food supply chain. Each shop breach is leading to a potential additional inventory carrying cost. Thus, through this study, we aim to show that aided with such analytics, the network can be made more cost effective. The methods we illustrate in this study are applicable to other commercial supply chains as well.

Keywords: PDS, analytics, cost effectiveness, Karnataka, inventory cost, service level JEL classification: C53

Procedia PDF Downloads 533
6006 Optimality of Shapley Value Mechanism under Sybil Strategies

Authors: Bruno Mazorra Roig

Abstract:

In the realm of cost-sharing mechanisms, the vulnerability to Sybil strategies, where agents can create fake identities to manipulate outcomes, has not yet been studied. In this paper, we delve into the intricacies of different cost-sharing mechanisms proposed in the literature, highlighting its non-Sybil-resistance nature. Furthermore, we prove that under mild conditions, a Sybil-proof cost-sharing mechanism for public excludable goods is at least (n/2 + 1)−approximate. This finding reveals an exponential increase in the worst-case social cost in environments where agents are restricted from using Sybil strategies. We introduce the concept of Sybil Welfare Invariant mechanisms, where a mechanism maintains its worst-case welfare under Sybil strategies for every set of prior beliefs with full support even when the mechanism is not Sybil-proof. Finally, we prove that the Shapley value mechanism for public excludable goods holds this property and so deduce that the worst-case social cost of this mechanism is the nth harmonic number Hn under the equilibrium of the game with Sybil strategies, matching the worst-case social cost bound for cost-sharing mechanisms. This finding carries important implications for decentralized autonomous organizations (DAOs), indicating that they are capable of funding public excludable goods efficiently, even when the total number of agents is unknown.

Keywords: game theory, mechanism design, cost sharing, false-name proofness

Procedia PDF Downloads 64
6005 Influence of Procurement Methods on Cost Performance of Building Projects in Gombe State, Nigeria

Authors: S. U. Kunya, S. Abdulkadir, M. A. Anas, L. Z. Adam

Abstract:

Procurement methods is described as systems of contractual arrangements used by the contractor in order to secure the design and construction services based on the stipulated cost and within the required time and quality. Despite that, major projects in the Nigerian construction industry failed because of wrong procurement methods with major consequences leads to cost overrun which needs to find lasting solution. The aim of the study is to evaluate the influence of procurement methods on cost performance of building projects in Gombe State, Nigeria. Study adopts descriptive and explorative design approach. Data were collected through administering of one hundred questionnaire using convenient sampling techniques. Data analyses using percentages, mean value and Anova analysis. Major finding show that more than fifty percent (50%) of procurement methods available are mainly utilized in the study area and the top procurement methods that have high impacts on cost performance as compare with the other methods is project management and direct labour procurement methods. The results of hypothesis’ tests with pvalue 0.12 and 0.07 validated that there was no significant variation in the perception of stakeholders’ on the impacts of procurements methods on cost performance. Therefore, the study concluded that projects management and direct labour are the most appropriate procurement methods that will ensure successful completion of project at stipulated cost in building projects.

Keywords: cost, effects, performance, procurement, projects

Procedia PDF Downloads 224
6004 Economic Cost of Malaria: A Threat to Household Income in Nigeria

Authors: Nsikan Affiah, Kayode Osungbade, Williams Uzoma

Abstract:

