Search results for: subsea tunnel construction
3602 Injury Prevention among Construction Workers: A Case Study on Iranian Steel Bar Bending Workers
Authors: S. Behnam Asl, H. Sadeghi Naeini, L. Sadat Ensaniat, R. Khorshidian, S. Alipour, S. Behnam Asl
Abstract:
Nowadays, the construction industry is growing, especially among developing countries. Iran also has a critical role in these industries in terms of workers disorders. Work-related musculoskeletal disorders (WMSDs) account for 7% of the whole diseases in the society, which makes some limitations. One of the main factors which causes WMSDs is awkward posture. Steel bar bending is considered as one of the prominent performance among construction workers. In this case study, we aimed to find the major tasks of bar benders and the most important risk factors related to it. This study was carried out among twenty workers (18-45 years) as our volunteer samples in some construction sites with less than 6 floors in two regions of Tehran municipality. The data was gathered through in depth observation, interview and questionnaire. Also postural analysis was done by OWAS method. In another part of study we used NMQ for gathering some data about psychosocial effects of work related disorders. Our findings show that 64% of workers were not aware of work risks, about 59% of workers had troubles in their wrists, hands, especially workers who worked in steel bar bending. In 46% cases lower back pain was in prevalence. Considering gathered data and results, awkward postures and long term tasks and their duration are known as the main risk factors of WMSDs among construction workers, meaning that work-rest schedule and tools design should be reconsidered to make an ergonomic condition for the mentioned workers.Keywords: bar benders, construction workers, musculoskeletal disorders (WMSDs), OWAS method
Procedia PDF Downloads 3103601 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa
Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq
Abstract:
The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa
Procedia PDF Downloads 1063600 Using Building Information Modelling to Mitigate Risks Associated with Health and Safety in the Construction and Maintenance of Infrastructure Assets
Authors: Mohammed Muzafar, Darshan Ruikar
Abstract:
BIM, an acronym for Building Information Modelling relates to the practice of creating a computer generated model which is capable of displaying the planning, design, construction and operation of a structure. The resulting simulation is a data-rich, object-oriented, intelligent and parametric digital representation of the facility, from which views and data, appropriate to various users needs can be extracted and analysed to generate information that can be used to make decisions and to improve the process of delivering the facility. BIM also refers to a shift in culture that will influence the way the built environment and infrastructure operates and how it is delivered. One of the main issues of concern in the construction industry at present in the UK is its record on Health & Safety (H&S). It is, therefore, important that new technologies such as BIM are developed to help improve the quality of health and safety. Historically the H&S record of the construction industry in the UK is relatively poor as compared to the manufacturing industries. BIM and the digital environment it operates within now allow us to use design and construction data in a more intelligent way. It allows data generated by the design process to be re-purposed and contribute to improving efficiencies in other areas of a project. This evolutionary step in design is not only creating exciting opportunities for the designers themselves but it is also creating opportunity for every stakeholder in any given project. From designers, engineers, contractors through to H&S managers, BIM is accelerating a cultural change. The paper introduces the concept behind a research project that mitigates the H&S risks associated with the construction, operation and maintenance of assets through the adoption of BIM.Keywords: building information modeling, BIM levels, health, safety, integration
Procedia PDF Downloads 2513599 An Investigation on Interface Shear Resistance of Twinwall Units for Tank Structures
Authors: Jaylina Rana, Chanakya Arya, John Stehle
Abstract:
Hybrid precast twinwall concrete units, mainly used in basement, core and crosswall construction, are now being adopted in water retaining tank structures. Their use offers many advantages compared with conventional in-situ concrete alternatives, however, the design could be optimised further via a deeper understanding of the unique load transfer mechanisms in the system. In the tank application, twinwall units, which consist of two precast concrete biscuits connected by steel lattices and in-situ concrete core, are subject to bending. Uncertainties about the degree of composite action between the precast biscuits and hence flexural performance of the units necessitated laboratory tests to investigate the interface shear resistance. Testing was also required to assess both the leakage performance and buildability of a variety of joint details. This paper describes some aspects of this novel approach to the design/construction of tank structures as well as selected results from some of the tests that were carried out.Keywords: hybrid construction, twinwall, precast construction, composite action
