14183 Drawing Building Blocks in Existing Neighborhoods: An Automated Pilot Tool for an Initial Approach Using GIS and Python

Authors: Konstantinos Pikos, Dimitrios Kaimaris

Abstract:

Although designing building blocks is a procedure used by many planners around the world, there isn’t an automated tool that will help planners and designers achieve their goals with lesser effort. The difficulty of the subject lies in the repeating process of manually drawing lines, while not only it is mandatory to maintain the desirable offset but to also achieve a lesser impact to the existing building stock. In this paper, using Geographical Information Systems (GIS) and the Python programming language, an automated tool integrated into ArcGIS PRO, is being presented. Despite its simplistic enviroment and the lack of specialized building legislation due to the complex state of the field, a planner who is aware of such technical information can use the tool to draw an initial approach of the final building blocks in an area with pre-existing buildings in an attempt to organize the usually sprawling suburbs of a city or any continuously developing area. The tool uses ESRI’s ArcPy library to handle the spatial data, while interactions with the user is made throught Tkinter. The main process consists of a modification of building edgescoordinates, using NumPy library, in an effort to draw the line of best fit, so the user can get the optimal results per block’s side. Finally, after the tool runs successfully, a table of primary planning information is shown, such as the area of the building block and its coverage rate. Regardless of the primary stage of the tool’s development, it is a solid base where potential planners with programming skills could invest, so they can make the tool adapt to their individual needs. An example of the entire procedure in a test area is provided, highlighting both the strengths and weaknesses of the final results.

Keywords: arcPy, GIS, python, building blocks

Procedia PDF Downloads 157
14182 BIM Data and Digital Twin Framework: Preserving the Past and Predicting the Future

Authors: Mazharuddin Syed Ahmed

Abstract:

This research presents a framework used to develop The Ara Polytechnic College of Architecture Studies building “Kahukura” which is Green Building certified. This framework integrates the development of a smart building digital twin by utilizing Building Information Modelling (BIM) and its BIM maturity levels, including Levels of Development (LOD), eight dimensions of BIM, Heritage-BIM (H-BIM) and Facility Management BIM (FM BIM). The research also outlines a structured approach to building performance analysis and integration with the circular economy, encapsulated within a five-level digital twin framework. Starting with Level 1, the Descriptive Twin provides a live, editable visual replica of the built asset, allowing for specific data inclusion and extraction. Advancing to Level 2, the Informative Twin integrates operational and sensory data, enhancing data verification and system integration. At Level 3, the Predictive Twin utilizes operational data to generate insights and proactive management suggestions. Progressing to Level 4, the Comprehensive Twin simulates future scenarios, enabling robust “what-if” analyses. Finally, Level 5, the Autonomous Twin, represents the pinnacle of digital twin evolution, capable of learning and autonomously acting on behalf of users.

Keywords: building information modelling, circular economy integration, digital twin, predictive analytics

Procedia PDF Downloads 17
14181 Wind Interference Effect on Tall Building

Authors: Atul K. Desai, Jigar K. Sevalia, Sandip A. Vasanwala

Abstract:

When a building is located in an urban area, it is exposed to a wind of different characteristics then wind over an open terrain. This is development of turbulent wake region behind an upstream building. The interaction with upstream building can produce significant changes in the response of the tall building. Here, in this paper, an attempt has been made to study wind induced interference effects on tall building. In order to study wind induced interference effect (IF) on Tall Building, initially a tall building (which is termed as Principal Building now on wards) with square plan shape has been considered with different Height to Width Ratio and total drag force is obtained considering different terrain conditions as well as different incident wind direction. Then total drag force on Principal Building is obtained by considering adjacent building which is termed as Interfering Building now on wards with different terrain conditions and incident wind angle. To execute study, Computational Fluid Dynamics (CFD) Code namely Fluent and Gambit have been used.

Keywords: computational fluid dynamics, tall building, turbulent, wake region, wind

Procedia PDF Downloads 504
14180 Assessment of Causes of Building Collapse in Nigeria

Authors: Olufemi Oyedele

Abstract:

Building collapse (BC) in Nigeria is becoming a regular occurrence, each recording great casualties in the number of lives and materials lost. Building collapse is a situation where building which has been completed and occupied, completed but not occupied or under construction, collapses on its own due to action or inaction of man or due to natural event like earthquake, storm, flooding, tsunami or wildfire. It is different from building demolition. There are various causes of building collapse and each case requires expert judgment to decide the cause of its collapse. Rate of building collapse is a reflection of the level of organization and control of building activities and degree of sophistication of the construction professionals in a country. This study explored the use of case study by examining the causes of six (6) collapsed buildings (CB) across Nigeria. Samples of materials from the sites of the collapsed buildings were taken for testing and analysis, while critical observations were made at the sites to note the conditions of the ground (building base). The study found out that majority of the building collapses in Nigeria were due to poor workmanship, sub-standard building materials, followed by bad building base and poor design. The National Building Code 2006 is not effective due to lack of enforcement and the Physical Development Departments of states and Federal Capital Territory are just mere agents of corruption allowing all types of construction without building approvals.

