5058 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 37
5057 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.

Keywords: strategy, project management, strategy implementation, agile

Procedia PDF Downloads 94
5056 Integration from Laboratory to Industrialization for Hybrid Printed Electronics

Authors: Ahmed Moulay, Mariia Zhuldybina, Mirko Torres, Mike Rozel, Ngoc Duc Trinh, Chloé Bois

Abstract:

Hybrid printed electronics technology (HPE) provides innovative opportunities to enhance conventional electronics applications, which are often based on printed circuit boards (PCB). By combining the best of both performance from conventional electronic components and the flexibility from printed circuits makes it possible to manufacture HPE at high volumes using roll-to-roll printing processes. However, several challenges must be overcome in order to accurately integrate an electronic component on a printed circuit. In this presentation, we will demonstrate the integration process of electronic components from the lab scale to the industrialization. Both the printing quality and the integration technique must be studied to define the optimal conditions. To cover the parameters that influence the print quality of the printed circuit, different printing processes, flexible substrates, and conductive inks will be used to determine the optimized printing process/ink/substrate system. After the systems is selected, an electronic component of 2.5 mm2 chip size will be integrated to validate the functionality of the printed, electronic circuit. Critical information such as the conductive adhesive, the curing conditions, and the chip encapsulation will be determined. Thanks to these preliminary results, we are able to demonstrate the chip integration on a printed circuit using industrial equipment, showing the potential of industrialization, compatible using roll-to-roll printing and integrating processes.

Keywords: flat bed screen-printing, hybrid printed electronics, integration, large-scale production, roll-to-roll printing, rotary screen printing

Procedia PDF Downloads 158
5055 Building Information Modeling and Its Application in the State of Kuwait

Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad

Abstract:

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.

Keywords: building information modeling, BIM, construction industry, Kuwait

Procedia PDF Downloads 359
5054 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 149
5053 Current Approach in Biodosimetry: Electrochemical Detection of DNA Damage

Authors: Marcela Jelicova, Anna Lierova, Zuzana Sinkorova, Radovan Metelka

Abstract:

At present, electrochemical methods are used in various research fields, especially for analysis of biological molecules. The fact offers the possibility of using the detection of oxidative damage induced indirectly by γ rays in DNA in biodosimentry. The main goal of our study is to optimize the detection of 8-hydroxyguanine by differential pulse voltammetry. The level of this stable and specific indicator of DNA damage could be determined in DNA isolated from peripheral blood lymphocytes, plasma or urine of irradiated individuals. Screen-printed carbon electrodes modified with carboxy-functionalized multi-walled carbon nanotubes were utilized for highly sensitive electrochemical detection of 8-hydroxyguanine. Electrochemical oxidation of 8-hydroxoguanine monitored by differential pulse voltammetry was found pH-dependent and the most intensive signal was recorded at pH 7. After recalculating the current density, several times higher sensitivity was attained in comparison with already published results, which were obtained using screen-printed carbon electrodes with unmodified carbon ink. Subsequently, the modified electrochemical technique was used for the detection of 8-hydroxoguanine in calf thymus DNA samples irradiated by 60Co gamma source in the dose range from 0.5 to 20 Gy using by various types of sample pretreatment and measurement conditions. This method could serve for fast retrospective quantification of absorbed dose in cases of accidental exposure to ionizing radiation and may play an important role in biodosimetry.

Keywords: biodosimetry, electrochemical detection, voltametry, 8-hydroxyguanine

Procedia PDF Downloads 262
5052 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan

Authors: Ghaleb Y. Abbasi, Satanay Alhiary

Abstract:

This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.

Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing

Procedia PDF Downloads 438
5051 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 406
5050 Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques

Authors: Soheila Sadeghi

Abstract:

In the dynamic landscape of project management, scope changes are an inevitable reality that can significantly impact project performance. These changes, whether initiated by stakeholders, external factors, or internal project dynamics, can lead to cost overruns and schedule delays. Accurately predicting the consequences of these changes is crucial for effective project control and informed decision-making. This study aims to develop predictive models to estimate the impact of scope changes on project cost and schedule using machine learning techniques. The research utilizes a comprehensive dataset containing detailed information on project tasks, including the Work Breakdown Structure (WBS), task type, productivity rate, estimated cost, actual cost, duration, task dependencies, scope change magnitude, and scope change timing. Multiple machine learning models are developed and evaluated to predict the impact of scope changes on project cost and schedule. These models include Linear Regression, Decision Tree, Ridge Regression, Random Forest, Gradient Boosting, and XGBoost. The dataset is split into training and testing sets, and the models are trained using the preprocessed data. Cross-validation techniques are employed to assess the robustness and generalization ability of the models. The performance of the models is evaluated using metrics such as Mean Squared Error (MSE) and R-squared. Residual plots are generated to assess the goodness of fit and identify any patterns or outliers. Hyperparameter tuning is performed to optimize the XGBoost model and improve its predictive accuracy. The feature importance analysis reveals the relative significance of different project attributes in predicting the impact on cost and schedule. Key factors such as productivity rate, scope change magnitude, task dependencies, estimated cost, actual cost, duration, and specific WBS elements are identified as influential predictors. The study highlights the importance of considering both cost and schedule implications when managing scope changes. The developed predictive models provide project managers with a data-driven tool to proactively assess the potential impact of scope changes on project cost and schedule. By leveraging these insights, project managers can make informed decisions, optimize resource allocation, and develop effective mitigation strategies. The findings of this research contribute to improved project planning, risk management, and overall project success.

Keywords: cost impact, machine learning, predictive modeling, schedule impact, scope changes

Procedia PDF Downloads 17
5049 Building Information Modeling Implementation for Managing an Extra Large Governmental Building Renovation Project

Authors: Pornpote Nusen, Manop Kaewmoracharoen

Abstract:

In recent years, there was an observable shift in fully developed countries from constructing new buildings to modifying existing buildings. The issue was that although an effective instrument like BIM (Building Information Modeling) was well developed for constructing new buildings, it was not widely used to renovate old buildings. BIM was accepted as an effective means to overcome common managerial problems such as project delay, cost overrun, and poor quality of the project life cycle. It was recently introduced in Thailand and rarely used in a renovation project. Today, in Thailand, BIM is mostly used for creating aesthetic 3D models and quantity takeoff purposes, though it can be an effective tool to use as a project management tool in planning and scheduling. Now the governmental sector in Thailand begins to recognize the uses of using BIM to manage a construction project, but the knowledge about the BIM implementation to governmental construction projects is underdeveloped. Further studies need to be conducted to maximize its advantages for the governmental sector. An educational extra large governmental building of 17,000 square-meters was used in this research. It is currently under construction for a two-year renovation project. BIM models of the building for the exterior and interior areas were created for the whole five floors. Then 4D BIM with combination of 3D BIM plus time was created for planning and scheduling. Three focus groups had been done with executive committee, contractors, and officers of the building to discuss the possibility of usage and usefulness of BIM approach over the traditional process. Several aspects were discussed in the positive sides, especially several foreseen problems, such as the inadequate accessibility of ways, the altered ceiling levels, the impractical construction plan created through a traditional approach, and the lack of constructability information. However, for some parties, the cost of BIM implementation was a concern, though, this study believes, its uses outweigh the cost.

Keywords: building information modeling, extra large building, governmental building renovation, project management, renovation, 4D BIM

Procedia PDF Downloads 134
5048 Project Risk Assessment of the Mining Industry of Ghana

Authors: Charles Amoatey

Abstract:

The issue of risk in the mining industry is a global phenomenon and the Ghanaian mining industry is not exempted. The main purpose of this study is to identify the critical risk factors affecting the mining industry. The study takes an integrated view of the mining industry by examining the contribution of various risk factors to mining project failure in Ghana. A questionnaire survey was conducted to solicit the critical risk factors from key mining practitioners. About 80 respondents from 11 mining firms participated in the survey. The study identified 22 risk factors contributing to mining project failure in Ghana. The five most critical risk factors based on both probability of occurrence and impact were: (1) unstable commodity prices, (2) inflation/exchange rate, (3) land degradation, (4) high cost of living and (5) government bureaucracy for obtaining licenses. Furthermore, the study found that risk assessment in the mining sector has a direct link with mining project sustainability. Mitigation measures for addressing the identified risk factors were discussed. The key findings emphasize the need for a comprehensive risk management culture in the entire mining industry.