Procedia PDF Downloads 4823598 ESG and Corporate Financial Performance: Empirical Evidence from Vietnam’s Listed Construction Companies
Authors: My Linh Hoang, Van Dung Hoang
Abstract:
Environmental, Social, and Governance (ESG) factors have become a focus for companies globally, as businesses are now focusing on long-term sustainable goals rather than only operating for the goals of profit maximization. According to recent research, in several countries, companies have shown positive results in their financial performance by improving their ESG performance. The construction industry is one of the most crucial components of social and economic development; as a result, considerations for ESG factors are becoming more and more essential for companies in this sector. In Vietnam, the construction industry has been growing rapidly in recent years; however, it has yet to be discussed and studied extensively in Vietnam how ESG factors create impacts on corporate financial performance in general and construction corporations’ financial performance in particular. This research aims to examine the relationship between ESG factors and financial indicators in construction companies from 2011 to 2021 through panel data analysis of 75 listed construction companies in Vietnam and to provide insights into how these companies can better integrate ESG considerations into their operations to enhance their financial performance. The data was analyzed through 3 main methods: descriptive statistics, correlation coefficient analysis applied to all dependent, explanatory and control variables, and panel data analysis method. In panel data analysis, the study uses the fixed effects model (FEM) and random effects model (REM). The Hausman test will be used to select which model is suitable to be used. The findings indicate that maintaining a strong commitment to ESG principles can have a positive impact on financial performance. Finally, FGLS estimation will be performed when the problem of autocorrelation and variable variance appears in the model. This is significant for all parties involved, including investors, company managers, decision-makers, and industry regulators.Keywords: ESG, financial performance, construction company, Vietnam
Procedia PDF Downloads 903597 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers
Authors: Mamoon Mousa Atout
Abstract:
The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities
Procedia PDF Downloads 2993596 Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of Kampala City
Authors: Tukundane Hillary
Abstract:
This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the outcome of project control practices on the productivity of the companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple literature to obtain the variables. The research adopts 34 standard control practices from four vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded on their relevance to the construction companies. Results showed that evaluating performance with the use of curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), Project feasibility validation (8.86), Budgeting for each activity (8.84), Key project route definition (8.81), Team awareness of the budget (8.77), Setting realistic targets for projects (8.50) and Consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.Keywords: cost value, project control, cost control, time control, project performance, control practices
Procedia PDF Downloads 743595 Essential Factors of Risk Perception Crucial in Efficient Construction Management
Authors: Francis Edum-Fotwe, Tony Thorpe, Charles Afetornu
Abstract:
Risk perception informs the outcome of how issues are responded to in either solving or overcoming a problem or improving a situation. Risk perception is established to be affected by some key factors reflecting in the varying ways in which work is done as well as the level of efficiency achieved. These factors potentially would influence risk perception to different extents. Such that if these factors are said to determine risk perception, how does a change in any affect risk perception. Since the ability to address risk is influenced by risk perception, establishing and developing awareness of that perception should enable construction professionals to make viable decisions. Any act to improve the construction industry cannot be overemphasised, considering its contribution to national development. A survey questionnaire was conducted in Ghana to elicit data that measures the risk perception and the essential factors as well as the necessary demographics of the respondents, who are construction professionals. This study finds out the sensitivity of the critical factors of risk perception. It uses the Relative Importance Index analysis tool to investigate the differential effect of these essential factors on risk perception, such that a slight change in a factor makes a significant change in risk perception, having established that it is influenced by essential factors. The findings can lead to policy formation for employers on the prioritisation factors to undertake to improve the risk perception of employees. Other areas in which this study can be useful in team formation for sensitive and complex projects where efficient risk management is critical.Keywords: construction industry, risk, risk management, risk perception
