Search results for: railway vehicles
1428 A Case Study of Determining the Times of Overhauls and the Number of Spare Parts for Repairable Items in Rolling Stocks with Simulation
Authors: Ji Young Lee, Jong Woon Kim
Abstract:
It is essential to secure high availability of railway vehicles to realize high quality and efficiency of railway service. Once the availability decreased, planned railway service could not be provided or more cars need to be reserved. additional cars need to be purchased or the frequency of railway service could be decreased. Such situation would be a big loss in terms of quality and cost related to railway service. Therefore, we make various efforts to get high availability of railway vehicles. Because it is a big loss to operators, we make various efforts to get high availability of railway vehicles. To secure high availability, the idle time of the vehicle needs to be reduced and the following methods are applied to railway vehicles. First, through modularization design, exchange time for line replaceable units is reduced which makes railway vehicles could be put into the service quickly. Second, to reduce periodic preventive maintenance time, preventive maintenance with short period would be proceeded test oriented to minimize the maintenance time, and reliability is secured through overhauls for each main component. With such design changes for railway vehicles, modularized components are exchanged first at the time of vehicle failure or overhaul so that vehicles could be put into the service quickly and exchanged components are repaired or overhauled. Therefore, spare components are required for any future failures or overhauls. And, as components are modularized and costs for components are high, it is considerably important to get reasonable quantities of spare components. Especially, when a number of railway vehicles were put into the service simultaneously, the time of overhauls come almost at the same time. Thus, for some vehicles, components need to be exchanged and overhauled before appointed overhaul period so that these components could be secured as spare parts for the next vehicle’s component overhaul. For this reason, components overhaul time and spare parts quantities should be decided at the same time. This study deals with the time of overhauls for repairable components of railway vehicles and the calculation of spare parts quantities in consideration of future failure/overhauls. However, as railway vehicles are used according to the service schedule, maintenance work cannot be proceeded after the service was closed thus it is quite difficult to resolve this situation mathematically. In this study, Simulation software system is used in this study for analyzing the time of overhauls for repairable components of railway vehicles and the spare parts for the railway systems.Keywords: overhaul time, rolling stocks, simulation, spare parts
Procedia PDF Downloads 3371427 PLC Based Automatic Railway Crossing System for India
Authors: Tapan Upadhyay, Aqib Siddiqui, Sameer Khan
Abstract:
Railway crossing system in India is a manually operated level crossing system, either manned or unmanned. The main aim is to protect pedestrians and vehicles from colliding with trains, which pass at regular intervals, as India has the largest and busiest railway network. But because of human error and negligence, every year thousands of lives are lost due to accidents at railway crossings. To avoid this, we suggest a solution, by using Programmable Logical Controller (PLC) based automatic system, which will automatically control the barrier as well as roadblocks to stop people from crossing while security warning is given. Often people avoid security warning, and pass two-wheelers from beneath the barrier, while the train is at a distance away. This paper aims at reducing the fatality and accident rate by controlling barrier and roadblocks using sensors which sense the incoming train and vehicles and sends a signal to PLC. The PLC in return sends a signal to barrier and roadblocks. Once the train passes, the barrier and roadblocks retrieve back, and the passage is clear for vehicles and pedestrians to cross. PLC’s are used because they are very flexible, cost effective, space efficient, reduces complexity and minimises errors. Supervisory Control And Data Acquisition (SCADA) is used to monitor the functioning.Keywords: level crossing, PLC, sensors, SCADA
Procedia PDF Downloads 4271426 Characteristics and Durability Evaluation of Air Spring
Authors: Chang Su Woo, Hyun Sung Park
Abstract:
Air spring system is widely accepted for railway vehicle secondary suspension to reduce and absorb the vibration and noise. The low natural frequency ensures a comfortable ride and an invariably good stiffness. In this paper, the characteristic and durability test was conducted in laboratory by using servo-hydraulic fatigue testing system to reliability evaluation of air spring for electric railway vehicle. The experimental results show that the characteristics and durability of domestically developed products are excellent. Moreover, to guarantee the adaption of air spring, the ride comfort and air pressure variation were measured in train test on subway line. Air spring developed by this study for railway vehicles can guarantee the reliability of average usage of 1 million times at 90% confidence level.Keywords: air spring, reliability, railway, service lifetime
Procedia PDF Downloads 4761425 Optical Flow Direction Determination for Railway Crossing Occupancy Monitoring
Authors: Zdenek Silar, Martin Dobrovolny
Abstract:
This article deals with the obstacle detection on a railway crossing (clearance detection). Detection is based on the optical flow estimation and classification of the flow vectors by K-means clustering algorithm. For classification of passing vehicles is used optical flow direction determination. The optical flow estimation is based on a modified Lucas-Kanade method.Keywords: background estimation, direction of optical flow, K-means clustering, objects detection, railway crossing monitoring, velocity vectors
Procedia PDF Downloads 5181424 Inspection of Railway Track Fastening Elements Using Artificial Vision
Authors: Abdelkrim Belhaoua, Jean-Pierre Radoux
Abstract:
In France, the railway network is one of the main transport infrastructures and is the second largest European network. Therefore, railway inspection is an important task in railway maintenance to ensure safety for passengers using significant means in personal and technical facilities. Artificial vision has recently been applied to several railway applications due to its potential to improve the efficiency and accuracy when analyzing large databases of acquired images. In this paper, we present a vision system able to detect fastening elements based on artificial vision approach. This system acquires railway images using a CCD camera installed under a control carriage. These images are stitched together before having processed. Experimental results are presented to show that the proposed method is robust for detection fasteners in a complex environment.Keywords: computer vision, image processing, railway inspection, image stitching, fastener recognition, neural network
Procedia PDF Downloads 4551423 Modeling of Crack Growth in Railway Axles under Static Loading
Authors: Zellagui Redouane, Bellaouar Ahmed, Lachi Mohammed
Abstract:
The railway axles are the essential parts in the bogie of train, and its failure creates a big problem in the railway transport; during the work of this parts we noticed a premature deterioration. The aim has been presented a predictive model allowing the identification of the probable causes that are the cause of these premature deterioration. The results are employed for predicting fatigue crack growth in the railway axle, Also we want to present the variation value of stress intensity factor in different positions of elliptical crack tip. The modeling of axle in performed by the SOLID WORKS software and imported into ANSYS.Keywords: crack growth, static load, railway axle, lifetime
Procedia PDF Downloads 3641422 Condition Monitoring of Railway Earthworks using Distributed Rayleigh Sensing
Authors: Andrew Hall, Paul Clarkson
Abstract:
Climate change is predicted to increase the number of extreme weather events intensifying the strain on Railway Earthworks. This paper describes the use of Distributed Rayleigh Sensing to monitor low frequency activity on a vulnerable earthworks sectionprone to landslides alongside a railway line in Northern Spain. The vulnerable slope is instrumented with conventional slope stability sensors allowing an assessment to be conducted of the application of Distributed Rayleigh Sensing as an earthwork condition monitoring tool to enhance the resilience of railway networks.Keywords: condition monitoring, railway earthworks, distributed rayleigh sensing, climate change
Procedia PDF Downloads 2061421 Acoustics Barrier Design to Reduce Railway Noise by Using Maekawa's Method
Authors: Malinda Sabrina, Khoerul Anwar
Abstract:
Railway noise generated by pass-by train has been described as a form of environmental pollutants especially for the residential area near the railway. Many studies have shown, that environmental noise particularly transportation noise has negative effects on people which resulting in annoyance and specific health problems such as cardiovascular disease, cognitive impairment and sleep disturbance. Therefore, various attempts are made to reduce the noise. One method of reducing such noise to acceptable noise levels is to build acoustically barrier walls. The objective of this study was to review the method of reducing railway noise and obtain the preliminary design of the acoustics barrier on the edge of railway tracks close to the residential area. The design of this barrier is using the Maekawa's method. Measurements have been performed in residential areas around the railroads in the Karawang - Indonesia with the absence of an acoustical barrier. From the observation, it was found that the railway was passed by five trains within thirty minutes. With the limited distance between the railway tracks and the location of the residential area as well as the street of residents, then it was obtained that a reduction in sound pressure level is 25 dBA. Maximum sound pressure level obtained is 86.9 dBA then by setting the barrier as high as 4 m at a distance, 2.5 m from the railway, the noise level received by residents in the settlement around the railway line becomes 61.9 dBA.Keywords: acoustics barrier, Maekawa's method, noise attenuation, railway noise
Procedia PDF Downloads 2001420 Progressive View on Quality Management and Research on Improving Services in Railway Transport
Authors: Eva Nedeliakova, Michal Panak
Abstract:
This article describes the results of research focused on progressive view on quality management. It characterizes a research of improving services in railway transport. Improvement of these services has a strong importance in customer considering on the future use of railway transport. The research provides quality characteristics of transportation, defines critical points of technological processes and specifies the quality model supported by software solution. Main principles and results of the research have a significant importance and belong to numerous initiatives aimed to develop and support railway transport.Keywords: quality, service, software solution, railway transport