Malaria remains one of the major killers of humans worldwide, threatening the lives of more than one-third of the world’s population. Some people refers it to; a disease of poverty because it contributes towards national poverty through its impact on foreign direct investment, tourism, labour productivity, and trade. At the micro level, it may cause poverty through spending on health care, income losses, and premature deaths. Unfortunately, malaria is a disease that affects both low-income household and its high-income counterpart, but low-income households are still at greater risk because significant part of the available monthly income is dedicated to various preventive and treatment measures. The objective of this study is to estimate direct and indirect cost of malaria treatment in households in a section of South-South Region (Akwa Ibom State) of Nigeria. A cross-sectional study of Six Hundred and Forty (640) heads of households or any adult representative of households in three local government areas of Akwa Ibom State, Nigeria from May 1-31, 2015 were ascertained through interviewer-administered questionnaire adapted from Nigerian Malaria Indicator Survey Report. The clustering technique was used to select 640 households with the help of Primary Health Care (PHC) house numbering system. Using exchange rate of 197 Naira/USD, result shows that direct cost of malaria treatment was 8,894.44 USD while the indirect cost of malaria treatment was 11,012.81 USD. Total cost of treatment made up of 44.7% direct cost and 55.3% indirect cost, with average direct cost of malaria treatment per household estimated at 20.6 USD and the average indirect cost of treatment per household estimated at 25.1 USD. Average total cost for each episode (888) of malaria was estimated at 22.4 USD. While at household level, the average total cost was estimated at 45.5 USD. From the average total cost, low-income households would spend 36% of monthly household income on treating malaria and the impact could be said to be catastrophic, compared to high-income households where only 1.2% of monthly household income is spent on malaria treatment. It could be concluded that the cost of malaria treatment is well beyond the means of households and given the reality of repeated bouts of malaria and its contribution to the impoverishment of households, there is a need for urgent action.

Keywords: direct cost, indirect cost, low income households, malaria

Procedia PDF Downloads 257
6003 Cost Valuation Method for Development Concurrent, Phase Appropriate Requirement Valuation Using the Example of Load Carrier Development in the Lithium-Ion-Battery Production

Authors: Achim Kampker, Christoph Deutskens, Heiner Hans Heimes, Mathias Ordung, Felix Optehostert

Abstract:

In the past years electric mobility became part of a public discussion. The trend to fully electrified vehicles instead of vehicles fueled with fossil energy has notably gained momentum. Today nearly every big car manufacturer produces and sells fully electrified vehicles, but electrified vehicles are still not as competitive as conventional powered vehicles. As the traction battery states the largest cost driver, lowering its price is a crucial objective. In addition to improvements in product and production processes a non-negligible, but widely underestimated cost driver of production can be found in logistics, since the production technology is not continuous yet and neither are the logistics systems. This paper presents an approach to evaluate cost factors on different designs of load carrier systems. Due to numerous interdependencies, the combination of costs factors for a particular scenario is not transparent. This is effecting actions for cost reduction negatively, but still cost reduction is one of the major goals for simultaneous engineering processes. Therefore a concurrent and phase appropriate cost valuation method is necessary to serve cost transparency. In this paper the four phases of this cost valuation method are defined and explained, which based upon a new approach integrating the logistics development process in to the integrated product and process development.

Keywords: research and development, technology and innovation, lithium-ion-battery production, load carrier development process, cost valuation method

Procedia PDF Downloads 594
6002 Economic Meltdown and Inflation and Its Effect on Organization Performance: A Study of Nigerian Manufacturing Companies

Authors: Cynthia Oluchi Akagha

Abstract:

This paper highlights the increase in production cost and the corresponding outcomes in Nigeria using six major manufacturing companies as a case study. During an inflationary period, the cost-of-living increases, which reduces the purchasing power of money. Inflation has become a severe issue in many countries recently. To examine how inflation affects the success of businesses in Nigeria, a quantitative approach and a focus on causality were utilized to examine six (6) functional Nigerian manufacturing enterprises. The correlation between business production cost, cost of items supplied, and gross profit from 2021-2022 was analyzed. The analysis recorded that the cost of production increased in 2022 compared to 2021. The expansion varied between the six companies by 77.1%. Only one company out of six reported a decrease in gross profit in 2022 compared to the previous year. The other five companies' profits increased between 6.5% and 87%. Companies like these have thrived despite the rising cost of living because they have adjusted by increasing their product pricing. Since this change has the most significant influence on consumers, the best long-term reaction for a corporation to inflationary effects is often an improvement in cost efficiency, output, or both.

Keywords: economic meltdown, inflation, organization, performance

Procedia PDF Downloads 80
6001 Status and Proposed Models of Backhauling System in Thailand

Authors: Tarathorn Podcharathitikull, Jirarat Teeravaraprug

Abstract:

Transportation cost is the highest cost in logistics cost of Thailand, and truck transportation is counted as about 90% of the overall transportation cost. The main problem of truck transportation is backhauling. Backhauling has become an attractive cost-saving approach in logistics. To explore such opportunities, this paper investigated the current backhauling systems in Thailand. It was found that the backhauling problem is attracted to both governmental agencies and private sector. They gave attempts to build backhauling systems. This paper investigated two systems built by governmental agencies and one by private sector. Moreover, based on the interviews with the system representatives and users, pros and cons of the systems were found. The obstacles and challenges were obtained. This paper finally proposed a conceptual model of to-be backhauling system in Thailand.

