6808 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 400
6807 Decision Making during the Project Management Life Cycle of Infrastructure Projects

Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik

Abstract:

The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.

Keywords: leadership style, construction, decision-making, built environment

Procedia PDF Downloads 334
6806 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts

Authors: E. Harrer, M. Mauerhofer, T. Werginz

Abstract:

As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.

Keywords: building projects, contract models, partnering, project risks

Procedia PDF Downloads 245
6805 Cross-Cultural Analysis of the Impact of Project Atmosphere on Project Success and Failure

Authors: Omer Livvarcin, Mary Kay Park, Michael Miles

Abstract:

The current literature includes a few studies that mention the impact of relations between teams, the business environment, and experiences from previous projects. There is, however, limited research that treats the phenomenon of project atmosphere (PA) as a whole. This is especially true of research identifying parameters and sub-parameters, which allow project management (PM) teams to build a project culture that ultimately imbues project success. This study’s findings identify a number of key project atmosphere parameters and sub-parameters that affect project management success. One key parameter identified in the study is a cluster related to cultural concurrence, including artifacts such as policies and mores, values, perceptions, and assumptions. A second cluster centers on motivational concurrence, including such elements as project goals and team-member expectations, moods, morale, motivation, and organizational support. A third parameter cluster relates to experiential concurrence, with a focus on project and organizational memory, previous internal PM experience, and external environmental PM history and experience). A final cluster of parameters is comprised of those falling in the area of relational concurrence, including inter/intragroup relationships, role conflicts, and trust. International and intercultural project management data was collected and analyzed from the following countries: Canada, China, Nigeria, South Korea and Turkey. The cross-cultural nature of the data set suggests increased confidence that the findings will be generalizable across cultures and thus applicable for future international project management success. The intent of the identification of project atmosphere as a critical project management element is that a clear understanding of the dynamics of its sub-parameters upon projects may significantly improve the odds of success of future international and intercultural projects.

Keywords: project management, project atmosphere, cultural concurrence, motivational concurrence, relational concurrence

Procedia PDF Downloads 295
6804 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia

Authors: Juha Kettunen

Abstract:

This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.

Keywords: higher education, innovations, social network, project management

Procedia PDF Downloads 258
6803 The Project Management for Quality Services in Special Education Schools

Authors: Aysegul Salikutluk, Zehra Altinay, Gokmen Dagli, Fahriye Altinay

Abstract:

The aim of the study is to reveal the performance of special education schools as regards the service quality and management within the school culture. The project management and school climate are the fundamental elements for the quality in organisations. Having strategic plans, activities and funded projects improve service quality and satisfaction for the families who have children with disabilities. The research has qualitative nature, self-reports were used to examine the perceptions of teachers upon project management and school climate for service quality. The results show that special education schools' teachers are aware of essence of school climate and flow of communication for service quality and project management.

Keywords: disability, education, service quality, project management

Procedia PDF Downloads 230
6802 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 506
6801 Design of a Multidisciplinary Project-Oriented Capstone Course for Mechanical Engineering Education

Authors: Chi-Cheng Cheng, Che-Hsin Lin, Yu-Jen Wang, Chua-Chin Wang

Abstract:

The project-oriented capstone course has become a required element for most engineering educational units. It is not only because the capstone course is an important criterion for international accreditation of engineering degree programs under Washington Accord, but also the capstone course provides an opportunity for students to apply what they have learned in their school years to actual engineering problems. Nevertheless, most project-oriented capstone courses are conducted with one single project for all students or teams. In other words, students work to reach the same or similar goals by coming up with different layouts and approaches. It appears not suitable for a multidisciplinary engineering department. Therefore, a one-year multidisciplinary project-oriented capstone course was designed for the junior year of the undergraduate program. About one-half of faculty members in the department needs to be involved in generating as many projects as possible to meet different students' interests and specialties. Project achievement has to be displayed and demonstrated in the annual exposition and competition at the end of this course. Significant success in attracting attention and hardworking of students on projects was witnessed for the past two pilot years. Analysis of course evaluation demonstrates positive impact on all perspectives despite of slightly negative influence due to poor communication and collaboration between students and their project supervisors.