Procedia PDF Downloads 3521419 Railway Accidents: Using the Global Railway Accident Database and Evaluation for Risk Analysis
Authors: Mathias Linden, André Schneider, Harald F. O. von Korflesch
Abstract:
The risk of train accidents is an ongoing concern for railway organizations, governments, insurance companies and other depended sectors. Safety technologies are installed to reduce and to prevent potential damages of train accidents. Since the budgetary for the safety of railway organizations is limited, it is necessary not only to achieve a high availability and high safety standard but also to be cost effective. Therefore, an economic assessment of safety technologies is fundamental to create an accurate risk analysis. In order to conduct an economical assessment of a railway safety technology and a quantification of the costs of the accident causes, the Global Railway Accident Database & Evaluation (GRADE) has been developed. The aim of this paper is to describe the structure of this accident database and to show how it can be used for risk analyses. A number of risk analysis methods, such as the probabilistic safety assessment method (PSA), was used to demonstrate this accident database’s different possibilities of risk analysis. In conclusion, it can be noted that these analyses would not be as accurate without GRADE. The information gathered in the accident database was not available in this way before. Our findings are relevant for railway operators, safety technology suppliers, assurances, governments and other concerned railway organizations.Keywords: accident causes, accident costs, accident database, global railway accident database & evaluation, GRADE, probabilistic safety assessment, PSA, railway accidents, risk analysis
Procedia PDF Downloads 3591418 Investigation on the Bogie Pseudo-Hunting Motion of a Reduced-Scale Model Railway Vehicle Running on Double-Curved Rails
Authors: Barenten Suciu, Ryoichi Kinoshita
Abstract:
In this paper, an experimental and theoretical study on the bogie pseudo-hunting motion of a reduced-scale model railway vehicle, running on double-curved rails, is presented. Since the actual bogie hunting motion, occurring for real railway vehicles running on straight rails at high travelling speeds, cannot be obtained in laboratory conditions, due to the speed and wavelength limitations, a pseudo- hunting motion was induced by employing double-curved rails. Firstly, the test rig and the experimental procedure are described. Then, a geometrical model of the double-curved rails is presented. Based on such model, the variation of the carriage rotation angle relative to the bogies and the working conditions of the yaw damper are clarified. Vibration spectra recorded during vehicle travelling, on straight and double-curved rails, are presented and interpreted based on a simple vibration model of the railway vehicle. Ride comfort of the vehicle is evaluated according to the ISO 2631 standard, and also by using some particular frequency weightings, which account for the discomfort perceived during the reading and writing activities. Results obtained in this work are useful for the adequate design of the yaw dampers, which are used to attenuate the lateral vibration of the train car bodies.Keywords: double-curved rail, octave analysis, vibration model, ride comfort, railway vehicle
Procedia PDF Downloads 3161417 Factors Affecting At-Grade Railway Level Crossing Accidents in Bangladesh
Authors: Armana Huq
Abstract:
Railway networks have a significant role in the economy of any country. Similar to other transportation modes, many lives suffer from fatalities or injuries caused by accidents related to the railway. Railway accidents are not as common as roadway accidents yet they are more devastating and damaging than other roadway accidents. Despite that, issues related to railway accidents are not taken into consideration with significant attention as a major threat because of their less frequency compared to other accident categories perhaps. However, the Federal Railroad Administration reported nearly twelve thousand train accidents related to the railroad in the year 2014, resulting in more than eight hundred fatalities and thousands of injuries in the United States alone of which nearly one third fatalities resulted from railway crossing accidents. From an analysis of railway accident data of six years (2005-2010), it has been revealed that 344 numbers of the collision were occurred resulting 200 people dead and 443 people injured in Bangladesh. This paper includes a comprehensive overview of the railway safety situation in Bangladesh from 1998 to 2015. Each year on average, eight fatalities are reported in at-grade level crossings due to railway accidents in Bangladesh. In this paper, the number of railway accidents that occurred in Bangladesh has been presented and a fatality rate of 58.62% has been estimated as the percentage of total at-grade railway level crossing accidents. For this study, analysis of railway accidents in Bangladesh for the period 1998 to 2015 was obtained from the police reported accident database using MAAP (Microcomputer Accident Analysis Package). Investigation of the major contributing factors to the railway accidents has been performed using the Multinomial Logit model. Furthermore, hotspot analysis has been conducted using ArcGIS. Eventually, some suggestions have been provided to mitigate those accidents.Keywords: safety, human factors, multinomial logit model, railway
Procedia PDF Downloads 1481416 Ridership Study for the Proposed Installation of Automatic Guide-way Transit (AGT) System along Sapphire Street in Balanga City, Bataan
Authors: Nelson Andres, Meeko C. Masangcap, John Denver D. Catapang
Abstract:
Balanga City as, the heart of Bataan, is a growing City and is now at its fast pace of development. The growth of commerce in the city results to an increase in commuters who travel back and forth through the city, leading to congestions. Consequently, queuing of vehicles along national roads and even in the highways of the city have become a regular occurrence. This common scenario of commuters flocking the city, private and public vehicles going bumper to bumper, especially during the rush hours, greatly affect the flow of traffic vehicles and is now a burden not only to the commuters but also to the government who is trying to address this dilemma. Seeing these terrible events, the implementation of an elevated Automated Guide-way transit is seen as a possible solution to help in the decongestion of the affected parts of Balanga City.In response to the problem, the researchers identify if it is feasible to have an elevated guide-way transit in the vicinity of Sapphire Street in Balanga City, Bataan. Specifically, the study aims to determine who will be the riders based on the demographic profile, where the trip can be generated and distributed, the time when volume of people usually peaks and the estimated volume of passengers. Statistical analysis is applied to the data gathered to find out if there is an important relationship between the demographic profile of the respondents and their preference of having an elevated railway transit in the City of Balanga.Keywords: ridership, AGT, railway, elevated track
Procedia PDF Downloads 821415 Creation of a Realistic Railway Simulator Developed on a 3D Graphic Game Engine Using a Numerical Computing Programming Environment
Authors: Kshitij Ansingkar, Yohei Hoshino, Liangliang Yang
Abstract:
Advances in algorithms related to autonomous systems have made it possible to research on improving the accuracy of a train’s location. This has the capability of increasing the throughput of a railway network without the need for the creation of additional infrastructure. To develop such a system, the railway industry requires data to test sensor fusion theories or implement simultaneous localization and mapping (SLAM) algorithms. Though such simulation data and ground truth datasets are available for testing automation algorithms of vehicles, however, due to regulations and economic considerations, there is a dearth of such datasets in the railway industry. Thus, there is a need for the creation of a simulation environment that can generate realistic synthetic datasets. This paper proposes (1) to leverage the capabilities of open-source 3D graphic rendering software to create a visualization of the environment. (2) to utilize open-source 3D geospatial data for accurate visualization and (3) to integrate the graphic rendering software with a programming language and numerical computing platform. To develop such an integrated platform, this paper utilizes the computing platform’s advanced sensor models like LIDAR, camera, IMU or GPS and merges it with the 3D rendering of the game engine to generate high-quality synthetic data. Further, these datasets can be used to train Railway models and improve the accuracy of a train’s location.Keywords: 3D game engine, 3D geospatial data, dataset generation, railway simulator, sensor fusion, SLAM
Procedia PDF Downloads 41414 Low-Level Modeling for Optimal Train Routing and Scheduling in Busy Railway Stations
Authors: Quoc Khanh Dang, Thomas Bourdeaud’huy, Khaled Mesghouni, Armand Toguy´eni
Abstract:
This paper studies a train routing and scheduling problem for busy railway stations. Our objective is to allow trains to be routed in dense areas that are reaching saturation. Unlike traditional methods that allocate all resources to setup a route for a train and until the route is freed, our work focuses on the use of resources as trains progress through the railway node. This technique allows a larger number of trains to be routed simultaneously in a railway node and thus reduces their current saturation. To deal with this problem, this study proposes an abstract model and a mixed-integer linear programming formulation to solve it. The applicability of our method is illustrated on a didactic example.Keywords: busy railway stations, mixed-integer linear programming, offline railway station management, train platforming, train routing, train scheduling
Procedia PDF Downloads 2541413 Restoration of Railway Turnout Frog with FCAW
Authors: D. Sergejevs, A. Tipainis, P. Gavrilovs
Abstract:
Railway turnout frogs restored with MMA often have such defects as infusions, pores, a.o., which under the influence of dynamic forces cause premature destruction of the restored surfaces. To prolong the operational time of turnout frog, i.e. operational time of the restored surface, turnout frog was restored using FCAW and afterwards matallographic examination was performed. Experimental study revealed that railway turnout frog restored with FCAW had better quality than elements restored with MMA, furthermore it provided considerable time economy.Keywords: elements of railway turnout, FCAW, metallographic examination, quality of build-up welding
Procedia PDF Downloads 6431412 Study on Monitoring Techniques Developed for a City Railway Construction
Authors: Myoung-Jin Lee, Sung-Jin Lee, Young-Kon Park, Jin-Wook Kim, Bo-Kyoung Kim, Song-Hun Chong, Sun-Il Kim
Abstract:
Currently, sinkholes may occur due to natural or unknown causes. When the sinkhole is an instantaneous phenomenon, most accidents occur because of significant damage. Thus, methods of monitoring are being actively researched, such that the impact of the accident can be mitigated. A sinkhole can severely affect and wreak havoc in community-based facilities such as a city railway construction. Therefore, the development of a laser / scanning system and an image-based tunnel is one method of pre-monitoring that it stops the accidents. The laser scanning is being used but this has shortcomings as it involves the development of expensive equipment. A laser / videobased scanning tunnel is being developed at Korea Railroad Research Institute. This is designed to automatically operate the railway. The purpose of the scanning is to obtain an image of the city such as of railway structures (stations, tunnel). At the railway structures, it has developed 3D laser scanning that can find a micro-crack can not be distinguished by the eye. An additional aim is to develop technology to monitor the status of the railway structure without the need for expensive post-processing of 3D laser scanning equipment, by developing corresponding software.Keywords: 3D laser scanning, sinkhole, tunnel, city railway construction
Procedia PDF Downloads 4351411 Fuzzy Decision Support System for Human-Realistic Overtaking in Railway Traffic Simulations
Authors: Tomáš Vyčítal
Abstract:
In a simulation model of a railway system it is important, besides other crucial algorithms, to have correct behaviour of train overtaking in stochastic conditions. This problem is being addressed in many simulation tools focused on railway traffic, however these are not very human-realistic. The goal of this paper is to create a more human-realistic overtaking decision support system for the use in railway traffic simulations. A fuzzy system has been chosen for this task as fuzzy systems are well-suited for human-like decision making. The fuzzy system designed takes into account timetables, train positions, delays and buffer times as inputs and provides an instruction to overtake or not overtake.Keywords: decision-making support, fuzzy systems, simulation, railway, transport
Procedia PDF Downloads 1401410 Fuel Cells Not Only for Cars: Technological Development in Railways
Authors: Marita Pigłowska, Beata Kurc, Paweł Daszkiewicz
Abstract:
Railway vehicles are divided into two groups: traction (powered) vehicles and wagons. The traction vehicles include locomotives (line and shunting), railcars (sometimes referred to as railbuses), and multiple units (electric and diesel), consisting of several or a dozen carriages. In vehicles with diesel traction, fuel energy (petrol, diesel, or compressed gas) is converted into mechanical energy directly in the internal combustion engine or via electricity. In the latter case, the combustion engine generator produces electricity that is then used to drive the vehicle (diesel-electric drive or electric transmission). In Poland, such a solution dominates both in heavy linear and shunting locomotives. The classic diesel drive is available for the lightest shunting locomotives, railcars, and passenger diesel multiple units. Vehicles with electric traction do not have their own source of energy -they use pantographs to obtain electricity from the traction network. To determine the competitiveness of the hydrogen propulsion system, it is essential to understand how it works. The basic elements of the construction of a railway vehicle drive system that uses hydrogen as a source of traction force are fuel cells, batteries, fuel tanks, traction motors as well as main and auxiliary converters. The compressed hydrogen is stored in tanks usually located on the roof of the vehicle. This resource is supplemented with the use of specialized infrastructure while the vehicle is stationary. Hydrogen is supplied to the fuel cell, where it oxidizes. The effect of this chemical reaction is electricity and water (in two forms -liquid and water vapor). Electricity is stored in batteries (so far, lithium-ion batteries are used). Electricity stored in this way is used to drive traction motors and supply onboard equipment. The current generated by the fuel cell passes through the main converter, whose task is to adjust it to the values required by the consumers, i.e., batteries and the traction motor. The work will attempt to construct a fuel cell with unique electrodes. This research is a trend that connects industry with science. The first goal will be to obtain hydrogen on a large scale in tube furnaces, to thoroughly analyze the obtained structures (IR), and to apply the method in fuel cells. The second goal is to create low-energy energy storage and distribution station for hydrogen and electric vehicles. The scope of the research includes obtaining a carbon variety and obtaining oxide systems on a large scale using a tubular furnace and then supplying vehicles. Acknowledgments: This work is supported by the Polish Ministry of Science and Education, project "The best of the best! 4.0", number 0911/MNSW/4968 – M.P. and grant 0911/SBAD/2102—B.K.Keywords: railway, hydrogen, fuel cells, hybrid vehicles
Procedia PDF Downloads 1891409 Microtomographic Analysis of Friction Materials Used in the Brakes of Railway Vehicles
Authors: Mikołaj Szyca
Abstract:
Friction elements of rail vehicle brakes are more and more often made of composite materials that displace cast iron. Materials are tested primarily in terms of their dynamic abilities, but the material structure of brake pads and linings changes during operation. In connection with the above, the changes taking place in the tested rubbing materials were analyzed using X-ray computed tomography in order to obtain data on changes in the structure of the material immediately after production and after a certain number of operating cycles. The implementation of microtomography research for experimental work on new friction materials may result in increasing the potential for the production of new composites by eliminating unfavorable material factors and, consequently, improving the dynamic parameters.Keywords: composite materials, friction pair, X-ray computed microtomography, railway
