Search results for: public private partnership
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1316

Search results for: public private partnership

1316 Public-Public Partnership and Tourism Development Strategy: The Case of Municipality of Gazi Baba in Macedonia

Authors: Dejan Metodijeski, Elizabeta Mitreva, Nako Taskov, Oliver Filiposki

Abstract:

Tourism development strategies are an important link in the tourism policy that is used to make its management better and easier. A public-public partnership (PUP) is a partnership between two or more public authorities or between a public authority and any non-profit organization with the goal of providing services and facilities or transferring technical skills. The paper presents this kind of partnership between two public authorities in Macedonia, the Municipality of Gazi Baba on one hand, and the University of Goce Delcev on the other. The main idea of this partnership is the development of a tourism strategy for the Municipality of Gazi Baba by the University on one side, and on the other, the construction of a mini park in the court of the University by the Municipality. This paper presents the causes and analyzes the procedures relating to this partnership and the methodology of the tourism development strategy. It contains a relevant literature review related to PUPs and tourism development strategy. The results and benefits of this partnership are presented with figures.

Keywords: Public-public partnership, tourism development strategy, municipality of Gazi Baba, Macedonia.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1446
1315 Public-Private Partnership Transportation Projects: An Exploratory Study

Authors: Medya Fathi

Abstract:

When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results show that PPP highway projects on average have saved time and cost; however, the main benefit is a faster delivery rather than an under-budget completion. This study can provide better insights to understand PPP highways’ performance and assist practitioners in applying PPP for transportation projects with the opportunity to save time and cost.

Keywords: Cost, delivery method, highway, public-private partnership, schedule, transportation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 470
1314 Modelling the States of Public Client Participation in Public Private Partnership Arrangements

Authors: Eisa A. Alsafran, Francis T. Edum-Fotwe, Wayne E. Lord

Abstract:

The degree to which a public client actively participates in Public Private Partnership (PPP) schemes, is seen as a determinant of the success of the arrangement, and in particular, efficiency in the delivery of the assets of any infrastructure development. The asset delivery is often an early barometer for judging the overall performance of the PPP. Currently, there are no defined descriptors for the degree of such participation. The lack of defined descriptors makes the association between the degree of participation and efficiency of asset delivery, difficult to establish. This is particularly so if an optimum effect is desired. In addition, such an association is important for the strategic decision to embark on any PPP initiative. This paper presents a conceptual model of different levels of participation that characterise PPP schemes. The modelling was achieved by a systematic review of reported sources that address essential aspects and structures of PPP schemes, published from 2001 to 2015. As a precursor to the modelling, the common areas of Public Client Participation (PCP) were investigated. Equity and risk emerged as two dominant factors in the common areas of PCP, and were therefore adopted to form the foundation of the modelling. The resultant conceptual model defines the different states of combined PCP. The defined states provide a more rational basis for establishing how the degree of PCP affects the efficiency of asset delivery in PPP schemes.

Keywords: Asset delivery, infrastructure development, public private partnership, public client participation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1607
1313 Public-Private Partnership Projects in Canada: A Case Study Approach

Authors: Samuel Carpintero

Abstract:

Public-private partnerships (PPP) arrangements have been extensively used in Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transportation sector. This paper analyses the evolution of the PPP market for transportation projects in Canada and examines the participation of Spanish developers in this market, which have been particularly successful in winning PPP contracts during the last decade.

Keywords: PPP, concession, infrastructure, construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2639
1312 Analysis on the Decision-Making Model of Private Sector Companies in PPP Projects

Authors: Xueqin Shan, Chuanming Wu, Wenhua Hou, Xiaosu Ye

Abstract:

Successful public-private-partnership (PPP) implementation can not be achieved without the active participation of private sector companies. This paper examines the decision-making of private sector companies in public works delivered by the PPP model on the basis of social responsibility theory. It proposes that private sector companies should indentify objectives of entering into PPP projects, and shoulder relevant social responsibilities, while a minimum return should also be guaranteed in their favor, so as to compensate for their assumed risk and support them to take on responsibilities in the future. The paper also gives a calculation regarding the appropriate scale and reasonable degree of private sector involvement in PPP projects through the cost-benefit analysis in a specific case study, with the purpose to guide the private sector companies to create a cooperation environment resembling “symbiosis" and facilitate the smooth implementation of public works delivered by the PPP model.