Keywords: risk, assessment, mining, Ghana

Procedia PDF Downloads 430
5047 Integrated Clean Development Mechanism and Risk Management Approach for Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Clean development mechanism (CDM) can act as an effective instrument for mitigating climate change. This mechanism can effectively reduce the emission of CO2 and other green house gases (GHG). Construction of a mega infrastructure project like underground corridor construction for metro rail operation involves in consumption of substantial quantity of concrete which consumes huge quantity of energy consuming materials like cement and steel. This paper is an attempt to develop an integrated clean development mechanism and risk management approach for sustainable development for an underground corridor metro rail project in India during its construction phase. It was observed that about 35% reduction in CO2 emission can be obtained by adding fly ash as a part replacement of cement. The reduced emission quantity of CO2 which is of the quantum of about 21,646.36 MT would result in cost savings of approximately INR 8.5 million (USD 1,29,878).But construction and operation of such infrastructure projects of the present era are subject to huge risks and uncertainties throughout all the phases of the project, thus reducing the probability of successful completion of the project within stipulated time and cost frame. Thus, an integrated approach of combining CDM with risk management would enable the metro rail authorities to develop a sustainable risk mitigation measure framework to ensure more cost and energy savings and lesser time and cost over-run.

Keywords: clean development mechanism (CDM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 462
5046 Converting Scheduling Time into Calendar Date Considering Non-Interruptible Construction Tasks

Authors: Salman Ali Nisar, Suzuki Koji

Abstract:

In this paper we developed a new algorithm to convert the project scheduling time into calendar date in order to handle non-interruptible activities not to be split by non-working days (such as weekend and holidays). In a construction project some activities might require not to be interrupted even on non-working days, or to be finished on the end day of business days. For example, concrete placing work might be required to be completed by the end day of weekdays i.e. Friday, and curing in the weekend. This research provides an algorithm that imposes time constraint for start and finish times of non-interruptible activities. The algorithm converts working days, which is obtained by Critical Path Method (CPM), to calendar date with consideration of the start date of a project. After determining the interruption by non-working days, the start time of a certain activity should be postponed, if there is enough total float value. Otherwise, the duration is shortened by hiring additional resources capacity or/and using overtime work execution. Then, time constraints are imposed to start time and finish time of the activity. The algorithm is developed in Excel Spreadsheet for microcomputer and therefore we can easily get a feasible, calendared construction schedule for such a construction project with some non-interruptible activities.

Keywords: project management, scheduling, critical path method, time constraint, non-interruptible tasks

Procedia PDF Downloads 489
5045 Using Design Sprint For Software Engineering Undergraduate Student Projects: A Method Paper

Authors: Sobhani U. Pilapitiya, Tharanga Peiris

Abstract:

Software Engineering curriculums generally consist of industry-based practices such as project-based learning (PBL) which mainly focuses on efficient and innovative product development. These approaches can be tailored and used in project-based modules in software engineering curriculums. However, there are very limited attempts in the area especially related to the Sri Lankan context. This paper describes a tailored pedagogical approach and its results of using design sprint which can be used for project-based modules in SE curriculums. A controlled group of second-year software engineering students was selected for the study. The study results indicate that 100% of students agreed that the Design Sprint approach is effective in group-based projects and 83% of students stated that it minimized the re-work compared to traditional project approaches. The tailored process was effective, easy to implement and produced desired results at the end of the session while providing students an enjoyable experience.