Keywords: building collapse, concrete tests, differential settlement, integrity test, quality control

Procedia PDF Downloads 494
14179 Design and Modeling of a Green Building Energy Efficient System

Authors: Berhane Gebreslassie

Abstract:

Conventional commericial buildings are among the highest unwisely consumes enormous amount of energy and as consequence produce significant amount Carbon Dioxide (CO2). Traditional/conventional buildings have been built for years without consideration being given to their impact on the global warming issues as well as their CO2 contributions. Since 1973, simulation of Green Building (GB) for Energy Efficiency started and many countries in particular the US showed a positive response to minimize the usage of energy in respect to reducing the CO2 emission. As a consequence many software companies developed their own unique building energy efficiency simulation software, interfacing interoperability with Building Information Modeling (BIM). The last decade has witnessed very rapid growing number of researches on GB energy efficiency system. However, the study also indicates that the results of current GB simulation are not yet satisfactory to meet the objectives of GB. In addition most of these previous studies are unlikely excluded the studies of ultimate building energy efficiencies simulation. The aim of this project is to meet the objectives of GB by design, modeling and simulation of building ultimate energy efficiencies system. This research project presents multi-level, L-shape office building in which every particular part of the building materials has been tested for energy efficiency. An overall of 78.62% energy is saved, approaching to NetZero energy saving. Furthermore, the building is implements with distributed energy resources like renewable energies and integrating with Smart Building Automation System (SBAS) for controlling and monitoring energy usage.

Keywords: ultimate energy saving, optimum energy saving, green building, sustainable materials and renewable energy

Procedia PDF Downloads 248
14178 Identification of Failures Occurring on a System on Chip Exposed to a Neutron Beam for Safety Applications

Authors: S. Thomet, S. De-Paoli, F. Ghaffari, J. M. Daveau, P. Roche, O. Romain

Abstract:

In this paper, we present a hardware module dedicated to understanding the fail reason of a System on Chip (SoC) exposed to a particle beam. Impact of Single-Event Effects (SEE) on processor-based SoCs is a concern that has increased in the past decade, particularly for terrestrial applications with automotive safety increasing requirements, as well as consumer and industrial domains. The SEE created by the impact of a particle on an SoC may have consequences that can end to instability or crashes. Specific hardening techniques for hardware and software have been developed to make such systems more reliable. SoC is then qualified using cosmic ray Accelerated Soft-Error Rate (ASER) to ensure the Soft-Error Rate (SER) remains in mission profiles. Understanding where errors are occurring is another challenge because of the complexity of operations performed in an SoC. Common techniques to monitor an SoC running under a beam are based on non-intrusive debug, consisting of recording the program counter and doing some consistency checking on the fly. To detect and understand SEE, we have developed a module embedded within the SoC that provide support for recording probes, hardware watchpoints, and a memory mapped register bank dedicated to software usage. To identify CPU failure modes and the most important resources to probe, we have carried out a fault injection campaign on the RTL model of the SoC. Probes are placed on generic CPU registers and bus accesses. They highlight the propagation of errors and allow identifying the failure modes. Typical resulting errors are bit-flips in resources creating bad addresses, illegal instructions, longer than expected loops, or incorrect bus accesses. Although our module is processor agnostic, it has been interfaced to a RISC-V by probing some of the processor registers. Probes are then recorded in a ring buffer. Associated hardware watchpoints are allowing to do some control, such as start or stop event recording or halt the processor. Finally, the module is also providing a bank of registers where the firmware running on the SoC can log information. Typical usage is for operating system context switch recording. The module is connected to a dedicated debug bus and is interfaced to a remote controller via a debugger link. Thus, a remote controller can interact with the monitoring module without any intrusiveness on the SoC. Moreover, in case of CPU unresponsiveness, or system-bus stall, the recorded information can still be recovered, providing the fail reason. A preliminary version of the module has been integrated into a test chip currently being manufactured at ST in 28-nm FDSOI technology. The module has been triplicated to provide reliable information on the SoC behavior. As the primary application domain is automotive and safety, the efficiency of the module will be evaluated by exposing the test chip under a fast-neutron beam by the end of the year. In the meantime, it will be tested with alpha particles and electromagnetic fault injection (EMFI). We will report in the paper on fault-injection results as well as irradiation results.

Keywords: fault injection, SoC fail reason, SoC soft error rate, terrestrial application

Procedia PDF Downloads 200
14177 Implementation of Building Information Modeling in Turkish Government Sector Projects

Authors: Mohammad Lemar Zalmai, Mustafa Nabi Kocakaya, Cemil Akcay, Ekrem Manisali

Abstract:

In recent years, the Building Information Modeling (BIM) approach has been developed expeditiously. As people see the benefits of this approach, it has begun to be used widely in construction projects and some countries made it mandatory to get more benefits from it. To promote the implementation of BIM in construction projects, it will be helpful to get some relevant information from surveys and interviews. The purpose of this study is to research the current adoption and implementation of BIM in public projects in Turkey. This study specified the challenges of BIM implementation in Turkey and proposed some solutions to overcome them. In this context, the challenges for BIM implementation and the factors that affect the BIM usage are determined based on previous academic researches and expert opinions by conducting interviews and questionnaire surveys. Several methods are used to process information in order to obtain weights of different factors to make BIM widespread in Turkey. This study concluded interviews' and questionnaire surveys' outcomes and proposed some suggestions to promote the implementation of BIM in Turkey. We believe research findings will be a good reference for boosting BIM implementation in Turkey.

Keywords: building information modelling, BIM implementations, Turkish construction industry, Turkish government sector projects

Procedia PDF Downloads 110
14176 The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance

Authors: P. F. Wong, H. Salleh, F. A. Rahim

Abstract:

The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.