Keywords: Social Responsibility Theory, Cost-benefit Analysis, PPP Projects, Private Sector Companies, Decision-making Modell

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1530
1311 Risk Allocation in Public-Private Partnership (PPP) Projects for Wastewater Treatment Plants

Authors: Samuel Capintero, Ole H. Petersen

Abstract:

This paper examines the utilization of public-private partnerships for the building and operation of wastewater treatment plants. Our research focuses on risk allocation in this kind of projects. Our analysis builds on more than hundred wastewater treatment plants built and operated through PPP projects in Aragon (Spain). The paper illustrates the consequences of an inadequate management of construction risk and an unsuitable transfer of demand risk in wastewater treatment plants. It also shows that the involvement of many public bodies at local, regional and national level further increases the complexity of this kind of projects and make time delays more likely.

Keywords: Wastewater, treatment plants, PPP, construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2286
1310 Deregulation of Turkish State Railways Based on Public-Private Partnership Approaches

Authors: S. Shakibaei, P. Alpkokin

Abstract:

The railway network is one of the major components of a transportation system in a country which may be an indicator of the country’s level of economic improvement. Since 2000s on, revival of national railways and development of High Speed Rail (HSR) lines are one of the most remarkable policies of Turkish government in railway sector. Within this trend, the railway age is to be revived and coming decades will be a golden opportunity. Indubitably, major infrastructures such as road and railway networks require sizeable investment capital, precise maintenance and reparation. Traditionally, governments are held responsible for funding, operating and maintaining these infrastructures. However, lack or shortage of financial resources, risk responsibilities (particularly cost and time overrun), and in some cases inefficacy in constructional, operational and management phases persuade governments to find alternative options. Financial power, efficient experiences and background of private sector are the factors convincing the governments to make a collaboration with private parties to develop infrastructures. Public-Private Partnerships (PPP or 3P or P3) and related regulatory issues are born considering these collaborations. In Turkey, PPP approaches have attracted attention particularly during last decade and these types of investments have been accelerated by government to overcome budget limitations and cope with inefficacy of public sector in improving transportation network and its operation. This study mainly tends to present a comprehensive overview of PPP concept, evaluate the regulatory procedure in Europe and propose a general framework for Turkish State Railways (TCDD) as an outlook on privatization, liberalization and deregulation of railway network.

Keywords: Deregulation, high-speed rail, liberalization, privatization, public-private partnership.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1085
1309 Public Private Partnership for Infrastructure Projects: Mapping the Key Risks

Authors: Julinda Keçi

Abstract:

In many countries, governments have been promoting the involvement of private sector entities to enter into long-term agreements for the development and delivery of large infrastructure projects, with a focus on overcoming the limitations upon public fund of the traditional approach. The involvement of private sector through public private partnerships (PPP) brings in new capital investments, value for money and additional risks to handle. Worldwide research studies have shown that an objective, systematic, reliable and useroriented risk assessment process and an optimal allocation mechanism among different stakeholders is crucial to the successful completion. In this framework, this paper, which is the first stage of a research study, aims to identify the main risks for the delivery of PPP projects. A review of cross-countries research projects and case studies was performed to map the key risks affecting PPP infrastructure delivery. The matrix of mapping offers a summary of the frequency of factors, clustered in eleven categories: construction, design, economic, legal, market, natural, operation, political, project finance, project selection and relationship. Results will highlight the most critical risk factors, and will hopefully assist the project managers in directing the managerial attention in the further stages of risk allocation.

