4126 Procurement for Management Services in Delivery of Public Construction Projects in Poland
Authors: A. Leśniak, E. Plebankiewicz, K. Zima
Abstract:
Construction projects can be implemented under various contractual and organizational systems. They can be divided into two groups: systems without the managing company where the Client manages the process, and systems with the managing company, where management is entrusted to an external company. In the public sector of the Polish market there are two ways of delivery of construction projects with the participation of the manager: one is to assign operations to another party, the so called Project Supervisor, whilst the other results from the application of FIDIC conditions of contract, which entail appointment of the Engineer. The decision is to be made by the Client and depends on various factors. On the public procurement market in Poland the selection of construction project manager boils down to awarding the contract for such a service. The selection can be done by one of eight public procurement procedures identified by the procurement law. The paper provides the analysis of 96 contracts for services awarded in 2011, which employed construction management. The study aimed to investigate the methods and criteria for selecting managers, applied in practice by the Polish public Clients.
Keywords: construction management, construction services, methods and criteria of tender selection, public procurement
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 17884125 Project Complexity Indices based on Topology Features
Authors: Amer A. Boushaala
Abstract:
The heuristic decision rules used for project scheduling will vary depending upon the project-s size, complexity, duration, personnel, and owner requirements. The concept of project complexity has received little detailed attention. The need to differentiate between easy and hard problem instances and the interest in isolating the fundamental factors that determine the computing effort required by these procedures inspired a number of researchers to develop various complexity measures. In this study, the most common measures of project complexity are presented. A new measure of project complexity is developed. The main privilege of the proposed measure is that, it considers size, shape and logic characteristics, time characteristics, resource demands and availability characteristics as well as number of critical activities and critical paths. The degree of sensitivity of the proposed measure for complexity of project networks has been tested and evaluated against the other measures of complexity of the considered fifty project networks under consideration in the current study. The developed measure showed more sensitivity to the changes in the network data and gives accurate quantified results when comparing the complexities of networks.Keywords: Activity networks, Complexity index, Networkcomplexity measure, Network topology, Project Network.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16814124 The Use of Project to Enhance Writing Skill
Authors: Duangkamol Thitivesa, Abigail Melad Essien
Abstract:
This paper explores the use of project work in a content-based instruction in a Rajabhat University, a teacher college, where student teachers are instructed to perform teaching roles mainly in basic education level. Its aim is to link theory to practice, and to help language teachers maximize the full potential of project work for genuine communication and give real meaning to writing activity. Two research questions are formulated to guide this study: a) What is the academic achievement of the students- writing skill against the 70% attainment target after the use of project to enhance the skill? and b) To what degree is the development of the students- writing skills during the course of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of achievement test, student writing works, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students- record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students- ability to attend to, recognize, and focus on meaningful patterns of language forms.Keywords: EFL classroom, Project-Based Learning, project work, writing skill.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 33254123 The Risk Assessment of Cancer Risk during Normal Operation of Tehran Research Reactor Due to Radioactive Gas Emission
Authors: B. Salmasian, A. Rabiee, T. Yousefzadeh
Abstract:
In this research, the risk assessment of radiation hazard for the Research Nuclear Reactor has been studied. In the current study, the MCNPx computational code has been used and coupled with a developed program using MATLAB software to evaluate Total Effective Dose Equivalent (TEDE) and cancer risk according to the BEIR equations for various human organs. In this study, the risk assessment of cancer has been calculated for ten years after exposure, in each of body organs of different ages and sexes. Also, the risk assessment of cancer has been calculated in each of body organs of different ages and sexes due to exposure after the retirement of the reactor staff. According to obtained results, a conservative whole-body dose rate, during a year, is 0.261 Sv and the probability the cancer risk for women is more than men and for children is more than adults. It has been shown that thyroid cancer was more possible than others.