Keywords: Building Information Modeling (BIM), quantity surveyors, capability, project performance

Procedia PDF Downloads 337
14175 Building User Behavioral Models by Processing Web Logs and Clustering Mechanisms

Authors: Madhuka G. P. D. Udantha, Gihan V. Dias, Surangika Ranathunga

Abstract:

Today Websites contain very interesting applications. But there are only few methodologies to analyze User navigations through the Websites and formulating if the Website is put to correct use. The web logs are only used if some major attack or malfunctioning occurs. Web Logs contain lot interesting dealings on users in the system. Analyzing web logs has become a challenge due to the huge log volume. Finding interesting patterns is not as easy as it is due to size, distribution and importance of minor details of each log. Web logs contain very important data of user and site which are not been put to good use. Retrieving interesting information from logs gives an idea of what the users need, group users according to their various needs and improve site to build an effective and efficient site. The model we built is able to detect attacks or malfunctioning of the system and anomaly detection. Logs will be more complex as volume of traffic and the size and complexity of web site grows. Unsupervised techniques are used in this solution which is fully automated. Expert knowledge is only used in validation. In our approach first clean and purify the logs to bring them to a common platform with a standard format and structure. After cleaning module web session builder is executed. It outputs two files, Web Sessions file and Indexed URLs file. The Indexed URLs file contains the list of URLs accessed and their indices. Web Sessions file lists down the indices of each web session. Then DBSCAN and EM Algorithms are used iteratively and recursively to get the best clustering results of the web sessions. Using homogeneity, completeness, V-measure, intra and inter cluster distance and silhouette coefficient as parameters these algorithms self-evaluate themselves to input better parametric values to run the algorithms. If a cluster is found to be too large then micro-clustering is used. Using Cluster Signature Module the clusters are annotated with a unique signature called finger-print. In this module each cluster is fed to Associative Rule Learning Module. If it outputs confidence and support as value 1 for an access sequence it would be a potential signature for the cluster. Then the access sequence occurrences are checked in other clusters. If it is found to be unique for the cluster considered then the cluster is annotated with the signature. These signatures are used in anomaly detection, prevent cyber attacks, real-time dashboards that visualize users, accessing web pages, predict actions of users and various other applications in Finance, University Websites, News and Media Websites etc.

Keywords: anomaly detection, clustering, pattern recognition, web sessions

Procedia PDF Downloads 257
14174 Geometric Simplification Method of Building Energy Model Based on Building Performance Simulation

Authors: Yan Lyu, Yiqun Pan, Zhizhong Huang

Abstract:

In the design stage of a new building, the energy model of this building is often required for the analysis of the performance on energy efficiency. In practice, a certain degree of geometric simplification should be done in the establishment of building energy models, since the detailed geometric features of a real building are hard to be described perfectly in most energy simulation engine, such as ESP-r, eQuest or EnergyPlus. Actually, the detailed description is not necessary when the result with extremely high accuracy is not demanded. Therefore, this paper analyzed the relationship between the error of the simulation result from building energy models and the geometric simplification of the models. Finally, the following two parameters are selected as the indices to characterize the geometric feature of in building energy simulation: the southward projected area and total side surface area of the building, Based on the parameterization method, the simplification from an arbitrary column building to a typical shape (a cuboid) building can be made for energy modeling. The result in this study indicates that this simplification would only lead to the error that is less than 7% for those buildings with the ratio of southward projection length to total perimeter of the bottom of 0.25~0.35, which can cover most situations.

Keywords: building energy model, simulation, geometric simplification, design, regression

Procedia PDF Downloads 152
14173 Building Information Modeling Acting as Protagonist and Link between the Virtual Environment and the Real-World for Efficiency in Building Production

Authors: Cristiane R. Magalhaes

Abstract:

Advances in Information and Communication Technologies (ICT) have led to changes in different sectors particularly in architecture, engineering, construction, and operation (AECO) industry. In this context, the advent of BIM (Building Information Modeling) has brought a number of opportunities in the field of the digital architectural design process bringing integrated design concepts that impact on the development, elaboration, coordination, and management of ventures. The project scope has begun to contemplate, from its original stage, the third dimension, by means of virtual environments (VEs), composed of models containing different specialties, substituting the two-dimensional products. The possibility to simulate the construction process of a venture in a VE starts at the beginning of the design process offering, through new technologies, many possibilities beyond geometrical digital modeling. This is a significant change and relates not only to form, but also to how information is appropriated in architectural and engineering models and exchanged among professionals. In order to achieve the main objective of this work, the Design Science Research Method will be adopted to elaborate an artifact containing strategies for the application and use of ICTs from BIM flows, with pre-construction cut-off to the execution of the building. This article intends to discuss and investigate how BIM can be extended to the site acting as a protagonist and link between the Virtual Environments and the Real-World, as well as its contribution to the integration of the value chain and the consequent increase of efficiency in the production of the building. The virtualization of the design process has reached high levels of development through the use of BIM. Therefore it is essential that the lessons learned with the virtual models be transposed to the actual building production increasing precision and efficiency. Thus, this paper discusses how the Fourth Industrial Revolution has impacted on property developments and how BIM could be the propellant acting as the main fuel and link between the virtual environment and the real production for the structuring of flows, information management and efficiency in this process. The results obtained are partial and not definite up to the date of this publication. This research is part of a doctoral thesis development, which focuses on the discussion of the impact of digital transformation in the construction of residential buildings in Brazil.