Keywords: design sprint, PBL, software engineering, curriculum

Procedia PDF Downloads 183
5044 Optimal Cropping Pattern in an Irrigation Project: A Hybrid Model of Artificial Neural Network and Modified Simplex Algorithm

Authors: Safayat Ali Shaikh

Abstract:

Software has been developed for optimal cropping pattern in an irrigation project considering land constraint, water availability constraint and pick up flow constraint using modified Simplex Algorithm. Artificial Neural Network Models (ANN) have been developed to predict rainfall. AR (1) model used to generate 1000 years rainfall data to train the ANN. Simulation has been done with expected rainfall data. Eight number crops and three types of soil class have been considered for optimization model. Area under each crop and each soil class have been quantified using Modified Simplex Algorithm to get optimum net return. Efficacy of the software has been tested using data of large irrigation project in India.

Keywords: artificial neural network, large irrigation project, modified simplex algorithm, optimal cropping pattern

Procedia PDF Downloads 188
5043 Methodology of the Turkey’s National Geographic Information System Integration Project

Authors: Buse A. Ataç, Doğan K. Cenan, Arda Çetinkaya, Naz D. Şahin, Köksal Sanlı, Zeynep Koç, Akın Kısa

Abstract:

With its spatial data reliability, interpretation and questioning capabilities, Geographical Information Systems make significant contributions to scientists, planners and practitioners. Geographic information systems have received great attention in today's digital world, growing rapidly, and increasing the efficiency of use. Access to and use of current and accurate geographical data, which are the most important components of the Geographical Information System, has become a necessity rather than a need for sustainable and economic development. This project aims to enable sharing of data collected by public institutions and organizations on a web-based platform. Within the scope of the project, INSPIRE (Infrastructure for Spatial Information in the European Community) data specifications are considered as a road-map. In this context, Turkey's National Geographic Information System (TUCBS) Integration Project supports sharing spatial data within 61 pilot public institutions as complied with defined national standards. In this paper, which is prepared by the project team members in the TUCBS Integration Project, the technical process with a detailed methodology is explained. In this context, the main technical processes of the Project consist of Geographic Data Analysis, Geographic Data Harmonization (Standardization), Web Service Creation (WMS, WFS) and Metadata Creation-Publication. In this paper, the integration process carried out to provide the data produced by 61 institutions to be shared from the National Geographic Data Portal (GEOPORTAL), have been trying to be conveyed with a detailed methodology.

Keywords: data specification, geoportal, GIS, INSPIRE, Turkish National Geographic Information System, TUCBS, Turkey's national geographic information system

Procedia PDF Downloads 128
5042 Remote Wireless Communications Lab in Real Time

Authors: El Miloudi Djelloul

Abstract:

Technology nowadays enables the remote access to laboratory equipment and instruments via Internet. This is especially useful in engineering education, where students can conduct laboratory experiment remotely. Such remote laboratory access can enable student to use expensive laboratory equipment, which is not usually available to students. In this paper, we present a method of creating a Web-based Remote Laboratory Experimentation in the master degree course “Wireless Communications Systems” which is part of “ICS (Information and Communication Systems)” and “Investment Management in Telecommunications” curriculums. This is done within the RIPLECS Project and the NI2011 FF005 Research Project “Implementation of Project-Based Learning in an Interdisciplinary Master Program”.

Keywords: remote access, remote laboratory, wireless telecommunications, external antenna-switching controller board (EASCB)

Procedia PDF Downloads 496
5041 Quantitative Risk Analysis for Major Subsystems and Project Success of a Highthrouput Satellite

Authors: Ibrahim Isa Ali (Pantami), Abdu Jaafaru Bambale, Abimbola Alale, Danjuma Ibrahim Ndihgihdah, Muhammad Alkali, Adamu Idris Umar, Babadoko Dantala Mohammed, Moshood Kareem Olawole

Abstract:

This paper dwells on the risk management required for High throughput Satellite (HTS) project, and major subsystems that pertains to the improved performance and reliability of the spacecraft. The paper gives a clear picture of high‐throughput satellites (HTS) and the associated technologies with performances as they align and differ with the traditional geostationary orbit or Geosynchronous Equatorial Orbit (GEO) Communication Satellites. The paper also highlights critical subsystems and processes in project conceptualization and execution. The paper discusses the configuration of the payload. The need for optimization of resources for the HTS project and successful integration of critical subsystems for spacecraft requires implementation of risk analysis and mitigation from the preliminary design stage; Assembly, Integration and Test (AIT); Launch and in-orbit- Management stage.

Keywords: AIT, HTS, in-orbit management, optimization

Procedia PDF Downloads 78
5040 Developing Islamic Module Project for Preschool Teachers Using Modified Delphi Technique

Authors: Mazeni Ismail, Nurul Aliah, Hasmadi Hassan

Abstract:

The purpose of this study is to gather the consensus of experts regarding the use of moral guidance amongst preschool teachers vis-a-vis the Islamic Project module (I-Project Module). This I-Project Module seeks to provide pertinent data on the assimilation of noble values in subject-matter teaching. To obtain consensus for the various components of the module, the Modified Delphi technique was used to develop the module. 12 subject experts from various educational fields of Islamic education, early childhood education, counselling and language fully participated in the development of this module. The Modified Delphi technique was administered in two mean cycles. The standard deviation value derived from questionnaires completed by the participating panel of experts provided the value of expert consensus reached. This was subsequently analyzed using SPSS version 22. Findings revealed that the panel of experts reached a discernible degree of agreement on five topics outlined in the module, viz; content (mean value 3.36), teaching strategy (mean value 3.28), programme duration (mean value 3.0), staff involved and attention-grabbing strategy of target group participating in the value program (mean value 3.5), and strategy to attract attention of target group to utilize i-project (mean value 3.0). With regard to the strategy to attract the attention of the target group, the experts proposed for creative activities to be added in order to enhance teachers’ creativity.

Keywords: Modified Delphi Technique, Islamic project, noble values, teacher moral guidance

Procedia PDF Downloads 166
5039 A Relational Case-Based Reasoning Framework for Project Delivery System Selection

Authors: Yang Cui, Yong Qiang Chen

Abstract:

An appropriate project delivery system (PDS) is crucial to the success of a construction project. Case-based reasoning (CBR) is a useful support for PDS selection. However, the traditional CBR approach represents cases as attribute-value vectors without taking relations among attributes into consideration, and could not calculate the similarity when the structures of cases are not strictly same. Therefore, this paper solves this problem by adopting the relational case-based reasoning (RCBR) approach for PDS selection, considering both the structural similarity and feature similarity. To develop the feature terms of the construction projects, the criteria and factors governing PDS selection process are first identified. Then, feature terms for the construction projects are developed. Finally, the mechanism of similarity calculation and a case study indicate how RCBR works for PDS selection. The adoption of RCBR in PDS selection expands the scope of application of traditional CBR method and improves the accuracy of the PDS selection system.

Keywords: relational cased-based reasoning, case-based reasoning, project delivery system, PDS selection

Procedia PDF Downloads 412
5038 The Cost of Innovation in Software Development Projects

Authors: Mihai Liviu Despa

Abstract:

The paper tackles the topic of determining the cost of innovation in software development projects. Innovation can be achieved either in a planned or unplanned manner. The paper approaches the scenarios were innovation is planned for. As a starting point an innovative software development project is analyzed. The project is depicted step by step as it was implemented, from inception to delivery. Costs that are proprietary to innovation in software development are isolated based on the author’s personal experience in managing the above mentioned project. Innovation costs components identified by the author are then validated using open discussions with software development professionals and projects managers on LinkedIn groups. In order to receive relevant feedback only groups that focus on software development and innovation management are targeted. Additional innovation cost components suggested by software development professionals and projects managers are also considered. Based on the identified cost components an indicator is built. The indicator is meant to formalize the process of determining the cost of innovation in a software development project. The indicator aggregates all the innovation cost components that are identified in the research process. The process of calculating each cost component is also described. Conclusions are formulated and new related research topics are submitted for debate.