Keywords: Capstone course, CDIO, engineering education, project-oriented learning

Procedia PDF Downloads 423
6800 Shipboard Power Plant Design as Senior Design Project

Authors: Hesham Shaalan

Abstract:

Senior design projects teach students many important skills. One of the major goals is to prepare students to apply effective problem-solving techniques to a problem that represents a real-world situation. This includes the ability to define the problem, compare alternative solutions, identify the best solution, and design the system. This paper describes the design of a shipboard power plant as a senior project in the Marine Engineering program at the U.S. Merchant Marine Academy. The design project was supervised by faculty members who guided a multidisciplinary group of seniors. The research project was sponsored by the Office of Naval Research. Each group of seniors focused on one of the main design aspects of the project, including the electric power system, nuclear power plant, ship hull design, and economics.

Keywords: senior design project, shipboard power system, engineering education, marine engineering

Procedia PDF Downloads 51
6799 On-Site Management from Reactive to Proactive

Authors: Yu-Tzu Chen, Luh-Maan Chang

Abstract:

Construction is an inherently risky industry. The projects have been dominated by reactive actions owing to non-routine in nature. The on-site activities are especially crucial for successful project control. In order to alter actions from reactive to proactive, this paper presents an on-site data collection system utilizing advanced technology RFID and GPS in assisting on-site management with near real time progress monitoring.

Keywords: On-Site management, progress monitoring, RFID, GPS

Procedia PDF Downloads 534
6798 Training Program for Kindergarden Teachers on Learning through Project Approach

Authors: Dian Hartiningsih, Miranda Diponegoro, Evita Eddie Singgih

Abstract:

In facing the 21st century, children need to be prepared in reaching their optimum development level which encompasses all aspect of growth and to achieve the learning goals which include not only knowledge and skill, but also disposition and feeling. Teachers as the forefront of education need to be equipped with the understanding and skill of a learning method which can prepare the children to face this 21st century challenge. Project approach is an approach which utilizes active learning which is beneficial for the children. Subject to this research are kindergarten teachers at Dwi Matra Kindergarten and Kirana Preschool. This research is a quantitative research using before and after study design. The result suggest that through preliminary training program on learning with project approach, the kindergarten teachers ability to explain project approach including understanding, benefit and stages of project approach have increased significantly, the teachers ability to design learning with project approach have also improved significantly. The result of learning design that the teachers had made shows a remarkable result for the first stage of the project approach; however the second and third design result was not as optimal. Challenges faced in the research will be elaborated further in the research discussion.

Keywords: project approach, teacher training, learning method, kindergarten

Procedia PDF Downloads 304
6797 An Explorative Analysis of Effective Project Management of Research and Research-Related Projects within a recently Formed Multi-Campus Technology University

Authors: Àidan Higgins

Abstract:

Higher education will be crucial in the coming decades in helping to make Ireland a nation is known for innovation, competitive enterprise, and ongoing academic success, as well as a desirable location to live and work with a high quality of life, vibrant culture, and inclusive social structures. Higher education institutions will actively connect with each student community, society, and business; they will help students develop a sense of place and identity in Ireland and provide the tools they need to contribute significantly to the global community. It will also serve as a catalyst for novel ideas through research, many of which will become the foundation for long-lasting inventive businesses in the future as part of the 2030 National Strategy on Education focuses on change and developing our education system with a focus on how we carry out Research. The emphasis is central to knowledge transfer and a consistent research framework with exploiting opportunities and having the necessary expertise. The newly formed Technological Universities (TU) in Ireland are based on a government initiative to create a new type of higher education institution that focuses on applied and industry-focused research and education. The basis of the TU is to bring together two or more existing institutes of technology to create a larger and more comprehensive institution that offers a wider range of programs and services to students and industry partners. The TU model aims to promote collaboration between academia, industry, and community organizations to foster innovation, research, and economic development. The TU model also aims to enhance the student experience by providing a more seamless pathway from undergraduate to postgraduate studies, as well as greater opportunities for work placements and engagement with industry partners. Additionally, the TUs are designed to provide a greater emphasis on applied research, technology transfer, and entrepreneurship, with the goal of fostering innovation and contributing to economic growth. A project is a collection of organised tasks carried out precisely to produce a singular output (product or service) within a given time frame. Project management is a set of activities that facilitates the successful implementation of a project. The significant differences between research and development projects are the (lack of) precise requirements and (the inability to) plan an outcome from the beginning of the project. The evaluation criteria for a research project must consider these and other "particularities" in works; for instance, proving something cannot be done may be a successful outcome. This study intends to explore how a newly established multi-campus technological university manages research projects effectively. The study will identify the potential and difficulties of managing research projects, the tools, resources and processes available in a multi-campus Technological University context and the methods and approaches employed to deal with these difficulties. Key stakeholders like project managers, academics, and administrators will be surveyed as part of the study, which will also involve an explorative investigation of current literature and data. The findings of this study will contribute significantly to creating best practices for project management in this setting and offer insightful information about the efficient management of research projects within a multi-campus technological university.

