Search results for: offshore island
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 757

Search results for: offshore island

727 Investigating the Effective Physical Factors in the Development of Coastal Ecotourism in Southern Islands of Iran: A Case Study of Hendurabi Island, Iran

Authors: Zahra Khodaee

Abstract:

Background and Objective: The attractive potential for tourism in the southern islands of Iran, Kish, and Qeshm and recently Hendurabi, are becoming more and more popular and object of increased attention from the investors. The Iranian coral reef islands, with the exception of Kish and Qeshm, have not undergone sufficient development. The southern islands of Iran have faced two problems with climate change and the desire for the presence of tourists. The lack of proper planning, inefficient management, and lack of adequate knowledge of ecosystems of offshore regions have severely damaged the world natural heritage. This study was conducted to consider the correlation of tourism, development, and ecosystem because there is a need for further addressing the ecotourism in coral islands. Method: Through qualitative research, this paper was used of library studies and field studies and surveying to study the physical (objective-subjective) physical factors of ecotourism development in Honduran Island. Using SPSS software and descriptive-analytical method was shown the results. The survey was conducted with the participation of 150 tourists on Kish islands, who were chosen at random and who expressed their desire to travel to Hendurabi Island. Information was gathered using SPSS software and unique statistical T-test. The questionnaire was put together using AMOS software to ensure that the questions asked were sufficiently relevant. Findings: The results of this study presented that physical factors affecting the development of ecotourism in two categories are objective and subjective factors because IFI factor = 0.911 and CFI Factor = 0.907 into the target community. Discussion and conclusion: The results were satisfactory in that they showed that eco-tourists attached importance to see views, quiet, secluded areas, tranquility security, quality of the area being visited, easy access to services these were the top criteria for those visiting the area while they adhere to environmental compliance. Developing Management of these regions should maintain appropriate utilization along with sustainable and ecological responsibility.

Keywords: ecotourism, coral reef island, development management, Hendurabi Island

Procedia PDF Downloads 117
726 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: wind energy project, uncertain resources, risks, Monte Carlo simulation

Procedia PDF Downloads 333
725 Reducing the Urban Heat Island Effect by Urban Design Strategies: Case Study of Aksaray Square in Istanbul

Authors: Busra Ekinci

Abstract:

Urban heat island term becomes one of the most important problem in urban areas as a reflection of global warming in local scale last years. Many communities and governments are taking action to reduce heat island effects on urban areas where the half of the world's population live today. At this point, urban design turned out to be an important practice and research area for providing an environmentally sensitive urban development. In this study, mitigating strategies of urban heat island effects by urban design are investigated in Aksaray Square and surroundings in Istanbul. Aksaray is an important historical and commercial center of Istanbul, which has an increasing density due to be the node of urban transportation. Also, Istanbul Metropolitan Municipality prepared an urban design project to respond the needs of growing population in the area for 2018. The purpose of the study is emphasizing the importance of urban design objectives and strategies that are developed to reduce the heat island effects on urban areas. Depending on this, the urban heat island effect of the area was examined based on the albedo (reflectivity) parameter which is the most effective parameter in the formation of the heat island effect in urban areas. Albedo values were calculated by Albedo Viewer web application model that was developed by Energy and Environmental Engineering Department of Kyushu University in Japan. Albedo parameter had examined for the present situation and the planned situation with urban design project. The results show that, the current area has urban heat island potential. With the Aksaray Square Project, the heat island effect on the area can be reduced, but would not be completely prevented. Therefore, urban design strategies had been developed to reduce the island effect in addition to the urban design project of the area. This study proves that urban design objectives and strategies are quite effective to reduce the heat island effects, which negatively affect the social environment and quality of life in urban areas.

Keywords: Albedo, urban design, urban heat island, sustainable design

Procedia PDF Downloads 555
724 Techno-Economic Analysis of Offshore Hybrid Energy Systems with Hydrogen Production

Authors: Anna Crivellari, Valerio Cozzani

Abstract:

Even though most of the electricity produced in the entire world still comes from fossil fuels, new policies are being implemented in order to promote a more sustainable use of energy sources. Offshore renewable resources have become increasingly attractive thanks to the huge entity of power potentially obtained. However, the intermittent nature of renewables often limits the capacity of the systems and creates mismatches between supply and demand. Hydrogen is foreseen to be a promising vector to store and transport large amounts of excess renewable power by using existing oil and gas infrastructure. In this work, an offshore hybrid energy system integrating wind energy conversion with hydrogen production was conceptually defined and applied to offshore gas platforms. A techno-economic analysis was performed by considering two different locations for the installation of the innovative power system, i.e., the North Sea and the Adriatic Sea. The water depth, the distance of the platform from the onshore gas grid, the hydrogen selling price and the green financial incentive were some of the main factors taken into account in the comparison. The results indicated that the use of well-defined indicators allows to capture specifically different cost and revenue features of the analyzed systems, as well as to evaluate their competitiveness in the actual and future energy market.