Keywords: backhauling system, backhauls, interview, Thailand

Procedia PDF Downloads 285
6000 Cost Overrun in Construction Projects

Authors: Hailu Kebede Bekele

Abstract:

Construction delays are suitable where project events occur at a certain time expected due to causes related to the client, consultant, and contractor. Delay is the major cause of the cost overrun that leads to the poor efficiency of the project. The cost difference between completion and the originally estimated is known as cost overrun. The common ways of cost overruns are not simple issues that can be neglected, but more attention should be given to prevent the organization from being devastated to be failed, and financial expenses to be extended. The reasons that may raised in different studies show that the problem may arise in construction projects due to errors in budgeting, lack of favorable weather conditions, inefficient machinery, and the availability of extravagance. The study is focused on the pace of mega projects that can have a significant change in the cost overrun calculation.15 mega projects are identified to study the problem of the cost overrun in the site. The contractor, consultant, and client are the principal stakeholders in the mega projects. 20 people from each sector were selected to participate in the investigation of the current mega construction project. The main objective of the study on the construction cost overrun is to prioritize the major causes of the cost overrun problem. The methodology that was employed in the construction cost overrun is the qualitative methodology that mostly rates the causes of construction project cost overrun. Interviews, open-ended and closed-ended questions group discussions, and rating qualitative methods are the best methodologies to study construction projects overrun. The result shows that design mistakes, lack of labor, payment delay, old equipment and scheduling, weather conditions, lack of skilled labor, payment delays, transportation, inflation, and order variations, market price fluctuation, and people's thoughts and philosophies, the prior cause of the cost overrun that fail the project performance. The institute shall follow the scheduled activities to bring a positive forward in the project life.

Keywords: cost overrun, delay, mega projects, design

Procedia PDF Downloads 62
5999 Clarification of the Essential of Life Cycle Cost upon Decision-Making Process: An Empirical Study in Building Projects

Authors: Ayedh Alqahtani, Andrew Whyte

Abstract:

Life Cycle Cost (LCC) is one of the goals and key pillars of the construction management science because it comprises many of the functions and processes necessary, which assist organisations and agencies to achieve their goals. It has therefore become important to design and control assets during their whole life cycle, from the design and planning phase through to disposal phase. LCCA is aimed to improve the decision making system in the ownership of assets by taking into account all the cost elements including to the asset throughout its life. Current application of LCC approach is impractical during misunderstanding of the advantages of LCC. This main objective of this research is to show a different relationship between capital cost and long-term running costs. One hundred and thirty eight actual building projects in United Kingdom (UK) were used in order to achieve and measure the above-mentioned objective of the study. The result shown that LCC is one of the most significant tools should be considered on the decision making process.

Keywords: building projects, capital cost, life cycle cost, maintenance costs, operation costs

Procedia PDF Downloads 546
5998 Socioeconomic Burden of Life Long Disease: A Case of Diabetes Care in Bangladesh

Authors: Samira Humaira Habib

Abstract:

Diabetes has profound effects on individuals and their families. If diabetes is not well monitored and managed, then it leads to long-term complications and a large and growing cost to the health care system. Prevalence and socioeconomic burden of diabetes and relative return of investment for the elimination or the reduction of the burden are much more important regarding its cost burden. Various studies regarding the socioeconomic cost burden of diabetes are well explored in developed countries but almost absent in developing countries like Bangladesh. The main objective of the study is to estimate the total socioeconomic burden of diabetes. It is a prospective longitudinal follow up study which is analytical in nature. Primary and secondary data are collected from patients who are undergoing treatment for diabetes at the out-patient department of Bangladesh Institute of Research & Rehabilitation in Diabetes, Endocrine & Metabolic Disorders (BIRDEM). Of the 2115 diabetic subjects, females constitute around 50.35% of the study subject, and the rest are male (49.65%). Among the subjects, 1323 are controlled, and 792 are uncontrolled diabetes. Cost analysis of 2115 diabetic patients shows that the total cost of diabetes management and treatment is US$ 903018 with an average of US$ 426.95 per patient. In direct cost, the investigation and medical treatment at hospital along with investigation constitute most of the cost in diabetes. The average cost of a hospital is US$ 311.79, which indicates an alarming warn for diabetic patients. The indirect cost shows that cost of productivity loss (US$ 51110.1) is higher among the all indirect item. All constitute total indirect cost as US$ 69215.7. The incremental cost of intensive management of uncontrolled diabetes is US$ 101.54 per patient and event-free time gained in this group is 0.55 years and the life years gain is 1.19 years. The incremental cost per event-free year gained is US$ 198.12. The incremental cost of intensive management of the controlled group is US$ 89.54 per patient and event-free time gained is 0.68 years, and the life year gain is 1.12 years. The incremental cost per event-free year gained is US$ 223.34. The EuroQoL difference between the groups is found to be 64.04. The cost-effective ratio is found to be US$ 1.64 cost per effect in case of controlled diabetes and US$ 1.69 cost per effect in case of uncontrolled diabetes. So management of diabetes is much more cost-effective. Cost of young type 1 diabetic patient showed upper socioeconomic class, and with the increase of the duration of diabetes, the cost increased also. The dietary pattern showed macronutrients intake and cost are significantly higher in the uncontrolled group than their counterparts. Proper management and control of diabetes can decrease the cost of care for the long term.

Keywords: cost, cost-effective, chronic diseases, diabetes care, burden, Bangladesh

Procedia PDF Downloads 147
5997 Reduction in the Metabolic Cost of Human Walking Gaits Using Quasi-Passive Upper Body Exoskeleton

Authors: Nafiseh Ebrahimi, Gautham Muthukumaran, Amir Jafari

Abstract:

Human walking gait is considered to be the most efficient biped walking gait. There are various types of gait human follows during locomotion and arm swing is one of the most important factors which controls and differentiates human gaits. Earlier studies declared a 7% reduction in the metabolic cost due to the arm swing. In this research, we compared different types of arm swings in terms of metabolic cost reduction and then suggested, designed, fabricated and tested a quasi-passive upper body exoskeleton to study the metabolic cost reduction in the folded arm walking gate scenarios. Our experimental results validate a 10% reduction in the metabolic cost of walking aided by the application of the proposed exoskeleton.

Keywords: arm swing, MET (metabolic equivalent of a task), calorimeter, oxygen consumption, upper body quasi-passive exoskeleton

Procedia PDF Downloads 157
5996 The Current Application of BIM - An Empirical Study Focusing on the BIM-Maturity Level

Authors: Matthias Stange

Abstract:

Building Information Modelling (BIM) is one of the most promising methods in the building design process and plays an important role in the digitalization of the Architectural, Engineering, and Construction (AEC) Industry. The application of BIM is seen as the key enabler for increasing productivity in the construction industry. The model-based collaboration using the BIM method is intended to significantly reduce cost increases, schedule delays, and quality problems in the planning and construction of buildings. Numerous qualitative studies based on expert interviews support this theory and report perceived benefits from the use of BIM in terms of achieving project objectives related to cost, schedule, and quality. However, there is a large research gap in analysing quantitative data collected from real construction projects regarding the actual benefits of applying BIM based on representative sample size and different application regions as well as different project typologies. In particular, the influence of the project-related BIM maturity level is completely unexplored. This research project examines primary data from 105 construction projects worldwide using quantitative research methods. Projects from the areas of residential, commercial, and industrial construction as well as infrastructure and hydraulic engineering were examined in application regions North America, Australia, Europe, Asia, MENA region, and South America. First, a descriptive data analysis of 6 independent project variables (BIM maturity level, application region, project category, project type, project size, and BIM level) were carried out using statistical methods. With the help of statisticaldata analyses, the influence of the project-related BIM maturity level on 6 dependent project variables (deviation in planning time, deviation in construction time, number of planning collisions, frequency of rework, number of RFIand number of changes) was investigated. The study revealed that most of the benefits of using BIM perceived through numerous qualitative studies have not been confirmed. The results of the examined sample show that the application of BIM did not have an improving influence on the dependent project variables, especially regarding the quality of the planning itself and the adherence to the schedule targets. The quantitative research suggests the conclusion that the BIM planning method in its current application has not (yet) become a recognizable increase in productivity within the planning and construction process. The empirical findings indicate that this is due to the overall low level of BIM maturity in the projects of the examined sample. As a quintessence, the author suggests that the further implementation of BIM should primarily focus on an application-oriented and consistent development of the project-related BIM maturity level instead of implementing BIM for its own sake. Apparently, there are still significant difficulties in the interweaving of people, processes, and technology.