Keywords: Construction, infrastructure, public private partnerships, risks.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3524
1308 Taking People, Process and Partnership on Board for Participatory Decision Making

Authors: B. Mikulskienė

Abstract:

Public administration institutions in cooperation with politicians are not the sole policy decision makers in full meaning any longer. Meanwhile, a special role, namely steering the decision making process, could be delegated to them. Despite the wide scientific discussion on different aspects what has direct impact on policy creation, there is a lack of holistic practical managerial advice, which could integrate infrastructure of policy decision making with intellectual capital and with interconnection of partnership. The proposed harmonized decision making model of process, people and partnership entitled by acronym HM-3P is analyzed as a framework for implementation of public administration steering role seeking the coherent social involvement in policy decision making.

Keywords: participatory decision making, partnership, stakeholders.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1453
1307 Client Satisfaction: Does Private or Public Health Sector Make a Difference? Results from Secondary Data Analysis in Sindh, Pakistan

Authors: Wajiha Javed, Arsalan Jabbar, Nelofer Mehboob, Muhammad Tafseer, Zahid Memon

Abstract:

Introduction: Researchers globally have strived to explore diverse factors that augment the continuation and uptake of family planning methods. Clients’ satisfaction is one of the core determinants facilitating continuation of family planning methods. There is a major debate yet scanty evidence to contrast public and private sectors with respect to client satisfaction. The objective of this study is to compare quality-of-care provided by public and private sectors of Pakistan through a client satisfaction lens. Methods: We used Pakistan Demographic Heath Survey 2012-13 dataset on 3133 women. Ten different multivariate models were made. to explore the relationship between client satisfaction and dependent outcome after adjusting for all known confounding factors and results are presented as OR and AOR (95% CI). Results: Multivariate analyses showed that clients were less satisfied in contraceptive provision from private sector as compared to public sector (AOR 0.92, 95% CI 0.63-1.68) even though the result was not statistically significant. Clients were more satisfied from private sector as compared to the public sector with respect to other determinants of quality-of-care follow-up care (AOR 3.29, 95% CI 1.95-5.55), infection prevention (AOR 2.41, 95% CI 1.60-3.62), counseling services (AOR 2.01, 95% CI 1.27-3.18, timely treatment (AOR 3.37, 95% CI 2.20-5.15), attitude of staff (AOR 2.23, 95% CI 1.50-3.33), punctuality of staff (AOR 2.28, 95% CI 1.92-4.13), timely referring (AOR 2.34, 95% CI 1.63-3.35), staff cooperation (AOR 1.75, 95% CI 1.22-2.51) and complications handling (AOR 2.27, 95% CI 1.56-3.29). Discussion: Public sector has successfully attained substantial satisfaction levels with respect to provision of contraceptives, but it contrasts previous literature from a multi country studies. Our study though in is concordance with a study from Tanzania where public sector was more likely to offer family planning services to clients as compared to private facilities. Conclusion: In majority of the developing countries, public sector is more involved in FP service provision; however, in Pakistan clients’ satisfaction in private sector is more, which opens doors for public-private partnerships and collaboration in the near future. 

Keywords: Client satisfaction, Family Planning, Public private partnership, Quality of care

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2026
1306 Effectual Role of Local Level Partnership Schemes in Affordable Housing Delivery

Authors: Hala S. Mekawy

Abstract:

Affordable housing delivery for low and lower middle income families is a prominent problem in many developing countries; governments alone are unable to address this challenge due to diverse financial and regulatory constraints, and the private sector's contribution is rare and assists only middle-income households even when institutional and legal reforms are conducted to persuade it to go down market. Also, the market-enabling policy measures advocated by the World Bank since the early nineties have been strongly criticized and proven to be inappropriate to developing country contexts, where it is highly unlikely that the formal private sector can reach low income population. In addition to governments and private developers, affordable housing delivery systems involve an intricate network of relationships between a diverse range of actors. Collaboration between them was proven to be vital, and hence, an approach towards partnership schemes for affordable housing delivery has emerged. The basic premise of this paper is that addressing housing affordability challenges in Egypt demands direct public support, as markets and market actors alone would never succeed in delivering decent affordable housing to low and lower middle income groups. It argues that this support would ideally be through local level partnership schemes, with a leading decentralized local government role, and partners being identified according to specific local conditions. It attempts to identify major attributes that would ensure the fulfillment of the goals of such schemes in the Egyptian context. This is based upon evidence from diversified worldwide experiences, in addition to the main outcomes of a questionnaire that was conducted to specialists and chief actors in the field.