Keywords: cost analysis, energy efficiency assessment, hydrogen production, offshore wind energy

Procedia PDF Downloads 107
723 Windstorm Risk Assessment for Offshore Wind Farms in the North Sea

Authors: Paul Buchana, Patrick E. Mc Sharry

Abstract:

In 2017 there will be about 38 wind farms in the North Sea belonging to 5 different countries. The North Sea is ideal for offshore wind power generation and is thus attractive to offshore wind energy developers and investors. With concerns about the potential for offshore wind turbines to sustain substantial damage as a result of extreme weather conditions, particularly windstorms, this poses a unique challenge to insurers and reinsurers as to adequately quantify the risk and offer appropriate insurance cover for these assets. The need to manage this risk also concerns regulators, who provide the oversight needed to ensure that if a windstorm or a series of storms occur in this area over a one-year time frame, the insurers of these assets in the EU remain solvent even after meeting consequent damage costs. In this paper, using available European windstorm data for the past 33 years and actual wind farm locations together with information pertaining to each of the wind farms (number of turbines, total capacity and financial value), we present a Monte Carlo simulation approach to assess the number of turbines that would be buckled in each of the wind farms using maximum wind speeds reaching each of them. These wind speeds are drawn from historical windstorm data. From the number of turbines buckled, associated financial loss and output capacity can be deduced. The results presented in this paper are targeted towards offshore wind energy developers, insurance and reinsurance companies and regulators.

Keywords: catastrophe modeling, North Sea wind farms, offshore wind power, risk analysis

Procedia PDF Downloads 276
722 Stable Isotope Analysis of Faunal Remains of Ancient Kythnos Island for Paleoenvironmental Reconstruction

Authors: M. Tassi, E. Dotsika, P. Karalis, A. Trantalidou, A. Mazarakis Ainian

Abstract:

The Kythnos Island in Greece is of particular archaeological interest, as it has been inhabited from the 12th BC until the 7th AD. From island excavations, numerous faunal and human skeletal remains have been recovered. This work is the first attempt at the paleoenvironmental reconstruction of the island via stable isotope analysis. Specifically, we perform 13C and 18O isotope analysis in faunal bone apatite in order to investigate the climate conditions that prevailed in the area. Additionally, we conduct 13C and 15N isotope analysis in faunal bone collagen, which will constitute the baseline for the subsequent diet reconstruction of the ancient Kythnos population.

Keywords: stable isotopes analysis, bone collagen stable isotope analysis, bone apatite stable isotope analysis, paleodiet, palaeoclimate

Procedia PDF Downloads 122
721 Designing Offshore Pipelines Facing the Geohazard of Active Seismic Faults

Authors: Maria Trimintziou, Michael Sakellariou, Prodromos Psarropoulos

Abstract:

Nowadays, the exploitation of hydrocarbons reserves in deep seas and oceans, in combination with the need to transport hydrocarbons among countries, has made the design, construction and operation of offshore pipelines very significant. Under this perspective, it is evident that many more offshore pipelines are expected to be constructed in the near future. Since offshore pipelines are usually crossing extended areas, they may face a variety of geohazards that impose substantial permanent ground deformations (PGDs) to the pipeline and potentially threaten its integrity. In case of a geohazard area, there exist three options to proceed. The first option is to avoid the problematic area through rerouting, which is usually regarded as an unfavorable solution due to its high cost. The second is to apply (if possible) mitigation/protection measures in order to eliminate the geohazard itself. Finally, the last appealing option is to allow the pipeline crossing through the geohazard area, provided that the pipeline will have been verified against the expected PGDs. In areas with moderate or high seismicity the design of an offshore pipeline is more demanding due to the earthquake-related geohazards, such as landslides, soil liquefaction phenomena, and active faults. It is worthy to mention that although worldwide there is a great experience in offshore geotechnics and pipeline design, the experience in seismic design of offshore pipelines is rather limited due to the fact that most of the pipelines have been constructed in non-seismic regions (e.g. North Sea, West Australia, Gulf of Mexico, etc.). The current study focuses on the seismic design of offshore pipelines against active faults. After an extensive literature review of the provisions of the seismic norms worldwide and of the available analytical methods, the study simulates numerically (through finite-element modeling and strain-based criteria) the distress of offshore pipelines subjected to PGDs induced by active seismic faults at the seabed. Factors, such as the geometrical properties of the fault, the mechanical properties of the ruptured soil formations, and the pipeline characteristics, are examined. After some interesting conclusions regarding the seismic vulnerability of offshore pipelines, potential cost-effective mitigation measures are proposed taking into account constructability issues.

Keywords: offhore pipelines, seismic design, active faults, permanent ground deformations (PGDs)

Procedia PDF Downloads 561
720 Comparison of Radiated Emissions in Offshore and Onshore Wind Turbine Towers

Authors: Sajeesh Sulaiman, Gomathisankar A., Aravind Devaraj, Aswin R., Vijay Kumar G., Rachana Raj

Abstract:

Wind turbines are the next big answer to the emerging and ever-growing demand for electricity, and this need is increasing day by day. These high mast structures, whether on land or on the sea, has also become one of the big sources of electromagnetic interferences (EMI) in the not so distant past. With the emergence of the AC-AC converter and drawing of large power cables through the wind turbine towers has made this clean and efficient source of renewable energy to become one of the culprits in creating electromagnetic interference. This paper will present the sources of such EMIs, a comparison of radiated emissions (both electric and magnetic field) patterns in wind turbine towers for both onshore and offshore wind turbines and close look into the IEC 61400-40 (new standard for EMC design on wind turbine). At present, offshore wind turbines are tested in onshore facilities. This paper will present the anomaly in results for offshore wind turbines when tested in onshore, which the existing standards and the upcoming standards have failed to address.