Keywords: MCNPx code, BEIR equation, equivalent dose, risk analysis.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7284122 Assessments of Internal Erosion in a Landfill Due to Changes in Groundwater Level
Authors: Siamak Feizi, Gunvor Baardvik
Abstract:
Soil erosion has special consequences for landfills that are more serious than those found at conventional construction sites. Different potential heads between two sides of a landfill and the subsequent movement of water through pores within the soil body could trigger the soil erosion and construction instability. Such condition was encountered in a landfill project in the southern part of Norway. To check the risk of internal erosion due changes in the groundwater level (because of seasonal flooding in the river), a series of numerical simulations by means of Geo-Seep software were conducted. Output of this study provides a total picture of the landfill stability, possibilities of erosions and necessary measures to prevent or reduce the risk for the landfill operator.
Keywords: Erosion, seepage, landfill, stability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4504121 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures
Authors: Sunaitan Al Mutairi
Abstract:
A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.
Keywords: Construction activities delays, delay analysis for construction projects, mobilization delays, oil and gas projects delays.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18504120 Six Sigma Process and its Impact on the Organizational Productivity
Authors: Masoud Hekmatpanah, Mohammad Sadroddin, Saeid Shahbaz, Farhad Mokhtari, Farahnaz Fadavinia
Abstract:
The six sigma method is a project-driven management approach to improve the organization-s products, services, and processes by continually reducing defects in the organization. Understanding the key features, obstacles, and shortcomings of the six sigma method allows organizations to better support their strategic directions, and increasing needs for coaching, mentoring, and training. It also provides opportunities to better implement six sigma projects. The purpose of this paper is the survey of six sigma process and its impact on the organizational productivity. So I have studied key concepts , problem solving process of six sigmaas well as the survey of important fields such as: DMAIC, six sigma and productivity applied programme, and other advantages of six sigma. In the end of this paper, present research conclusions. (direct and positive relation between six sigma and productivity)
Keywords: Six sigma, project management, quality, theory, productivity.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 69764119 Health Risk Assessment of Trihalogenmethanes in Drinking Water
Authors: Lenka Jesonkova, Frantisek Bozek
Abstract:
Trihalogenmethanes (THMs) are disinfection byproducts with non-carcinogenic and genotoxic effects. The contamination of 6 sites close to the water treatment plant has been monitored in second largest city of the Czech Republic. Health risk assessment including both non-carcinogenic and genotoxic risk for long term exposition was realized using the critical concentrations. Concentrations of trihalogenmethanes met national standards in all samples. Risk assessment proved that health risks from trihalogenmethanes are acceptable on each site.
Keywords: Drinking water, health risk assessment, trihalogenmethanes, water pollution.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19914118 Strategic Risk Issues for Film Distributors of Hindi Film Industry in Mumbai: A Grounded Theory Approach
Abstract:
The purpose of the paper is to address the strategic risk issues surrounding Hindi film distribution in Mumbai for a film distributor, who acts as an entrepreneur when launching a product (movie) in the market (film territory).The paper undertakes a fundamental review of films and risk in the Hindi film industry and applies Grounded Theory technique to understand the complex phenomena of risk taking behavior of the film distributors (both independent and studios) in Mumbai. Rich in-depth interviews with distributors are coded to develop core categories through constant comparison leading to conceptualization of the phenomena of interest. This paper is a first-of-its-kind-attempt to understand risk behavior of a distributor, which is akin to entrepreneurial risk behavior under conditions of uncertainty.Keywords: Entrepreneurial Risk Behavior, Film Distribution Strategy, Hindi Film Industry, Risk.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26154117 A Mixed Approach to Assess Information System Risk, Operational Risk, and Congolese Microfinance Institutions Performance
Authors: Alfred Kamate Siviri, Angelus Mafikiri Tsongo, Jean Robert Kala Kamdjoug
Abstract:
Well organized digitalization and information systems have been selected as relevant measures to mitigate operational risks within organizations. Unfortunately, information system comes with new threats that can cause severe damage and quick organization lockout. This study aims to measure perceived information system risks and their effects on operational risks within the microfinance institution in D.R. Congo. Also, the factors influencing the operational risk are to be identified, and the link between operational risk with other risks and performance is to be assessed. The study proposes a research model drawn on the combination of Resources-Based-View, dynamic capabilities, the agency theory, the Information System Security Model, and social theories of risk. Therefore, we suggest adopting a mixed methods research with the sole aim of increasing the literature that already exists on perceived operational risk assessment and its link with other risk and performance, with a focus on information system risks.
