Search results for: construction project dispute resolution
9545 Bias Minimization in Construction Project Dispute Resolution
Authors: Keyao Li, Sai On Cheung
Abstract:
Incorporation of alternative dispute resolution (ADR) mechanism has been the main feature of current trend of construction project dispute resolution (CPDR). ADR approaches have been identified as efficient mechanisms and are suitable alternatives to litigation and arbitration. Moreover, the use of ADR in this multi-tiered dispute resolution process often leads to repeated evaluations of a same dispute. Multi-tiered CPDR may become a breeding ground for cognitive biases. When completed knowledge is not available at the early tier of construction dispute resolution, disputing parties may form preconception of the dispute matter or the counterpart. This preconception would influence their information processing in the subsequent tier. Disputing parties tend to search and interpret further information in a self-defensive way to confirm their early positions. Their imbalanced information collection would boost their confidence in the held assessments. Their attitudes would be hardened and difficult to compromise. The occurrence of cognitive bias, therefore, impedes efficient dispute settlement. This study aims to explore ways to minimize bias in CPDR. Based on a comprehensive literature review, three types of bias minimizing approaches were collected: strategy-based, attitude-based and process-based. These approaches were further operationalized into bias minimizing measures. To verify the usefulness and practicability of these bias minimizing measures, semi-structured interviews were conducted with ten CPDR third party neutral professionals. All of the interviewees have at least twenty years of experience in facilitating settlement of construction dispute. The usefulness, as well as the implications of the bias minimizing measures, were validated and suggested by these experts. There are few studies on cognitive bias in construction management in general and in CPDR in particular. This study would be the first of its type to enhance the efficiency of construction dispute resolution by highlighting strategies to minimize the biases therein.Keywords: bias, construction project dispute resolution, minimization, multi-tiered, semi-structured interview
Procedia PDF Downloads 1869544 Enhancing Dispute Resolution in Construction: The Potential Contributions of Dispute Boards and the Roadblock to Vaster Adoption
Authors: Zeyad M. Abdelgawad, A. Samer Ezeldin, Waleed El Nemr
Abstract:
The Egyptian construction industry has evolved significantly over the past decade, driven by enhanced economic sectors and the need for industrial development. This complexity requires diverse and flexible alternative dispute resolution (ADR) techniques. Dispute boards (DB) are globally recognized as effective ADR methods, especially since their introduction to World Bank projects in 1995. Despite their advantages, dispute boards remain underutilized in Egypt aside from the World Bank-financed projects due to several misconceptions. The study reveals the perceptions hindering the wider adoption of dispute boards in the Egyptian construction industry through detailed literature review and interviews with the experts. The perceptions encompassed the lack of awareness and understanding of dispute boards and implementation procedures, misconceptions about the costs associated with implementing dispute boards and the impact on the bid prices, the common orientation of resolving disputes internally and avoid resorting to external parties to preserve the long-term relationship, and lack of trust in the ability of the dispute boards to positively affect the project performance. In response to these identified misconceptions, a proposed alternative draft to the FIDIC 2017 clause twenty-one “Disputes and Arbitration” is provided, offering a way for a practical application of the dispute boards within the Egyptian context.Keywords: alternative dispute resolution, claim management system, dispute boards, Egyptian construction industry, FIDIC
Procedia PDF Downloads 219543 Identifying Reforms Required in Construction Contracts from Resolved Disputed Cases
Authors: K. C. Iyer, Yogita Manan Bindal, Sumit Kumar Bakshi
Abstract:
The construction industry is plagued with disputes and litigation in India with many stalled projects seeking dispute resolution. This has an adverse effect on the performance and overall project delivery and impacts future investments within the industry. While construction industry is the major driver of growth, there has not been major reforms in the government construction contracts. The study is aimed at identifying the proactive means of dispute avoidance, focusing on reforms required within the construction contracts, by studying 49 arbitration awards of construction disputes. The claims presented in the awards are aggregated to study the causes linked to the contract document and are referred against the prospective recommendation and practices as surveyed from literature review of research papers. Within contract administration, record keeping has been a major concern as they are required by the parties to substantiate the claims or the counterclaims and therefore are essential in any dispute redressal process. The study also observes that the right judgment is inhibited when the record keeping is improper and due to lack of coherence between documents, the dispute resolution period is also prolonged. The finding of the research will be relevant to industry practitioners in contract drafting with a view to avoid disputes.Keywords: construction contract, contract administration, contract management, dispute avoidance