Keywords: emissions, electric field, magnetic field, wind turbine, tower, standards and regulations

Procedia PDF Downloads 224
719 Evaluation of a Hybrid System for Renewable Energy in a Small Island in Greece

Authors: M. Bertsiou, E. Feloni, E. Baltas

Abstract:

The proper management of the water supply and electricity is the key issue, especially in small islands, where sustainability has been combined with the autonomy and covering of water needs and the fast development in potential sectors of economy. In this research work a hybrid system in Fournoi island (Icaria), a small island of Aegean, has been evaluated in order to produce hydropower and cover water demands, as it can provide solutions to acute problems, such as the water scarcity or the instability of local power grids. The meaning and the utility of hybrid system and the cooperation with a desalination plant has also been considered. This kind of project has not yet been widely applied, so the consideration will give us valuable information about the storage of water and the controlled distribution of the generated clean energy. This process leads to the conclusions about the functioning of the system and the profitability of this project, covering the demand for water and electricity.

Keywords: hybrid system, water, electricity, island

Procedia PDF Downloads 301
718 Techno-Economic Prospects of High Wind Energy Share in Remote vs. Interconnected Island Grids

Authors: Marina Kapsali, John S. Anagnostopoulos

Abstract:

On the basis of comparative analysis of alternative “development scenarios” for electricity generation, the main objective of the present study is to investigate the techno-economic viability of high wind energy (WE) use at the local (island) level. An integrated theoretical model is developed based on first principles assuming two main possible scenarios for covering future electrification needs of a medium–sized Greek island, i.e. Lesbos. The first scenario (S1), assumes that the island will keep using oil products as the main source for electricity generation. The second scenario (S2) involves the interconnection of the island with the mainland grid to satisfy part of the electricity demand, while remarkable WE penetration is also achieved. The economic feasibility of the above solutions is investigated in terms of determining their Levelized Cost of Energy (LCOE) for the time-period 2020-2045, including also a sensitivity analysis on the worst/reference/best Cases. According to the results obtained, interconnection of Lesbos Island with the mainland grid (S2) presents considerable economic interest in comparison to autonomous development (S1) with WE having a prominent role to this effect.

Keywords: electricity generation cost, levelized cost of energy, mainland, wind energy surplus

Procedia PDF Downloads 321
717 Channel Dynamics along the Northern Bank of the Upper Brahmaputra River and Formation of a Larger Island with the Loss of the Majuli Island

Authors: Luna Moni Das

Abstract:

This paper is an attempt to study the channel dynamics in the area bounded by the foothills of the eastern Himalayas in the north, the Brahmaputra in the south and southeast and eastern side and the Subansiri River in the west. There are many streams in this region and only a few are perennial. There are two major anabranches of the Brahmaputra called Kharkutia Xuti and Charikoria. All of these makes it a very dynamic area. The analysis done in this paper is based on the remote sensing data and mapping of the channel planforms in GIS environment. The temporal trend of the change in channel planform has been produced. This study shows that, during the period from 1973 to 2013, the streams/rivers originating in the north have experienced a reduction in the total length. The other most important result is that even though the western edge of Majuli Island is eroding faster there is a formation of a larger island in between Charikoria and Brahmaputra, that comprises of Majuli island and parts of Dhakuakhana subdivision of Lakhimpur District along the south of Charikoria river. The field study shows that the Kharkutia Xuti, that divides Majuli from Dhakuakhana, do not experience any flow from the Brahmaputra for the major portion of the year and Charikoria has developed as a major anabranch of the Brahmaputra.

Keywords: channel dynamics, Brahmaputra river, Majuli Island, sinuosity

Procedia PDF Downloads 101
716 Site Suitability of Offshore Wind Energy: A Combination of Geographic Referenced Information and Analytic Hierarchy Process

Authors: Ayat-Allah Bouramdane

Abstract:

Power generation from offshore wind energy does not emit carbon dioxide or other air pollutants and therefore play a role in reducing greenhouse gas emissions from the energy sector. In addition, these systems are considered more efficient than onshore wind farms, as they generate electricity from the wind blowing across the sea, thanks to the higher wind speed and greater consistency in direction due to the lack of physical interference that the land or human-made objects can present. This means offshore installations require fewer turbines to produce the same amount of energy as onshore wind farms. However, offshore wind farms require more complex infrastructure to support them and, as a result, are more expensive to construct. In addition, higher wind speeds, strong seas, and accessibility issues makes offshore wind farms more challenging to maintain. This study uses a combination of Geographic Referenced Information (GRI) and Analytic Hierarchy Process (AHP) to identify the most suitable sites for offshore wind farm development in Morocco, with a particular focus on the Dakhla city. A range of environmental, socio-economic, and technical criteria are taken into account to solve this complex Multi-Criteria Decision-Making (MCDM) problem. Based on experts' knowledge, a pairwise comparison matrix at each level of the hierarchy is performed, and fourteen sub-criteria belong to the main criteria have been weighted to generate the site suitability of offshore wind plants and obtain an in-depth knowledge on unsuitable areas, and areas with low-, moderate-, high- and very high suitability. We find that wind speed is the most decisive criteria in offshore wind farm development, followed by bathymetry, while proximity to facilities, the sediment thickness, and the remaining parameters show much lower weightings rendering technical parameters most decisive in offshore wind farm development projects. We also discuss the potential of other marine renewable energy potential, in Morocco, such as wave and tidal energy. The proposed approach and analysis can help decision-makers and can be applied to other countries in order to support the site selection process of offshore wind farms.