Keywords: information system risk, operational risk, microfinance performance, DR Congo
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6164116 Finding Pareto Optimal Front for the Multi-Mode Time, Cost Quality Trade-off in Project Scheduling
Authors: H. Iranmanesh, M. R. Skandari, M. Allahverdiloo
Abstract:
Project managers are the ultimate responsible for the overall characteristics of a project, i.e. they should deliver the project on time with minimum cost and with maximum quality. It is vital for any manager to decide a trade-off between these conflicting objectives and they will be benefited of any scientific decision support tool. Our work will try to determine optimal solutions (rather than a single optimal solution) from which the project manager will select his desirable choice to run the project. In this paper, the problem in project scheduling notated as (1,T|cpm,disc,mu|curve:quality,time,cost) will be studied. The problem is multi-objective and the purpose is finding the Pareto optimal front of time, cost and quality of a project (curve:quality,time,cost), whose activities belong to a start to finish activity relationship network (cpm) and they can be done in different possible modes (mu) which are non-continuous or discrete (disc), and each mode has a different cost, time and quality . The project is constrained to a non-renewable resource i.e. money (1,T). Because the problem is NP-Hard, to solve the problem, a meta-heuristic is developed based on a version of genetic algorithm specially adapted to solve multi-objective problems namely FastPGA. A sample project with 30 activities is generated and then solved by the proposed method.Keywords: FastPGA, Multi-Execution Activity Mode, ParetoOptimality, Project Scheduling, Time-Cost-Quality Trade-Off.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16864115 Resource Leveling Optimization in Construction Projects of High Voltage Substations Using Nature-Inspired Intelligent Evolutionary Algorithms
Authors: Dimitrios Ntardas, Alexandros Tzanetos, Georgios Dounias
Abstract:
High Voltage Substations (HVS) are the intermediate step between production of power and successfully transmitting it to clients, making them one of the most important checkpoints in power grids. Nowadays - renewable resources and consequently distributed generation are growing fast, the construction of HVS is of high importance both in terms of quality and time completion so that new energy producers can quickly and safely intergrade in power grids. The resources needed, such as machines and workers, should be carefully allocated so that the construction of a HVS is completed on time, with the lowest possible cost (e.g. not spending additional cost that were not taken into consideration, because of project delays), but in the highest quality. In addition, there are milestones and several checkpoints to be precisely achieved during construction to ensure the cost and timeline control and to ensure that the percentage of governmental funding will be granted. The management of such a demanding project is a NP-hard problem that consists of prerequisite constraints and resource limits for each task of the project. In this work, a hybrid meta-heuristic method is implemented to solve this problem. Meta-heuristics have been proven to be quite useful when dealing with high-dimensional constraint optimization problems. Hybridization of them results in boost of their performance.
Keywords: High voltage substations, nature-inspired algorithms, project management, meta-heuristics.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12184114 Adding Security Blocks to the DevOps Lifecycle
Authors: Andrew John Zeller, Francis Pouatcha
Abstract:
Working according to the DevOps principle has gained in popularity over the past decade. While its extension DevSecOps started to include elements of cybersecurity, most real-life projects do not focus risk and security until the later phases of a project as teams are often more familiar with engineering and infrastructure services. To help bridge the gap between security and engineering, this paper will take six building blocks of cybersecurity and apply them to the DevOps approach. After giving a brief overview of the stages in the DevOps lifecycle, the main part discusses to what extent six cybersecurity blocks can be utilized in various stages of the lifecycle. The paper concludes with an outlook on how to stay up to date in the dynamic world of cybersecurity.