Keywords: building information modeling, building production, digital transformation, ICT

Procedia PDF Downloads 101
14172 Simulation of Photovoltaic Array for Specified Ratings of Converter

Authors: Smita Pareek, Ratna Dahiya

Abstract:

The power generated by solar photovoltaic (PV) module depends on surrounding irradiance, temperature, shading conditions, and shading pattern. This paper presents a simulation of photovoltaic module using Matlab/Simulink. PV Array is also simulated by series and parallel connections of modules and their characteristics curves are given. Further PV module topology/configuration are proposed for 5.5kW inverter available in the literature. Shading of a PV array either complete or partial can have a significant impact on its power output and energy yield; therefore, the simulated model characteristics curves (I-V and P-V) are drawn for uniform shading conditions (USC) and then output power, voltage and current are calculated for variation in insolation for shading conditions. Additionally the characteristics curves are also given for a predetermined shadowing condition.

Keywords: array, series, parallel, photovoltaic, partial shading

Procedia PDF Downloads 535
14171 A Case Study on Post-Occupancy Evaluation of User Satisfaction in Higher Educational Buildings

Authors: Yuanhong Zhao, Qingping Yang, Andrew Fox, Tao Zhang

Abstract:

Post-occupancy evaluation (POE) is a systematic approach to assess the actual building performance after the building has been occupied for some time. In this paper, a structured POE assessment was conducted using the building use survey (BUS) methodology in two higher educational buildings in the United Kingdom. This study aims to help close the building performance gap, provide optimized building operation suggestions, and to improve occupants’ satisfaction level. In this research, the questionnaire survey investigated the influences of environmental factors on user satisfaction from the main aspects of building overall design, thermal comfort, perceived control, indoor environment quality for noise, lighting, ventilation, and other non-environmental factors, such as the background information about age, sex, time in buildings, workgroup size, and so on. The results indicate that the occupant satisfaction level with the main aspects of building overall design, indoor environment quality, and thermal comfort in summer and winter on both two buildings, which is lower than the benchmark data. The feedback of this POE assessment has been reported to the building management team to allow managers to develop high-performance building operation plans. Finally, this research provided improvement suggestions to the building operation system to narrow down the performance gap and improve the user work experience satisfaction and productivity level.

Keywords: building performance assessment systems, higher educational buildings, post-occupancy evaluation, user satisfaction

Procedia PDF Downloads 122
14170 An Evaluation of Cognitive Function Level, Depression, and Quality of Life of Elderly People Living in a Nursing Home

Authors: Ayse Inel Manav, Saliha Bozdogan Yesilot, Pinar Yesil Demirci, Gursel Oztunc

Abstract:

Introduction: This study was conducted with a view to evaluating cognitive function level, depression, and quality of life of elderly people living in a nursing home. Methods: This study, which is cross-sectional and descriptive in nature, was conducted in the Nursing and Rehabilitation Center for the Elderly in Adana/Turkey between 1st of May and 1st of August, 2016. The participants included 118 elderly people who were chosen using simple random sampling method. The data were collected using the Personal Information Form, the Standardized Mini Mental State Exam (SMMSE), the Geriatric Depression Scale (GDS), and the World Health Organization Quality of Life-OLD (WHOQOL-OLD) module. The data were analyzed using IBM SPSS Statistics 22 (IBM, SPSS, Turkey) program. Results: Of all the participants, 36,4% (n=43) were female, 63,6% (n=75) were male, and average age was 74,08 ± 8,23 years. The participants’ SMMSE mean score was found 20,37 ± 7,08, GDS mean score was 14,92 ± 4,29, and WHOQOL-OLD module mean score was 69,76 ± 11,54. There was a negative, significant relationship between SMMSE and GDS scores, a positive relationship between WHOQOL-OLD module total scores and a negative, significant relationship between GDS scores and WHOQOL-OLD module total scores. Discussıon and Conclusion: Results showed that more than half of the elderly people living in the nursing home experienced cognitive deterioration and depression; and cognitive state, depression, and quality of life were found to be significantly related to each other.

Keywords: depression, cognitive function level, quality of life

Procedia PDF Downloads 266
14169 Influence of Orientation in Complex Building Architecture in Various Climatic Regions in Winter

Authors: M. Alwetaishi, Giulia Sonetti

Abstract:

It is architecturally accepted that building form and design is considered as one of the most important aspects in affecting indoor temperature. The total area of building plan might be identical, but the design will have a major influence on the total area of external walls. This will have a clear impact on the amount of heat exchange with outdoor. Moreover, it will affect the position and area of glazing system. This has not received enough consideration in research by the specialists, since most of the publications are highlighting the impact of building envelope in terms of physical heat transfer in buildings. This research will investigate the impact of orientation of various building forms in various climatic regions. It will be concluded that orientation and glazing to wall ratio were recognized to be the most effective variables despite the shape of the building. However, linear ad radial forms were found more appropriate shapes almost across the continent.