Keywords: AEC-process, building information modeling, BIM maturity level, project results, productivity of the construction industry

Procedia PDF Downloads 73
5995 An Evaluation on the Methodology of Manufacturing High Performance Organophilic Clay at the Most Efficient and Cost Effective Process

Authors: Siti Nur Izati Azmi, Zatil Afifah Omar, Kathi Swaran, Navin Kumar

Abstract:

Organophilic Clays, also known as Organoclays, is used as a viscosifier in Oil based Drilling fluids. Most often, Organophilic clay are produced from modified Sodium and Calcium based Bentonite. Many studies and data show that Organophilic Clay using Hectorite based clays provide the best yield and good fluid loss properties in an oil-based drilling fluid at a higher cost. In terms of the manufacturing process, the two common methods of manufacturing organophilic clays are a Wet Process and a Dry Process. Wet process is known to produce better performance product at a higher cost while Dry Process shorten the production time. Hence, the purpose of this study is to evaluate the various formulation of an organophilic clay and its performance vs. the cost, as well as to determine the most efficient and cost-effective method of manufacturing organophilic clays.

Keywords: organophilic clay, viscosifier, wet process, dry process

Procedia PDF Downloads 226
5994 Financial Burden of Family for the Children with Autism Spectrum Disorder

Authors: M. R. Bhuiyan, S. M. M. Hossain, M. Z. Islam

Abstract:

Autism Spectrum Disorder (ASD) is the fastest growing serious developmental disorder characterized by social deficits, communicative difficulties, and repetitive behaviors. ASD is an emerging public health issue globally which is associated with huge financial burden to the family, community and the nation. The aim of this study was to assess the financial burden of family for the children with Autism spectrum Disorder. This cross-sectional study was carried out from July 2015 to June 2016 among 154 children with ASD to assess the financial burden of family. Data were collected by face-to-face interview with semi-structured questionnaire following systematic random sampling technique. Majority (73.4%) children were male and mean (±SD) age was 6.66 ± 2.97 years. Most (88.8%) of the children were from urban areas with average monthly family income Tk. 41785.71±23936.45. Average monthly direct cost of the children was Tk.17656.49 ± 9984.35, while indirect cost was Tk. 13462.90 ± 9713.54 and total treatment cost was Tk. 23076.62 ± 15341.09. Special education cost (Tk. 4871.00), cost of therapy (Tk. 4124.07) and travel cost (Tk. 3988.31) were the major types of direct cost, while loss of income (Tk.14570.18) was the chief indirect cost incurred by the families. The study found that majority (59.8%) of the children attended special schools were incurred Tk.20001-78700 as total treatment cost, which were statistically significant (p<0.001). Again, families with higher monthly family income incurred higher treatment cost (r=0.526, p<0.05). Difference between mean direct and indirect cost was found significant (t=4.190, df=61, p<0.001). According to the analysis of variance, mean difference of father’s educational status among direct cost (F=10.337, p<0.001) and total treatment cost (F=7.841, p<0.001), which were statistically significant. The study revealed that maximum children with ASD were under five years, three-fourth were male. According to monthly family income, maximum family were in middle class. The study recommends cost effective interventions and financial safety-net measures to reduce the financial burden of families for the children with ASD.

Keywords: autism spectrum disorder, financial burden, direct cost, indirect cost, special education

Procedia PDF Downloads 136