Keywords: project management, research and research-related projects, multi-campus technology university, processes

Procedia PDF Downloads 38
6796 Results of Operation of Online Medical Care System

Authors: Mahsa Houshdar, Seyed Mehdi Samimi Ardestani , ُSeyed Saeed Sadr

Abstract:

Introduction: Online Medicare is a method in which parts of a medical process - whether its diagnostics, monitoring or the treatment itself will be done by using online services. This system has been operated in one boy’s high school, one girl’s high school and one high school in deprived aria. Method: At the first step the students registered for using the system. It was not mandatory and not free. They participated in estimating depression scale, anxiety scale and clinical interview by online medical care system. During this estimation, we could find the existence and severity of depression and anxiety in each one of the participants, also we could find the consequent needs of each one, such as supportive therapy in mild depression or anxiety, need to visited by psychologist in moderate cases, need to visited by psychiatrist in moderate-severe cases, need to visited by psychiatrist and psychologist in severe cases and need to perform medical lab examination tests. The lab examination tests were performed on persons specified by the system. The lab examinations were included: serum level of vitamin D, serum level of vitamin B12, serum level of calcium, fasting blood sugar, HbA1c, thyroid function tests and CBC. All of the students were solely treated by vitamins or minerals therapy and/ or treatment of medical problem (such as hypothyroidism). After a few months, we came back to high schools and estimated the existence and severity of depression and anxiety in treated students. With comparing these results, the affectability of the system could be prof. Results: Totally, we operate this project in 1077 participants in 243 of participant, the lab examination test were performed. In girls high schools: the existence and severity of depression significantly deceased (P value= 0.018<0.05 & P value 0.004< 0.05), but results about anxiety was not significant. In boys high schools: the existence and severity of depression significantly decreased (P value= 0.023<0.05 & P value = 0.004< 0.05 & P value= 0.049< 0.05). In boys high schools: the existence and severity of anxiety significantly decreased (P value= 0.041<0.05 & P value = 0.046< 0.05 &) but in one high school results about anxiety was not significant. In high school in deprived area the students did not have any problem paying for participating in the project, but they could not pay for medical lab examination tests. Thus, operation of the system was not possible in deprived area without a sponsor. Conclusion: This online medical system was successful in creating medical and psychiatric profile without attending physician. It was successful in decreasing depression without using antidepressants, but it was partially successful in decreasing anxiety.

Keywords: depression, diabetes, online medicare, vitamin D deficiency

Procedia PDF Downloads 295
6795 Implementation of Lean Management in Non-Governmental Organizations: A Case Study on WrocłAw Food Bank

Authors: Maciej Pieńkowski

Abstract:

Lean Management is nowadays one of the most dominating management concepts within industrial and service environment, providing compelling business benefits to many companies. At the same time, its application in the non-governmental organizations has not been extensively researched yet. Filling this gap will address clear necessity of efficient management system in NGO environment and significantly improve operational performance of many organizations. The goal of the research is to verify effectiveness of Lean Management implementation in the non-governmental organizations, based on Wrocław Food Bank case study. The case study describes a Lean Management implementation project within analyzed organization. During the project, Wrocław Food Bank went through full 5-step Lean Thinking processes, which consist of value identification, value stream mapping, creation of flow, establishing pull and seeking perfection. The research contains a detailed summary of each of those steps and provides with information regarding results of their implementation. The major findings of the study indicate, that application of Lean Management in NGO environment is possible, however physical implementation of its guidelines can be strongly impeded by multiple constraints, which non-governmental organizations are facing. Due to challenges like limited resources, project based activities and lack of traditional supplier-customer relationship, many NGOs may fail in their efforts to implement Lean Management. Successful Lean application requires therefore strong leadership commitment, which would drive transformation to remove barriers and obstacles.