Procedia PDF Downloads 2659542 OAS and Interstate Dispute Resolution at the Beginning of the 21st Century: General Pattern and Peculiarities
Authors: Victor Jeifets, Liliia Khadorich
Abstract:
The paper describes the OAS role in dispute resolution. The authors make an attempt to identify a general pattern of the OAS activities within the peaceful settlement of interstate conflicts, in the beginning of 21st century, as well as to analyze some features of Honduras–Belize, Nicaragua–Honduras, Honduras–El Salvador, Costa-Rica–Nicaragua, Colombia–Ecuador cases.Keywords: OAS, peace maintenance, border dispute, dispute resolution, peaceful settlement
Procedia PDF Downloads 4929541 Alternate Dispute Resolution: Expeditious Justice
Authors: Uzma Fakhar, Osama Fakhar, Aamir Shafiq Ch
Abstract:
Methods of alternate dispute resolution (ADR) like conciliation, arbitration, mediation are the supplement to ensure inexpensive and expeditious justice in a country. Justice delayed has not only created chaos, but an element of rebellious behavior towards judiciary is being floated among people. Complexity of traditional judicial system and its diversity has created an overall coherence. Admittedly, In Pakistan the traditional judicial system has failed to achieve its goals which resulted in the backlog of cases pending in courts, resultantly even the critics of alternate dispute resolution agree to restore the spirit of expeditious justice by reforming the old Panchayat system. The Government is keen to enact certain laws and make amendments to facilitate the resolution of a dispute through a simple and faster ADR framework instead of a lengthy and exhausting complex trial in order to create proliferation and faith in alternate dispute resolution. This research highlights the value of ADR in a country like Pakistan for revival of the confidence of the people upon the judicial process and a useful judicial tool to reduce the pressure on the judiciary.Keywords: alternate dispute resolution, development of law, expeditious justice, Pakistan
Procedia PDF Downloads 2229540 Alternative Dispute Resolution in the Settlement of Environmental Disputes in South Africa
Authors: M. van der Bank, C. M. van der Bank
Abstract:
Alternative Dispute Resolution denotes all forms of dispute resolution other than litigation or adjudication through the courts. This definition of Alternative Dispute Resolution, however, makes no mention of a vital consideration. ADR is the generally accepted acronym for alternative dispute resolution. Despite the choice not to proceed before a court or statutory tribunal, ADR will still be regulated by law and by the Constitution. Fairness is one of the core values of the South African constitutional order. Environmental disputes occur frequently, but due to delays and costs, ADR is a mechanism to resolve this kind of disputes which is a resolution of non-judicial mechanism. ADR can be used as a mechanism in environmental disputes that are less expensive and also more expeditious than formal litigation. ADR covers a broad range of mechanisms and processes designed to assist parties in resolving disputes creatively and effectively. In so far as this may involve the selection or design of mechanisms and processes other than formal litigation, these mechanisms and processes are not intended to supplant court adjudication, but rather to supplement it. A variety of ADR methods have been developed to deal with numerous problems encountered during environmental disputes. The research questions are: How can ADR facilitate environmental disputes in South Africa? Are they appropriate? And what improvements should be made?Keywords: alternative dispute, environmental disputes, non-judicial, resolution and settlement
Procedia PDF Downloads 2409539 The Dubai World Islamic Finance Arbitration Center and Jurisprudence Office as the Dispute Resolution Center and Mechanism for the Islamic Finance Industry
Authors: Camille Paldi
Abstract:
As the Islamic finance industry is growing annually at a rate of 10% to 15% per year, it is imperative that a unique, independent legal framework is established in order to effectively adjudicate Islamic finance disputes. Currently, Islamic finance disputes are being adjudicated in inadequate civil and common law courts and arbitration centers where the contracts in dispute are being transformed from Islamic to conventional transactions. Through case analysis combined with an exploration of the efficacy of existing arbitration centers and dispute resolution methods available to Islamic finance, this paper will seek to reveal that the Islamic finance industry currently lacks an adequate dispute resolution mechanism and facility to adjudicate disputes arising from Islamic finance contracts. Hence, now is the time for the Dubai World Islamic Finance Arbitration Center (DWIFAC) and Jurisprudence Office (DWIFACJO) as the Dispute Resolution Center and Mechanism for the Islamic Finance Industry.Keywords: Islamic finance, dispute resolution, Dubai world Islamic finance arbitration center, jurisprudence office
Procedia PDF Downloads 4139538 Revisiting Dispute Resolution Mechanisms in the Southern African Development Community: A Proposal for Synchronization
Authors: Tapiwa Shumba, Nyaradzo D. T. Karubwa
Abstract:
