Search results for: design-build-finance-operate (DBFO) road projects
2675 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey
Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali
Abstract:
Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling
Procedia PDF Downloads 2432674 GIS Based Project Management Information System for Infrastructure Projects
Authors: Riki Panchal, Debasis Sarkar
Abstract:
This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.Keywords: GIS, project management, integrated model, infrastructure project
Procedia PDF Downloads 5192673 The Development of Traffic Devices Using Natural Rubber in Thailand
Authors: Weeradej Cheewapattananuwong, Keeree Srivichian, Godchamon Somchai, Wasin Phusanong, Nontawat Yoddamnern
Abstract:
Natural rubber used for traffic devices in Thailand has been developed and researched for several years. When compared with Dry Rubber Content (DRC), the quality of Rib Smoked Sheet (RSS) is better. However, the cost of admixtures, especially CaCO₃ and sulphur, is higher than the cost of RSS itself. In this research, Flexible Guideposts and Rubber Fender Barriers (RFB) are taken into consideration. In case of flexible guideposts, the materials used are both RSS and DRC60%, but for RFB, only RSS is used due to the controlled performance tests. The objective of flexible guideposts and RFB is to decrease a number of accidents, fatal rates, and serious injuries. Functions of both devices are to save road users and vehicles as well as to absorb impact forces from vehicles so as to decrease of serious road accidents. This leads to the mitigation methods to remedy the injury of motorists, form severity to moderate one. The solution is to find the best practice of traffic devices using natural rubber under the engineering concepts. In addition, the performances of materials, such as tensile strength and durability, are calculated for the modulus of elasticity and properties. In the laboratory, the simulation of crashes, finite element of materials, LRFD, and concrete technology methods are taken into account. After calculation, the trials' compositions of materials are mixed and tested in the laboratory. The tensile test, compressive test, and weathering or durability test are followed and based on ASTM. Furthermore, the Cycle-Repetition Test of Flexible Guideposts will be taken into consideration. The final decision is to fabricate all materials and have a real test section in the field. In RFB test, there will be 13 crash tests, 7 Pickup Truck tests, and 6 Motorcycle Tests. The test of vehicular crashes happens for the first time in Thailand, applying the trial and error methods; for example, the road crash test under the standard of NCHRP-TL3 (100 kph) is changed to the MASH 2016. This is owing to the fact that MASH 2016 is better than NCHRP in terms of speed, types, and weight of vehicles and the angle of crash. In the processes of MASH, Test Level 6 (TL-6), which is composed of 2,270 kg Pickup Truck, 100 kph, and 25 degree of crash-angle is selected. The final test for real crash will be done, and the whole system will be evaluated again in Korea. The researchers hope that the number of road accidents will decrease, and Thailand will be no more in the top tenth ranking of road accidents in the world.Keywords: LRFD, load and resistance factor design, ASTM, american society for testing and materials, NCHRP, national cooperation highway research program, MASH, manual for assessing safety hardware
Procedia PDF Downloads 1282672 Reading High Rise Residential Development in Istanbul on the Theory of Globalization
Authors: Tuba Sari
Abstract:
One of the major transformations caused by the industrial revolution, technological developments and globalization is undoubtedly acceleration of urbanization process. Globalization, in particular, is one of the major factors that trigger this transformation. In this context, as a result of the global metropolitan city system, multifunctional rising structure forms are becoming undeniable fact of the world’s leading metropolises as the manifestation of prestige and power with different life choices, easy accessibility to services related to the era of technology. The scope of research deals with five different urban centers in İstanbul where high-rise housing is increasing dramatically after 2000’s. Therefore, the research regards multi-centered urban residential pattern being created by high-rise housing structures in the city. The methodology of the research is based on two main issue, one of them is related to sampling method of high-rise housing projects in İstanbul, while the other method of the research is based on the model of Semantics. In the framework of research hypothesis, it is aimed to prove that the character of vertical intensive structuring in Istanbul is based on seeking of different forms and images in the expressive quality, considering the production of existing high-rise buildings in residential areas in recent years. In respect to rising discourse of 'World City' in the globalizing world, it is very important to state the place of Istanbul in other developing world metropolises. In the perspective of 'World City' discourse, Istanbul has different projects concerning with globalization, international finance companies, cultural activities, mega projects, etc. In brief, the aim of this research is examining transformation forms of high-rise housing development in Istanbul within the frame of developing world cities, searching and analyzing discourse and image related to these projects.Keywords: globalization, high-rise, housing, image
Procedia PDF Downloads 2842671 Research on Urban Point of Interest Generalization Method Based on Mapping Presentation
Authors: Chengming Li, Yong Yin, Peipei Guo, Xiaoli Liu
Abstract:
Without taking account of the attribute richness of POI (point of interest) data and spatial distribution limited by roads, a POI generalization method considering both attribute information and spatial distribution has been proposed against the existing point generalization algorithm merely focusing on overall information of point groups. Hierarchical characteristic of urban POI information expression has been firstly analyzed to point out the measurement feature of the corresponding hierarchy. On this basis, an urban POI generalizing strategy has been put forward: POIs urban road network have been divided into three distribution pattern; corresponding generalization methods have been proposed according to the characteristic of POI data in different distribution patterns. Experimental results showed that the method taking into account both attribute information and spatial distribution characteristics of POI can better implement urban POI generalization in the mapping presentation.Keywords: POI, road network, selection method, spatial information expression, distribution pattern