Keywords: analytic hierarchy process, dakhla, geographic referenced information, morocco, multi-criteria decision-making, offshore wind, site suitability

Procedia PDF Downloads 125
715 Impact Study on a Load Rich Island and Development of Frequency Based Auto-Load Shedding Scheme to Improve Service Reliability of the Island

Authors: Md. Shafiullah, M. Shafiul Alam, Bandar Suliman Alsharif

Abstract:

Electrical quantities such as frequency, voltage, current are being fluctuated due to abnormalities in power system. Most of the abnormalities cause fluctuation in system frequency and sometimes extreme abnormalities lead to system blackout. To protect the system from complete blackout planned and proper islanding plays a very important role even in case of extreme abnormalities. Islanding operation not only helps stabilizing a faulted system but also supports power supplies to critical and important loads, in extreme emergency. But the islanding systems are weaker than integrated system so the stability of islands is the prime concern when an integrated system is disintegrated. In this paper, different impacts on a load rich island have been studied and a frequency based auto-load shedding scheme has been developed for sudden load addition, generation outage and combined effect of both to the island. The developed scheme has been applied to Khulna-Barisal Island to validate the effectiveness of the developed technique. Various types of abnormalities to the test system have been simulated and for the simulation purpose CYME PSAF (Power System Analysis Framework) has been used.

Keywords: auto load shedding, FS&FD relay, impact study, island, PSAF, ROCOF

Procedia PDF Downloads 437
714 Construction Port Requirements for Floating Wind Turbines

Authors: Alan Crowle, Philpp Thies

Abstract:

As the floating offshore wind turbine industry continues to develop and grow, the capabilities of established port facilities need to be assessed as to their ability to support the expanding construction and installation requirements. This paper assesses current infrastructure requirements and projected changes to port facilities that may be required to support the floating offshore wind industry. Understanding the infrastructure needs of the floating offshore renewable industry will help to identify the port-related requirements. Floating Offshore Wind Turbines can be installed further out to sea and in deeper waters than traditional fixed offshore wind arrays, meaning that it can take advantage of stronger winds. Separate ports are required for substructure construction, fit-out of the turbines, moorings, subsea cables and maintenance. Large areas are required for the laydown of mooring equipment; inter-array cables, turbine blades and nacelles. The capabilities of established port facilities to support floating wind farms are assessed by evaluation of the size of substructures, the height of wind turbine with regards to the cranes for fitting of blades, distance to offshore site and offshore installation vessel characteristics. The paper will discuss the advantages and disadvantages of using large land-based cranes, inshore floating crane vessels or offshore crane vessels at the fit-out port for the installation of the turbine. Water depths requirements for import of materials and export of the completed structures will be considered. There are additional costs associated with any emerging technology. However part of the popularity of Floating Offshore Wind Turbines stems from the cost savings against permanent structures like fixed wind turbines. Floating Offshore Wind Turbine developers can benefit from lighter, more cost-effective equipment which can be assembled in port and towed to the site rather than relying on large, expensive installation vessels to transport and erect fixed bottom turbines. The ability to assemble Floating Offshore Wind Turbines equipment onshore means minimizing highly weather-dependent operations like offshore heavy lifts and assembly, saving time and costs and reducing safety risks for offshore workers. Maintenance might take place in safer onshore conditions for barges and semi-submersibles. Offshore renewables, such as floating wind, can take advantage of this wealth of experience, while oil and gas operators can deploy this experience at the same time as entering the renewables space The floating offshore wind industry is in the early stages of development and port facilities are required for substructure fabrication, turbine manufacture, turbine construction and maintenance support. The paper discusses the potential floating wind substructures as this provides a snapshot of the requirements at the present time, and potential technological developments required for commercial development. Scaling effects of demonstration-scale projects will be addressed, however, the primary focus will be on commercial-scale (30+ units) device floating wind energy farms.

Keywords: floating wind, port, marine construction, offshore renewables

Procedia PDF Downloads 260
713 Towards Automated Remanufacturing of Marine and Offshore Engineering Components

Authors: Aprilia, Wei Liang Keith Nguyen, Shu Beng Tor, Gerald Gim Lee Seet, Chee Kai Chua

Abstract:

Automated remanufacturing process is of great interest in today’s marine and offshore industry. Most of the current remanufacturing processes are carried out manually and hence they are error prone, labour-intensive and costly. In this paper, a conceptual framework for automated remanufacturing is presented. This framework involves the integration of 3D non-contact digitization, adaptive surface reconstruction, additive manufacturing and machining operation. Each operation is operated and interconnected automatically as one system. The feasibility of adaptive surface reconstruction on marine and offshore engineering components is also discussed. Several engineering components were evaluated and the results showed that this proposed system is feasible. Conclusions are drawn and further research work is discussed.