Dispute resolution is the plinth of regional integration initiatives anchored on the rule of law and compliance with obligations. Without effective and reliable despite resolution mechanisms, it may be difficult to foster deeper integration. Within the Southern African Development Community (SADC) legal and institutional framework exists an apparent recognition that dispute resolution is an integral part of the regional integration. Almost all legal instruments of SADC include some provision for dispute resolution. Institutionally, the somewhat now defunct SADC Tribunal is meant to be the fulcrum for resolving disputes that arise under SADC instruments. However, after a closer analysis of the substance of these legal provisions and the attendant procedural mechanisms for addressing disputes, an argument can be made that dispute resolution in SADC is somewhat scant, fragmented and neglected. In most instruments, the common provision on dispute resolution appears to be a ‘mid-night clause’. In other instruments which have specialised provisions and procedures, questions of practicality and genius cannot be avoided. Worse still there now appears to be a lack of magnanimity between the substantive provisions in various instruments and the role of the transformed Tribunal. This scant, fragmented and neglected dispute resolution system may have an impact on the observance of the rule of law and compliance with obligations in the rules-based SADC system. This all, in turn, has an effect on the common agenda for deeper regional integration. This article seeks to expose this scant, fragmented and neglected SADC dispute resolution system and to propose a harmonised system that addresses these challenges. A ‘one stop shop’ system under a strengthened SADC tribunal is proposed as a responsive solution.Keywords: regional integration, harmonisation, SADC tribunal, dispute resolution
Procedia PDF Downloads 1919537 The Concept of Commercial Dispute Resolution through the Court in Indonesia
Authors: Anita Afriana, Efa Laela Fakhriah
Abstract:
The law of civil procedure which is currently in effect in Indonesia is still referring to the rules applicable at the time of the Dutch East Indies, that is Het Herziene Indonesisch Reglement (HIR) and Reglement Tot Regeling Van Het Rechtswezen In De gewesten Buiten Java En Madura (RBg). With the fact that the enactment of this has been very long, there are some things that are no longer suitable with the circumstances and needs of the community in seeking justice today. Therefore, a new regulation on the law of civil procedure is required and the discussions of the draft are currently being carried out. The fast examination of dispute in civil procedure is required to accelerate the growth of Indonesia’s economy by accelerating the dispute resolution method (time efficiency). With the provision of the quick examination on commercial disputes mentioned above, it is expected to benefit the community in order to obtain a tool of dispute resolution efficiently and effectively, so as making justice fast and inexpensive, especially for the resolution of commercial disputes.Keywords: commercial dispute, civil law procedure, court, Indonesia
Procedia PDF Downloads 5109536 The Growth of E-Commerce and Online Dispute Resolution in Developing Nations: An Analysis
Authors: Robin V. Cupido
Abstract:
Online dispute resolution has been identified in many countries as a viable alternative for resolving conflicts which have arisen in the so-called digital age. This system of dispute resolution is developing alongside the Internet, and as new types of transactions are made possible by our increased connectivity, new ways of resolving disputes must be explored. Developed nations, such as the United States of America and the European Union, have been involved in creating these online dispute resolution mechanisms from the outset, and currently have sophisticated systems in place to deal with conflicts arising in a number of different fields, such as e-commerce, domain name disputes, labour disputes and conflicts arising from family law. Specifically, in the field of e-commerce, the Internet’s borderless nature has served as a way to promote cross-border trade, and has created a global marketplace. Participation in this marketplace boosts a country’s economy, as new markets are now available, and consumers can transact from anywhere in the world. It would be especially advantageous for developing nations to be a part of this global marketplace, as it could stimulate much-needed investment in these nations, and encourage international co-operation and trade. However, for these types of transactions to proliferate, an effective system for resolving the inevitable disputes arising from such an increase in e-commerce is needed. Online dispute resolution scholarship and practice is flourishing in developed nations, and it is clear that the gap is widening between developed and developing nations in this regard. The potential for implementing online dispute resolution in developing countries has been discussed, but there are a number of obstacles that have thus far prevented its continued development. This paper aims to evaluate the various political, infrastructural and socio-economic challenges faced in developing nations, and to question how these have impacted the acceptance and development of online dispute resolution, scholarship and training of online dispute resolution practitioners and, ultimately, developing nations’ readiness to participate in cross-border e-commerce.Keywords: developing countries, feasibility, online dispute resolution, progress
Procedia PDF Downloads 3029535 Empirical Research on Preference for Conflict Resolution Styles of Owners and Contractors in China
Authors: Junqi Zhao, Yongqiang Chen
Abstract:
The preference for different conflict resolution styles are influenced by cultural background and power distance of two parties involving in conflict. This research put forward 7 hypotheses and tested the preference differences of the five conflict resolution styles between Chinese owner and contractor as well as the preference differences concerning the same style between two parties. The research sample includes 202 practitioners from construction enterprises in mainland China. Research result found that theories concerning conflict resolution styles could be applied in the Chinese construction industry. Some results of this research were not in line with former research, and this research also gave explanation to the differences from the characteristics of construction projects. Based on the findings, certain suggestions were made to serve as a guidance for managers to choose appropriate conflict resolution styles for a better handling of conflict.Keywords: Chinese owner and contractor, conflict, construction project, conflict resolution styles
Procedia PDF Downloads 5319534 Materialisation of Good Governance Concept by Effective Investment Dispute Resolution in the European Union
Authors: Jagna Mucha, Anna Kańciak
Abstract:
The concept of good governance constitutes a wide perspective for academic discussion, because it provides a substantial theoretical background for settling many practical problems faced contemporarily by the EU. The basic assumptions of good governance have basically remained unchanged since the 90’s, when the concept was introduced by the World Bank, although the scholarly discussions reveal new facets of the said concept, when related to specific domains. The paper discusses the application of the specific elements of the concept of good governance in the field of the international investment law. Specifically, it seeks to demonstrate that the concept of good governance regulates the issue of international investments in that, among others, it requires the application of the alternative dispute resolution in order to make the investment law enforceable in the best possible way.Keywords: dispute resolution, european union, investments, good governance
Procedia PDF Downloads 3569533 Settlement of Dispute and the Islamic Financial Institutions
Authors: Yusuf Sani Abubakar
Abstract:
This paper investigates mechanisms of settlement of disputes at the Islamic Financial Institutions (IFIs). Dispute settlement at the Islamic Financial Institutions (IFIs) can be both through litigation as well as Alternative Dispute Resolution (ADR). The paper aims to investigate how disputes are settled at the Islamic Financial Institutions (IFIs), as it is natural to have disagreements between different parties involved in the business of Islamic Financial Institutions (IFIs). The paper adopts a qualitative methodology where the sources are taken from journals, books, websites etc. In analyzing the data obtained from the sources, content analysis will be used. In addition to writings on this topic by various writers, this paper will add to the literature and will recommend certain effective ways of solving disputes arising between parties participating in the business of Islamic Financial Institutions (IFIs).Keywords: Islamic finance, dispute resolution, Islamic financial institutions, litigation
Procedia PDF Downloads 1669532 Mediation in Turkey
Authors: Ibrahim Ercan, Mustafa Arikan
Abstract:
In recent years, alternative dispute resolution methods have attracted the attention of many country’s legislators. Instead of solving the disputes by litigation, putting the end to a dispute by parties themselves is more important for the preservation of social peace. Therefore, alternative dispute resolution methods (ADR) have been discussed more intensively in Turkey as well as the whole world. After these discussions, Mediation Act was adopted on 07.06.2012 and entered into force on 21.06.2013. According to the Mediation Act, it is only possible to mediate issues arising from the private law. Also, it is not compulsory to go to mediation in Turkish law, it is optional. Therefore, the parties are completely free to choose mediation method in dispute resolution. Mediators need to be a lawyer with experience in five years. Therefore, it is not possible to be a mediator who is not lawyers. Beyond five years of experience, getting education and success in exams about especially body language and psychology is also very important to be a mediator. If the parties compromise as a result of mediation, a document is issued. This document will also have the ability to exercising availability under certain circumstances. Thus, the parties will not need to apply to the court again. On the contrary, they will find the opportunity to execute this document, so they can regain their debts. However, the Mediation Act has entered into force in a period of nearly two years of history; it is possible to say that the interest in mediation is not at the expected level. Therefore, making mediation mandatory for some disputes has been discussed recently. At this point, once the mediation becomes mandatory and good results follows it, this institution will be able to find a serious interest in Turkey. Otherwise, if the results will not be satisfying, the mediation method will be removed.Keywords: alternative dispute resolution methods, mediation act, mediation, mediator, mediation in Turkey
Procedia PDF Downloads 3659531 A Review of the Fundamental Aspects and Dimensions of Alternative Dispute Resolution (ADR) as Important Components in the Promotion of Social Justice in Nigeria
Authors: Odoh Ben Uruchi
Abstract:
Access to Justice implies access to social and distributive Justice. Access to social justice in Nigeria remains an illusion where cases last in courts for unduly long period of time, as is currently the situation in the country. As the popular saying goes– justice delayed is justice denied. It is, however, important to underscore the point that these perspectives are not necessarily disconnected since the extent to which one can have distributive justice in any system is largely determined by the level and effectiveness of social justice in the country. Generally, Alternative Dispute Resolution (ADR) Processes are increasingly being accepted in Nigeria as appropriate mechanisms for resolving disputes. While some jurisdictions have institutionalized ADR through the concept of a Multidoor Courthouse, many other are at different stages of doing same. With these developments, it is obvious that stakeholders in the administration of justice in Nigeria, can no longer be indifferent about understanding and fully mainstreaming ADR into their various activities and professional practice. Any framework for promoting social justice in Nigeria should therefore of necessity include provision of avenues for use of ADR in the protection and enforcement of citizen’s rights. The constitutional and other legal provisions that guarantee various rights of citizens cannot of itself ensure the enjoyment of the rights in the absence of an effective framework for dispute resolution. Excessive reliance on litigation and other adversarial approaches will also fail to ensure a sound regime of social justice. There should be structured mainstreaming of alternative dispute resolution mechanisms in justice delivery if the society must provide and guarantee social justice to the citizens. This paper seeks to address some of the fundamental issues affecting the perception, knowledge and skills of ADR in the provision of social justice. In doing this, the paper proposes to unlock the full enormous potentials of Alternative Dispute Resolution (ADR) in promoting access to justice in Nigeria.Keywords: aspects, dimensions, alternative dispute resolution, social justice
Procedia PDF Downloads 4349530 The Social Process of Alternative Dispute Resolution and Collective Conciliation: Unveiling the Theoretical Framework
Authors: Adejoke Yemisi Ige
Abstract:
This study presents a conceptual analysis and investigation into the development of a systematic framework required for better understanding of the social process of Alternative Dispute Resolution (ADR) and collective conciliation. The critical examination presented in this study is significant because; it draws on insight from ADR, negotiation and collective bargaining literature and applies it in our advancement of a methodical outline which gives an insight into the influence of the key actors and other stakeholder strategies and behaviours during dispute resolution in relation to the outcomes which is novel. This study is qualitative and essentially inductive in nature. One of the findings of the study confirms the need to consider ADR and collective conciliation within the context of the characteristic conditions; which focus on the need for some agreement to be reached. Another finding of the study shows the extent which information-sharing, willingness of the parties to negotiate and make concession assist both parties to attain resolution. This paper recommends that in order to overcome deadlock and attain acceptable outcomes at the end of ADR and collective conciliation, the importance of information exchange and sustenance of trade union and management relationship cannot be understated. The need for trade unions and management, the representatives to achieve their expectations in order to build the confidence and assurance of their respective constituents is essential. In conclusion, the analysis presented in this study points towards a set of factors that together can be called the social process of collective conciliation nevertheless; it acknowledges that its application to collective conciliation is new.Keywords: alternative dispute resolution, collective conciliation, social process, theoretical framework, unveiling
Procedia PDF Downloads 1539529 A comparative Analysis of the Good Faith Principle in Construction Contracts
Authors: Nadine Rashed, A. Samer Ezeldin, Engy Serag
Abstract:
The principle of good faith plays a critical role in shaping contractual relationships, yet its application varies significantly across different types of construction contracts and legal systems. This paper presents a comparative analysis of how various construction contracts perceive the principle of good faith, a fundamental aspect that influences contractual relationships and project outcomes. The primary objective of this analysis is to examine the differences in the application and interpretation of good faith across key construction contracts, including JCT (Joint Contracts Tribunal), FIDIC (Fédération Internationale des Ingénieurs-Conseils), NEC (New Engineering Contract), and ICE (Institution of Civil Engineers) Contracts. To accomplish this, a mixed-methods approach will be employed, integrating a thorough literature review of current legal frameworks and academic publications with primary data gathered from a structured questionnaire aimed at industry professionals such as contract managers, legal advisors, and project stakeholders. This combined strategy will enable a holistic understanding of the theoretical foundations of good faith in construction contracts and its practical effects in real-world contexts. The findings of this analysis are expected to yield valuable insights into how varying interpretations of good faith can impact project performance, dispute resolution, and collaborative practices within the construction industry. This paper contributes to a deeper understanding of how the principle of good faith is evolving in the construction industry, providing insights for contract drafters, legal practitioners, and project managers seeking to navigate the complexities of contractual obligations across different legal systems.Keywords: construction contracts, contractual obligations, ethical practices, good faith