Keywords: Affordable housing, partnership schemes.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2805
1305 Decision-Making Criteria of PPP Projects: Stakeholder Theoretic Perspective

Authors: Xueqin Shan, Wenhua Hou, Xiaosu Ye, Chuanming Wu

Abstract:

Any decision-making is based on certain theory. Taking the public rental housing in Chongqing municipality as an example, this essay states that the stakeholder theory can provide innovative criteria and evaluation methods for Public Private Partnership (PPP) projects. It gives an analysis of how to choose decision-making criteria for different stakeholders in the PPP model and what measures to take to meet the criteria to form “symbiotic" decision-making mode through contracts and to boost the application of PPP model in large-scale public programs in China.

Keywords: PPP, Stakeholder Theory, Stakeholders, Decision- making Criteria

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2422
1304 Private Monetary Rates of Return to Humanities and Education Programs in Public Universities in Osun State, Nigeria

Authors: A. S. Adelokun, O. O. Gambo, A. A. Adegboye

Abstract:

This study estimates the private cost of Humanities and Education programs in public universities in Osun state, Nigeria, as well as the private monetary returns to Humanities and Education programs in public universities in the state. It also estimates the private rates of return to Humanities and Education programmes in public universities in Osun state; with the view of providing information on the relative profitability of investments in Humanities and Education programs in public universities in Osun state. The study adopted a descriptive survey research design. The population for the study consisted of all Humanities and Education students from public universities in Osun State and all Humanities and Education graduates who are workers in Osun state establishments. The sample was made up of 600 students and 120 workers. The students were selected through simple random sampling technique from the two public universities in the state while the workers were purposively selected from Osun state establishments. These workers were graduates of Humanities and Education programs. The selected programs included Bachelor of Arts (B.A.) in English, Bachelor of Education (B.Ed.) in English, B.A. in Religious Studies, B.Ed. in Religious Studies, B.A. in Yoruba and B.Ed. in Yoruba. Two research instruments were used, namely: Private Costs of University Education Questionnaire (PCUEQ) and Age Education Earnings of Workers Questionnaire (AEEWQ). The data were analyzed using compounding and discount cash flow techniques. The results showed that the private costs of Humanities and Education programs in public universities in Osun state were N855,935.59 and N694,269.34 respectively. The private monetary returns to Humanities and Education programs in public universities in the State were N9,052,859.28 and N9,052,859.28, respectively. The private rates of return to Humanities and Education programmes in public universities in Osun state were 27.36% and 34.40% respectively. The study concluded that it was more profitable to invest in Education programs than in Humanities programs at public universities in Osun state, Nigeria.

Keywords: Rates of return, private cost, investment, education.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 445
1303 Software to Encrypt Messages Using Public-Key Cryptography

Authors: E. Inzunza-González, C. Cruz-Hernández, R. M. López-Gutiérrez, E. E. García-Guerrero, L. Cardoza- Avendaño, H. Serrano-Guerrero

Abstract:

In this paper the development of a software to encrypt messages with asymmetric cryptography is presented. In particular, is used the RSA (Rivest, Shamir and Adleman) algorithm to encrypt alphanumeric information. The software allows to generate different public keys from two prime numbers provided by the user, the user must then select a public-key to generate the corresponding private-key. To encrypt the information, the user must provide the public-key of the recipient as well as the message to be encrypted. The generated ciphertext can be sent through an insecure channel, so that would be very difficult to be interpreted by an intruder or attacker. At the end of the communication, the recipient can decrypt the original message if provide his/her public-key and his/her corresponding private-key.