Keywords: architectural building design, building form, building design in different climate, indoor air temperature

Procedia PDF Downloads 375
14168 Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework

Authors: Faris Elghaish, Sepehr Abrishami, Mark Gaterell, Richard Wise

Abstract:

The collaboration and integration between all building information management (BIM) processes and tasks are necessary to ensure that all project objectives can be delivered. The literature review has been used to explore the state of the art BIM technologies to manage construction materials as well as the challenges which have faced the construction process using traditional methods. Thus, this paper aims to articulate a framework to integrate traditional material planning methods such as ABC analysis theory (Pareto principle) to analyse and categorise the project materials, as well as using independent material planning methods such as Economic Order Quantity (EOQ) and Fixed Order Point (FOP) into the BIM 4D, and 5D capabilities in order to articulate a dependent material planning cycle into BIM, which relies on the constructability method. Moreover, we build a model to connect between the material planning outputs and the BIM 4D and 5D data to ensure that all project information will be accurately presented throughout integrated and complementary BIM reporting formats. Furthermore, this paper will present a method to integrate between the risk management output and the material management process to ensure that all critical materials are monitored and managed under the all project stages. The paper includes browsers which are proposed to be embedded in any 4D BIM platform in order to predict the EOQ as well as FOP and alarm the user during the construction stage. This enables the planner to check the status of the materials on the site as well as to get alarm when the new order will be requested. Therefore, this will lead to manage all the project information in a single context and avoid missing any information at early design stage. Subsequently, the planner will be capable of building a more reliable 4D schedule by allocating the categorised material with the required EOQ to check the optimum locations for inventory and the temporary construction facilitates.

Keywords: building information management, BIM, economic order quantity, EOQ, fixed order point, FOP, BIM 4D, BIM 5D

Procedia PDF Downloads 142
14167 Comparison of Efficient Production of Small Module Gears

Authors: Vaclav Musil, Robert Cep, Sarka Malotova, Jiri Hajnys, Frantisek Spalek

Abstract:

The new designs of satellite gears comprising a number of small gears pose high requirements on the precise production of small module gears. The objective of the experimental activity stated in this article was to compare the conventional rolling gear cutting technology with the modern wire electrical discharge machining (WEDM) technology for the production of small module gear m=0.6 mm (thickness of 2.5 mm and material 30CrMoV9). The WEDM technology lies in copying the profile of gearing from the rendered trajectory which is then transferred to the track of a wire electrode. During the experiment, we focused on the comparison of these production methods. Main measured parameters which significantly influence the lifetime and noise was chosen. The first parameter was to compare the precision of gearing profile in respect to the mathematic model. The second monitored parameter was the roughness and surface topology of the gear tooth side. The experiment demonstrated high accuracy of WEDM technology, but a low quality of machined surface.

Keywords: precision of gearing, small module gears, surface topology, WEDM technology

Procedia PDF Downloads 204
14166 The Effectiveness of the Counselling Module in Counseling Interventions for Low Performance Employees

Authors: Hazaila Hassan

Abstract:

This research aims and discusses about the effectiveness of the Psynnova i-Behaviour Modification Technique (iBMT) module towards the change in behaviour of low-performing employees. The purpose of the study is to examine the effectiveness of the Psynnova Module on changing behaviour through five factors among low-performing employees in the public sector. The five main factors/constructs were cognitive enhancement and rationality, emotional stability, attitude alignment and adjustment, social skills development and psycho-spirituality enhancement. In this research, 5 main constructs will be using to indicate behaviour changing performance of the employees after attending The Psynnova Program that using this Psynnova IBMT Module. The respondents are among those who have low scores in terms of annual performance through annual performance value reports and have gone through various stages before being required to attend Psynnova Program. Besides that, the research plan was also to critically examine and understand the change in behaviour among the low-performing employees through the five dimensions in the Psynnova Module. A total of 50 respondent will purposively sampled to be the respondents of this research. This study will use the Experimental Method to One Group Purposively Pre and Post Test using the Time Series Design. Experimental SPSS software version 22.0 will be used to analyse this data. Hopefully this research can see the changing of their behaviour in five factors as an indicator to the respondent after attending the Psynnova Programme. Findings from this study are also used to propose to assisting psychologist to see the changes that occurred to the respondents with the best framework of behaviour changing for them.

Keywords: five dimension of behaviour changing, among adult, low performance, modul effectiveness

Procedia PDF Downloads 138
14165 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction

Authors: Shu-Hui Jan, Shih-Ping Ho, Hui-Ping Tserng

Abstract:

Construction knowledge can be referred to and reused among involved project managers and job-site engineers to alleviate problems on a construction job-site and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by job-site engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.

Keywords: construction knowledge management, building information modeling, project management, web-based information system

Procedia PDF Downloads 316
14164 Application of Genetic Algorithm with Multiobjective Function to Improve the Efficiency of Photovoltaic Thermal System

Authors: Sonveer Singh, Sanjay Agrawal, D. V. Avasthi, Jayant Shekhar

Abstract:

The aim of this paper is to improve the efficiency of photovoltaic thermal (PVT) system with the help of Genetic Algorithms with multi-objective function. There are some parameters that affect the efficiency of PVT system like depth and length of the channel, velocity of flowing fluid through the channel, thickness of the tedlar and glass, temperature of inlet fluid i.e. all above parameters are considered for optimization. An attempt has been made to the model and optimizes the parameters of glazed hybrid single channel PVT module when two objective functions have been considered separately. The two objective function for optimization of PVT module is overall electrical and thermal efficiency. All equations for PVT module have been derived. Using genetic algorithms (GAs), above two objective functions of the system has been optimized separately and analysis has been carried out for two cases. Two cases are: Case-I; Improvement in electrical and thermal efficiency when overall electrical efficiency is optimized, Case-II; Improvement in electrical and thermal efficiency when overall thermal efficiency is optimized. All the parameters that are used in genetic algorithms are the parameters that could be changed, and the non-changeable parameters, like solar radiation, ambient temperature cannot be used in the algorithm. It has been observed that electrical efficiency (14.08%) and thermal efficiency (19.48%) are obtained when overall thermal efficiency was an objective function for optimization. It is observed that GA is a very efficient technique to estimate the design parameters of hybrid single channel PVT module.