Keywords: Information security, data security, cybersecurity, DevOps, IT management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1184113 Project Management at University: Towards an Evaluation Process around Cooperative Learning
Authors: J. L. Andrade-Pineda, J.M. León-Blanco, M. Calle, P. L. González-R
Abstract:
The enrollment in current Master's degree programs usually pursues gaining the expertise required in real-life workplaces. The experience we present here concerns the learning process of "Project Management Methodology (PMM)", around a cooperative/collaborative mechanism aimed at affording students measurable learning goals and providing the teacher with the ability of focusing on the weaknesses detected. We have designed a mixed summative/formative evaluation, which assures curriculum engage while enriches the comprehension of PMM key concepts. In this experience we converted the students into active actors in the evaluation process itself and we endowed ourselves as teachers with a flexible process in which along with qualifications (score), other attitudinal feedback arises. Despite the high level of self-affirmation on their discussion within the interactive assessment sessions, they ultimately have exhibited a great ability to review and correct the wrong reasoning when that was the case.
Keywords: Cooperative-collaborative learning, educational management, formative-summative assessment, leadership training.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13664112 Finding Pareto Optimal Front for the Multi- Mode Time, Cost Quality Trade-off in Project Scheduling
Authors: H. Iranmanesh, M. R. Skandari, M. Allahverdiloo
Abstract:
Project managers are the ultimate responsible for the overall characteristics of a project, i.e. they should deliver the project on time with minimum cost and with maximum quality. It is vital for any manager to decide a trade-off between these conflicting objectives and they will be benefited of any scientific decision support tool. Our work will try to determine optimal solutions (rather than a single optimal solution) from which the project manager will select his desirable choice to run the project. In this paper, the problem in project scheduling notated as (1,T|cpm,disc,mu|curve:quality,time,cost) will be studied. The problem is multi-objective and the purpose is finding the Pareto optimal front of time, cost and quality of a project (curve:quality,time,cost), whose activities belong to a start to finish activity relationship network (cpm) and they can be done in different possible modes (mu) which are non-continuous or discrete (disc), and each mode has a different cost, time and quality . The project is constrained to a non-renewable resource i.e. money (1,T). Because the problem is NP-Hard, to solve the problem, a meta-heuristic is developed based on a version of genetic algorithm specially adapted to solve multi-objective problems namely FastPGA. A sample project with 30 activities is generated and then solved by the proposed method.Keywords: FastPGA, Multi-Execution Activity Mode, Pareto Optimality, Project Scheduling, Time-Cost-Quality Trade-Off.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18104111 Knowledge Management Model for Research Projects Masters Program
Authors: Víctor Hugo Medina García, Darío Alejandro Segura Torres
Abstract:
This paper presents the adaptation of the knowledge management model and intellectual capital measurement NOVA to the needs of work or research project must be developed when conducting a program of graduate-level master. Brackets are added in each of the blocks which is represented in the original model NOVA and which allows to represent those involved in each of these.
Keywords: Knowledge management, masters programs, Nova model, research projects
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13404110 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland
Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben
Abstract:
Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 10684109 The Key Challenges of the New Bank Regulations
Authors: Petr Teply
Abstract:
The New Basel Capital Accord (Basel II) influences how financial institutions around the world, and especially European Union institutions, determine the amount of capital to reserve. However, as the recent global crisis has shown, the revision of Basel II is needed to reflect current trends, such as increased volatility and correlation, in the world financial markets. The overall objective of Basel II is to increase the safety and soundness of the international financial system. Basel II builds on three main pillars: Pillar I deals with the minimum capital requirements for credit, market and operational risk, Pillar II focuses on the supervisory review process and finally Pillar III promotes market discipline through enhanced disclosure requirements for banks. The aim of this paper is to provide the historical background, key features and impact of Basel II on financial markets. Moreover, we discuss new proposals for international bank regulation (sometimes referred to as Basel III) which include requirements for higher quality, constituency and transparency of banks' capital and risk management, regulation of OTC markets and introduction of new liquidity standards for internationally active banks.