Procedia PDF Downloads 1433594 Review of the Model-Based Supply Chain Management Research in the Construction Industry
Authors: Aspasia Koutsokosta, Stefanos Katsavounis
Abstract:
This paper reviews the model-based qualitative and quantitative Operations Management research in the context of Construction Supply Chain Management (CSCM). Construction industry has been traditionally blamed for low productivity, cost and time overruns, waste, high fragmentation and adversarial relationships. The construction industry has been slower than other industries to employ the Supply Chain Management (SCM) concept and develop models that support the decision-making and planning. However the last decade there is a distinct shift from a project-based to a supply-based approach of construction management. CSCM comes up as a new promising management tool of construction operations and improves the performance of construction projects in terms of cost, time and quality. Modeling the Construction Supply Chain (CSC) offers the means to reap the benefits of SCM, make informed decisions and gain competitive advantage. Different modeling approaches and methodologies have been applied in the multi-disciplinary and heterogeneous research field of CSCM. The literature review reveals that a considerable percentage of CSC modeling accommodates conceptual or process models which discuss general management frameworks and do not relate to acknowledged soft OR methods. We particularly focus on the model-based quantitative research and categorize the CSCM models depending on their scope, mathematical formulation, structure, objectives, solution approach, software used and decision level. Although over the last few years there has been clearly an increase of research papers on quantitative CSC models, we identify that the relevant literature is very fragmented with limited applications of simulation, mathematical programming and simulation-based optimization. Most applications are project-specific or study only parts of the supply system. Thus, some complex interdependencies within construction are neglected and the implementation of the integrated supply chain management is hindered. We conclude this paper by giving future research directions and emphasizing the need to develop robust mathematical optimization models for the CSC. We stress that CSC modeling needs a multi-dimensional, system-wide and long-term perspective. Finally, prior applications of SCM to other industries have to be taken into account in order to model CSCs, but not without the consequential reform of generic concepts to match the unique characteristics of the construction industry.Keywords: construction supply chain management, modeling, operations research, optimization, simulation
Procedia PDF Downloads 5033593 Supply Chain Logistics Integration in Bahrain's Construction Industry
Authors: Randolf Von N. Salindo
Abstract:
The study was conducted to measure the logistics integration capabilities of selected companies in the Bahrain construction industry using the Supply Chain 2000 framework; and, determine the extent and direction of influence of these logistics capabilities and integration competencies on the supply chain performance of the firm. A total of 50 executive respondents (from supervisor to managing director level) from 22 construction and construction supplier firms participated in the study from September to November 2014. The results reveal that respondent Bahraini construction firms have significantly lower levels of logistics capabilities, but higher levels of logistics integration competencies compared to international benchmarks. Using stepwise multiple regression analysis, eight logistics capabilities of Bahraini constructions firms were identified to be positively associated with firm performance; with comprehensive metrics as the most positively dominant influential logistics capability. Activity based and total cost methodology is found to be the most negatively dominant influential logistics capability. In terms of logistics integration competencies, the study revealed that that customer integration, internal integration, and, measurement integration are negatively associated with firm performance. There was no logistics integration competency found to be positively associated with the supply chain performance among the companies who participated in the study. The research reveals that there are areas for improvement in supply chain capabilities and logistics integration competencies of the construction firms in the Kingdom of Bahrain to improve their supply chain performance to a global level.Keywords: comprehensive metrics, customer integration, logistics integration capabilities, logistics integration competencies
Procedia PDF Downloads 6413592 Investigating Potential Pest Management Strategies for Citrus Gall Wasp in Australia
Authors: M. Yazdani, J. F. Carragher
Abstract:
Citrus gall wasp (CGW), Bruchophagus fellis (Hym: Eurytomidae), is an Australian native insect pest. CGW has now become a problem of national concern, threatening the viability of the entire Australian citrus industry. However, CGW appears to exhibit a preference for certain citrus species; growers report that grapefruit and lemons are most severely infested, with oranges and mandarins affected to a lesser extent. Given the specificity of the host plant-insect interactions, it is speculated that plant volatiles may play a significant role in host recognition. To address whether plant volatiles is involved in host plant preference by CGW we tested the behavioral response of CGW to plants in a wind tunnel. The result showed that CGW had significantly higher preference to grapefruit and lemon than other cultivars and the least preference was recorded to mandarin (Chi-square test, P<0.001). Because CGW exhibited a detectable choice further studies were undertaken to identify the components of the volatiles from each species. We trapped the volatile chemicals emitted by a 30 cm tip of each plant onto a solid Porapak matrix. Eluted extracts were then analysed by Gas Chromatography-Mass Spectrometry (GCMS) and the presumptive identity of the major compounds from each species inferred from the MS library. Although the same major compounds existed in all of the cultivars, the relative ratios of them differed between species. Next, we will validate the identity of the key volatiles using authentic standards and establish their ability to elicit olfactory responses in CGW in wind tunnel and field experiments. Identification of semiochemicals involved in host location by CGW is of interest not only from an ecological perspective but also for the development of novel pest control strategies.Keywords: Citrus gall wasp, Bruchophagus fellis, volatiles, semiochemicals, IPM
Procedia PDF Downloads 2323591 Assessment of Barriers Influencing the Adoption of Building Information Modelling in the Construction Industry, Lagos State, Nigeria
Authors: Tosin Deborah Akanbi, Adeyemi Oluwaseun Adepoju, Hameed Olusegun Adebambo, Akinloye Fatai Lawal
Abstract:
Building information modelling (BIM) is a process that starts with the development of a sequential 3D design and encourages data administration, organization, and visualization throughout the life span of a facility (drawings, construction, and supervision). The implementation of building information modelling has been slow in recent years, and this is due to some prominent barriers that hinder its adoption. In this regard, the study aims to examine the significant barriers that influence the adoption of building information modelling in the Lagos state construction industry. Data were gathered through a questionnaire survey with 332 construction professionals in the study area. Three online structured interviews were conducted to support and validate the findings of the quantitative analysis. The results revealed that interest (lack of awareness and understanding of BIM, absence of in-house BIM competent professionals, and unavailability of BIM competent professionals in the labour market), legal (lack of policies and regulations on copyright ownership and lack of enforcement from government agencies and industry leaderships) and professional (people’s inability or refusal to learn new technologies and processes, waste in time and human resource and lack of clarity of professional roles in BIM) barriers are the major barriers influencing the adoption of BIM. The results also revealed that six final themes were generated, namely: finance barriers, industry barriers, interest barriers, leadership barriers, legal barriers, and professional barriers. Thus, there is a need for policymakers to design and implement policies (regulatory, economic, and information) to promote financial schemes to support construction firms and professionals and to reduce financial barriers. It is also important for the government to lay down rules and regulations that must be enforced among the construction professionals and firms in the Lagos state construction industry.Keywords: BIM barriers, BIM adoption characteristics, construction industry, Lagos State Nigeria
Procedia PDF Downloads 503590 Enterpreneurial Orientation Dimensions for Sustainable Development in Construction Firms
Authors: Kudirat I. Zakariyyah, Iniobong B. John, Julius O. Faremi, David Adio-Moses
Abstract:
One of the key contributors to firms’ growth, performance, and sustainability is entrepreneurial orientation (EO). Most studies on EO, however, are in other industries than construction and, more often, exploratory. The purpose of this study is thus to create an awareness on entrepreneurial orientation and its dimensions in contracting firms. Considering the need for sustainability, the study thus examined contracting firms’ entrepreneurial orientation dimensions that are required in order to keep pace with the demands for sustainable development. This was done by giving out questionnaires to a sample of 116 respondents from a population of 166 construction firms in Lagos state. Data were collected through a survey and analysed using mean scores and analysis of variance (ANOVA). The result revealed the prevalence of the four dimensions of EO, though in moderate proportion. In addition, the study identified review of organisational structure as the top entrepreneurial orientation dimension needed for sustainable development. The study concludes that the firms should identify the existing orientation dimensions and its relevance with sustainability so as to be able to know the required review that will be appropriate in the industry. It is recommended that the firms need to do more on raising the level of prevalence of the various orientation dimensions in order to achieve the merits of the different constructs of sustainability.Keywords: construction, culture, entrepreneurial-orientation, dimension, sustainability