Keywords: lean management, non-governmental organizations, continuous improvement, lean thinking

Procedia PDF Downloads 256
6794 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 251
6793 A Case Study on the Guidelines for Application of Project Management Methods in Infrastructure Projects

Authors: Fernanda Varella Borges, Silvio Burrattino Melhado

Abstract:

Motivated by the importance of public infrastructure projects in the civil construction chain, this research shows the study of project management methods and the infrastructure projects’ characteristics. The research aims at the objective of improving management efficiency by proposing guidelines for the application of project management methods in infrastructure projects. Through literature review and case studies, the research analyses two major infrastructure projects underway in Brazil, identifying the critical points for achieving its success. As a result, the proposed guidelines indicate that special attention should be given to the management of stakeholders, focusing on their knowledge and experience, their different interests, the efficient management of their communication, and their behavior in the day-by-day project management process.

Keywords: construction, infrastructure, project management, public projects

Procedia PDF Downloads 451
6792 The End Is Just the Beginning: The Importance of Project Post-Implementation Reviews

Authors: Catalin-Teodor Dogaru, Ana-Maria Dogaru

Abstract:

Success means different things to different people. For us, project managers, it becomes even harder to find a definition. Many factors have to be included in the evaluation. Moreover, literature is not very helpful, lacking consensus and neutrality. Post-implementation reviews (PIR) can be an efficient tool in evaluating how things worked on a certain project. Despite the visible progress, PIR is not a very detailed subject yet and there is not a common understanding in this matter. This may be the reason that some organizations include it in the projects’ lifecycle and some do not. Through this paper, we point out the reasons why all project managers should pay proper attention to this important step and to the elements, which can be assessed, beside the already famous triple constraints: cost, budget, and time. It is essential to take notice that PIR is not a checklist. It brings the edge in eliminating subjectivity and judging projects based on actual proof. Based on our experience, our success indicator model, presented in this paper, contributes to the success of the project! In the same time, it increases trust among customers who will perceive success more objectively.

Keywords: project, post implementation, review, success, indicators

Procedia PDF Downloads 344
6791 A Review of Information Systems Development in Developing Countries

Authors: B. N. Asare, O. A. Ajigini

Abstract:

Information systems (IS) are highly important in the operation of private and public organisations in developing and developed countries. Developing countries are saddled with many project failures during the implementation of information systems. However, successful information systems are greatly needed in developing countries in order to enhance their economies. This paper is highly important in view of the high failure rate of information systems in developing countries which needs to be reduced to minimum acceptable levels by means of recommended interventions. This paper centres on a review of IS development in developing countries. The paper presents evidences of the IS successes and failures in developing countries and posits a model to address the IS failures. The proposed model can then be utilised by developing countries to reduce their IS project implementation failure rate. A comparison is drawn between IS development in developing countries and developed countries. The paper provides valuable information to assist in reducing IS failure, and developing IS models and theories on IS development for developing countries.

Keywords: developing countries, information systems, IS development, information systems failure, information systems success, information systems success model

Procedia PDF Downloads 337
6790 Transforming the Education System for the Innovative Society: A Case Study

Authors: Mario Chiasson, Monique Boudreau

Abstract:

Problem statement: Innovation in education has become a central topic of discussion at various levels, including schools and scholarly literature, driven by the global technological advancements of Industry 4.0. This study aims to contribute to the ongoing dialogue by examining the role of innovation in transforming school culture through the reimagination of traditional structures. The study argues that such a transformation necessitates an understanding and experience of systems leadership. This paper presents the case of the Francophone South School District, where a transformative initiative created an innovative learning environment by engaging students, teachers, and community members collaboratively through eco-communities. Traditional barriers and structures in education were dismantled to facilitate this process. The research component of this paper focuses on the Intr’Appreneur project, a unique initiative launched by the district team in the New Brunswick, Canada to support a system-wide transformation towards progressive and innovative organizational models. Methods This study is part of a larger research project that focuses on the transformation of educational systems in six pilot schools involved in the Intr’Appreneur project. Due to COVID-19 restrictions, the project was downscaled to three schools, and virtual qualitative interviews were conducted with volunteer teachers and administrators. Data was collected from students, teachers, and principals regarding their perceptions of the new learning environment and experiences. The analysis process involved developing categories, establishing codes for emerging themes, and validating the findings. The study emphasizes the importance of system leadership in achieving successful transformation. Results: The findings demonstrate that school principals played a vital role in enabling system-wide change by fostering a dynamic, collaborative, and inclusive culture, coordinating and mobilizing community members, and serving as educational role models who facilitated active and personalized pedagogy among the teaching staff. These qualities align with the characteristics of Leadership 4.0 and are crucial for successful school system transformations. Conclusion: This paper emphasizes the importance of systems leadership in driving educational transformations that extend beyond pedagogical and technological advancements. The research underscores the potential impact of such a leadership approach on teaching, learning, and leading processes in Education 4.0.

Keywords: leadership, system transformation, innovation, innovative learning environment, Education 4.0, system leadership

Procedia PDF Downloads 35
6789 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: wind energy project, uncertain resources, risks, Monte Carlo simulation

Procedia PDF Downloads 328
6788 Contributing Factors Affecting the Safety in Construction Sites of Bangladesh

Authors: Farzana Rahman, Mohammed Hossain Ezaz, Dipak Halder, Proshanta Mondal

Abstract:

Site safety is an important function regardless of project size. A key goal, which must be met for a successful project, is to finish the project with a good safety record. Construction safety is an important issue in all over the world. Today, developed countries strictly follow the safety procedure to avoid any hazard, accident or fatality. However, for a least developed country like Bangladesh, still accidents and fatalities are quite high due to lack of safety management. With the increased volume of construction work in Bangladesh, the need for proper attention in safety issues has become essential for human, economic and other consideration. Recently lots of accidents are taking place in construction sites of Bangladesh causing severe injury to death to the workers and pedestrians. There are a number of reasons/factors that these high numbers are widespread to the construction industry that are not found in most other businesses. The objective of this research work is to identify and explore the various factor that affect the construction site safety in Bangladesh. A questionnaire surveys was conducted to the reputed construction companies of Bangladesh to examine the present safety situation in construction sites. Nine factors were selected for the survey. The finding shows that 78% of organizations’ from the respondents are conscious about the safety procedure and they usually provide safety measures for the workers. Promotion of safety measures at the working site results in a better working environment, higher productivity and greater contentment among the workers.

Keywords: construction sites, fatalities, safety issues, safety situation

Procedia PDF Downloads 534
6787 Leading Virtual Project Teams in the Post Pandemic Era: Trust and Conflict Management Strategies

Authors: Vidya Badrinarayanan, Appa Iyer Sivakumar

Abstract:

The coronavirus pandemic has sent an important message that future project teams need to be trained to work under virtual conditions, which has already become the new norm in organizations across the world. As organizations increasingly rely on virtual teams to achieve project objectives, it is essential to comprehend how leadership functions in virtual project teams. The purpose of this research is to analyze the leadership behaviors exhibited by project managers for building trust and managing conflicts effectively in virtual project teams. This convergent parallel mixed method research was conducted by surveying 185 virtual leaders and conducting a semi-structured interview with 13 senior virtual leaders involved in managing projects across the industry sectors. The research findings indicate that establishing trust and managing conflicts were ranked as significant challenges in leading virtual project teams in the post-pandemic era. In contrast to earlier findings, our research findings suggest that productivity was not ranked as a significant challenge in leading virtual project teams. This indeed is a positive finding for organizations to consider adopting virtual project teams in the long run. Additionally, the research findings recommend that virtual leaders need to strive to build a high-trust environment and develop effective conflict resolution skills to improve the effectiveness of virtual project teams. As the project management profession struggles with low project success rates, mixed-method research aims to contribute to the knowledge in the growing research area of virtual project leadership. This research contributes to the knowledge by offering first-person accounts from senior virtual leaders on the innovative strategies they had implemented for building trust and resolving conflicts effectively in the virtual project when there were limited opportunities for face-to-face interaction on account of the pandemic. In addition, the leadership framework created as a part of this research for trust development and conflict management in virtual project teams will guide project managers to improve virtual project team effectiveness.