Keywords: genetic algorithm, energy, exergy, PVT module, optimization

Procedia PDF Downloads 582
14163 Exploring Academic Writing Challenges of First Year English as an Additional Language Students at an ODeL Institution in South Africa

Authors: Tumelo Jaquiline Ntsopi

Abstract:

This study explored the academic writing challenges of first-year students who use English as an Additional Language (EAL) registered in the EAW101 module at an ODeL institution. Research shows that academic writing is a challenge for EAL teaching and learning contexts across the globe in higher education institutions (HEIs). Academic writing is an important aspect of academic literacy in any institution of higher learning, more so in an ODeL institution. This has probed research that shows that academic writing is and continues to pose challenges for EAL teaching and learning contexts in higher education institutions. This study stems from the researcher’s experience in teaching academic writing to first-year students in the EAW101 module. The motivation for this study emerged from the fact that EAW101 is a writing module that has a high number of students in the Department of English Studies with an average of between 50-80 percent pass rate. These statistics elaborate on the argument that most students registered in this module struggle with academic writing, and they need intervention to assist and support them in achieving competence in the module. This study is underpinned by Community of Inquiry (CoI) framework and Transactional distance theory. This study adopted a qualitative research methodology and utilised a case study approach as a research design. Furthermore, the study gathered data from first year students and the EAW101 module’s student support initiatives. To collect data, focus group discussions, structured open-ended evaluation questions, and an observation schedule were used to gather data. The study is vital towards exploring academic writing challenges that first-year students in EAW101 encounter so that lecturers in the module may consider re-evaluating their methods of teaching to improve EAL students’ academic writing skills. This study may help lecturers towards enhancing academic writing in a ODeL context by assisting first year students through using student support interventions.

Keywords: academic writing, academic writing challenge, ODeL, EAL

Procedia PDF Downloads 67
14162 Sustainable Building Law - The Legal Issues Abound

Authors: Richard J. Sobelsohn

Abstract:

Green Building and Sustainable Development help fight climate change, and protects the ozone, animal habitats, air quality, and ground water. The myriad of reasons to go Green has multiplied to the point that a developer that is building a ground-up or renovating/retrofitting a property has a plethora of choices to get to the green goal post. Sustainability not affects the bottom line but satisfies corporate mandates (ESG), consumer demand, market requirements, and the many laws dictating green building practices. The good news is that there are many paths a property owner can take to become green. The bad news is that there are many paths a property owner can take to become green, and they need to choose which direction to take. Certification of a building used to be the highest achievement in the Green building world. Now there are so many variables and laws with which a property owner must comply, and the legal analysis has mushroomed. Operation and Maintenance have also become one of the most important functions for a prudent Green Building owner. So adding to the “development/retrofit” parties involved in the sustainable building legal world, we now need to include all those people who keep the building green, and there are a lot of them!

Keywords: green building, sustainable development, legal issues, greenwashing, green cleaning, compliance, ESQ

Procedia PDF Downloads 93
14161 Flipped Classroom in a European Public Health Program: The Need for Students' Self-Directness

Authors: Nynke de Jong, Inge G. P. Duimel-Peeters

Abstract:

The flipped classroom as an instructional strategy and a type of blended learning that reverses the traditional learning environment by delivering instructional content, off- and online, in- and outside the classroom, has been implemented in a 4-weeks module focusing on ageing in Europe at the Maastricht University. The main aim regarding the organization of this module was implementing flipped classroom-principles in order to create meaningful learning opportunities, while educational technologies are used to deliver content outside of the classroom. Technologies used in this module were an online interactive real time lecture from England, two interactive face-to-face lectures with visual supports, one group session including role plays and team-based learning meetings. The cohort of 2015-2016, using educational technologies, was compared with the cohort of 2014-2015 on module evaluation such as organization and instructiveness of the module, who studied the same content, although conforming the problem-based educational strategy, i.e. educational base of the Maastricht University. The cohort of 2015-2016 with its specific organization, was also more profound evaluated on outcomes as (1) experienced duration of the lecture by students, (2) experienced content of the lecture, (3) experienced the extent of the interaction and (4) format of lecturing. It was important to know how students reflected on duration and content taken into account their background knowledge so far, in order to distinguish between sufficient enough regarding prior knowledge and therefore challenging or not fitting into the course. For the evaluation, a structured online questionnaire was used, whereby above mentioned topics were asked for to evaluate by scoring them on a 4-point Likert scale. At the end, there was room for narrative feedback so that interviewees could express more in detail, if they wanted, what they experienced as good or not regarding the content of the module and its organization parts. Eventually, the response rate of the evaluation was lower than expected (54%), however, due to written feedback and exam scores, we dare to state that it gives a good and reliable overview that encourages to work further on it. Probably, the response rate may be explained by the fact that resit students were included as well, and that there maybe is too much evaluation as some time points in the program. However, overall students were excited about the organization and content of the module, but the level of self-directed behavior, necessary for this kind of educational strategy, was too low. They need to be more trained in self-directness, therefore the module will be simplified in 2016-2017 with more clear and fewer topics and extra guidance (step by step procedure). More specific information regarding the used technologies will be explained at the congress, as well as the outcomes (min and max rankings, mean and standard deviation).