Keywords: adaptive surface reconstruction, automated remanufacturing, automatic repair, reverse engineering

Procedia PDF Downloads 303
712 Performance and Breeding Potency of Local Buffalo in Kangean Island, Sumenep, East Java, Indonesia

Authors: A. Nurgiartiningsih, G. Ciptadi, S. B. Siswijono

Abstract:

This research was done to identify the performance and breeding potency of Local Buffalo in Kangean Island, Sumenep, East Java, Indonesia. Materials used were buffalo and farmer in Kangean Island. Method used was survey with purposive sampling method. Qualitative trait and existing breeding system including the type of production system were directly observed. Quantitative trait consisted of chest girth, body weight and wither height were measured and recorded. Data were analyzed using analysis of variance applying software GENSTAT 14. Results showed the purposes of buffalo breeding in Kangean Island were for production of calves, saving, religion tradition, and buffalo racing. The combination between grazing and cut and carry system were applied in Kangean Island. Forage, grass and agricultural waste product were available abundantly especially, during the wet season. Buffalo in Kangean Island was categorized as swamp buffalo with 48 chromosomes. Observation on qualitative trait indicated that there were three skin color types: gray (81.25%), red (10.42%) and white/albino (8.33%). Analysis on quantitative trait showed that there was no significant difference between male and female buffalo. The performance of male buffalo was 132.56 cm, 119.33 cm and 174.11 cm, for the mean of body length, whither height and chest girth, respectively. The performance of female buffalo were 129.8 cm, 114.0 cm and 166.2 cm, for mean of body length, wither height and chest girth (CG), respectively. The performance of local buffalo in Kangean Island was categorized well. Kangean Island could be promoted as center of buffalo breeding and conservation. For optimal improvement of population number and its genetics value, government policy in buffalo breeding program should be implemented.

Keywords: chromosome, qualitative trait, quantitative trait, swamp buffalo

Procedia PDF Downloads 240
711 Indonesia: Top Five Tax Haven Countries as the Strategy to Tax Avoidance

Authors: Maya Safira Dewi

Abstract:

Indonesia is one in the top ten countries most funds flowing into Tax Haven. Illegal funds flowing out of Indonesia reached USD 10.9 billion per year. While the total to 2010 of the Indonesian financial assets are in tax havens from Indonesia amounted to USD 331 billion (Kar and Freitas, 2012). Singapore, Netherlands, Virgin Island, Mauritius and Cayman Island are the highest countries that became the location of companies affiliated with the company listed in Indonesia Stock Exchange. The 469 companies listed on the stock exchange there are 128 companies (27.29%) with overseas entities, listed total overseas affiliated companies amounted to 417 firms in 2012 and 415 companies in 2011. The most of the branches or the parent company are located in Singapore, Netherlands, Virgin Island, Mauritius and Cayman Island. Judging from the existing tax provisions in these countries, have corporate tax rates that is lower than Indonesia. Tax avoidance to tax haven countries can be made by using some Strategies. They are transfer pricing, shopping treaty, thin capitalization and the controlled foreign company. Singapore, Netherlands, Virgin Island, Mauritius and Cayman Island are tax haven countries which become a tax heaven for Indonesian tax payer. It can be concluded that tax havens are a serious problem for Indonesia, and the need for a more assertive policy establishment and more detail about tax havens.

Keywords: tax avoidance, tax haven, transfer pricing, tax rate, tax payer

Procedia PDF Downloads 387
710 Bearing Behavior of a Hybrid Monopile Foundation for Offshore Wind Turbines

Authors: Zicheng Wang

Abstract:

Offshore wind energy provides a huge potential for the expansion of renewable energies to the coastal countries. High demands are required concerning the shape and type of foundations for offshore wind turbines (OWTs) to find an economically, technically and environmentally-friendly optimal solution. A promising foundation concept is the hybrid foundation system, which consists of a steel plate attached to the outer side of a hollow steel pipe pile. In this study, the bearing behavior of a large diameter foundation is analyzed using a 3-dimensional finite element (FE) model. Non-linear plastic soil behavior is considered. The results of the numerical simulations are compared to highlight the priority of the hybrid foundation to the conventional monopile foundation.

Keywords: hybrid foundation system, mechanical parameters, plastic soil behaviors, numerical simulations

Procedia PDF Downloads 95
709 Advantages of Electrifying Offshore Compression System

Authors: Siva Sankara Arudra, Kamaruzaman Baharuddin, Ir. Ahmed Fadzil Mustafa Kamal, Ir. Abdul Latif Mohamed

Abstract:

The advancement of electrical and electronics technologies has rewarded the oil and gas industry with great opportunities to embed more environmentally solutions into design. Most offshore oil and gas producers have their engineering and production asset goals to promote greater use of environmentally friendly compression system technologies to eliminate hazardous emissions from conventional gas compressor drivers. Therefore, this paper comprehensively elaborates the parametric study conducted in integrating the latest electrical and electronics drives technology into the existing compression system. This study was conducted in aspects of layout, reliability & availability, maintainability, emission, and cost. An existing offshore facility that utilized gas turbines as the driver for gas compression was set as Conventional Case for this study. The Electrification Case will utilize electric motor drives as the driver for the compression system. Findings from this study indicate more advantages in driver electrification compared to conventional compression systems. The findings of this paper can be set as a benchmark for future offshore driver selection for gas compression systems of similar operating parameters and power range.