Keywords: innovation cost, IT project management, software development, innovation management

Procedia PDF Downloads 436
5037 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 279
5036 The Effects of Adding Vibrotactile Feedback to Upper Limb Performance during Dual-Tasking and Response to Misleading Visual Feedback

Authors: Sigal Portnoy, Jason Friedman, Eitan Raveh

Abstract:

Introduction: Sensory substitution is possible due to the capacity of our brain to adapt to information transmitted by a synthetic receptor via an alternative sensory system. Practical sensory substitution systems are being developed in order to increase the functionality of individuals with sensory loss, e.g. amputees. For upper limb prosthetic-users the loss of tactile feedback compels them to allocate visual attention to their prosthesis. The effect of adding vibrotactile feedback (VTF) to the applied force has been studied, however its effect on the allocation if visual attention during dual-tasking and the response during misleading visual feedback have not been studied. We hypothesized that VTF will improve the performance and reduce visual attention during dual-task assignments in healthy individuals using a robotic hand and improve the performance in a standardized functional test, despite the presence of misleading visual feedback. Methods: For the dual-task paradigm, twenty healthy subjects were instructed to toggle two keyboard arrow keys with the left hand to retain a moving virtual car on a road on a screen. During the game, instructions for various activities, e.g. mix the sugar in the glass with a spoon, appeared on the screen. The subject performed these tasks with a robotic hand, attached to the right hand. The robotic hand was controlled by the activity of the flexors and extensors of the right wrist, recorded using surface EMG electrodes. Pressure sensors were attached at the tips of the robotic hand and induced VTF using vibrotactile actuators attached to the right arm of the subject. An eye-tracking system tracked to visual attention of the subject during the trials. The trials were repeated twice, with and without the VTF. Additionally, the subjects performed the modified box and blocks, hidden from eyesight, in a motion laboratory. A virtual presentation of a misleading visual feedback was be presented on a screen so that twice during the trial, the virtual block fell while the physical block was still held by the subject. Results: This is an ongoing study, which current results are detailed below. We are continuing these trials with transradial myoelectric prosthesis-users. In the healthy group, the VTF did not reduce the visual attention or improve performance during dual-tasking for the tasks that were typed transfer-to-target, e.g. place the eraser on the shelf. An improvement was observed for other tasks. For example, the average±standard deviation of time to complete the sugar-mixing task was 13.7±17.2s and 19.3±9.1s with and without the VTF, respectively. Also, the number of gaze shifts from the screen to the hand during this task were 15.5±23.7 and 20.0±11.6, with and without the VTF, respectively. The response of the subjects to the misleading visual feedback did not differ between the two conditions, i.e. with and without VTF. Conclusions: Our interim results suggest that the performance of certain activities of daily living may be improved by VTF. The substitution of visual sensory input by tactile feedback might require a long training period so that brain plasticity can occur and allow adaptation to the new condition.

Keywords: prosthetics, rehabilitation, sensory substitution, upper limb amputation

Procedia PDF Downloads 321
5035 Correlation between Funding and Publications: A Pre-Step towards Future Research Prediction

Authors: Ning Kang, Marius Doornenbal

Abstract:

Funding is a very important – if not crucial – resource for research projects. Usually, funding organizations will publish a description of the funded research to describe the scope of the funding award. Logically, we would expect research outcomes to align with this funding award. For that reason, we might be able to predict future research topics based on present funding award data. That said, it remains to be shown if and how future research topics can be predicted by using the funding information. In this paper, we extract funding project information and their generated paper abstracts from the Gateway to Research database as a group, and use the papers from the same domains and publication years in the Scopus database as a baseline comparison group. We annotate both the project awards and the papers resulting from the funded projects with linguistic features (noun phrases), and then calculate tf-idf and cosine similarity between these two set of features. We show that the cosine similarity between the project-generated papers group is bigger than the project-baseline group, and also that these two groups of similarities are significantly different. Based on this result, we conclude that the funding information actually correlates with the content of future research output for the funded project on the topical level. How funding really changes the course of science or of scientific careers remains an elusive question.