Procedia PDF Downloads 771408 Dynamic Model Conception of Improving Services Quality in Railway Transport
Authors: Eva Nedeliakova, Jaroslav Masek, Juraj Camaj
Abstract:
This article describes the results of research focused on quality of railway freight transport services. Improvement of these services has a crucial importance in customer considering on the future use of railway transport. Processes filling the customer demands and output quality assessment were defined as a part of the research. In this, contribution is introduced the map of quality planning and the algorithm of applied methodology. It characterises a model which takes into account characters of transportation with linking a perception services quality in ordinary and extraordinary operation. Despite the fact that rail freight transport has its solid position in the transport market, lots of carriers worldwide have been experiencing a stagnation for a couple of years. Therefore, specific results of the research have a significant importance and belong to numerous initiatives aimed to develop and support railway transport not only by creating a single railway area or reducing noise but also by promoting railway services. This contribution is focused also on the application of dynamic quality models which represent an innovative method of evaluation quality services. Through this conception, time factor, expected and perceived quality in each moment of the transportation process can be taken into account.Keywords: quality, railway, transport, service
Procedia PDF Downloads 4451407 Model of Multi-Criteria Evaluation for Railway Lines
Authors: Juraj Camaj, Martin Kendra, Jaroslav Masek
Abstract:
The paper is focused to the evaluation railway tracks in the Slovakia by using Multi-Criteria method. Evaluation of railway tracks has important impacts for the assessment of investment in technical equipment. Evaluation of railway tracks also has an important impact for the allocation of marshalling yards. Marshalling yards are in transport model as centers for the operation assigned catchment area. This model is one of the effective ways to meet the development strategy of the European Community's railways. By applying this model in practice, a transport company can guarantee a higher quality of service and then expect an increase in performance. The model is also applicable to other rail networks. This model supplements a theoretical problem of train formation problem of new ways of looking at evaluation of factors affecting the organization of wagon flows.Keywords: railway track, multi-criteria methods, evaluation, transportation model
Procedia PDF Downloads 4691406 A Study on Traction Motor Design for Obtaining the Maximum Traction Force of Tram-Train
Authors: Geochul Jeong, In-Gun Kim, Hyun-Seok Hong, Dong-Woo Kang, Ju Lee
Abstract:
This study is about IPMSM design for obtaining the maximum traction force of Tram-Train. Tram-Train is a Tram and Train-combined railway vehicles, which operates at a maximum speed of 70km/h in the city section (Tram section) and at a maximum speed of 150km/h in the out-of-city section (Train section). For this reason, tram-train was designed to be an IPMSM (Interior Permanent Synchronous Motor) with a wide range of speed variation. IPMSM’s magnetic path varies depending on the shape of rotor and in this case, the power characteristics are different in the constant torque area and the flux weakening area. Therefore, this study suggests a method to improve Tram-Train’s traction force, based on the relationship between magnetic torque and reluctance torque. The suggested method was applied through IPMSM rotor shape design and electromagnetic field finite element method was conducted to verify the validity of the suggested method.Keywords: tram-train, traction motor, IPMSM, synchronous motor, railway vehicles
Procedia PDF Downloads 4711405 Evaluation of Railway Network and Service Performance Based on Transportation Sustainability in DKI Jakarta
Authors: Nur Bella Octoria Bella, Ayomi Dita Rarasati
Abstract:
DKI Jakarta is Indonesia's capital city with the 10th highest congestion rate in the world based on the 2019 traffic index. Other than that based on World Air Quality Report in 2019 showed DKI Jakarta's air pollutant concentrate 49.4 µg and the 5th highest air pollutant in the world. In the urban city nowadays, the mobility rate is high enough and the efficiency for sustainability assessment in transport infrastructure development is needed. This efficiency is the important key for sustainable infrastructure development. DKI Jakarta is nowadays in the process of constructing the railway infrastructure to support the transportation system. The problems appearing are the railway infrastructure networks and the service in DKI Jakarta already planned based on sustainability factors or not. Therefore, the aim of this research is to make the evaluation of railways infrastructure networks performance and services in DKI Jakarta regards on the railway sustainability key factors. Further, this evaluation will be used to make the railway sustainability assessment framework and to offer some of the alternative solutions to improve railway transportation sustainability in DKI Jakarta. Firstly a very detailed literature review of papers that have focused on railway sustainability factors and their improvements of railway sustainability, published in the scientific journal in the period 2011 until 2021. Regarding the sustainability factors from the literature review, further, it is used to assess the current condition of railway infrastructure in DKI Jakarta. The evaluation will be using a Likert rate questionnaire and directed to the transportation railway expert and the passenger. Furthermore, the mapping and evaluation rate based on the sustainability factors will be compared to the effect factors using the Analytical Hierarchical Process (AHP). This research offers the network's performance and service rate impact on the sustainability aspect and the passenger willingness for using the rail public transportation in DKI Jakarta.Keywords: transportation sustainability, railway transportation, sustainability, DKI Jakarta