Procedia PDF Downloads 4102670 Statistical Investigation Projects: A Way for Pre-Service Mathematics Teachers to Actively Solve a Campus Problem
Authors: Muhammet Şahal, Oğuz Köklü
Abstract:
As statistical thinking and problem-solving processes have become increasingly important, teachers need to be more rigorously prepared with statistical knowledge to teach their students effectively. This study examined preservice mathematics teachers' development of statistical investigation projects using data and exploratory data analysis tools, following a design-based research perspective and statistical investigation cycle. A total of 26 pre-service senior mathematics teachers from a public university in Turkiye participated in the study. They formed groups of 3-4 members voluntarily and worked on their statistical investigation projects for six weeks. The data sources were audio recordings of pre-service teachers' group discussions while working on their projects in class, whole-class video recordings, and each group’s weekly and final reports. As part of the study, we reviewed weekly reports, provided timely feedback specific to each group, and revised the following week's class work based on the groups’ needs and development in their project. We used content analysis to analyze groups’ audio and classroom video recordings. The participants encountered several difficulties, which included formulating a meaningful statistical question in the early phase of the investigation, securing the most suitable data collection strategy, and deciding on the data analysis method appropriate for their statistical questions. The data collection and organization processes were challenging for some groups and revealed the importance of comprehensive planning. Overall, preservice senior mathematics teachers were able to work on a statistical project that contained the formulation of a statistical question, planning, data collection, analysis, and reaching a conclusion holistically, even though they faced challenges because of their lack of experience. The study suggests that preservice senior mathematics teachers have the potential to apply statistical knowledge and techniques in a real-world context, and they could proceed with the project with the support of the researchers. We provided implications for the statistical education of teachers and future research.Keywords: design-based study, pre-service mathematics teachers, statistical investigation projects, statistical model
Procedia PDF Downloads 852669 Assessing Traffic Calming Measures for Safe and Accessible Emergency Routes in Norrkoping City in Sweden
Authors: Ghazwan Al-Haji
Abstract:
Most accidents occur in urban areas, and the most related casualties are vulnerable road users (pedestrians and cyclists). The traffic calming measures (TCMs) are widely used and considered to be successful in reducing speed and traffic volume. However, TCMs create unwanted effects include: noise, emissions, energy consumption, vehicle delays and emergency response time (ERT). Different vertical and horizontal TCMs have been already applied nationally (Sweden) and internationally with different impacts. It is a big challenge among traffic engineers, planners, and policy-makers to choose and priorities the best TCMs to be implemented. This study will assess the existing guidelines for TCMs in relation to safety and ERT with focus on data from Norrkoping city in Sweden. The expected results will save lives, time, and money on particularly Swedish Roads. The study will also review newly technologies and how they can improve safety and reduce ERT.Keywords: traffic calming measures, traffic safety, delay time, vulnerable road users
Procedia PDF Downloads 1402668 A Vehicle Detection and Speed Measurement Algorithm Based on Magnetic Sensors
Authors: Panagiotis Gkekas, Christos Sougles, Dionysios Kehagias, Dimitrios Tzovaras
Abstract:
Cooperative intelligent transport systems (C-ITS) can greatly improve safety and efficiency in road transport by enabling communication, not only between vehicles themselves but also between vehicles and infrastructure. For that reason, traffic surveillance systems on the road are of great importance. This paper focuses on the development of an on-road unit comprising several magnetic sensors for real-time vehicle detection, movement direction, and speed measurement calculations. Magnetic sensors can feel and measure changes in the earth’s magnetic field. Vehicles are composed of many parts with ferromagnetic properties. Depending on sensors’ sensitivity, changes in the earth’s magnetic field caused by passing vehicles can be detected and analyzed in order to extract information on the properties of moving vehicles. In this paper, we present a prototype algorithm for real-time, high-accuracy, vehicle detection, and speed measurement, which can be implemented as a portable, low-cost, and non-invasive to existing infrastructure solution with the potential to replace existing high-cost implementations. The paper describes the algorithm and presents results from its preliminary lab testing in a close to real condition environment. Acknowledgments: Work presented in this paper was co-financed by the European Regional Development Fund of the European Union and Greek national funds through the Operational Program Competitiveness, Entrepreneurship, and Innovation (call RESEARCH–CREATE–INNOVATE) under contract no. Τ1EDK-03081 (project ODOS2020).Keywords: magnetic sensors, vehicle detection, speed measurement, traffic surveillance system
Procedia PDF Downloads 1212667 VCloud: A Security Framework for VANET
Authors: Wiseborn Manfe Danquah, D. Turgay Altilar
Abstract:
Vehicular Ad-hoc Network (VANET) is an integral component of Intelligent Transport Systems (ITS) that has enjoyed a lot of attention from the research community and the automotive industry. This is mainly due to the opportunities and challenges it presents. Vehicular Ad-hoc Network being a class of Mobile Ad-hoc Networks (MANET) has all the security concerns existing in traditional MANET as well as new security and privacy concerns introduced by the unique vehicular communication environment. This paper provides a survey of the possible attacks in vehicular environment, as well as security and privacy concerns in VANET. It also provides an insight into the development of a comprehensive cloud framework to provide a more robust and secured communication among vehicular nodes and road side units. Our proposal, a Metropolitan Based Public Interconnected Vehicular Cloud (MIVC) infrastructure seeks to provide a more reliable and secured vehicular communication network.Keywords: mobile Ad-hoc networks, vehicular ad hoc network, cloud, ITS, road side units (RSU), metropolitan interconnected vehicular cloud (MIVC)
Procedia PDF Downloads 3542666 Risk Factors Affecting Construction Project Cost in Oman
Authors: Omar Amoudi, Latifa Al Brashdi
Abstract:
Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.Keywords: construction cost, construction projects, Oman, risk factors, risk management
Procedia PDF Downloads 3452665 Optimization Method of the Number of Berth at Bus Rapid Transit Stations Based on Passenger Flow Demand
Authors: Wei Kunkun, Cao Wanyang, Xu Yujie, Qiao Yuzhi, Liu Yingning
Abstract:
The reasonable design of bus parking spaces can improve the traffic capacity of the station and reduce traffic congestion. In order to reasonably determine the number of berths at BRT (Bus Rapid Transit) stops, it is based on the actual bus rapid transit station observation data, scheduling data, and passenger flow data. Optimize the number of station berths from the perspective of optimizing the balance of supply and demand at the site. Combined with the classical capacity calculation model, this paper first analyzes the important factors affecting the traffic capacity of BRT stops by using SPSS PRO and MATLAB programming software, namely the distribution of BRT stops and the distribution of BRT stop time. Secondly, the method of calculating the number of the classic human capital management (HCM) model is optimized based on the actual passenger demand of the station, and the method applicable to the actual number of station berths is proposed. Taking Gangding Station of Zhongshan Avenue Bus Rapid Transit Corridor in Guangzhou as an example, based on the calculation method proposed in this paper, the number of berths of sub-station 1, sub-station 2 and sub-station 3 is 2, which reduces the road space of the station by 33.3% compared with the previous berth 3 of each sub-station, and returns to social vehicles. Therefore, under the condition of ensuring the passenger flow demand of BRT stations, the road space of the station is reduced, and the road is returned to social vehicles, the traffic capacity of social vehicles is improved, and the traffic capacity and efficiency of the BRT corridor system are improved as a whole.Keywords: urban transportation, bus rapid transit station, HCM model, capacity, number of berths
Procedia PDF Downloads 952664 A Framework Based Blockchain for the Development of a Social Economy Platform
Authors: Hasna Elalaoui Elabdallaoui, Abdelaziz Elfazziki, Mohamed Sadgal
Abstract:
Outlines: The social economy is a moral approach to solidarity applied to the projects’ development. To reconcile economic activity and social equity, crowdfunding is as an alternative means of financing social projects. Several collaborative blockchain platforms exist. It eliminates the need for a central authority or an inconsiderate middleman. Also, the costs for a successful crowdfunding campaign are reduced, since there is no commission to be paid to the intermediary. It improves the transparency of record keeping and delegates authority to authorities who may be prone to corruption. Objectives: The objectives are: to define a software infrastructure for projects’ participatory financing within a social and solidarity economy, allowing transparent, secure, and fair management and to have a financial mechanism that improves financial inclusion. Methodology: The proposed methodology is: crowdfunding platforms literature review, financing mechanisms literature review, requirements analysis and project definition, a business plan, Platform development process and implementation technology, and testing an MVP. Contributions: The solution consists of proposing a new approach to crowdfunding based on Islamic financing, which is the principle of Mousharaka inspired by Islamic financing, which presents a financial innovation that integrates ethics and the social dimension into contemporary banking practices. Conclusion: Crowdfunding platforms need to secure projects and allow only quality projects but also offer a wide range of options to funders. Thus, a framework based on blockchain technology and Islamic financing is proposed to manage this arbitration between quality and quantity of options. The proposed financing system, "Musharaka", is a mode of financing that prohibits interests and uncertainties. The implementation is offered on the secure Ethereum platform as investors sign and initiate transactions for contributions using their digital signature wallet managed by a cryptography algorithm and smart contracts. Our proposal is illustrated by a crop irrigation project in the Marrakech region.Keywords: social economy, Musharaka, blockchain, smart contract, crowdfunding
Procedia PDF Downloads 772663 Analysis of Rockfall Hazard along Himalayan Road Cut Slopes
Authors: Sarada Prasad Pradhan, Vikram Vishal, Tariq Siddique
Abstract:
With a vast area of India comprising of hilly terrain and road cut slopes, landslides and rockfalls are a common phenomenon. However, while landslide studies have received much attention in the past in India, very little literature and analysis is available regarding rockfall hazard of many rockfall prone areas, specifically in Uttarakhand Himalaya, India. The subsequent lack of knowledge and understanding of the rockfall phenomenon as well as frequent incidences of rockfall led fatalities urge the necessity of conducting site-specific rockfall studies to highlight the importance of addressing this issue as well as to provide data for safe design of preventive structures. The present study has been conducted across 10 rockfall prone road cut slopes for a distance of 15 km starting from Devprayag, India along National Highway 58 (NH-58). In order to make a qualitative assessment of Rockfall Hazard posed by these slopes, Rockfall Hazard Rating using standards for Indian Rockmass has been conducted at 10 locations under different slope conditions. Moreover, to accurately predict the characteristics of the possible rockfall phenomenon, numerical simulation was carried out to calculate the maximum bounce heights, total kinetic energies, translational velocities and trajectories of the falling rockmass blocks when simulated on each of these slopes according to real-life conditions. As it was observed that varying slope geometry had more fatal impacts on Rockfall hazard than size of rock masses, several optimizations have been suggested for each slope regarding location of barriers and modification of slope geometries in order to minimize damage by falling rocks. This study can be extremely useful in emphasizing the significance of rockfall studies and construction of mitigative barriers and structures along NH-58 around Devprayag.Keywords: rockfall, slope stability, rockmass, hazard
