5523 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 540
5522 Measurement of Ionospheric Plasma Distribution over Myanmar Using Single Frequency Global Positioning System Receiver

Authors: Win Zaw Hein, Khin Sandar Linn, Su Su Yi Mon, Yoshitaka Goto

Abstract:

The Earth ionosphere is located at the altitude of about 70 km to several 100 km from the ground, and it is composed of ions and electrons called plasma. In the ionosphere, these plasma makes delay in GPS (Global Positioning System) signals and reflect in radio waves. The delay along the signal path from the satellite to the receiver is directly proportional to the total electron content (TEC) of plasma, and this delay is the largest error factor in satellite positioning and navigation. Sounding observation from the top and bottom of the ionosphere was popular to investigate such ionospheric plasma for a long time. Recently, continuous monitoring of the TEC using networks of GNSS (Global Navigation Satellite System) observation stations, which are basically built for land survey, has been conducted in several countries. However, in these stations, multi-frequency support receivers are installed to estimate the effect of plasma delay using their frequency dependence and the cost of multi-frequency support receivers are much higher than single frequency support GPS receiver. In this research, single frequency GPS receiver was used instead of expensive multi-frequency GNSS receivers to measure the ionospheric plasma variation such as vertical TEC distribution. In this measurement, single-frequency support ublox GPS receiver was used to probe ionospheric TEC. The location of observation was assigned at Mandalay Technological University in Myanmar. In the method, the ionospheric TEC distribution is represented by polynomial functions for latitude and longitude, and parameters of the functions are determined by least-squares fitting on pseudorange data obtained at a known location under an assumption of thin layer ionosphere. The validity of the method was evaluated by measurements obtained by the Japanese GNSS observation network called GEONET. The performance of measurement results using single-frequency of GPS receiver was compared with the results by dual-frequency measurement.

Keywords: ionosphere, global positioning system, GPS, ionospheric delay, total electron content, TEC

Procedia PDF Downloads 137
5521 Design of a Multidisciplinary Project-Oriented Capstone Course for Mechanical Engineering Education

Authors: Chi-Cheng Cheng, Che-Hsin Lin, Yu-Jen Wang, Chua-Chin Wang

Abstract:

The project-oriented capstone course has become a required element for most engineering educational units. It is not only because the capstone course is an important criterion for international accreditation of engineering degree programs under Washington Accord, but also the capstone course provides an opportunity for students to apply what they have learned in their school years to actual engineering problems. Nevertheless, most project-oriented capstone courses are conducted with one single project for all students or teams. In other words, students work to reach the same or similar goals by coming up with different layouts and approaches. It appears not suitable for a multidisciplinary engineering department. Therefore, a one-year multidisciplinary project-oriented capstone course was designed for the junior year of the undergraduate program. About one-half of faculty members in the department needs to be involved in generating as many projects as possible to meet different students' interests and specialties. Project achievement has to be displayed and demonstrated in the annual exposition and competition at the end of this course. Significant success in attracting attention and hardworking of students on projects was witnessed for the past two pilot years. Analysis of course evaluation demonstrates positive impact on all perspectives despite of slightly negative influence due to poor communication and collaboration between students and their project supervisors.

Keywords: Capstone course, CDIO, engineering education, project-oriented learning

Procedia PDF Downloads 452
5520 Weak Solutions Of Stochastic Fractional Differential Equations

Authors: Lev Idels, Arcady Ponosov

Abstract:

Stochastic fractional differential equations have recently attracted considerable attention, as they have been used to model real-world processes, which are subject to natural memory effects and measurement uncertainties. Compared to conventional hereditary differential equations, one of the advantages of fractional differential equations is related to more realistic geometric properties of their trajectories that do not intersect in the phase space. In this report, a Peano-like existence theorem for nonlinear stochastic fractional differential equations is proven under very general hypotheses. Several specific classes of equations are checked to satisfy these hypotheses, including delay equations driven by the fractional Brownian motion, stochastic fractional neutral equations and many others.