Keywords: Basel II, Basel III, risk management, bank regulation
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20744108 A Study of Relationship between Mountaineering Participation Motivation and Risk Perception
Authors: Yen-Chieh Wen, Ching-Hui Lin
Abstract:
The main purpose of this study is to analyze climbers involved in motivation and risk perception and analysis of the predictive ability of the risk perception "mountaineering" involved in motivation. This study used questionnaires, to have to climb the 3000m high mountain in Taiwan climbers object to carry out an investigation in order to non-random sampling, a total of 231 valid questionnaires were. After statistical analysis, the study found that: 1. Climbers the highest climbers involved in motivation "to enjoy the natural beauty of the fun. 2 climbers for climbers "risk perception" the highest: the natural environment of risk. 3. Climbers “seeking adventure stimulate", “competence achievement" motivation highly predictive of risk perception. Based on these findings, this study not only practices the recommendations of the outdoor leisure industry, and also related research proposals for future researchers.Keywords: Mountaineering, motivation, risk perception, decision-making.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 28564107 Designing for Sustainable Public Housing from Property Management and Financial Feasibility Perspectives
Authors: Kung-Jen Tu
Abstract:
Many public housing properties developed by local governments in Taiwan in the 1980s have deteriorated severely as these rental apartment buildings aged. The lack of building maintainability considerations during project design phase as well as insufficient maintenance funds have made it difficult and costly for local governments to maintain and keep public housing properties in good shape. In order to assist the local governments in achieving and delivering sustainable public housing, this paper intends to present a developed design evaluation method to be used to evaluate the presented design schemes from property management and financial feasibility perspectives during project design phase of public housing projects. The design evaluation results, i.e. the property management and financial implications of presented design schemes that could occur later during the building operation and maintenance phase, will be reported to the client (the government) and design schemes revised consequently. It is proposed that the design evaluation be performed from two main perspectives: (1) Operation and property management perspective: Three criteria such as spatial appropriateness, people and vehicle circulation and control, property management working spaces are used to evaluate the ‘operation and PM effectiveness’ of a design scheme. (2) Financial feasibility perspective: Four types of financial analyses are performed to assess the long term financial feasibility of a presented design scheme, such as operational and rental income analysis, management fund analysis, regular operational and property management service expense analysis, capital expense analysis. The ongoing Chung-Li Public Housing Project developed by the Taoyuan City Government will be used as a case to demonstrate how the presented design evaluation method is implemented. The results of property management assessment as well as the annual operational and capital expenses of a proposed design scheme are presented.
Keywords: Design evaluation method, management fund, operational and capital expenses, rental apartment buildings.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11624106 Measuring Banks’ Antifragility via Fuzzy Logic
Authors: Danielle Sandler dos Passos, Helder Coelho, Flávia Mori Sarti
Abstract:
Analysing the world banking sector, we realize that traditional risk measurement methodologies no longer reflect the actual scenario with uncertainty and leave out events that can change the dynamics of markets. Considering this, regulators and financial institutions began to search more realistic models. The aim is to include external influences and interdependencies between agents, to describe and measure the operationalization of these complex systems and their risks in a more coherent and credible way. Within this context, X-Events are more frequent than assumed and, with uncertainties and constant changes, the concept of antifragility starts to gain great prominence in comparison to others methodologies of risk management. It is very useful to analyse whether a system succumbs (fragile), resists (robust) or gets benefits (antifragile) from disorder and stress. Thus, this work proposes the creation of the Banking Antifragility Index (BAI), which is based on the calculation of a triangular fuzzy number – to "quantify" qualitative criteria linked to antifragility.