Keywords: blended learning, flipped classroom, public health, self-directness

Procedia PDF Downloads 195
14160 Capacity Building of Extension Agents for Sustainable Dissemination of Agricultural Information and Technologies in Developing Countries

Authors: Michael T. Ajayi, Oluwakemi E. Fapojuwo

Abstract:

Farmers are in need of regular and relevant information relating to new technologies. Production of extension materials has been found to be useful in facilitating the process. Extension materials help to provide information to reach large numbers of farmers quickly and economically. However, as good as extension materials are, previous materials produced are not used by farmers. The reasons for this include lack of involvement of farmers in the production of the extension materials, most of the extension materials are not relevant to the farmers’ environments, the agricultural extension agents lack capacity to prepare the materials, and many extension agents lack commitment. These problems led to this innovative capacity building of extension agents. This innovative approach involves five stages. The first stage is the diagnostic survey of farmers’ environment to collect useful information. The second stage is the development and production of draft extension materials. The third stage is the field testing and evaluation of draft materials by the same farmers that were involved at the diagnostic stage. The fourth stage is the revision of the draft extension materials by incorporating suggestions from farmers. The fifth stage is the action plans. This process improves the capacity of agricultural extension agents in the preparation of extension materials and also promotes engagement of farmers and beneficiaries in the process. The process also makes farmers assume some level of ownership of the exercise and the extension materials.

Keywords: capacity building, extension agents, dissemination, information/technologies

Procedia PDF Downloads 329
14159 The Development Learning Module Physics based on Guided Inquiry Approach on Model Cooperative Learning Type STAD (Student Team Achievement Division) in the Main Subject of Temperature and Heat

Authors: Fani Firmahandari

Abstract:

The development learning module physics based on guided inquiry approach on model cooperative learning type STAD (Student Team Achievement Division) in the main subject of temperature and heat. The research development aimed to produce physics learning module based on guided cooperative learning type STAD (Student Team Achievement Division) in the main subject of temperature and heat to the student in X class. The research method used Research and Development approach. The development procedure of this module includes potential problems, data collection to meet the need, product design, and feasibility of this module. The impact of learning can be seen or observed clearly when the learning process takes place, the teachers or the students already implemented measures cooperative learning model type STAD, so that the learning process goes well, the interaction of teachers and students, students with student looks good, besides that students can interact and work together in group.

Keywords: cooperative learning type STAD (student team achievement division), development, inquiry, interaction students

Procedia PDF Downloads 336
14158 Establishment of an Information Platform Increases Spontaneous Reporting of Adverse Drug Reactions

Authors: Pei-Chun Chen, Chi-Ting Tseng, Lih-Chi Chen, Kai-Hsiang Yang

Abstract:

Introduction: The pharmacist is responsible for encouraging adverse drug reaction (ADR) reporting. In a local center in Northern Taiwan, promotion and rewarding of ADR reporting have continued for over six years but failed to bring significant changes. This study aims to find a solution to increase ADR reporting. Research question or hypothesis: We hypothesized that under-reporting is due to the inconvenience of the reporting system. Reports were made conventionally through printed sheets. We proposed that reports made per month will increase if they were computerized. Study design: An ADR reporting platform was established in April 2015, before which was defined as the first stage of this study (January-March, 2015) and after which the second stage. The third stage commenced in November, 2015, after adding a reporting module to physicians prescription system. ADRs could be reported simultaneously when documenting drug allergies. Methods: ADR report rates during the three stages of the study were compared. Effects of the information platform on reporting were also analyzed. Results: During the first stage, the number of ADR reports averaged 6 per month. In the second stage, the number of reports per month averaged 1.86. Introducing the information platform had little effect on the monthly number of ADR reports. The average number of reports each month during the third stage of the study was 11±3.06, with 70.43% made electronically. Reports per month increased significantly after installing the reporting module in November, 2015 (P<0.001, t-test). In the first two stages, 29.03% of ADR reports were made by physicians, as compared to 70.42% of cases in the third stage of the study. Increased physician reporting possibly account for these differences. Conclusion: Adding a reporting module to the prescription system significantly increased ADR reporting. Improved accessibility is likely the cause. The addition of similar modules to computer systems of other healthcare professions may be considered to encourage spontaneous ADR reporting.