Keywords: delay equations, operator methods, stochastic noise, weak solutions

Procedia PDF Downloads 209
5519 Shipboard Power Plant Design as Senior Design Project

Authors: Hesham Shaalan

Abstract:

Senior design projects teach students many important skills. One of the major goals is to prepare students to apply effective problem-solving techniques to a problem that represents a real-world situation. This includes the ability to define the problem, compare alternative solutions, identify the best solution, and design the system. This paper describes the design of a shipboard power plant as a senior project in the Marine Engineering program at the U.S. Merchant Marine Academy. The design project was supervised by faculty members who guided a multidisciplinary group of seniors. The research project was sponsored by the Office of Naval Research. Each group of seniors focused on one of the main design aspects of the project, including the electric power system, nuclear power plant, ship hull design, and economics.

Keywords: senior design project, shipboard power system, engineering education, marine engineering

Procedia PDF Downloads 83
5518 Real-Time Neuroimaging for Rehabilitation of Stroke Patients

Authors: Gerhard Gritsch, Ana Skupch, Manfred Hartmann, Wolfgang Frühwirt, Hannes Perko, Dieter Grossegger, Tilmann Kluge

Abstract:

Rehabilitation of stroke patients is dominated by classical physiotherapy. Nowadays, a field of research is the application of neurofeedback techniques in order to help stroke patients to get rid of their motor impairments. Especially, if a certain limb is completely paralyzed, neurofeedback is often the last option to cure the patient. Certain exercises, like the imagination of the impaired motor function, have to be performed to stimulate the neuroplasticity of the brain, such that in the neighboring parts of the injured cortex the corresponding activity takes place. During the exercises, it is very important to keep the motivation of the patient at a high level. For this reason, the missing natural feedback due to a movement of the effected limb may be replaced by a synthetic feedback based on the motor-related brain function. To generate such a synthetic feedback a system is needed which measures, detects, localizes and visualizes the motor related µ-rhythm. Fast therapeutic success can only be achieved if the feedback features high specificity, comes in real-time and without large delay. We describe such an approach that offers a 3D visualization of µ-rhythms in real time with a delay of 500ms. This is accomplished by combining smart EEG preprocessing in the frequency domain with source localization techniques. The algorithm first selects the EEG channel featuring the most prominent rhythm in the alpha frequency band from a so-called motor channel set (C4, CZ, C3; CP6, CP4, CP2, CP1, CP3, CP5). If the amplitude in the alpha frequency band of this certain electrode exceeds a threshold, a µ-rhythm is detected. To prevent detection of a mixture of posterior alpha activity and µ-activity, the amplitudes in the alpha band outside the motor channel set are not allowed to be in the same range as the main channel. The EEG signal of the main channel is used as template for calculating the spatial distribution of the µ - rhythm over all electrodes. This spatial distribution is the input for a inverse method which provides the 3D distribution of the µ - activity within the brain which is visualized in 3D as color coded activity map. This approach mitigates the influence of lid artifacts on the localization performance. The first results of several healthy subjects show that the system is capable of detecting and localizing the rarely appearing µ-rhythm. In most cases the results match with findings from visual EEG analysis. Frequent eye-lid artifacts have no influence on the system performance. Furthermore, the system will be able to run in real-time. Due to the design of the frequency transformation the processing delay is 500ms. First results are promising and we plan to extend the test data set to further evaluate the performance of the system. The relevance of the system with respect to the therapy of stroke patients has to be shown in studies with real patients after CE certification of the system. This work was performed within the project ‘LiveSolo’ funded by the Austrian Research Promotion Agency (FFG) (project number: 853263).

Keywords: real-time EEG neuroimaging, neurofeedback, stroke, EEG–signal processing, rehabilitation

Procedia PDF Downloads 387
5517 H∞ Sampled-Data Control for Linear Systems Time-Varying Delays: Application to Power System

Authors: Chang-Ho Lee, Seung-Hoon Lee, Myeong-Jin Park, Oh-Min Kwon

Abstract:

This paper investigates improved stability criteria for sampled-data control of linear systems with disturbances and time-varying delays. Based on Lyapunov-Krasovskii stability theory, delay-dependent conditions sufficient to ensure H∞ stability for the system are derived in the form of linear matrix inequalities(LMI). The effectiveness of the proposed method will be shown in numerical examples.