Keywords: turbomachinery, electrification, emission, compression system

Procedia PDF Downloads 120
708 Climate Change Results in Increased Accessibility of Offshore Wind Farms for Installation and Maintenance

Authors: Victoria Bessonova, Robert Dorrell, Nina Dethlefs, Evdokia Tapoglou, Katharine York

Abstract:

As the global pursuit of renewable energy intensifies, offshore wind farms have emerged as a promising solution to combat climate change. The global offshore wind installed capacity is projected to increase 56-fold by 2055. However, the impacts of climate change, particularly changes in wave climate, are not widely understood. Offshore wind installation and maintenance activities often require specific weather windows, characterized by calm seas and low wave heights, to ensure safe and efficient operations. However, climate change-induced alterations in wave characteristics can reduce the availability of suitable weather windows, leading to delays and disruptions in project timelines. it applied the operational limits of installation and maintenance vessels to past and future climate wave projections. This revealed changes in the annual and monthly accessibility of offshore wind farms at key global development locations. When accessibility is only defined by significant wave height, spatial patterns in the annual accessibility roughly follow changes in significant wave height, with increased availability where significant wave height is decreasing. This resulted in a 1-6% increase in Europe and North America and a similar decrease in South America, Australia and Asia. Monthly changes suggest unchanged or slightly decreased (1-2%) accessibility in summer months and increased (2-6%) in winter. Further assessment includes assessing the sensitivity of accessibility to operational limits defined by wave height combined with wave period and wave height combined with wind speed. Results of this assessment will be included in the presentation. These findings will help stakeholders inform climate change adaptations in installation and maintenance planning practices.

Keywords: climate change, offshore wind, offshore wind installation, operations and maintenance, wave climate, wind farm accessibility

Procedia PDF Downloads 58
707 Evaluation of Corrosion Behaviour of Coatings Applied in a High-Strength Low Alloy Steel in Different Climatic Cabinets

Authors: Raquel Bayon, Ainara Lopez-Ortega, Elena Rodriguez, Amaya Igartua

Abstract:

Corrosion is one of the most concerning phenomenon that accelerates material degradation in offshore applications. In order to avoid the premature failure of metallic materials in marine environments, organic coatings have widely been used, due to their elevated corrosion resistance. Thermally-sprayed metals have recently been used in offshore applications, whereas ceramic materials are usually less employed, due to their high cost. The protectiveness of the coatings can be evaluated and categorized in corrosivity categories in accordance with the ISO 12944-6 Standard. According to this standard, for coatings that are supposed to work in marine environments, a C5-M category is required for components working out of the water or partially immersed in the splash zone, and an Im2 category for totally immersed components. C5-M/Im-2 high category would correspond to a durability of more than 20 years without maintenance in accordance with ISO 12944 and NORSOK M501 standards. In this work, the corrosion behavior of three potential coatings used in offshore applications has been evaluated. For this aim, the materials have been subjected to different environmental conditions in several climatic chambers (humidostatic, climatic, immersion, UV and salt-fog). The category of the coatings to each condition has been selected, in accordance with the previously mentioned standard.

Keywords: cabinet, coatings, corrosion, offshore

Procedia PDF Downloads 393
706 Increasing the Use of LNG on the Java Island (Bali Province) through the Development of Small-Scale LNG Projects

Authors: Herman Susilo, Rahmat Budiman

Abstract:

Bali province is one of the most famous tourist destinations in Indonesia. As a central tourist destination, Bali is very concerned about the use of clean energy. Since Bali is an area that does not have natural resources, so all of its energy sources are imported from java island and other islands. As an example, currently, Pertagas is developing the use of LNG for the needs of the retail industry. Right now, LNG is transported from the LNG plant facility in Bontang (Kalimantan Province) using ISO Tanks which are transported by cargo ships and then transported by trucks to the island of Bali. After that, LNG from ISO Tank is breakbulk into LNG Cylinders for distribution to retail customers. The existing distribution scheme is very long and costly since the source of LNG is come from another island (Kalimantan) and is relatively far away. To solve this problem, we plan to build the mini-LNG plant on Java Island since there are lots of gas sources available. There are some small gas reserves (flared or stranded gas) that are not yet monetized and are less valuable (cheaper) because the volume is very small. After liquifying the gas from the gas field, the LNG is transported by the truck using ISO Tank. After that, LNG from ISO Tank is breakbulk into LNG Cylinders for distribution to retail customers. From this new LNG distribution scheme, there are 4-5 USD/MMBTU saving compared to the existing distribution scheme. It is hoped that with these cost savings, the number of retail LNG sales can increase rapidly.