Keywords: Asymmetric cryptography, Prime number, Publickey, Private-key, Software.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1687
1302 PPP in Light Rail Transit Systems in Spain

Authors: S. Carpintero, R. Barcham

Abstract:

Light rail systems have proliferated in Spain in the last decade, following a tendency that is common not only in other European countries but also in other parts of the world. This paper reviews the benefits of light rail systems, both related to environmental issues and mobility issues. It analyses the evolution of light rail projects in Spain and shows that light rail systems in this country have evolved towards an extensive use of public-private partnerships. The analysis of the Spanish projects, however, does not contribute any conclusive evidence about whether public-private partnerships have been more efficient than publicly owned enterprises in building and operating light rail systems.

Keywords: Light rail systems, public-private partnerships, BOT.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3276
1301 Citizens- Expectations from Rural Telecentres: A Case Study of Implementation of Common Service Centres in Mushedpur Village, Haryana, India

Authors: Charru Malhotra, Girija Krishnaswamy

Abstract:

Setting up of rural telecentres, popularly referred to as Common Service Centres (CSCs), are considered one of the initial forerunners of rural e-Governance initiatives under the Government of India-s National e-Governance Plan (NeGP). CSCs are implemented on public-private partnership (PPP) – where State governments play a major role in facilitating the establishment of CSCs and investments are made by private companies referred to as Service Centre Agencies (SCAs). CSC implementation is expected to help in improving public service delivery in a transparent and efficient manner. However, there is very little research undertaken to study the actual impact of CSC implementation at the grassroots level. This paper addresses the gap by identifying the circumstances, concerns and expectations from the point-of-view of citizens and examining the finer aspects of social processes in the context of rural e-Governance.

Keywords: Capacity Building, Citizens' Participation, e- Government, NeGP, PPP, Rural Telecentres

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1761
1300 Role of Investment in the Course of Economic Growth in Pakistan

Authors: Maqbool Hussain Sial, Maaida Hussain Hashmi, Sofia Anwar

Abstract:

The present research was focused to investigate the role of investment in the course of economic growth with reference to Pakistan. The study analyzed the role of the public and private investment and impact of the political and macroeconomic uncertainty on economic growth of Pakistan by using the vector autoregressive approach (VAR). In long-run both public and private investment showed a positive impact on economic growth but the growth was largely driven by private investment as compared to public investment. Government consumption expenditure, economic uncertainty and political instability hampered the economic growth of Pakistan. In short-run the private investment positively influences the growth but there was negative and insignificant effect of the public investment and government consumption expenditure on the growth. There was a positive relationship found between economic uncertainty (proxy for inflation) and GDP in short run.

Keywords: Investment, Government Consumption, Growth, Co-integration, Pakistan.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2124
1299 A Study of the Costs and Benefits of Smart City Projects Including the Scenario of Public-Private Partnerships

Authors: Patrick T. I. Lam, Wenjing Yang

Abstract:

A smart city project embraces benefits and costs which can be classified under direct and indirect categories. Externalities come into the picture, but they are often difficult to quantify. Despite this barrier, policy makers need to carry out cost-benefit analysis to justify the huge investments needed to make a city smart. The recent trend is towards the engagement of the private sector to utilize their resources and expertise, especially in the Information and Communication Technology (ICT) areas, where innovations blossom. This study focuses on the identification of costs (on a life cycle basis) and benefits associated with smart city project developments based on a comprehensive literature review and case studies, where public-private partnerships would warrant consideration, the related costs and benefits are highlighted. The findings will be useful for policy makers of cities.