Procedia PDF Downloads 1631404 Identifying Strategies for Improving Railway Services in Bangladesh
Authors: Armana Sabiha Huq, Tahmina Rahman Chowdhury
Abstract:
In this paper, based on the stated preference experiment, the service quality of Bangladesh Railway has been assessed, and particular importance has been given to investigate if there exists a relationship between service quality and safety. For investigation purposes, environmental and organizational factors were assumed to determine the safety performance of the railway. Data collected from the survey has been analyzed by importance-performance analysis (IPA). In this paper, a modification of the well-known importance-performance analysis (IPA) has been done by adopting the importance of the weights determined through a structural equation modeling (SEM) approach and by plotting the gap between importance and performance on a visual graph. It has been found that there exists a relationship between safety and serviceability to some extent. Limited resources are an important factor to improve the safety and serviceability condition of the BD railway. Moreover, it is observed that the limited resources available to monitor and improve the safety performance of railway.Keywords: importance-performance analysis, GAP-IPA, SEM, serviceability, safety, factor analysis
Procedia PDF Downloads 1401403 Enhancement of the Corrosion Resistance of Fastening System of Ballasted Railway in Sandy Desert by Using Nano-Coating
Authors: Milad Alizadeh Galdiani, Navid Sabet, Mohamad Ali Mohit, Fatemeh Palizdar
Abstract:
Railway as one of the most important transportation modes, passes through various areas with different conditions inevitably, and in many countries such as China, United States, Australia, and Iran, it passes through sandy desert areas. One of the main problems in these areas is the movement of sand, causing various damages to ballasted railway track such as corrosion in the railway fastening system. The soil composition of some desert areas like Fahraj in Iran consists of sand and salt. Due to the movement of sand and corrosive ions of salt, the fastening system of the railway is corroded, which, in turn, reduces the thickness of the components and their life span. In this research, the Nano-coating for fastening system of the railway is introduced, and its performance has been investigated in both laboratory and field tests. The Nano-coating of the fastening system consists of zinc-rich, epoxy, polyurethane, and additive, which is produced through Nano technology. This layer covers the surface of the fastening system and prohibits the chemical reactions, which result in corrosion. The results of Electrochemical Impedance Spectroscopy (EIS) indicate that corrosion resistance increases 315 times by using nano-coating, salt spray test results demonstrate that nano-coated components remained intact after 1000 hours.Keywords: ballasted railway, Nano-coating, railway fastening system, sandy desert
Procedia PDF Downloads 1261402 Design and Analysis for a 4-Stage Crash Energy Management System for Railway Vehicles
Authors: Ziwen Fang, Jianran Wang, Hongtao Liu, Weiguo Kong, Kefei Wang, Qi Luo, Haifeng Hong
Abstract:
A 4-stage crash energy management (CEM) system for subway rail vehicles used by Massachusetts Bay Transportation Authority (MBTA) in the USA is developed in this paper. The 4 stages of this new CEM system include 1) energy absorbing coupler (draft gear and shear bolts), 2) primary energy absorbers (aluminum honeycomb structured box), 3) secondary energy absorbers (crush tube), and 4) collision post and corner post. A sliding anti-climber and a fixed anti-climber are designed at the front of the vehicle cooperating with the 4-stage CEM to maximize the energy to be absorbed and minimize the damage to passengers and crews. In order to investigate the effectiveness of this CEM system, both finite element (FE) methods and crashworthiness test have been employed. The whole vehicle consists of 3 married pairs, i.e., six cars. In the FE approach, full-scale railway car models are developed and different collision cases such as a single moving car impacting a rigid wall, two moving cars into a rigid wall, two moving cars into two stationary cars, six moving cars into six stationary cars and so on are investigated. The FE analysis results show that the railway vehicle incorporating this CEM system has a superior crashworthiness performance. In the crashworthiness test, a simplified vehicle front end including the sliding anti-climber, the fixed anti-climber, the primary energy absorbers, the secondary energy absorber, the collision post and the corner post is built and impacted to a rigid wall. The same test model is also analyzed in the FE and the results such as crushing force, stress, and strain of critical components, acceleration and velocity curves are compared and studied. FE results show very good comparison to the test results.Keywords: railway vehicle collision, crash energy management design, finite element method, crashworthiness test
Procedia PDF Downloads 4021401 Impacts on Regional Economy by the Upgrade of Railway Infrastructure
Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki
Abstract:
Transport is often the key driver for growth, especially for regions providing key opportunities for connectivity between busy areas and mature markets. Even though the benefits of transports are essential, limited research is published regarding the linkage of inland transport systems and other business sectors, the spillover effects on regional economy and the overall contribution to regional development. This paper deals with the determination of the key socioeconomic benefits on regions caused by the upgrade and the modernization of a railway corridor. The analysis framework is following a four-step analysis, providing key messages to planners, managers and decision makers. The provided case study is the upgrade of the railway corridor in North Greece, which is a very sensitive region suffering long time from economic stress. The application results are essential for comparisons with other destinations and provide key messages regarding the relationship of railway and economic development.Keywords: regional development, economic impact assessment variables, railway infrastructure, strategic planning
Procedia PDF Downloads 3091400 Monetary Evaluation of Dispatching Decisions in Consideration of Choice of Transport
Authors: Marcel Schneider, Nils Nießen
Abstract:
Microscopic simulation programs enable the description of the two processes of railway operation and the previous timetabling. Occupation conflicts are often solved based on defined train priorities on both process levels. These conflict resolutions produce knock-on delays for the involved trains. The sum of knock-on delays is commonly used to evaluate the quality of railway operations. It is either compared to an acceptable level-of-service or the delays are evaluated economically by linearly monetary functions. It is impossible to properly evaluate dispatching decisions without a well-founded objective function. This paper presents a new approach for evaluation of dispatching decisions. It uses models of choice of transport and considers the behaviour of the end-costumers. These models evaluate the knock-on delays in more detail than linearly monetary functions and consider other competing modes of transport. The new approach pursues the coupling of a microscopic model of railway operation with the macroscopic model of choice of transport. First it will be implemented for the railway operations process, but it can also be used for timetabling. The evaluation considers the possibility to change over to other transport modes by the end-costumers. The new approach first looks at the rail-mounted and road transport, but it can also be extended to air transport. The split of the end-costumers is described by the modal-split. The reactions by the end-costumers have an effect on the revenues of the railway undertakings. Various travel purposes has different pavement reserves and tolerances towards delays. Longer journey times affect besides revenue changes also additional costs. The costs depend either on time or track and arise from circulation of workers and vehicles. Only the variable values are summarised in the contribution margin, which is the base for the monetary evaluation of the delays. The contribution margin is calculated for different resolution decisions of the same conflict. The conflict resolution is improved until the monetary loss becomes minimised. The iterative process therefore determines an optimum conflict resolution by observing the change of the contribution margin. Furthermore, a monetary value of each dispatching decision can also be determined.Keywords: choice of transport, knock-on delays, monetary evaluation, railway operations
Procedia PDF Downloads 3281399 Adaptable Regulatory Oversight and Safety Awareness Regime: An Experience-Based Contribution Towards Sustainability in a Changing Railway Environment
Authors: Peaceman Sopazi, Mabila Mathebula, John Smallwood
Abstract:
Recent health and safety (H&S) concerns and their resultant impact on railway operations, namely, the severe acute respiratory syndrome (SARS) or collectively known as SARS-CoV-2 (Covid-19) pandemic and the Fourth Industrial Revolution (4IR), which have dominated public discourse, brought into question as to whether, or not, some aspects of how we have so far managed safety oversight as railway regulatory bodies and operators will remain relevant in a changing railway environment. Railway practitioners have generally found themselves between a proverbial rock and a hard place by being confronted by emerging challenges which have brought along great opportunities for sustainability. As witnesses and participants to the progressively introduced railway safety management, and transformation regimes, this paper attempts to share gathered field experience on adaptable regulatory oversight and safety awareness. The discourse is approached from a South African context but also with an informed perspective of what seems to work and what usually does not. The authors share their own multi and transdisciplinary experience coupled with insights they have gained as researchers of global trends in general safety management and specific aspects of railway safety management, for sustainability. In addition to sharing a largely experience-based methodology for survival, suggestions are offered for consideration as a way of keeping the railway safety management discourse alive as practitioners navigate a new path which is shrouded in a cloud of untold uncertainty. The authors further believe that the right timing for the implementation of the proposed suggestions in this paper will produce beneficial outcomes. Finally, the paper will identify areas that are still open for further investigation for and by researchers and practitioners alike.Keywords: health & safety management, safety awareness, railway safety management, railway systems sustainability
Procedia PDF Downloads 173