Keywords: LNG, LNG retail, mini LNG, small scale LNG

Procedia PDF Downloads 79
705 Microgrid: An Alternative of Electricity Supply to an Island in Thailand

Authors: Pawitchaya Srijaiwong, Surin Khomfoi

Abstract:

There are several solutions to supply electricity to an island in Thailand such as diesel generation, submarine power cable, and renewable energy power generation. However, each alternative has its own limitation like fuel and pollution of diesel generation, submarine power cable length resulting in loss of cable and cost of investment, and potential of renewable energy in the local area. This paper shows microgrid system which is a new alternative for power supply to an island. It integrates local power plant from renewable energy, energy storage system, and microgrid controller. The suitable renewable energy power generation on an island is selected from geographic location and potential evaluation. Thus, photovoltaic system and hydro power plant are taken into account. The capacity of energy storage system is also estimated by transient stability study in order to supply electricity demand sufficiently under normal condition. Microgrid controller plays an important role in conducting, communicating and operating for both sources and loads on an island so that its functions are discussed in this study. The conceptual design of microgrid operation is investigated in order to analyze the reliability and power quality. The result of this study shows that microgrid is able to operate in parallel with the main grid and in case of islanding. It is applicable for electricity supply to an island and a remote area. The advantages of operating microgrid on an island include the technical aspect like improving reliability and quality of power system and social aspects like outage cost saving and CO₂ reduction.

Keywords: energy storage, islanding, microgrid, renewable energy

Procedia PDF Downloads 304
704 Structural Health Monitoring of Offshore Structures Using Wireless Sensor Networking under Operational and Environmental Variability

Authors: Srinivasan Chandrasekaran, Thailammai Chithambaram, Shihas A. Khader

Abstract:

The early-stage damage detection in offshore structures requires continuous structural health monitoring and for the large area the position of sensors will also plays an important role in the efficient damage detection. Determining the dynamic behavior of offshore structures requires dense deployment of sensors. The wired Structural Health Monitoring (SHM) systems are highly expensive and always needs larger installation space to deploy. Wireless sensor networks can enhance the SHM system by deployment of scalable sensor network, which consumes lesser space. This paper presents the results of wireless sensor network based Structural Health Monitoring method applied to a scaled experimental model of offshore structure that underwent wave loading. This method determines the serviceability of the offshore structure which is subjected to various environment loads. Wired and wireless sensors were installed in the model and the response of the scaled BLSRP model under wave loading was recorded. The wireless system discussed in this study is the Raspberry pi board with Arm V6 processor which is programmed to transmit the data acquired by the sensor to the server using Wi-Fi adapter, the data is then hosted in the webpage. The data acquired from the wireless and wired SHM systems were compared and the design of the wireless system is verified.

Keywords: condition assessment, damage detection, structural health monitoring, structural response, wireless sensor network

Procedia PDF Downloads 253
703 Case Study: The Analysis of Maturity of West Buru Basin and the Potential Development of Geothermal in West Buru Island

Authors: Kefi Rahmadio, Filipus Armando Ginting, Richard Nainggolan

Abstract:

This research shows the formation of the West Buru Basin and the potential utilization of this West Buru Basin as a geothermal potential. The research area is West Buru Island which is part of the West Buru Basin. The island is located in Maluku Province, with its capital city named Namlea. The island is divided into 10 districts, namely District Kepalamadan, Airbuaya District, Wapelau District, Namlea District, Waeapo District, Batabual District, Namrole District, Waesama District, Leksula District, and Ambalau District. The formation in this basin is Permian-Quarter. They start from the Formation Ghegan, Dalan Formation, Mefa Formation, Kuma Formation, Waeken Formation, Wakatin Formation, Ftau Formation and Leko Formation. These formations are composing this West Buru Basin. Determination of prospect area in the geothermal area with preliminary investigation stage through observation of manifestation, topographic shape and structure are found around prospect area. This is done because there is no data of earth that support the determination of prospect area more accurately. In Waepo area, electric power generated based on field observation and structural analysis, geothermal area of ​Waeapo was approximately 6 km², with reference to the SNI 'Classification of Geothermal Potential' (No.03-5012-1999), an area of ​​1 km² is assumed to be 12.5 MWe. The speculative potential of this area is (Q) = 6 x 12.5 MWe = 75 MWe. In the Bata Bual area, the geothermal prospect projected 4 km², the speculative potential of the Bata Bual area is worth (Q) = 4 x 12.5 MWe = 50 MWe. In Kepala Madan area, based on the estimation of manifestation area, there is a wide area of ​​prospect in Kepala Madan area about 4 km². The geothermal energy potential of the speculative level in Kepala Madan district is (Q) = 4 x 12.5 MWe = 50 MWe. These three areas are the largest geothermal potential on the island of West Buru. From the above research, it can be concluded that there is potential in West Buru Island. Further exploration is needed to find greater potential. Therefore, researchers want to explain the geothermal potential contained in the West Buru Basin, within the scope of West Buru Island. This potential can be utilized for the community of West Buru Island.

Keywords: West Buru basin, West Buru island, potential, Waepo, Bata Bual, Kepala Madan

Procedia PDF Downloads 205
702 Offshore Power Transition Project

Authors: Kashmir Johal

Abstract:

Within a wider context of improving whole-life effectiveness of gas and oil fields, we have been researching how to generate power local to the wellhead. (Provision of external power to a subsea wellhead can be prohibitively expensive and results in uneconomic fields. This has been an oil/gas industry challenge for many years.) We have been developing a possible approach to “local” power generation and have been conducting technical, environmental, (and economic) research to develop a viable approach. We sought to create a workable design for a new type of power generation system that makes use of differential pressure that can exist between the sea surface and a gas (or oil reservoir). The challenge has not just been to design a system capable of generating power from potential energy but also to design it in such a way that it anticipates and deals with the wide range of technological, environmental, and chemical constraints faced in such environments. We believe this project shows the enormous opportunity in deriving clean, economic, and zero emissions renewable energy from offshore sources. Since this technology is not currently available, a patent has been filed to protect the advancement of this technology.