Procedia PDF Downloads 1543589 Internet of Things Professional Construction Building through the School-Enterprise Cooperation
Authors: Jumin Zhao, Na Li, Dengao Li, Yujuan Yan
Abstract:
As the rapid rise of the networking industry, the shortage of Internet of Things (IoT) talented people greatly stimulates the majority of colleges to speed up the pace of professional networking reform. Caused by the construction of the original specialty, many problems appear such as the vague specialty, the mixed theoretical, the poor practical ability and the different goal. To solve the issues above, we build a ‘theory-practice-theory-improvement’ four-step model of school-enterprise integration of personnel training. Besides, we integrate the advanced teaching philosophy: flip class and Mu class, making IoT teaching more professional and the ability of students more comprehensive.Keywords: IoT, theory-practice-theory-promotion, major construction, school-enterprise cooperation
Procedia PDF Downloads 3813588 Empirical Green’s Function Technique for Accelerogram Synthesis: The Problem of the Use for Marine Seismic Hazard Assessment
Authors: Artem A. Krylov
Abstract:
Instrumental seismological researches in water areas are complicated and expensive, that leads to the lack of strong motion records in most offshore regions. In the same time the number of offshore industrial infrastructure objects, such as oil rigs, subsea pipelines, is constantly increasing. The empirical Green’s function technique proved to be very effective for accelerograms synthesis under the conditions of poorly described seismic wave propagation medium. But the selection of suitable small earthquake record in offshore regions as an empirical Green’s function is a problem because of short seafloor instrumental seismological investigation results usually with weak micro-earthquakes recordings. An approach based on moving average smoothing in the frequency domain is presented for preliminary processing of weak micro-earthquake records before using it as empirical Green’s function. The method results in significant waveform correction for modeled event. The case study for 2009 L’Aquila earthquake was used to demonstrate the suitability of the method. This work was supported by the Russian Foundation of Basic Research (project № 18-35-00474 mol_a).Keywords: accelerogram synthesis, empirical Green's function, marine seismology, microearthquakes
Procedia PDF Downloads 3243587 Analysis of Causality between Defect Causes Using Association Rule Mining
Authors: Sangdeok Lee, Sangwon Han, Changtaek Hyun
Abstract:
Construction defects are major components that result in negative impacts on project performance including schedule delays and cost overruns. Since construction defects generally occur when a few associated causes combine, a thorough understanding of defect causality is required in order to more systematically prevent construction defects. To address this issue, this paper uses association rule mining (ARM) to quantify the causality between defect causes, and social network analysis (SNA) to find indirect causality among them. The suggested approach is validated with 350 defect instances from concrete works in 32 projects in Korea. The results show that the interrelationships revealed by the approach reflect the characteristics of the concrete task and the important causes that should be prevented.Keywords: causality, defect causes, social network analysis, association rule mining
Procedia PDF Downloads 3673586 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram
Abstract:
The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems
Procedia PDF Downloads 3563585 Theater Metaphor in Event Quantification: A Corpus Study
Authors: Zhuo Jing-Schmidt, Jun Lang
Abstract:
Numeral classifiers are common in Asian languages. Research on numeral classifiers primarily focuses on noun classifiers that quantify and individuate nominal referents. There is a scarcity of research on event quantification using verb classifiers. This study aims to understand the semantic and conceptual basis of event quantification in Chinese. From a usage-based Construction Grammar perspective, this study presents a corpus analysis of event quantification in Chinese. Drawing on a large balanced corpus of contemporary Chinese, we analyze 667 NOUN col-lexemes totaling 31136 tokens of a productive numeral classifier construction in Chinese. Using collostructional analysis of the collexemes, the results show that the construction quantifies and classifies dramatic events using a theater-based conceptual metaphor. We argue that the usage patterns reflect the cultural entrenchment of theater as in Chinese conceptualization and the construal of theatricality in linguistic expression. The study has implications for cognitive semantics and construction grammar.Keywords: event quantification, classifier, corpus, metaphor