Keywords: Complex adaptive systems, X-events, risk management, antifragility, banking antifragility index, triangular fuzzy number.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9004105 Peer Assessment in the Context of Project-Based Learning Online
Authors: Y. Benjelloun Touimi, N. Faddouli, S. Bennani, M. Khalidi Idrissi
Abstract:
The pedagogy project has been proven as an active learning method, which is used to develop learner-s skills and knowledge.The use of technology in the learning world, has filed several gaps in the implementation of teaching methods, and online evaluation of learners. However, the project methodology presents challenges in the assessment of learners online. Indeed, interoperability between E-learning platforms (LMS) is one of the major challenges of project-based learning assessment. Firstly, we have reviewed the characteristics of online assessment in the context of project-based teaching. We addressed the constraints encountered during the peer evaluation process. Our approach is to propose a meta-model, which will describe a language dedicated to the conception of peer assessment scenario in project-based learning. Then we illustrate our proposal by an instantiation of the meta-model through a business process in a scenario of collaborative assessment on line.Keywords: Online project based learning, meta-model, peer assessment process.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 23724104 Evolution of Performance Measurement Methods in Conditions of Uncertainty: The Implementation of Fuzzy Sets in Performance Measurement
Authors: E. A. Tkachenko, E. M. Rogova, V. V. Klimov
Abstract:
One of the basic issues of development management is connected with performance measurement as a prerequisite for identifying the achievement of development objectives. The aim of our research is to develop an improved model of assessing a company’s development results. The model should take into account the cyclical nature of development and the high degree of uncertainty in dealing with numerous management tasks. Our hypotheses may be formulated as follows: Hypothesis 1. The cycle of a company’s development may be studied from the standpoint of a project cycle. To do that, methods and tools of project analysis are to be used. Hypothesis 2. The problem of the uncertainty when justifying managerial decisions within the framework of a company’s development cycle can be solved through the use of the mathematical apparatus of fuzzy logic. The reasoned justification of the validity of the hypotheses made is given in the suggested article. The fuzzy logic toolkit applies to the case of technology shift within an enterprise. It is proven that some restrictions in performance measurement that are incurred to conventional methods could be eliminated by implementation of the fuzzy logic apparatus in performance measurement models.
Keywords: Fuzzy logic, fuzzy sets, performance measurement, project analysis.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 10784103 The Impact of Financial Risks on Profitability of Malaysian Commercial Banks: 1996-2005
Authors: Fauziah Hanim Tafri, Zarinah Hamid, Ahamed Kameel Mydin Meera, Mohd Azmi Omar
Abstract:
This paper examines the relationship between financial risks and profitability of the conventional and Islamic banks in Malaysia for the period between 1996 and 2005. The measures of profitability that have been used in the study are the return on equity (ROE) and return on assets (ROA) while the financial risks are credit risk, interest rate risk and liquidity risks. This study employs panel data regression analysis of Generalised Least Squares of fixed effects and random effects models. It was found that credit risk has a significant impact on ROA and ROE for the conventional as well as the Islamic banks. The relationship between interest rate risk and ROE were found to be weakly significant for the conventional banks and insignificant for the Islamic banks. The effect of interest rate risk on ROA is significant for the conventional banks. Liquidity risk was found to have an insignificant impact on both profitability measures.Keywords: Credit risk, interest rate risk, liquidity risk, market risk, profitability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 58344102 Effectiveness of Business Software Systems Development and Enhancement Projects versus Work Effort Estimation Methods
Authors: Beata Czarnacka-Chrobot
Abstract:
Execution of Business Software Systems (BSS) Development and Enhancement Projects (D&EP) is characterized by the exceptionally low effectiveness, leading to considerable financial losses. The general reason for low effectiveness of such projects is that they are inappropriately managed. One of the factors of proper BSS D&EP management is suitable (reliable and objective) method of project work effort estimation since this is what determines correct estimation of its major attributes: project cost and duration. BSS D&EP is usually considered to be accomplished effectively if product of a planned functionality is delivered without cost and time overrun. The goal of this paper is to prove that choosing approach to the BSS D&EP work effort estimation has a considerable influence on the effectiveness of such projects execution.