Keywords: natural language processing, noun phrase, tf-idf, cosine similarity

Procedia PDF Downloads 229
5034 Ecorium: The Ecological Project in Montevideo Uruguay

Authors: Chettou Souhaila, Soufi Omar, Roumia Mohammed Ammar

Abstract:

Protecting the environment is to preserve the survival and future of humanity. Indeed, the environment is our source of food and drinking water, the air is our source of oxygen, the climate allows our survival and biodiversity are a potential drug reservoir. Preserving the environment is, therefore, a matter of survival. The objective of this project is to familiarize the general public with environmental problems not only with the theme of environmental protection, but also with the concept of biodiversity in different ecosystems. For it, the aim of our project was to create the Ecorium which is a place that preserves many species of plants of different ecosystems, schools, malls, buildings, offices, ecological transports, gardens, and many familial activities that participated in the ecosystems development, strategic biodiversity and sustainable development.

Keywords: ecological system, ecorium, environment, sustainable development

Procedia PDF Downloads 314
5033 Gender-Based Violence Public Art Projects: An Analysis of the Value of Including Social Justice Topics in Tertiary Courses

Authors: F. Saptouw

Abstract:

This paper will examine the value of introducing social justice issues into the tertiary fine art curriculum at a first-year level. The paper will present detail of the conceptual impetus and the logistics related to the execution of a collaborative teaching project. The cohort of students was registered for the Fine Art Foundation course at the Michaelis School of Fine Art at the University of Cape Town. The course is dedicated to the development of critical thinking, communication skills, and varied approaches to knowledge construction within the first-year cohort. A core component of the course is the examination of the representation of gender, identity, politics, and power. These issues are examined within a range of public and private representations like art galleries, museum spaces, and contemporary popular culture. This particular project was a collaborative project with the Office of Inclusivity and Change, and the project leaders were Fabian Saptouw and Gabriel Khan. The paper will conclude by presenting an argument for the importance of such projects within the tertiary environment.

Keywords: art, education, gender-based violence, social responsiveness

Procedia PDF Downloads 121
5032 Formulation of Sun Screen Cream and Sun Protecting Factor Activity from Standardized–Partition Compound of Mahkota Dewa Leaf (Phaleria macrocarpa (Scheff.) Boerl.)

Authors: Abdul Karim Zulkarnain, Marchaban, Subagus Wahyono, Ratna Asmah Susidarti

Abstract:

Mahkota Dewa contains phalerin which has activity as sun screen. In this study, 13 formulations of cream oil in water (o/w) were prepared and tested for their physical characteristics. The physical characteristics were then used for determining the optimum formula. This study aimed to explore the physical stability of optimized formulation of cream, its sun protecting factor (SPF) values using in vitro and in vivo tests. The optimum formula of o/w cream were prepared based on Simplex Lattice Design (LSD) method using software Design Expert®. The formulation of o/w cream were varied based on the proportion of cetyl alcohol, mineral oil and tween 80. The difference of physical characteristic of optimum and predicted formula was tested using t-test with significant level of 95%. The optimum formula of o/w cream was the formula which consists of cetyl alcohol 9.71%, mineral oil, 29%, and tween 80 3.29. Based on t-test, there was no significant difference of physical characteristics of optimum and predicted formulation. Viscosity, spread power, adhesive power, and separation volume ratio of o/w at week 0-4 were relatively stable. The o/w creams were relatively stable at extreme temperature. The o/w creams from mahkota dewa, phalerin, and benzophenone have SPF values of 21.32, 33.12, and 42.49, respectively. The formulas did not irritate the skin based on in vivo test.