Keywords: renewable, energy, power, offshore

Procedia PDF Downloads 49
701 An Overview of Onshore and Offshore Wind Turbines

Authors: Mohammad Borhani, Afshin Danehkar

Abstract:

With the increase in population and the upward trend of energy demand, mankind has thought of using suppliers that guarantee a stable supply of energy, unlike fossil fuels, which, in addition to the widespread emission of greenhouse gases that one of the main factors in the destruction of the ozone layer and it will be finished in a short time in the not-so-distant future. In this regard, one of the sustainable ways of energy supply is the use of wind converters. That convert wind energy into electricity. For this reason, this research focused on wind turbines and their installation conditions. The main classification of wind turbines is based on the axis of rotation, which is divided into two groups: horizontal axis and vertical axis; each of these two types, with the advancement of technology in man-made environments such as cities, villages, airports, and other human environments can be installed and operated. The main difference between offshore and onshore wind turbines is their installation and foundation. Which are usually divided into five types; including of Monopile Wind Turbines, Jacket Wind Turbines, Tripile Wind Turbines, Gravity-Based Wind Turbines, and Floating Offshore Wind Turbines. For installation in a wind power plant requires an arrangement that produces electric power, the distance between the turbines is usually between 5 or 7 times the diameter of the rotor and if perpendicular to the wind direction be If they are 3 to 5 times the diameter of the rotor, they will be more efficient.

Keywords: wind farms, Savonius, Darrieus, offshore wind turbine, renewable energy

Procedia PDF Downloads 81
700 Practical Approach to Development Automated System of Record Research Results Architectural Cultural Heritage Objects Island-Town Sviyazhsk

Authors: Timur R. Azizov, Eugenia F. Shaykhutdinova, Ayrat G. Sitdikov

Abstract:

In this article, we consider problems of automatic research result analysis and current monitoring of cultural legacy objects in island-city Sviyazhsk. We make basic concept of creating Automatic system, including developing the knowledge library with all conditions of three historical objects. In addition, we made described process of developing Automatic system of research result analysis of cultural legacy objects in island-city Sviyazhsk.

Keywords: automated system, record, results of research, unity3D, ASP .NET

Procedia PDF Downloads 222
699 Comparative Study of Urban Structure between an Island-Type and a General-Type City

Authors: Tomoya Oshiro, Hiroko Ono

Abstract:

Japan's aging population is increasing due to the decrease in birthrate. It causes various problems like the decrease in the gross domestic product of the country. The reason is why the local government of Japan has been on the way to a sustainable city recently. Then it is essential to get control of an urban structure to make the compact city successful. There are many kinds of paper about the compact city; however, the paper about a compact city of the island-type city is less. The purpose of this study is to clarify difference of urban structure between an island-type and a general city type. The method which has conducted in this research has two steps. First of all, by using evaluation indexes in the handbook, we evaluated the urban structures among each same -population-class cities from 50,000 to 100,000 people. Next, to clear the difference about the urban structure and feature between island-type and general-type cities compare the radar chart which is composed with each evaluation indexes of urban structure. Moreover, in order to clarify the relationship between evaluation indexes and the place of residence by using GIS software to show up population density on the map. As a result of this research, the management of local government and the local economy in evaluation indexes are indicated to be negative point in comparison of island-type cities with general cities. However, evaluation indexes of safety/security and low-carbon/energy are proved to be positive point. The research to find the difference features of the island-type of urban structure proves that the management of local government or the local economy is negative point in these island-type cities. In addition, the public transportation coverage in Miyako Island, Sado Island, and Amakusa Island show low value compare with other islands and average value. Relationship between evaluation indexes of an urban structure and the place of residence prove that the place of residence is related to public transportation coverage. If the place of residence is spread out, the public transportation coverage will be decreased. The results of this research reveal that the finances in island-type cities are negative point compare to general cities. This problem is caused by declining population. In addition, the place of residence is related to the public transportation coverage. Even though, it needs a much money to increase the public transportation coverage. It is possibly to cause other problems furthermore the aspect of finance is influenced by that as well. The conclusion in this research suggests that it is important for creating the compact city in island-type cities that we first need to address solving the problems about the management of local government and the local economy.

Keywords: sustainable city, comparative analysis, geographic information system, urban structure

Procedia PDF Downloads 126
698 Modeling of Bed Level Changes in Larak Island

Authors: Saeed Zeinali, Nasser Talebbeydokhti, Mehdi Saeidian, Shahrad Vosough

Abstract:

In this article, bathymetry changes have been studied as a case study for Larak Island, located in The South of Iran. The advanced 2D model of Mike21 has been used for this purpose. A simple procedure has been utilized in this model. First, the hydrodynamic (HD) module of Mike21 has been used to obtain the required output for sediment transport model (ST module). The ST module modeled the area for tidal currents only. Bed level changes are resulted by series of modeling for both HD and ST module in 3 months time step. The final bathymetry in each time step is used as the primary bathymetry for next time step. This consecutive procedure been continued until bathymetry for the year 2020 is obtained.

Keywords: bed level changes, Larak Island, hydrodynamic, sediment transport

Procedia PDF Downloads 240