Procedia PDF Downloads 2082662 Design Thinking and Requirements Engineering in Application Development: Case Studies in Brazil
Authors: V. Prodocimo, A. Malucelli, S. Reinehr
Abstract:
Organizations, driven by business digitization, have in software the main core of value generation and the main channel of communication with their clients. The software, as well as responding to momentary market needs, spans an extensive product family, ranging from mobile applications to multilateral platforms. Thus, the software specification needs to represent solutions focused on consumer problems and market needs. However, requirements engineering, whose approach is strongly linked to technology, becomes deficient and ineffective when the problem is not well defined or when looking for an innovative solution, thus needing a complementary approach. Research has cited the combination of design thinking and requirements engineering, many correlating design thinking as a support technique for the elicitation step, however, little is known about the real benefits and challenges that this combination can bring. From the point of view of the development process, there is little empirical evidence of how Design Thinking interactions with requirements engineering occur. Given this scenario, this paper aims to understand how design thinking practices are applied in each of the requirements engineering stages in software projects. To elucidate these interactions, a qualitative and exploratory research was carried out through the application of the case study method in IT organizations in Brazil that work in the development of software projects. The results indicate that design thinking has aided requirements engineering, both in projects that adopt agile methods and those that adopt the waterfall process, bringing a complementary thought that seeks to build the best software solution design for business problems. It was also possible to conclude that organizations choose to use design thinking not based on a specific software family (e.g. mobile or desktop applications), but given the characteristics of the software projects, such as: vague nature of the problem, complex problems and/or need for innovative solutions.Keywords: software engineering, requirements engineering, design thinking, innovative solutions
Procedia PDF Downloads 1252661 Road Accidents Bigdata Mining and Visualization Using Support Vector Machines
Authors: Usha Lokala, Srinivas Nowduri, Prabhakar K. Sharma
Abstract:
Useful information has been extracted from the road accident data in United Kingdom (UK), using data analytics method, for avoiding possible accidents in rural and urban areas. This analysis make use of several methodologies such as data integration, support vector machines (SVM), correlation machines and multinomial goodness. The entire datasets have been imported from the traffic department of UK with due permission. The information extracted from these huge datasets forms a basis for several predictions, which in turn avoid unnecessary memory lapses. Since data is expected to grow continuously over a period of time, this work primarily proposes a new framework model which can be trained and adapt itself to new data and make accurate predictions. This work also throws some light on use of SVM’s methodology for text classifiers from the obtained traffic data. Finally, it emphasizes the uniqueness and adaptability of SVMs methodology appropriate for this kind of research work.Keywords: support vector mechanism (SVM), machine learning (ML), support vector machines (SVM), department of transportation (DFT)
Procedia PDF Downloads 2742660 Ultra-Poor Revisited: A Case of Southern Thailand
Authors: Sirirat Taneerananon
Abstract:
This paper presents the results of a study of the ultra-poor in the south of Thailand, revisited after 10 years since the original study in 2000. The original study was conducted in four provinces. The first two namely Phatthalung and Nakorn were chosen to represent the Thai Buddhists and the others, Satun and Pattani were chosen to represent the Thai Muslims. For this study, only the results from the three provinces except Pattani are reported as it was difficult and dangerous to conduct fieldwork in Pattani due to the continued unrest in the area since 2005. The objectives of the study are to find out the changes of the poverty situation after 10 years and to see the impacts of the poverty reduction projects implemented by the government on the poor. The research methodology used both quantitative and qualitative methods. The same villages in the four provinces studied in 1999 were again chosen. In each village, five ultra-poor people and heads of the villages were interviewed. The results show that the poverty situation of the ultra-poor groups has not changed much since they lacked the basic key factor to get themselves out of poverty: The ownership of land. Their chronic poverty situation has been passed on from the last generation. In the province of Phatthalung, the ultra-poor have improved in terms of economic situation because of the big increase in the price of rubber. However, the same could not be said for other provinces. Even though the government’s projects have not reduced the poverty directly, the projects have significantly contributed to the improvement of the quality of life of the poor and the people in the areas.Keywords: poverty, Southern Thailand, ultra-poor, social sustainability
Procedia PDF Downloads 2092659 A Geographical Spatial Analysis on the Benefits of Using Wind Energy in Kuwait
Authors: Obaid AlOtaibi, Salman Hussain
Abstract:
Wind energy is associated with many geographical factors including wind speed, climate change, surface topography, environmental impacts, and several economic factors, most notably the advancement of wind technology and energy prices. It is the fastest-growing and least economically expensive method for generating electricity. Wind energy generation is directly related to the characteristics of spatial wind. Therefore, the feasibility study for the wind energy conversion system is based on the value of the energy obtained relative to the initial investment and the cost of operation and maintenance. In Kuwait, wind energy is an appropriate choice as a source of energy generation. It can be used in groundwater extraction in agricultural areas such as Al-Abdali in the north and Al-Wafra in the south, or in fresh and brackish groundwater fields or remote and isolated locations such as border areas and projects away from conventional power electricity services, to take advantage of alternative energy, reduce pollutants, and reduce energy production costs. The study covers the State of Kuwait with an exception of metropolitan area. Climatic data were attained through the readings of eight distributed monitoring stations affiliated with Kuwait Institute for Scientific Research (KISR). The data were used to assess the daily, monthly, quarterly, and annual available wind energy accessible for utilization. The researchers applied the Suitability Model to analyze the study by using the ArcGIS program. It is a model of spatial analysis that compares more than one location based on grading weights to choose the most suitable one. The study criteria are: the average annual wind speed, land use, topography of land, distance from the main road networks, urban areas. According to the previous criteria, the four proposed locations to establish wind farm projects are selected based on the weights of the degree of suitability (excellent, good, average, and poor). The percentage of areas that represents the most suitable locations with an excellent rank (4) is 8% of Kuwait’s area. It is relatively distributed as follows: Al-Shqaya, Al-Dabdeba, Al-Salmi (5.22%), Al-Abdali (1.22%), Umm al-Hayman (0.70%), North Wafra and Al-Shaqeeq (0.86%). The study recommends to decision-makers to consider the proposed location (No.1), (Al-Shqaya, Al-Dabdaba, and Al-Salmi) as the most suitable location for future development of wind farms in Kuwait, this location is economically feasible.Keywords: Kuwait, renewable energy, spatial analysis, wind energy
Procedia PDF Downloads 1472658 Farmers Perception on the Level of Participation in Agricultural Project: The Case of a Community Garden Project in Imphendhle Municipality of Kwazulu-Natal Province, South Africa
Authors: Jorine T. Ndoro, Marietjie Van Der Merwe
Abstract:
Rural poverty remains a critical challenge in most developing countries and the participation of farmers in agricultural projects has taken a key role in development initiatives. Farmers’ participation in agricultural initiatives is crucial towards poverty alleviation and food security. Farmers’ involvement directly contributes towards sustainable agricultural development and livelihoods. This study focuses on investigating the perceptions of farmers’ participation in a community garden project. The study involved farmers belonging to community garden project in Imphendhle municipality in Mgungundlvu district of KwaZulu-Natal in South Africa. The study followed a qualitative research design using an interpretive research paradigm. The data was collected through conducting in-depth semi-structured interviews and a focus group was conducted with the eight farmers belonging to the community garden project. The findings show that the farmers are not involved in decision makings in the project. The farmers are passive participants. Participation of the farmers was mainly to carry out the activities from the extension officers. The study recommends that farmers be actively involved in projects and programmes introduced in their communities. Farmers’ active participation contributes to the sustainability of the projects through a sense of ownership.Keywords: farmers, participation, agricultural extension, community garden
Procedia PDF Downloads 2562657 Quantitative Analysis of Contract Variations Impact on Infrastructure Project Performance
Authors: Soheila Sadeghi
Abstract:
Infrastructure projects often encounter contract variations that can significantly deviate from the original tender estimates, leading to cost overruns, schedule delays, and financial implications. This research aims to quantitatively assess the impact of changes in contract variations on project performance by conducting an in-depth analysis of a comprehensive dataset from the Regional Airport Car Park project. The dataset includes tender budget, contract quantities, rates, claims, and revenue data, providing a unique opportunity to investigate the effects of variations on project outcomes. The study focuses on 21 specific variations identified in the dataset, which represent changes or additions to the project scope. The research methodology involves establishing a baseline for the project's planned cost and scope by examining the tender budget and contract quantities. Each variation is then analyzed in detail, comparing the actual quantities and rates against the tender estimates to determine their impact on project cost and schedule. The claims data is utilized to track the progress of work and identify deviations from the planned schedule. The study employs statistical analysis using R to examine the dataset, including tender budget, contract quantities, rates, claims, and revenue data. Time series analysis is applied to the claims data to track progress and detect variations from the planned schedule. Regression analysis is utilized to investigate the relationship between variations and project performance indicators, such as cost overruns and schedule delays. The research findings highlight the significance of effective variation management in construction projects. The analysis reveals that variations can have a substantial impact on project cost, schedule, and financial outcomes. The study identifies specific variations that had the most significant influence on the Regional Airport Car Park project's performance, such as PV03 (additional fill, road base gravel, spray seal, and asphalt), PV06 (extension to the commercial car park), and PV07 (additional box out and general fill). These variations contributed to increased costs, schedule delays, and