Keywords: cream, stability, In vitro, In vivo

Procedia PDF Downloads 211
5031 Equality in Higher Education: A Library and Learning Collaborative Project to Support Teachers

Authors: Ika Jorum

Abstract:

The aim of this collaborative project was to develop library support that contributes in a long-term way to a technical university’s work on increased equality in education. The background was an assessment made by the Higher Education Authority that showed the need for improvement regarding equality in several programs at the university. The university’s Vice President for equality and Vice President for sustainability announced funds for projects that supported the improvement of equality in education. The library was granted funding for a one-year project that aimed both to support teachers in order to embed equality in education and to support the library staff and improve the organization’s own work. The part of the project that was directed to teachers was performed as activities in different areas and forms, such as acquisition and collections, teaching, exhibitions and book discussions. Besides the activities and support that was offered to teachers, the education team had journal clubs in order to develop and embed equality in their own teaching. The part that was directed to library staff and management was performed as workshops in collaboration with Equality Office in order to identify areas where the library could make improvements on work with equality and inclusion. The expectation was that the activities would be well attended since the project team had got indications that the content would be relevant. The outcome of this project was that some activities turned out to be more attended than others and what is expected to be found relevant, for example, a workshop on information searching from a gender and equality perspective for teachers, might still not attract participants. On the other hand, Ph.D. students and students participated in the book discussions and wanted them to continue after the project had ended. Results will be shared both on what was successful and what was challenging. Some reflections will be given on what can be done to attract participants to activities in the area of gender equality that is most likely relevant for the expected attendants and how results from a project on gender equality can be integrated into an organization’s daily work.

Keywords: equality, higher education, critical information literacy, collaboration

Procedia PDF Downloads 59
5030 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 212
5029 Rewriting the 'Sick Man' History: Imagining Chinese Masculinity in the Contemporary Military Action Genre

Authors: Yongde Dai

Abstract:

The recent Chinese military action blockbusters, notably known as, Wolf Warrior/Zhan Lang (2015), Operation Mekong/Mei gong he xing dong (2016), Warrior 2/Zhan Lang 2 (2017) and Operation Red Sea/Hong hai xing dong (2018), have achieved phenomenal box-office successes and in particular, Wolf Warrior 2 became China’s highest-grossing film of all time. However, their yearly presence tends to show a paradigmic shift from China’s primacy of wen manliness (soft) to wu masculinity (hard). With the increasing cinematic exposure of a more muscular image manifesting in both the Chinese heroic soldiers and China itself as a rising global power, the backlash of the Chinese public against the proliferation of the feminized masculinity influenced by the ‘pretty-boy’ pop-culture and China’s harder approach to the current Sino-US tensions have correspondingly emerged and continued to brew. Chinese masculinity imagined in these films is one of the key factors that enable a gendered interpretation of the correlation between the Chinese on-screen fantasy and off-screen reality, that is, China’s public and official discourse about the hegemonic masculinity and non-hegemonic masculinity as well as China’s international profile on cinematic appearance and in today’s Sino-US relation. By reading closely at the four megahits as visual-audio texts with Chinese masculinity studies by Kam Louie and Geng Song, this paper attempts to examine the Chinese construction of manliness with historical accounts and argue why and how the recurrent emphasis of hard/military masculinity (wu) on screen are viewed as China’s contemporary rewriting of the ‘sick-man’ history in the film form. Through this investigation, the paper finds that the rewriting of the ‘sick-man’ history in the cinematic world through heroic brawny soldiers comes to resonate a collective anxiety of China in countering the real-life increasing feminized masculinity on the public appearance, particularly on the male celebrities. In addition, the superpower fantasy about China illuminates a hypermasculine imaginary of China as a global rising power and this coincidently echoes China’s current tougher diplomatic strategy tackling the Sino-US trade war, South China sea dispute and Huawei-US lawsuits.

Keywords: Chinese masculinity, Chinese military action film, feminized masculinity, manhood and nationhood, sick man of Asia

Procedia PDF Downloads 126