Keywords: adverse drug reactions, adverse drug reaction reporting systems, regional hospital, prescription system

Procedia PDF Downloads 310
14157 Electronic Payment Recording with Payment History Retrieval Module: A System Software

Authors: Adrian Forca, Simeon Cainday III

Abstract:

The Electronic Payment Recording with Payment History Retrieval Module is developed intendedly for the College of Science and Technology. This system software innovates the manual process of recording the payments done in the department through the development of electronic payment recording system software shifting from the slow and time-consuming procedure to quick yet reliable and accurate way of recording payments because it immediately generates receipts for every transaction. As an added feature to its software process, generation of recorded payment report is integrated eliminating the manual reporting to a more easy and consolidated report. As an added feature to the system, all recorded payments of the students can be retrieved immediately making the system transparent and reliable payment recording software. Viewing the whole process, the system software will shift from the manual process to an organized software technology because the information will be stored in a logically correct and normalized database. Further, the software will be developed using the modern programming language and implement strict programming methods to validate all users accessing the system, evaluate all data passed into the system and information retrieved to ensure data accuracy and reliability. In addition, the system will identify the user and limit its access privilege to establish boundaries of the specific access to information allowed for the store, modify, and update making the information secure against unauthorized data manipulation. As a result, the System software will eliminate the manual procedure and replace with an innovative modern information technology resulting to the improvement of the whole process of payment recording fast, secure, accurate and reliable software innovations.

Keywords: collection, information system, manual procedure, payment

Procedia PDF Downloads 139
14156 Approaches to Eco-Friendly Architecture: Modules Assembled Specially to Conserve

Authors: Arshleen Kaur, Sarang Barbarwar, Madhusudan Hamirwasia

Abstract:

Sustainable architecture is going to be the soul of construction in the near future, with building material as a vital link connecting sustainability to construction. The priority in Architecture has shifted from having a lesser negative footprint to having a positive footprint on Earth. The design has to be eco-centric as well as anthro-centric so as to attain its true purpose. Brick holds the same importance like a cell holds in one’s body. The study focuses on this basic building block with an experimental material and technique known as Module Assembled Specially to Conserve (MASC). The study explores the usage and construction of these modules in the construction of buildings. It also shows the impact assessment of the modules on the environment and its significance in reducing the carbon footprint of the construction industry. The aspects like cost-effectiveness, ease of working and reusability of MASC have been studied as well.

Keywords: anthro-centric, carbon footprint, eco-centric, sustainable

Procedia PDF Downloads 149
14155 Application of the Building Information Modeling Planning Approach to the Factory Planning

Authors: Peggy Näser

Abstract:

Factory planning is a systematic, objective-oriented process for planning a factory, structured into a sequence of phases, each of which is dependent on the preceding phase and makes use of particular methods and tools, and extending from the setting of objectives to the start of production. The digital factory, on the other hand, is the generic term for a comprehensive network of digital models, methods, and tools – including simulation and 3D visualisation – integrated by a continuous data management system. Its aim is the holistic planning, evaluation and ongoing improvement of all the main structures, processes and resources of the real factory in conjunction with the product. Digital factory planning has already become established in factory planning. The application of Building Information Modeling has not yet been established in factory planning but has been used predominantly in the planning of public buildings. Furthermore, this concept is limited to the planning of the buildings and does not include the planning of equipment of the factory (machines, technical equipment) and their interfaces to the building. BIM is a cooperative method of working, in which the information and data relevant to its lifecycle are consistently recorded, managed and exchanged in a transparent communication between the involved parties on the basis of digital models of a building. Both approaches, the planning approach of Building Information Modeling and the methodical approach of the Digital Factory, are based on the use of a comprehensive data model. Therefore it is necessary to examine how the approach of Building Information Modeling can be extended in the context of factory planning in such a way that an integration of the equipment planning, as well as the building planning, can take place in a common digital model. For this, a number of different perspectives have to be investigated: the equipment perspective including the tools used to implement a comprehensive digital planning process, the communication perspective between the planners of different fields, the legal perspective, that the legal certainty in each country and the quality perspective, on which the quality criteria are defined and the planning will be evaluated. The individual perspectives are examined and illustrated in the article. An approach model for the integration of factory planning into the BIM approach, in particular for the integrated planning of equipment and buildings and the continuous digital planning is developed. For this purpose, the individual factory planning phases are detailed in the sense of the integration of the BIM approach. A comprehensive software concept is shown on the tool. In addition, the prerequisites required for this integrated planning are presented. With the help of the newly developed approach, a better coordination between equipment and buildings is to be achieved, the continuity of the digital factory planning is improved, the data quality is improved and expensive implementation errors are avoided in the implementation.

Keywords: building information modeling, digital factory, digital planning, factory planning

Procedia PDF Downloads 237
14154 Traditional Terms, Spaces, Forms and Artifacts in Cultural Semiotics of Southwest Nigeria

Authors: Ajibade Adeyemo

Abstract:

The paper examined local terms used for spaces, forms and building practices in southwest Nigeria as cultural semiotics. Housing has more cultural meaning than mere shelter as shown in building terms such as ‘roof over my head’. The study is significant in the study area because its people were traditionally orally centered until ‘culture contact’ led to graphical presentation and appreciation in the form of drawings which is a modern language of architecture. This semiotic study will facilitate the understanding of the wholesomeness of traditional building practices and thoughts. This is in the culture of the traditional multi-sensory appreciation of architecture, urban design and the arts. It will analyze traditional aphoristic words and terms which are like proverbs which are significant in language because of their metaphorical essence. Many of such terms in the dominant Yoruba language of the study area are oftentimes phenomenal reducing universal terms like the earth and heaven to the simple module of housing. These words could be worth investigating because they are symbolic serve as codes which are cultural tool of regional ethnic significance. Sassure’s and Pierce’s concepts of Semiotics in line with Eco’s concept of semiotics of metaphor shall be deployed.

Keywords: traditional terms, spaces, forms, artifacts, cultural semiotics, southwest

Procedia PDF Downloads 249