Keywords: sampled-data control system, Lyapunov-Krasovskii functional, time delay-dependent, LMI, H∞ control

Procedia PDF Downloads 320
5516 Training Program for Kindergarden Teachers on Learning through Project Approach

Authors: Dian Hartiningsih, Miranda Diponegoro, Evita Eddie Singgih

Abstract:

In facing the 21st century, children need to be prepared in reaching their optimum development level which encompasses all aspect of growth and to achieve the learning goals which include not only knowledge and skill, but also disposition and feeling. Teachers as the forefront of education need to be equipped with the understanding and skill of a learning method which can prepare the children to face this 21st century challenge. Project approach is an approach which utilizes active learning which is beneficial for the children. Subject to this research are kindergarten teachers at Dwi Matra Kindergarten and Kirana Preschool. This research is a quantitative research using before and after study design. The result suggest that through preliminary training program on learning with project approach, the kindergarten teachers ability to explain project approach including understanding, benefit and stages of project approach have increased significantly, the teachers ability to design learning with project approach have also improved significantly. The result of learning design that the teachers had made shows a remarkable result for the first stage of the project approach; however the second and third design result was not as optimal. Challenges faced in the research will be elaborated further in the research discussion.

Keywords: project approach, teacher training, learning method, kindergarten

Procedia PDF Downloads 331
5515 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 280
5514 A Case Study on the Guidelines for Application of Project Management Methods in Infrastructure Projects

Authors: Fernanda Varella Borges, Silvio Burrattino Melhado

Abstract:

Motivated by the importance of public infrastructure projects in the civil construction chain, this research shows the study of project management methods and the infrastructure projects’ characteristics. The research aims at the objective of improving management efficiency by proposing guidelines for the application of project management methods in infrastructure projects. Through literature review and case studies, the research analyses two major infrastructure projects underway in Brazil, identifying the critical points for achieving its success. As a result, the proposed guidelines indicate that special attention should be given to the management of stakeholders, focusing on their knowledge and experience, their different interests, the efficient management of their communication, and their behavior in the day-by-day project management process.

Keywords: construction, infrastructure, project management, public projects

Procedia PDF Downloads 494
5513 An Adder with Novel PMOS and NMOS for Ultra Low Power Applications in Deep Submicron Technology

Authors: Ch. Ashok Babu, J. V. R. Ravindra, K. Lalkishore

Abstract:

Power has became a burning issue in modern VLSI design. As the technology advances especially below 45nm, technology of leakage power became a big problem apart of the dynamic power. This paper presents a full adder with novel PMOS and NMOS which consume less power compare to conventional full adder, DTMOS full adder. This paper shows different types of adders and their power consumption, area, and delay. All the experiments have been carried out using Cadence® Virtuoso® design lay out editor which shows power consumption of different types of adders.

Keywords: average power, leakage power, delay, DTMOS, PDP

Procedia PDF Downloads 389
5512 Practical Experiences as Part of Project Management Course

Authors: H. Hussain, N. H. Mohamad

Abstract:

Practical experiences have been one of the successful criteria for the Project Management course for the art and design students. There are series of events that the students have to undergo as part of their practical exercises in the learning context for Project Management courses. These series have been divided into few mini programs that involved the whole individual in each group. Therefore, the events have been one of the bench marks for these students. Through the practical experience, the task that has been given to individual has been performed according to the needs of professional practice and ethics.

Keywords: practical experience, project management, art and design students, events, programs

Procedia PDF Downloads 556
5511 The End Is Just the Beginning: The Importance of Project Post-Implementation Reviews

Authors: Catalin-Teodor Dogaru, Ana-Maria Dogaru

Abstract:

Success means different things to different people. For us, project managers, it becomes even harder to find a definition. Many factors have to be included in the evaluation. Moreover, literature is not very helpful, lacking consensus and neutrality. Post-implementation reviews (PIR) can be an efficient tool in evaluating how things worked on a certain project. Despite the visible progress, PIR is not a very detailed subject yet and there is not a common understanding in this matter. This may be the reason that some organizations include it in the projects’ lifecycle and some do not. Through this paper, we point out the reasons why all project managers should pay proper attention to this important step and to the elements, which can be assessed, beside the already famous triple constraints: cost, budget, and time. It is essential to take notice that PIR is not a checklist. It brings the edge in eliminating subjectivity and judging projects based on actual proof. Based on our experience, our success indicator model, presented in this paper, contributes to the success of the project! In the same time, it increases trust among customers who will perceive success more objectively.