Keywords: conflict management, trust building, virtual leadership, virtual teams

Procedia PDF Downloads 146
6786 The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance

Authors: P. F. Wong, H. Salleh, F. A. Rahim

Abstract:

The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.

Keywords: Building Information Modeling (BIM), quantity surveyors, capability, project performance

Procedia PDF Downloads 337
6785 The Views of Teachers, Students and Parents on the FATIH Project

Authors: Şemsettin Şahin, Ahmet Oğuz Aktürk, İsmail Çelik

Abstract:

This study investigated the views of teachers, students and students' parents on the FATIH (Movement of Enhancing Opportunities and Improving Technology) Project, which was put into service by the Ministry of National Education in cooperation with the Ministry of Transportation in Turkey in November 2010 for the purpose of increasing students' success and planned to be completed within 5 years. The study group consisted of teachers employed in a pilot school in the province of Karaman in central Turkey included within the scope of the FATIH Project, students attending this school and parents whose children are students in that school. The research data were collected through forms developed by the researchers to determine the views of teachers, students and students' parents on the FATIH Project. The descriptive analysis method, one of the qualitative research methods, was used in the study. An analysis of the data revealed that a large majority of the teachers and the students believed that if computers were used to serve their set purpose, then they could make considerable contributions to education. A large majority of the students' parents, on the other hand, regard the use of computers in education as a great opportunity for the students. The views of the teachers, students and students' parents on the FATIH Project usually overlap. Most of the participants in the study pointed out that the FATIH Project was intended to use technology effectively in education. Moreover, each individual participant described their role in the FATIH Project in accordance with their relative position and stated that they could perform whatever was expected of them for the effective and efficient use and progress of the project. The views of the participants regarding the FATİH Project vary according to the kind of the participants.

Keywords: education, FATIH project, technology, students

Procedia PDF Downloads 406
6784 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 219
6783 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 430
6782 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 482
6781 A Model Towards Creating Positive Accounting Classroom Conditions That Supports Successful Learning at School

Authors: Vine Petzer, Mirna Nel

Abstract:

An explanatory mixed method design was used to investigate accounting classroom conditions in the Further Education and Training (FET) Phase in South Africa. A descriptive survey research study with a heterogeneous group of learners and teachers was conducted in the first phase. In the qualitative phase, semi-structured individual interviews with learners and teachers, as well as observations in the accounting classroom, were employed to gain more in depth understanding of the learning conditions in the accounting classroom. The findings of the empirical research informed the development of a model for teachers in accounting, supporting them to use more effective teaching methods and create positive learning conditions for all learners to experience successful learning. A model towards creating positive Accounting classroom conditions that support successful learning was developed and recommended for education policy and decision-makers for use as a classroom intervention capacity building tool. The model identifies and delineates classroom practices that exert significant effect on learner attainment of quality education.

Keywords: accounting classroom conditions, positive education, successful learning, teaching accounting

Procedia PDF Downloads 121
6780 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 371
6779 RS Based SCADA System for Longer Distance Powered Devices

Authors: Harkishen Singh, Gavin Mangeni

Abstract:

This project aims at building an efficient and automatic power monitoring SCADA system, which is capable of monitoring the electrical parameters of high voltage powered devices in real time for example RMS voltage and current, frequency, energy consumed, power factor etc. The system uses RS-485 serial communication interface to transfer data over longer distances. Embedded C programming is the platform used to develop two hardware modules namely: RTU and Master Station modules, which both use the CC2540 BLE 4.0 microcontroller configured in slave / master mode. The Si8900 galvanic ally isolated microchip is used to perform ADC externally. The hardware communicates via UART port and sends data to the user PC using the USB port. Labview software is used to design a user interface to display current state of the power loads being monitored as well as logs data to excel spreadsheet file. An understanding of the Si8900’s auto baud rate process is key to successful implementation of this project.

Keywords: SCADA, RS485, CC2540, labview, Si8900