Keywords: Business software systems, development and enhancement projects, effectiveness, work effort estimation methods, software product size, software product functionality, project duration, project cost.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20844101 Deficiency Risk in Islamic and Conventional Banks
Authors: Korbi Fakhri
Abstract:
In this article, we have elaborated a study over the nature of financial intermediation in Islamic banks by comparison to those of conventional ones. We have found a striking difference between two kinds of intermediation. We tried, from another side, to study the relationship between the capital level and deficiency risk relying on econometric model, and we have obtained a positive and significant relation between the capital and the deficiency risk for the conventional banks. This means that when the capital of these banks increases, the deficiency risk increases as well. In return, since the Islamic banks are constrained to respect the Sharia Committee as well as customers’ demands that may, in certain contracts, choose to invest their capitals in projects they are interested in. These constraints have as effects to reduce the deficiency risk even when the capital increases.
Keywords: Conventional bank, deficiency risk, financial intermediation, Islamic bank.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19184100 Development of a Project Selection Method on Information System Using ANP and Fuzzy Logic
Authors: Ingu Kim, Shangmun Shin, Yongsun Choi, Nguyen Manh Thang, Edwin R. Ramos, Won-Joo Hwang
Abstract:
Project selection problems on management information system (MIS) are often considered a multi-criteria decision-making (MCDM) for a solving method. These problems contain two aspects, such as interdependencies among criteria and candidate projects and qualitative and quantitative factors of projects. However, most existing methods reported in literature consider these aspects separately even though these two aspects are simultaneously incorporated. For this reason, we proposed a hybrid method using analytic network process (ANP) and fuzzy logic in order to represent both aspects. We then propose a goal programming model to conduct an optimization for the project selection problems interpreted by a hybrid concept. Finally, a numerical example is conducted as verification purposes.Keywords: Analytic Network Process (ANP), Multi-Criteria Decision-Making (MCDM), Fuzzy Logic, Information System Project Selection, Goal Programming.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20904099 Attentiveness of Building Commissioning in the Malaysian Construction Industry
Authors: Kho Mei Ye, Hamzah Abdul Rahman
Abstract:
This paper provides some thoughts about the lack of attentiveness of building commissioning in the construction industry and the lack of handling in project commissioning as an integral part of the project life-cycle. Many have perceived commissioning as the problem solving process of a project, rather than the start up of the equipment, or the handing over of the project to the client. Therefore, there is a lack of proper attention in the planning of commissioning as a vital part of the project life-cycle. This review paper aims to highlight the benefits of building commissioning and to propose the lacking of knowledge gap on building commissioning. Finally, this paper hopes to propose the shift of focus on this matter in future research.Keywords: building, commissioning, construction, delay
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 21534098 Project and Experiment-Based Fluid Dynamics Education
Authors: Etsuo Morishita
Abstract:
This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.
Keywords: Aerodynamics, experiment, fluid dynamics, project.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14904097 Design Standardization in Aramco: Strategic Analysis
Authors: Mujahid S. Alharbi
Abstract:
The construction of process plants in oil and gas-producing countries, such as Saudi Arabia, necessitates substantial investment in design and building. Each new plant, while unique, includes common building types, suggesting an opportunity for design standardization. This study investigates the adoption of standardized Issue for Construction (IFC) packages for non-process buildings in Saudi Aramco. A SWOT analysis presents the strengths, weaknesses, opportunities, and threats of this approach. The approach's benefits are illustrated using the Hawiyah Unayzah Gas Reservoir Storage Program (HUGRSP) as a case study. Standardization not only offers significant cost savings and operational efficiencies, but also expedites project timelines, reduces the potential for change orders, and fosters local economic growth by allocating building tasks to local contractors. Standardization also improves project management by easing interface constraints between different contractors and promoting adaptability to future industry changes. This research underscores the standardization of non-process buildings as a powerful strategy for cost optimization, efficiency enhancement, and local economic development in process plant construction within the oil and gas sector.
Keywords: Building, construction, management, project, standardization.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 64