changes in the project's revenue profile. The study also examines the effectiveness of project management practices in managing variations and mitigating their impact. The research suggests that proactive risk management, thorough scope definition, and effective communication among project stakeholders can help minimize the negative consequences of variations. The findings emphasize the importance of establishing clear procedures for identifying, assessing, and managing variations throughout the project lifecycle. The outcomes of this research contribute to the body of knowledge in construction project management by demonstrating the value of analyzing tender, contract, claims, and revenue data in variation impact assessment. However, the research acknowledges the limitations imposed by the dataset, particularly the absence of detailed contract and tender documents. This constraint restricts the depth of analysis possible in investigating the root causes and full extent of variations' impact on the project. Future research could build upon this study by incorporating more comprehensive data sources to further explore the dynamics of variations in construction projects.Keywords: contract variation impact, quantitative analysis, project performance, claims analysis
Procedia PDF Downloads 402656 Study of Physico-Chimical Properties of a Silty Soil
Authors: Moulay Smaïne Ghembaza, Mokhtar Dadouch, Nour-Said Ikhlef
Abstract:
Soil treatment is to make use soil that does not have the characteristics required in a given context. We limit ourselves in this work to the field of road earthworks where we have chosen to develop a local material in the region of Sidi Bel Abbes (Algeria). This material has poor characteristics not meeting the standards used in road geo technics. To remedy this, firstly, we were trying to improve the Proctor Standard characteristics of this material by mechanical treatment increasing the compaction energy. Then, by a chemical treatment, adding some cement dosages, our results show that this material classified A1h a increase maximum dry density and a reduction in the water content of compaction. A comparative study is made on the optimal properties of the material between the two modes of treatment. On the other hand, after treatment, one finds a decrease in the plasticity index and the methylene blue value. This material exhibits a change of class. Therefore, soil class CL turned into a soil class composed CL-ML (Silt of low plasticity). This observation allows this material to be used as backfill or sub grade.Keywords: treatment of soil, cement, subgrade, Atteberg limits, classification, optimum proctor properties
Procedia PDF Downloads 4722655 Durability Analysis of a Knuckle Arm Using VPG System
Authors: Geun-Yeon Kim, S. P. Praveen Kumar, Kwon-Hee Lee
Abstract:
A steering knuckle arm is the component that connects the steering system and suspension system. The structural performances such as stiffness, strength, and durability are considered in its design process. The former study suggested the lightweight design of a knuckle arm considering the structural performances and using the metamodel-based optimization. The six shape design variables were defined, and the optimum design was calculated by applying the kriging interpolation method. The finite element method was utilized to predict the structural responses. The suggested knuckle was made of the aluminum Al6082, and its weight was reduced about 60% in comparison with the base steel knuckle, satisfying the design requirements. Then, we investigated its manufacturability by performing foraging analysis. The forging was done as hot process, and the product was made through two-step forging. As a final step of its developing process, the durability is investigated by using the flexible dynamic analysis software, LS-DYNA and the pre and post processor, eta/VPG. Generally, a car make does not provide all the information with the part manufacturer. Thus, the part manufacturer has a limit in predicting the durability performance with the unit of full car. The eta/VPG has the libraries of suspension, tire, and road, which are commonly used parts. That makes a full car modeling. First, the full car is modeled by referencing the following information; Overall Length: 3,595mm, Overall Width: 1,595mm, CVW (Curve Vehicle Weight): 910kg, Front Suspension: MacPherson Strut, Rear Suspension: Torsion Beam Axle, Tire: 235/65R17. Second, the road is selected as the cobblestone. The road condition of the cobblestone is almost 10 times more severe than that of usual paved road. Third, the dynamic finite element analysis using the LS-DYNA is performed to predict the durability performance of the suggested knuckle arm. The life of the suggested knuckle arm is calculated as 350,000km, which satisfies the design requirement set up by the part manufacturer. In this study, the overall design process of a knuckle arm is suggested, and it can be seen that the developed knuckle arm satisfies the design requirement of the durability with the unit of full car. The VPG analysis is successfully performed even though it does not an exact prediction since the full car model is very rough one. Thus, this approach can be used effectively when the detail to full car is not given.Keywords: knuckle arm, structural optimization, Metamodel, forging, durability, VPG (Virtual Proving Ground)
Procedia PDF Downloads 4192654 Occupational Exposure to Polycyclic Aromatic Hydrocarbons (Pha) among Asphalt and Road Paving Workers
Authors: Boularas El Alia, H. Rezk-Allah, S. Chaoui, A. Chama, B. Rezk-Allah
Abstract:
Aims: To assess the current exposure to the PHA among various workers in the sector of asphalt and road paving. Methods: The assessment of the exposure to PHA has been performed on workers (n=14) belonging to two companies, allocated into several activities such as road paving, manufacturing of coated bituminous warm, manufacturing of asphalt cut-back, manufacturing of emulsion of asphalt. A group of control subjects (n=18) was associated. The internal exposure to PHA was investigated by measurement of the urinary excretion of 2-naphtol, urine metabolite of naphtalene, one of the biomarkers of total PHA exposure. Urine samples were collected from the exposed workers, at the beginning of the week, at the beginning of the work shift (BWBS) and at the end of the work shift, at the end of the week (ESEW). In the control subjects, single samples of urine were collected after the end of the work shift.Every subject was invited to answer a questionnaire for the collection of technical and medical data as well as smoking habits and food intake. The concentration of 2-naphtol in the hydrolysate of urine was determined spectrophotometrically, after its reaction with the Fast Blue BB salt (diazotized 4-benzoylamino-2,5-diethoxyaniline). Results: For all the workers included in the study, the 2-urinary naphtol concentrations were higher than those in the control subjects (Median=9,55 µg/g creatinine) whether it is at (BWBS) (Md=16,2 µg/g creatinine) or at (ESEW) (n=18,Median=32,22 µg/g creatinine). Considerable differences are observed according to the category of job. The concentrations are also higher among smokers. Conclusion:The results show a significant exposure, mainly during manual laying, reveals an important risk particularly for the respiratory system.Considering the current criteria, carcinogenic risk due to the PHA seems not insignificant.Keywords: PHA, asphalt, assessment, occupational, exposure
Procedia PDF Downloads 4782653 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures
Authors: Sunaitan Al Mutairi
Abstract:
A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays
Procedia PDF Downloads 3182652 Investigating of the Fuel Consumption in Construction Machinery and Ways to Reduce Fuel Consumption
Authors: Reza Bahboodian
Abstract:
One of the most important factors in the use of construction machinery is the fuel consumption cost of this equipment. The use of diesel engines in off-road vehicles is an important source of nitrogen oxides and particulate matter. Emissions of nitrogen oxides and particulate matter 10 in off-road vehicles (construction and mining) may be high. Due to the high cost of fuel, it is necessary to minimize fuel consumption. Factors affecting the fuel consumption of these cars are very diverse. Climate changes such as changes in pressure, temperature, humidity, fuel type selection, type of gearbox used in the car are effective in fuel consumption and pollution, and engine efficiency. In this paper, methods for reducing fuel consumption and pollutants by considering valid European and European standards are examined based on new methods such as hybridization, optimal gear change, adding hydrogen to diesel fuel, determining optimal working fluids, and using oxidation catalysts.Keywords: improve fuel consumption, construction machinery, pollutant reduction, determining the optimal working cycle
Procedia PDF Downloads 1612651 Classic Modelled Hybrid Electric Vehicles Using The Power of Internet Of Things
Authors: Venkatesh Krishna Murthy
Abstract:
The era before government-regulated automotive designs gave us some astonishing vehicles that are well worth to keep on the road. The fact that restoring an automobile in 2015 does not mean it will perform like one designed in 2021. This is one of the reasons that manufacturers continue to turn to vintage hardware for future enhancements in their vehicles. Now we need to understand that a modern chassis could possibly allow manufacturers to give vintage performance cars a level of braking capability, compatibility with tires, chassis rigidity, suspension sophistication, and steering response, an experience only racers got until now. However, half a century of advancements in engineering can have a great impact on design in any field, and the automotive realm which holds no exception. In the current situation, a growing number of companies offer chassis and braking components to onboard manufacturers to retrofit contemporary technology for their vintage vehicles to modernize them at the foundation level. The recent question arises on performance on lithium batteries, as opposed to simply bolting upgraded components, for ex. lithium batteries with graphene as superconductive material to enhance performance, an area deeply investigated. Serving as the “bones” of the vehicle, the chassis and frame play a central role in dictating how that automobile will perform. While the desire to maintain originality is alluring for many, the benefits of a modern chassis are vast. In some situations, it also allows builders to put cars back on the road that might otherwise be too far gone. “There’s a couple of different factors at play here – one of them being that these older cars from the ’40s, ’50s, and ’60s have seen a lot of weather and a lot of road miles over the years, more often than not,” says Craig Morrison of Art Morrison Enterprises.Keywords: hybrid electric vehicles, internet of things, lithium graphene batteries, classic car chassis
Procedia PDF Downloads 1712650 Urban Gamification: Analyzing the Effects of UFLab’s Tangible Gamified Tools in Four Hungarian Urban Public Participation Processes
Authors: Olivia Kurucz
Abstract:
Gamification is one of the outstanding new methodological possibilities of urban public participation processes to make the most informed decision possible for the future steps of urban development. This paper examines four Hungarian experimental projects in which gamified tools were applied during the public participation progresses by the Urban Future Laboratory (UFLab) research workshop of Budapest University of Technology and Economics (BUTE). The recently implemented future planning projects (in the cities of Pécel, Kistarcsa, Budapest, and Salgótarján) were initiated by various motives, but the multi-stakeholder dialogues were facilitated through physical gamified tools in all cases. Based on the urban gamification hypothesis, the use of gamified tools supported certain steps of participatory processes in several aspects: it helped to increase the attractiveness of public events, to create a more informal atmosphere, to ensure equal conditions for actors, to recall a design mindset, to bridge contrasting social or cultural differences, to fix opinions and to assist dialogue between city actors, designers, and residents. This statement is confirmed by assessing the applied tools, analyzing the case studies, and comparing them to perceive their effects and interrelations.Keywords: experimental projects, future planning, gamification, gamified tools, Hungary, public participation, UFLab, urban gamification
Procedia PDF Downloads 1382649 Monitoring and Evaluation of the Distributed Agricultural Machinery of the Department of Agriculture Using a Web-Based Information System with a Short Messaging Service Technology
Authors: Jimmy L. Caldoza, Erlito M. Albina
Abstract:
Information Systems are increasingly being used to monitor and assess government projects as well as improve transparency and combat corruption. With reference to existing information systems relevant to monitoring and evaluation systems adopted by various government agencies from other countries, this research paper aims to help the Philippine government, particularly the Department of Agriculture, in assessing the impact of their programs and projects on their target beneficiaries through the development of the web-based Monitoring and Evaluation Information System with the application of a short messaging system (sms) technology.Keywords: monitoring and evaluation system, web-based information system, short messaging system technology, database structure and management
Procedia PDF Downloads 1472648 Evaluation of Aggregate Risks in Sustainable Manufacturing Using Fuzzy Multiple Attribute Decision Making
Authors: Gopinath Rathod, Vinod Puranik
Abstract:
Sustainability is regarded as a key concept for survival in the competitive scenario. Industrial risk and diversification of risk type’s increases with industrial developments. In the context of sustainable manufacturing, the evaluation of risk is difficult because of the incomplete information and multiple indicators. Fuzzy Multiple Attribute Decision Method (FMADM) has been used with a three level hierarchical decision making model to evaluate aggregate risk for sustainable manufacturing projects. A case study has been presented to reflect the risk characteristics in sustainable manufacturing projects.Keywords: sustainable manufacturing, decision making, aggregate risk, fuzzy logic, fuzzy multiple attribute decision method
Procedia PDF Downloads 5192647 Comparison of Hydrogen and Electrification Perspectives in Decarbonizing the Transport Sector
Authors: Matteo Nicoli, Gianvito Colucci, Valeria Di Cosmo, Daniele Lerede, Laura Savoldi
Abstract:
The transport sector is currently responsible for approximately 1/3 of greenhouse gas emissions in Europe. In the wider context of achieving carbon neutrality of the global energy system, different alternatives are available to decarbonizethe transport sector. In particular, while electricity is already the most consumed energy commodity in rail transport, battery electric vehicles are one of the zero-emissions options on the market for road transportation. On the other hand, hydrogen-based fuel cell vehicles are available for road and non-road vehicles. The European Commission is strongly pushing toward the integration of hydrogen in the energy systems of European countries and its widespread adoption as an energy vector to achieve the Green Deal targets. Furthermore, the Italian government is defining hydrogen-related objectives with the publication of a dedicated Hydrogen Strategy. The adoption of energy system optimization models to study the possible penetration of alternative zero-emitting transport technologies gives the opportunity to perform an overall analysis of the effects that the development of innovative technologies has on the entire energy system and on the supply-side, devoted to the production of energy carriers such as hydrogen and electricity. Using an open-source modeling framework such as TEMOA, this work aims to compare the role of hydrogen and electric vehicles in the decarbonization of the transport sector. The analysis investigates the advantages and disadvantages of adopting the two options, from the economic point of view (costs associated with the two options) and the environmental one (looking at the emissions reduction perspectives). Moreover, an analysis on the profitability of the investments in hydrogen and electric vehicles will be performed. The study investigates the evolution of energy consumption and greenhouse gas emissions in different transportation modes (road, rail, navigation, and aviation) by detailed analysis of the full range of vehicles included in the techno-economic database used in the TEMOA model instance adopted for this work. The transparency of the analysis is guaranteed by the accessibility of the TEMOA models, based on an open-access source code and databases.Keywords: battery electric vehicles, decarbonization, energy system optimization models, fuel cell vehicles, hydrogen, open-source modeling, TEMOA, transport
Procedia PDF Downloads 1122646 A Study on Factors Affecting (Building Information Modelling) BIM Implementation in European Renovation Projects
Authors: Fatemeh Daneshvartarigh
Abstract:
New technologies and applications have radically altered construction techniques in recent years. In order to anticipate how the building will act, perform, and appear, these technologies encompass a wide range of visualization, simulation, and analytic tools. These new technologies and applications have a considerable impact on completing construction projects in today's (architecture, engineering and construction)AEC industries. The rate of changes in BIM-related topics is different worldwide, and it depends on many factors, e.g., the national policies of each country. Therefore, there is a need for comprehensive research focused on a specific area with common characteristics. Therefore, one of the necessary measures to increase the use of this new approach is to examine the challenges and obstacles facing it. In this research, based on the Delphi method, at first, the background and related literature are reviewed. Then, using the knowledge obtained from the literature, a primary questionnaire is generated and filled by experts who are selected using snowball sampling. It covered the experts' attitudes towards implementing BIM in renovation projects and their view of the benefits and obstacles in this regard. By analyzing the primary questionnaire, the second group of experts is selected among the participants to be interviewed. The results are analyzed using Theme analysis. Six themes, including Management support, staff resistance, client willingness, Cost of software and implementation, the difficulty of implementation, and other reasons, are obtained. Then a final questionnaire is generated from the themes and filled by the same group of experts. The result is analyzed by the Fuzzy Delphi method, showing the exact ranking of the obtained themes. The final results show that management support, staff resistance, and client willingness are the most critical barrier to BIM usage in renovation projects.Keywords: building information modeling, BIM, BIM implementation, BIM barriers, BIM in renovation
Procedia PDF Downloads 166