Keywords: Costs and benefits, identification, public-private partnerships, smart city projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1694
1298 Lean Thinking and E-Commerce as New Opportunities to Improve Partnership in Supply Chain of Construction Industries

Authors: Kaustav Kundu, Alberto Portioli Staudacher

Abstract:

Construction industry plays a vital role in the economy of the world. However, due to high uncertainty and variability in the industry, its performance is not as efficient in terms of quality, lead times, productivity and costs as of other industries. Moreover, there are continuous conflicts among the different actors in the construction supply chains in terms of profit sharing. Previous studies suggested partnership as an important approach to promote cooperation among the different actors in the construction supply chains and thereby it improves the overall performance. Construction practitioners tried to focus on partnership which can enhance the performance of construction supply chains but they are not fully aware of different approaches and techniques for improving partnership. In this research, a systematic review on partnership in relation to construction supply chains is carried out to understand different elements influencing the partnership. The research development of this domain is analyzed by reviewing selected articles published from 1996 to 2015. Based on the papers, three major elements influencing partnership in construction supply chains are identified: ‘Lean approach’, ‘Relationship building’ and ‘E-commerce applications’. This study analyses the contributions in the areas within each element and provides suggestions for future developments of partnership in construction supply chains.

Keywords: Partnership, construction, lean, SCM, supply chain management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2420
1297 A Study on Websites of Public and Private Hospitals in Konya

Authors: H. Nur Gorkemli, Mehmet Fidan

Abstract:

After the first acquaintance with internet in April 1993, number of internet users increased rapidly in Turkey. Almost half of the population between 16-74 age group use internet in the country. Hospitals are one of the areas where the internet is intensively being used like many other businesses. As a part of public relations application, websites are important tools for hospitals to reach a wide range of target audience within and outside the organization. With their websites, hospitals have opportunities to give information about their organization, strengthen their image, compete with their rivals, interact with shareholders, reflect their transparency and meet with new audiences. This study examines web sites of totally 34 hospitals which are located in Konya. Institutions are categorized as public and private hospitals and then three main research categories are determined: content, visual and technical. Main and sub categories are examined by using content analysis method. Results are interpreted in scope of public and private institutions and as a whole.

Keywords: Health Communication, Hospital, Internet, Webpages, Websites

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1646
1296 The Potential of Hybrid Microgrids for Mitigating Power Outage in Lebanon

Authors: R. Chedid, R. Ghajar

Abstract:

Lebanon electricity crisis continues to escalate. Rationing hours still apply across the country but with different rates. The capital Beirut is subjected to 3 hours cut while other cities, town and villages may endure 9 to 14 hours of power shortage. To mitigate this situation, private diesel generators distributed illegally all over the country are being used to bridge the gap in power supply. Almost each building in large cities has its own generator and individual villages may have more than one generator supplying their loads. These generators together with their private networks form incomplete and ill-designed and managed microgrids (MG) but can be further developed to become renewable energy-based MG operating in island- or grid-connected modes. This paper will analyze the potential of introducing MG to help resolve the energy crisis in Lebanon. It will investigate the usefulness of developing MG under the prevailing situation of existing private power supply service providers and in light of the developed national energy policy that supports renewable energy development. A case study on a distribution feeder in a rural area will be analyzed using HOMER software to demonstrate the usefulness of introducing photovoltaic (PV) arrays along the existing diesel generators for all the stakeholders; namely, the developers, the customers, the utility and the community at large. Policy recommendations regarding MG development in Lebanon will be presented on the basis of the accumulated experience in private generation and the privatization and public-private partnership laws.

Keywords: Decentralized systems, microgrids, distributed generation, renewable energy.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 981
1295 The Role of Private Equity during Global Crises

Authors: Libena Cernohorska, Veronika Linhartova, Michal Sinka, Petr Teply

Abstract:

The term private equity usually refers to any type of equity investment in an asset in which the equity is not freely tradable on a public stock market. Some researchers believe that private equity contributed to the extent of the crisis and increased the pace of its spread over the world. We do not agree with this. On the other hand, we argue that during the economic recession private equity might become an important source of funds for firms with special needs (e.g. for firms seeking buyout financing, venture capital, expansion capital or distress debt financing). However, over-regulation of private equity in both the European Union and the US can slow down this specific funding channel to the economy and deepen credit crunch during global crises.