Procedia PDF Downloads 229528 A Probability Analysis of Construction Project Schedule Using Risk Management Tool
Authors: A. L. Agarwal, D. A. Mahajan
Abstract:
Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.Keywords: construction project, distributions, project schedule, uncertainty
Procedia PDF Downloads 3509527 Rethinking the Use of Online Dispute Resolution in Resolving Cross-Border Small E-Disputes in EU
Authors: Sajedeh Salehi, Marco Giacalone
Abstract:
This paper examines the role of existing online dispute resolution (ODR) mechanisms and their effects on ameliorating access to justice – as a protected right by Art. 47 of the EU Charter of Fundamental Rights – for consumers in EU. The major focus of this study will be on evaluating ODR as the means of dispute resolution for Business-to-Consumer (B2C) cross-border small claims raised in e-commerce transactions. The authors will elaborate the consequences of implementing ODR methods in the context of recent developments in EU regulatory safeguards on promoting consumer protection. In this analysis, both non-judiciary and judiciary ODR redress mechanisms are considered, however, the significant consideration is given to – obligatory and non-obligatory – judiciary ODR methods. For that purpose, this paper will particularly investigate the impact of the EU ODR platform as well as the European Small Claims Procedure (ESCP) Regulation 861/2007 and their role on accelerating the access to justice for consumers in B2C e-disputes. Although, considerable volume of research has been carried out on ODR for consumer claims, rather less (or no-) attention has been paid to provide a combined doctrinal and empirical evaluation of ODR’s potential in resolving cross-border small e-disputes, in EU. Hence, the methodological approach taken in this study is a mixed methodology based on qualitative (interviews) and quantitative (surveys) research methods which will be mainly based on the data acquired through the findings of the Small Claims Analysis Net (SCAN) project. This project contributes towards examining the ESCP Regulation implementation and efficiency in providing consumers with a legal watershed through using the ODR for their transnational small claims. The outcomes of this research may benefit both academia and policymakers at national and international level.Keywords: access to justice, consumers, e-commerce, small e-Disputes
Procedia PDF Downloads 1289526 Toward Green Infrastructure Development: Dispute Prevention Mechanisms along the Belt and Road and Beyond
Authors: Shahla Ali
Abstract:
In the context of promoting green infrastructure development, new opportunities are emerging to re-examine sustainable development practices. This paper presents an initial exploration of the development of community-investor dispute prevention and facilitation mechanisms in the context of the Belt and Road Initiative (BRI) spanning Asia, Africa, and Europe. Given the widescale impact of China’s multi-jurisdictional development initiative, learning how to coordinate with local communities is vital to realizing inclusive and sustainable growth. In the 20 years since the development of the first multilateral community-investor dispute resolution mechanism developed by the International Finance Centre/World Bank, much has been learned about public facilitation, community engagement, and dispute prevention during the early stages of major infrastructure development programs. This paper will explore initial findings as they relate to initiatives underway along the BRI within the Asian Infrastructure Investment Bank and the Asian Development Bank. Given the borderless nature of sustainability concerns, insights from diverse regions are critical to deepening insights into best practices. Drawing on a case-based methodology, this paper will explore the achievements, challenges, and lessons learned in community-investor dispute prevention and resolution for major infrastructure projects in the greater China region.Keywords: law and development, dispute prevention, sustainable development, mitigation
Procedia PDF Downloads 1069525 Process for Analyzing Information Security Risks Associated with the Incorporation of Online Dispute Resolution Systems in the Context of Conciliation in Colombia
Authors: Jefferson Camacho Mejia, Jenny Paola Forero Pachon, Luis Carlos Gomez Florez
Abstract:
The innumerable possibilities offered by the use of Information Technology (IT) in the development of different socio-economic activities has made a change in the social paradigm and the emergence of the so-called information and knowledge society. The Colombian government, aware of this reality, has been promoting the use of IT as part of the E-government strategy adopted in the country. However, it is well known that the use of IT implies the existence of certain threats that put the security of information in the digital environment at risk. One of the priorities of the Colombian government is to improve access to alternative justice through IT, in particular, access to Alternative Dispute Resolution (ADR): conciliation, arbitration and friendly composition; by means of which it is sought that the citizens directly resolve their differences. To this end, a trend has been identified in the use of Online Dispute Resolution (ODR) systems, which extend the benefits of ADR to the digital environment through the use of IT. This article presents a process for the analysis of information security risks associated with the incorporation of ODR systems in the context of conciliation in Colombia, based on four fundamental stages identified in the literature: (I) Identification of assets, (II) Identification of threats and vulnerabilities (III) Estimation of the impact and 4) Estimation of risk levels. The methodological design adopted for this research was the grounded theory, since it involves interactions that are applied to a specific context and from the perspective of diverse participants. As a result of this investigation, the activities to be followed are defined to carry out an analysis of information security risks, in the context of the conciliation in Colombia supported by ODR systems, thus contributing to the estimation of the risks to make possible its subsequent treatment.Keywords: alternative dispute resolution, conciliation, information security, online dispute resolution systems, process, risk analysis