Keywords: project, post implementation, review, success, indicators

Procedia PDF Downloads 371
5510 Dynamics of a Susceptible-Infected-Recovered Model along with Time Delay, Modulated Incidence, and Nonlinear Treatment

Authors: Abhishek Kumar, Nilam

Abstract:

As we know that, time delay exists almost in every biological phenomenon. Therefore, in the present study, we propose a susceptible–infected–recovered (SIR) epidemic model along with time delay, modulated incidence rate of infection, and Holling Type II nonlinear treatment rate. The present model aims to provide a strategy to control the spread of epidemics. In the mathematical study of the model, it has been shown that the model has two equilibriums which are named as disease-free equilibrium (DFE) and endemic equilibrium (EE). Further, stability analysis of the model is discussed. To prove the stability of the model at DFE, we derived basic reproduction number, denoted by (R₀). With the help of basic reproduction number (R₀), we showed that the model is locally asymptotically stable at DFE when the basic reproduction number (R₀) less than unity and unstable when the basic reproduction number (R₀) is greater than unity. Furthermore, stability analysis of the model at endemic equilibrium has also been discussed. Finally, numerical simulations have been done using MATLAB 2012b to exemplify the theoretical results.

Keywords: time delayed SIR epidemic model, modulated incidence rate, Holling type II nonlinear treatment rate, stability

Procedia PDF Downloads 155
5509 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: wind energy project, uncertain resources, risks, Monte Carlo simulation

Procedia PDF Downloads 352
5508 Optical Signal-To-Noise Ratio Monitoring Based on Delay Tap Sampling Using Artificial Neural Network

Authors: Feng Wang, Shencheng Ni, Shuying Han, Shanhong You

Abstract:

With the development of optical communication, optical performance monitoring (OPM) has received more and more attentions. Since optical signal-to-noise ratio (OSNR) is directly related to bit error rate (BER), it is one of the important parameters in optical networks. Recently, artificial neural network (ANN) has been greatly developed. ANN has strong learning and generalization ability. In this paper, a method of OSNR monitoring based on delay-tap sampling (DTS) and ANN has been proposed. DTS technique is used to extract the eigenvalues of the signal. Then, the eigenvalues are input into the ANN to realize the OSNR monitoring. The experiments of 10 Gb/s non-return-to-zero (NRZ) on–off keying (OOK), 20 Gb/s pulse amplitude modulation (PAM4) and 20 Gb/s return-to-zero (RZ) differential phase-shift keying (DPSK) systems are demonstrated for the OSNR monitoring based on the proposed method. The experimental results show that the range of OSNR monitoring is from 15 to 30 dB and the root-mean-square errors (RMSEs) for 10 Gb/s NRZ-OOK, 20 Gb/s PAM4 and 20 Gb/s RZ-DPSK systems are 0.36 dB, 0.45 dB and 0.48 dB respectively. The impact of chromatic dispersion (CD) on the accuracy of OSNR monitoring is also investigated in the three experimental systems mentioned above.

Keywords: artificial neural network (ANN), chromatic dispersion (CD), delay-tap sampling (DTS), optical signal-to-noise ratio (OSNR)

Procedia PDF Downloads 112
5507 The Underestimation of Cultural Risk in the Execution of Megaprojects

Authors: Alan Walsh, Peter Walker, Michael Ellis

Abstract:

There is a real danger that both practitioners and researchers considering risks associated with megaprojects ignore or underestimate the impacts of cultural risk. The paper investigates the potential impacts of a failure to achieve cultural unity between the principal actors executing a megaproject. The principle relationships include the relationships between the principle Contractors and the project stakeholders or the project stakeholders and their principle advisors, Western Consultants. This study confirms that cultural dissonance between these parties can delay or disrupt the megaproject execution and examines why cultural issues should be prioritized as a significant risk factor in megaproject delivery. This paper addresses the practical impacts and potential mitigation measures, which may reduce cultural dissonance for a megaproject's delivery. This information is retrieved from on-going case studies in live infrastructure megaprojects in Europe and the Middle East's GCC states, from Western Consultants' perspective. The collaborating researchers each have at least 30 years of construction experience and are engaged in architecture, project management and contracts management, dealing with megaprojects in Europe or the GCC. After examining the cultural interfaces they have observed during the execution of megaprojects, they conclude that globally, culture significantly influences their efficient delivery. The study finds that cultural risk is ever-present, where different nationalities co-manage megaprojects and that cultural conflict poses a real threat to the timely delivery of megaprojects. The study indicates that the higher the cultural distance between the principal actors, the more pronounced the risk, with the risk of cultural dissonance more prominent in GCC megaprojects. The findings support a more culturally aware and cohesive team approach and recommend cross-cultural training to mitigate the effects of cultural disparity.

Keywords: cultural risk underestimation, cultural distance, megaproject characteristics, megaproject execution

Procedia PDF Downloads 106
5506 Optimizing Fire Suppression Time in Buildings by Forming a Fire Feedback Loop

Authors: Zhdanova A. O., Volkov R. S., Kuznetsov G. V., Strizhak P. A.

Abstract:

Fires in different types of facilities are a serious problem worldwide.It is still an unaccomplished science and technology objective to establish the minimum number and type of sensors in automatic systems of compartment fire suppression which would turn the fire-extinguishing agent spraying on and off in real time depending on the state of the fire, minimize the amount of agent applied, delay time in fire suppression and system response, as well as the time of combustion suppression. Based on the results of experimental studies, the conclusion was made that it is reasonable to use a gas analysis system and heat sensors (in the event of their prior activation) to determine the effectiveness of fire suppression (fire-extinguishing composition interacts with the fire). Thus, the concentration of CO in the interaction of the firefighting liquid with the fire increases to 0.7–1.2%, which indicates a slowdown in the flame combustion, and heat sensors stop responding at a gas medium temperature below 80 ºC, which shows a gradual decrease in the heat release from the fire. The evidence from this study suggests that the information received from the video recording equipment (video camera) should be used in real time as an additional parameter confirming fire suppression. Research was supported by Russian Science Foundation (project No 21-19-00009, https://rscf.ru/en/project/21-19-00009/).

Keywords: compartment fires, fire suppression, continuous control of fire behavior, feedback systems

Procedia PDF Downloads 129
5505 Leading Virtual Project Teams in the Post Pandemic Era: Trust and Conflict Management Strategies

Authors: Vidya Badrinarayanan, Appa Iyer Sivakumar

Abstract:

The coronavirus pandemic has sent an important message that future project teams need to be trained to work under virtual conditions, which has already become the new norm in organizations across the world. As organizations increasingly rely on virtual teams to achieve project objectives, it is essential to comprehend how leadership functions in virtual project teams. The purpose of this research is to analyze the leadership behaviors exhibited by project managers for building trust and managing conflicts effectively in virtual project teams. This convergent parallel mixed method research was conducted by surveying 185 virtual leaders and conducting a semi-structured interview with 13 senior virtual leaders involved in managing projects across the industry sectors. The research findings indicate that establishing trust and managing conflicts were ranked as significant challenges in leading virtual project teams in the post-pandemic era. In contrast to earlier findings, our research findings suggest that productivity was not ranked as a significant challenge in leading virtual project teams. This indeed is a positive finding for organizations to consider adopting virtual project teams in the long run. Additionally, the research findings recommend that virtual leaders need to strive to build a high-trust environment and develop effective conflict resolution skills to improve the effectiveness of virtual project teams. As the project management profession struggles with low project success rates, mixed-method research aims to contribute to the knowledge in the growing research area of virtual project leadership. This research contributes to the knowledge by offering first-person accounts from senior virtual leaders on the innovative strategies they had implemented for building trust and resolving conflicts effectively in the virtual project when there were limited opportunities for face-to-face interaction on account of the pandemic. In addition, the leadership framework created as a part of this research for trust development and conflict management in virtual project teams will guide project managers to improve virtual project team effectiveness.