Keywords: scredit lunch, distress debt, global crisis, private equity, regulation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1865
1294 Risks and Mitigation Measures in Build-Operate-Transfer Projects

Authors: Syed Kamarul Bakri Syed Ahmad Bokharey, Kalaikumar Vallyutham, Narayanan Sambu Potty, Nabilah Abu Bakar

Abstract:

Infrastructure investments are important in developing countries, it will not only help to foster the economic growth of a nation, but it will also act as a platform in which new forms of partnership and collaboration can be developed mainly in East Asian countries. Since the last two decades, many infrastructure projects had been completed through build-operate-transfer (BOT) type of procurement. The developments of BOT have attracted participation of local and foreign private sector investor to secure funding and to deliver projects on time, within the budget and to the required specifications. Private sectors are preferred by the government in East Asia to participate in BOT projects due to lack of public funding. The finding has resulted that the private sector or promoter of the BOT projects is exposed to multiple risks which have been discussed in this paper. Effective risk management methods and good managerial skills are required in ensuring the success of the project. The review indicated that mitigation measures should be employed by the promoter throughout the concession period and support from the host government is also required in ensuring the success of the BOT project.

Keywords: BOT project, risks management, concessionaire, consortium.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8203
1293 The Dilemma of Retention in the Context of Rapidly Growing Economies Based on the Effectiveness of HRM Policies: A Case Study of Qatar

Authors: A. Qayed Al-Emadi, C. Schwabenland, B. Czarnecka

Abstract:

In 2009, the new HRM policy was implemented in Qatar for public sector organisations. The purpose of this research is to examine how Qatar’s 2009 HRM policy was significant in influencing employee retention in public organisations. The conducted study utilised quantitative methodology to analyse the data on employees’ perceptions of such HRM practices as Performance Management, Rewards and Promotion, Training and Development associated with the HRM policy in public organisations in comparison to semi-private organisations. Employees of seven public and semi-private organisations filled in the questionnaire based on the 5-point Likert scale to present quantitative results. The data was analysed with the correlation and multiple regression statistical analyses. It was found that Performance Management had the relationship with Employee Retention, and Rewards and Promotion influenced Job Satisfaction in public organisations. Relationship between Job Satisfaction and Employee Retention was also observed. However, no significant differences were observed in the role of HRM practices in public and semi-private organisations.

Keywords: Performance management, rewards, promotion, training and development, job satisfaction, employee retention, SHRM, configurationally perspective.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2708
1292 The Hybrid Socio-Technical Approach as a Strategic Program for Social Development in Geo-disaster Prone Area in Indonesia

Authors: D. Karnawati, T.F. Fathani , B. Andayani, Suharto

Abstract:

This paper highlights the importance of integrating social and technical approach (which is so called a “hybrid socio-technical approach") as one innovative and strategic program to support the social development in geodisaster prone area in Indonesia. Such program mainly based on public education and community participation as a partnership program by the University, local government and may also with the private company and/ or local NGO. The indigenous, simple and low cost technology has also been introduced and developed as a part of the hybrid sociotechnical system, in order to ensure the life and environmental protection, with respect to the sustainable human and social development.

Keywords: Hybrid socio-technical system, indigenoustechnology, life and environmental protection, public education.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1721
1291 A Model for Application of Knowledge Management in Public Organizations in Iran

Authors: Salavati, Adel, Ebadi Shaghayegh

Abstract:

This study examines knowledge management in the public organizations in Iran. The purpose of this article is to provide a conceptual framework for application of knowledge management in public organizations. The study indicates that an increasing tendency for implementation of knowledge management in organizations is emerging. Nonetheless knowledge management in public organizations is toddler and little has been done to bring the subject to use in the public sector. The globalization of change and popularization of some values like participation, citizen-orientation and knowledge-orientation in the new theories of public administration requires that the knowledge management is considered and attend to in the public sector. This study holds that a knowledge management framework for public organizations is different from this in the public sector, because public sector is stakeholder-dependent while the private is shareholder-dependent. Based on the research, we provide a conceptual model. The model proposed involves three factors: Organizational, knowledge citizens and contextual factors. The study results indicate these factors affect on knowledge management in public organizations in Iran.