Procedia PDF Downloads 2399524 The Role and Function of National Land Authority as Mediator in Land Dispute Settlements in Indonesia
Authors: Nia Kurniati, Efa Laela Fakhriah
Abstract:
The regulation in Indonesia provides space for the land dispute to be settled outside the court by the government through National Land. In this case, the bureaucrat of Badan Pertanahan Nasional (BPN) acts as mediator to reach a fair agreement between the disputing parties. Land dispute is from a party who denies the ownership of the other party of a land and denies legal-technical facts written on land certificate published by BPN. Appointing the bureaucrat of BPN as mediator in dispute settlements may possibly create conflict of interest since the object. It has become a concern since bureaucrat of BPN acts as mediator, he will be bias and partial in assisting the dispute settlement, thus the spirit and purposes of mediation will be hampered. This issue triggers to be thoroughly examined further in a relation with the role and function of BPN as land dispute mediator. The methodology used in this research is a normative-legal one with qualitative-legal analytical method. The object of this research is in the form of random sampling of land dispute cases being occurred in some areas. Several principles in mediation have to be made as the base of the consideration to appoint bureaucrat of BPN as mediator since the mediator is an impartial third party, working with both disputing parties and assisting them to reach a fair resolution written in agreement as a foundation of land dispute settlement. The existence of BPN as mediator in land dispute settlement encounters conflict of interest which uphold legal uncertainty to act objectively.Keywords: Indonesia, land dispute, mediator, national land authority
Procedia PDF Downloads 3089523 The Right to Engage in Collective Bargaining in South Africa: An Exploratory Analysis
Authors: Koboro J. Selala
Abstract:
Whilst the system of collective bargaining is well-researched in South Africa, recent studies reveal that this is an area of law and practice that is poorly understood. Despite the growing attention being paid by most scholars to the role of collective bargaining in the labour relations system, only a handful of the studies have considered collective bargaining as a mechanism of dispute resolution. The purpose of this paper is to provide a critical analysis of the current understanding of the right to engage in collective bargaining in South Africa to assess the extent to which collective bargaining is used to resolve labour disputes. The overall objective is to offer a deeper understanding of the role of collective bargaining in dispute resolution process within the South African constitutional labour law context. To this end, the paper examines the applicable legal framework of collective bargaining to address two fundamental questions that are critical to the proper understanding of the functioning of the South African collective labour dispute resolution system. The first concerns the extent to which the current South African legislative framework supports the fundamental labour rights entrenched in the Constitution of the Republic of South Africa. The second addresses the role of trade unions in collective dispute resolution processes and the extent to which they can best utilize collective bargaining to resolve labour disputes. Finally, the paper discusses the general implications of the findings to stimulate further research and to enhance the constitutional development of collective labour rights in South Africa.Keywords: collective bargaining, constitution, freedom of association, labour relations act
Procedia PDF Downloads 3249522 Effect of Pre-Construction on Construction Schedule and Client Loyalty
Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee
Abstract:
Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.Keywords: client loyalty, NPS, pre-construction, schedule reduction
Procedia PDF Downloads 3609521 Construction Project Planning Using Fuzzy Critical Path Approach
Authors: Omar M. Aldenali
Abstract:
Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.Keywords: construction project, critical path, fuzzy network project, planning
Procedia PDF Downloads 1439520 The Regulation of Alternative Dispute Resolution Institutions in Consumer Redress and Enforcement: A South African Perspective
Authors: Jacolien Barnard, Corlia Van Heerden
Abstract:
Effective and accessible consensual dispute resolution and in particular alternative dispute resolution, are central to consumer protection legislation. In this regard, the Consumer Protection Act 68 of 2008 (CPA) of South Africa is no exception. Due to the nature of consumer disputes, alternative dispute resolution (in theory) is an effective vehicle for the adjudication of disputes in a timely manner avoiding overburdening of the courts. The CPA sets down as one of its core purposes the provision of ‘an accessible, consistent, harmonized, effective and efficient system of redress for consumers’ (section 3(1)(h) of the CPA). Section 69 of the Act provides for the enforcement of consumer rights and provides for the National Consumer Commission to be the Central Authority which streamlines, adjudicates and channels disputes to the appropriate forums which include Alternative Dispute Resolution Agents (ADR-agents). The purpose of this paper is to analyze the regulation of these enforcement and redress mechanisms with particular focus on the Central Authority as well as the ADR-agents and their crucial role in successful and efficient adjudication of disputes in South Africa. The South African position will be discussed comparatively with the European Union (EU) position. In this regard, the European Union (EU) Directive on Alternative Dispute Resolution for Consumer Disputes (2013/11/EU) will be discussed (The ADR Directive). The aim of the ADR Directive is to solve contractual disputes between consumers and traders (suppliers or businesses) regardless of whether the agreement was concluded offline or online or whether or not the trader is situated in another member state (Recitals 4-6). The ADR Directive provides for a set of quality requirements that an ADR body or entity tasked with resolving consumer disputes should adhere to in member states which include regulatory mechanisms for control. Transparency, effectiveness, fairness, liberty and legality are all requirements for a successful ADR body and discussed within this chapter III of the Directive. Chapters III and IV govern the importance of information and co-operation. This includes information between ADR bodies and the European Commission (EC) but also between ADR bodies or entities and national authorities enforcing legal acts on consumer protection and traders. (In South Africa the National Consumer Tribunal, Provincial Consumer Protectors and Industry ombuds come to mind). All of which have a responsibility to keep consumers informed. Ultimately the papers aims to provide recommendations as to the successfulness of the current South African position in light of the comparative position in Europe and the highlight the importance of proper regulation of these redress and enforcement institutions.Keywords: alternative dispute resolution, consumer protection law, enforcement, redress
Procedia PDF Downloads 2339519 An Analytical Survey of Construction Changes: Gaps and Opportunities
Authors: Ehsan Eshtehardian, Saeed Khodaverdi
Abstract:
This paper surveys the studies on construction change and reveals some of the potential future works. A full-scale investigation of change literature, including change definitions, types, causes and effects, and change management systems, is accomplished to explore some of the coming change trends. It is tried to pick up the critical works in each section to deduct a true timeline of construction changes. The findings show that leaping from best practice guides in late 1990s and generic process models in the early 2000s to very advanced modeling environments in the mid-2000s and the early 2010s have made gaps along with opportunities for change researchers in order to develop some more easy and applicable models. Another finding is that there is a compelling similarity between the change and risk prediction models. Therefore, integrating these two concepts, specifically from proactive management point of view, may lead to a synergy and help project teams avoid rework. Also, the findings show that exploitation of cause-effect relationship models, in order to facilitate the dispute resolutions, seems to be an interesting field for future works.Keywords: construction change, change management systems, dispute resolutions, change literature
Procedia PDF Downloads 2959518 Identifying Project Delay Factors in the Australian Construction Industry
Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar
Abstract:
Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.Keywords: construction, delay factors, time delay, australian construction industry
Procedia PDF Downloads 1759517 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 3039516 Assessing the Role of Failed-ADR in Civil Litigation
Authors: Masood Ahmed
Abstract:
There is a plethora of literature (including judicial and extra-judicial comments) concerning the virtues of alternative dispute resolution processes within the English civil justice system. Lord Woolf in his Access to Justice Report ushered in a new pro-ADR philosophy and this was reinforced by Sir Rupert Jackson in his review of civil litigation costs. More recently, Briggs LJ, in his review of the Chancery Court, reiterated the significant role played by ADR and the need for better integration of ADR processes within the Chancery Court. His Lordship also noted that ADR which had failed to produce a settlement (i.e. a failed-ADR) continued to play a significant role in contributing to a ‘substantial narrowing of the issues or increased focus on the key issues’ which were ‘capable of assisting both the parties and the court in the economical determination of the dispute at trial.’ With the assistance of empirical data, this paper investigates the nature of failed-ADR and, in particular, assesses the effectiveness of failed-ADR processes as a tool in: (a) narrowing the legal and/or factual issues which may assist the courts in more effective and efficient case management of the dispute; (b) assisting the parties in the future settlement of the matter. This paper will also measure the effectiveness of failed-ADR by considering the views and experiences of legal practitioners who have engaged in failed-ADR.Keywords: English civil justice system, alternative dispute resolution processes, civil court process, empirical data from legal profession regarding failed ADR
Procedia PDF Downloads 465