Keywords: conflict management, trust building, virtual leadership, virtual teams

Procedia PDF Downloads 189
5504 Revolutionizing Project Management: A Comprehensive Review of Artificial Intelligence and Machine Learning Applications for Smarter Project Execution

Authors: Wenzheng Fu, Yue Fu, Zhijiang Dong, Yujian Fu

Abstract:

The integration of artificial intelligence (AI) and machine learning (ML) into project management is transforming how engineering projects are executed, monitored, and controlled. This paper provides a comprehensive survey of AI and ML applications in project management, systematically categorizing their use in key areas such as project data analytics, monitoring, tracking, scheduling, and reporting. As project management becomes increasingly data-driven, AI and ML offer powerful tools for improving decision-making, optimizing resource allocation, and predicting risks, leading to enhanced project outcomes. The review highlights recent research that demonstrates the ability of AI and ML to automate routine tasks, provide predictive insights, and support dynamic decision-making, which in turn increases project efficiency and reduces the likelihood of costly delays. This paper also examines the emerging trends and future opportunities in AI-driven project management, such as the growing emphasis on transparency, ethical governance, and data privacy concerns. The research suggests that AI and ML will continue to shape the future of project management by driving further automation and offering intelligent solutions for real-time project control. Additionally, the review underscores the need for ongoing innovation and the development of governance frameworks to ensure responsible AI deployment in project management. The significance of this review lies in its comprehensive analysis of AI and ML’s current contributions to project management, providing valuable insights for both researchers and practitioners. By offering a structured overview of AI applications across various project phases, this paper serves as a guide for the adoption of intelligent systems, helping organizations achieve greater efficiency, adaptability, and resilience in an increasingly complex project management landscape.

Keywords: artificial intelligence, decision support systems, machine learning, project management, resource optimization, risk prediction

Procedia PDF Downloads 21
5503 Role of Additional Food Resources in an Ecosystem with Two Discrete Delays

Authors: Ankit Kumar, Balram Dubey

Abstract:

This study proposes a three dimensional prey-predator model with additional food, provided to predator individuals, including gestation delay in predators and delay in supplying the additional food to predators. It is assumed that the interaction between prey and predator is followed by Holling type-II functional response. We discussed the steady states and their local and global asymptotic behavior for the non-delayed system. Hopf-bifurcation phenomenon with respect to different parameters has also been studied. We obtained a range of predator’s tendency factor on provided additional food, in which the periodic solutions occur in the system. We have shown that oscillations can be controlled from the system by increasing the tendency factor. Moreover, the existence of periodic solutions via Hopf-bifurcation is shown with respect to both the delays. Our analysis shows that both delays play an important role in governing the dynamics of the system. It changes the stability behavior into instability behavior. The direction and stability of Hopf-bifurcation are also investigated through the normal form theory and the center manifold theorem. Lastly, some numerical simulations and graphical illustrations have been carried out to validate our analytical findings.

Keywords: additional food, gestation delay, Hopf-bifurcation, prey-predator

Procedia PDF Downloads 130
5502 The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance

Authors: P. F. Wong, H. Salleh, F. A. Rahim

Abstract:

The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.

Keywords: Building Information Modeling (BIM), quantity surveyors, capability, project performance

Procedia PDF Downloads 367
5501 The Views of Teachers, Students and Parents on the FATIH Project

Authors: Şemsettin Şahin, Ahmet Oğuz Aktürk, İsmail Çelik

Abstract:

This study investigated the views of teachers, students and students' parents on the FATIH (Movement of Enhancing Opportunities and Improving Technology) Project, which was put into service by the Ministry of National Education in cooperation with the Ministry of Transportation in Turkey in November 2010 for the purpose of increasing students' success and planned to be completed within 5 years. The study group consisted of teachers employed in a pilot school in the province of Karaman in central Turkey included within the scope of the FATIH Project, students attending this school and parents whose children are students in that school. The research data were collected through forms developed by the researchers to determine the views of teachers, students and students' parents on the FATIH Project. The descriptive analysis method, one of the qualitative research methods, was used in the study. An analysis of the data revealed that a large majority of the teachers and the students believed that if computers were used to serve their set purpose, then they could make considerable contributions to education. A large majority of the students' parents, on the other hand, regard the use of computers in education as a great opportunity for the students. The views of the teachers, students and students' parents on the FATIH Project usually overlap. Most of the participants in the study pointed out that the FATIH Project was intended to use technology effectively in education. Moreover, each individual participant described their role in the FATIH Project in accordance with their relative position and stated that they could perform whatever was expected of them for the effective and efficient use and progress of the project. The views of the participants regarding the FATİH Project vary according to the kind of the participants.

Keywords: education, FATIH project, technology, students

Procedia PDF Downloads 441
5500 Investigating Safe Operation Condition for Iterative Learning Control under Load Disturbances Effect in Singular Values

Authors: Muhammad A. Alsubaie

Abstract:

An iterative learning control framework designed in state feedback structure suffers a lack in investigating load disturbance considerations. The presented work discusses the controller previously designed, highlights the disturbance problem, finds new conditions using singular value principle to assure safe operation conditions with error convergence and reference tracking under the influence of load disturbance. It is known that periodic disturbances can be represented by a delay model in a positive feedback loop acting on the system input. This model can be manipulated by isolating the delay model and finding a controller for the overall system around the delay model to remedy the periodic disturbances using the small signal theorem. The overall system is the base for control design and load disturbance investigation. The major finding of this work is the load disturbance condition found which clearly sets safe operation condition under the influence of load disturbances such that the error tends to nearly zero as the system keeps operating trial after trial.

Keywords: iterative learning control, singular values, state feedback, load disturbance

Procedia PDF Downloads 158
5499 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 248
5498 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle

Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter

Abstract:

The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.

Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework

Procedia PDF Downloads 100
5497 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 457
5496 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 511
5495 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 408
5494 Experiences and Challenges of Community Participation in Urban Renewal Projects: A Case Study of Bhendi Bazzar, Mumbai, India

Authors: Madhura Yadav

Abstract:

Urban redevelopment planning initiatives in developing countries have been largely criticised due to top-down planning approach and lack of involvement of the targeted beneficiaries which have led to a challenging situation which is contrary to the perceived needs of beneficiaries. Urban renewal projects improve the lives of people and meaningful participation of community plays a pivotal role. Public perceptions on satisfaction and participation have been given less priority in the investigation, which hinders effective planning and implementation of urban renewal projects. Moreover, challenges of community participation in urban renewal projects are less documented, particularly in relation to public participation and satisfaction. There is a need for new paradigm shift focusing on community participatory approach in urban renewal projects. The over 125-year-old Bhendi Bazar in Mumbai, India is the country’s first ever cluster redevelopment project, popularly known as Bhendi Bazaar redevelopment and it will be one of the largest projects for urban rejuvenation of one of Mumbai’s oldest and dying inner city areas. The project is led by the community trust, inputs were taken from various stakeholders, including residents, commercial tenants and expert consultants to shape the master plan and design of the project. The project started in 2016 but there is a significant delay in implementing the project. The study aimed at studying and assessing public perceptions on satisfaction and the relationship between community participation and community satisfaction in Bhendi Bazaar of Mumbai, India. Furthermore, the study will outline the challenges and problems of community participation in urban renewal projects and it suggests recommendations for the future. The qualitative and quantitative methods such as reconnaissance survey, key informant interviews, focus group discussions, walking interviews, a narrative inquiry is used for analysis of data. Preliminary findings revealed that all tenants are satisfied for the redevelopment of an area but the willingness of residential tenants to move in transit accommodation has made the projects successful and reductant of some residential and commercial tenants, regulatory provisions rising to face challenges in implementation. Experiences from the case study can help to understand dynamics behind public participation and government. At the same time, they serve as an inspiration and learning opportunity for future projects to ensure that they are sustainable not only from an economic standpoint but also, a social perspective.

Keywords: urban renewal, Bhendi Bazaar, community participation, satisfaction, social perspective

Procedia PDF Downloads 178