Keywords: Knowledge management, public organizations in Iran, model of knowledge management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2097
1290 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: Public-private partnerships, insurance, contract, risk.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 854
1289 Restructuring Kuwait Electric Power System: Mandatory or Optional?

Authors: Osamah A. Alsayegh

Abstract:

Kuwait-s electric power system is vertically integrated organization owned and operated by the government. For more than five decades, the government of Kuwait has provided relatively reliable electric services to consumers with subsidized electric service fees. Given the country-s rapid socio-economical development and consequently the increase of electricity demand, a question that inflicts itself: Is it necessary to reform the power system to face the fast growing demand? This paper recommends that the government should consider the private sector as a partner in operating the power system. Therefore, power system restructuring is needed to allow such partnership. There are challenges that prevent such restructuring. Abstract recommendations toward resolving these challenges are proposed.

Keywords: Deregulation, electricity market, ISO, private sector.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3679
1288 Juxtaposing South Africa’s Private Sector and Its Public Service Regarding Innovation Diffusion, to Explore the Obstacles to E-Governance

Authors: Petronella Jonck, Freda van der Walt

Abstract:

Despite the benefits of innovation diffusion in the South African public service, implementation thereof seems to be problematic, particularly with regard to e-governance which would enhance the quality of service delivery, especially accessibility, choice, and mode of operation. This paper reports on differences between the public service and the private sector in terms of innovation diffusion. Innovation diffusion will be investigated to explore identified obstacles that are hindering successful implementation of e-governance. The research inquiry is underpinned by the diffusion of innovation theory, which is premised on the assumption that innovation has a distinct channel, time, and mode of adoption within the organisation. A comparative thematic document analysis was conducted to investigate organisational differences with regard to innovation diffusion. A similar approach has been followed in other countries, where the same conceptual framework has been used to guide document analysis in studies in both the private and the public sectors. As per the recommended conceptual framework, three organisational characteristics were emphasised, namely the external characteristics of the organisation, the organisational structure, and the inherent characteristics of the leadership. The results indicated that the main difference in the external characteristics lies in the focus and the clientele of the private sector. With regard to organisational structure, private organisations have veto power, which is not the case in the public service. Regarding leadership, similarities were observed in social and environmental responsibility and employees’ attitudes towards immediate supervision. Differences identified included risk taking, the adequacy of leadership development, organisational approaches to motivation and involvement in decision making, and leadership style. Due to the organisational differences observed, it is recommended that differentiated strategies be employed to ensure effective innovation diffusion, and ultimately e-governance. It is recommended that the results of this research be used to stimulate discussion on ways to improve collaboration between the mentioned sectors, to capitalise on the benefits of each sector.

Keywords: E-governance, ICT, innovation diffusion, comparative analysis.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1787
1287 Classroom Incivility Behaviours among Medical Students: A Comparative Study in Pakistan

Authors: Manal Rauf

Abstract:

Trained medical practitioners are produced from medical colleges serving in public and private sectors. Prime responsibility of teaching faculty is to inculcate required work ethic among the students by serving as role models for them. It is an observed fact that classroom incivility behaviours are providing a friction in achieving these targets. Present study aimed at identification of classroom incivility behaviours observed by teachers and students of public and private medical colleges as per Glasser’s Choice Theory, making a comparison and investigating the strategies being adopted by teachers of both sectors to control undesired class room behaviours. Findings revealed that a significant difference occurs between teacher and student incivility behaviours. Public sector teacher focussed on survival as a strong factor behind in civil behaviours whereas private sector teachers considered power as the precedent for incivility. Teachers of both sectors are required to use verbal as well as non-verbal immediacy to reach a healthy leaning environment.

Keywords: Classroom incivility behaviour, Glasser choice theory, Mehrabian immediacy theory, medical student.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1364