Procedia PDF Downloads 853584 Performance Analysis of Vision-Based Transparent Obstacle Avoidance for Construction Robots
Authors: Siwei Chang, Heng Li, Haitao Wu, Xin Fang
Abstract:
Construction robots are receiving more and more attention as a promising solution to the manpower shortage issue in the construction industry. The development of intelligent control techniques that assist in controlling the robots to avoid transparency and reflected building obstacles is crucial for guaranteeing the adaptability and flexibility of mobile construction robots in complex construction environments. With the boom of computer vision techniques, a number of studies have proposed vision-based methods for transparent obstacle avoidance to improve operation accuracy. However, vision-based methods are also associated with disadvantages such as high computational costs. To provide better perception and value evaluation, this study aims to analyze the performance of vision-based techniques for avoiding transparent building obstacles. To achieve this, commonly used sensors, including a lidar, an ultrasonic sensor, and a USB camera, are equipped on the robotic platform to detect obstacles. A Raspberry Pi 3 computer board is employed to compute data collecting and control algorithms. The turtlebot3 burger is employed to test the programs. On-site experiments are carried out to observe the performance in terms of success rate and detection distance. Control variables include obstacle shapes and environmental conditions. The findings contribute to demonstrating how effectively vision-based obstacle avoidance strategies for transparent building obstacle avoidance and provide insights and informed knowledge when introducing computer vision techniques in the aforementioned domain.Keywords: construction robot, obstacle avoidance, computer vision, transparent obstacle
Procedia PDF Downloads 803583 Construction Noise Control: Hong Kong Reviews International Best Practices
Authors: Morgan Cheng, Wilson Ho, Max Yiu, Dragon Tsui, Wylog Wong, Richard Kwan, K. C. Lam, Hannah Lo, C. L. Wong
Abstract:
Hong Kong has been known worldwide for its ability to thrive under trying circumstances. The 7.5 million residents of this mature and busy metropolis are living in a primarily high-rise city whereby development and renewal of the cityscape are taking place unceasingly. Hong Kong residents are therefore affected by the virtually continuous and numerous construction activities. In 2020, the Hong Kong environmental protection department (EPD) completed a feasibility study on managing construction noise, including those associated with the renovation of domestic premises. Part of the study was the review of management and control of construction noise in other metropolitan cities globally. As far as the authors are aware of, such worldwide and extensive review of best practices on construction noise control has not been conducted for over 20 years. In order to benefit from international best practices, the extensive review is to identify possible areas for improvement in Hong Kong. The consultant of the study first referred to the United Nations Report ‘The World’s Cities in 2016’ and examined the top 100 cities therein. The 20 most suitable cities were then chosen for further review. Upon screening of each of these 20 cities, 12 cities with the more relevant management practices were selected for further scrutiny. These 12 cities were: Asia – Tokyo, Seoul, Taipei, Guangzhou, Singapore; Europe – City of Westminster (London), Berlin; North America – Toronto, New York City, San Francisco; Oceania – Sydney, Melbourne. Afterwards, three cities, namely Sydney, City of Westminster, and New York City, were selected for in-depth review. These cities were chosen primarily because of the maturity, success, and effectiveness of their construction noise management and control measures, as well as their similarity to Hong Kong in key and selected aspects. One of the more important findings of the review is the usefulness of early focus, with the aim of designing the noise issues away wherever practicable. The consultant examined the similar yet different construction noise early focus mechanisms of the three cities. This paper describes this landmark worldwide and extensive review of international best practices on construction noise management and control. The methodology, approach, and key findings are presented to give readers a succinct yet comprehensive view. The authors shared the findings with the acoustics professionals worldwide with the hope of global advancement of more mature construction noise management while welcoming sustainable development and construction.Keywords: construction noise, international best practices, noise control, noise management
Procedia PDF Downloads 1373582 Envisioning Process in Medium Enterprises: An Exploratory Study of Cambodian Living Arts
Authors: Alexandre Bédard, Caroline Coulombe, Jonathan Harvey
Abstract:
Envisioning process (EP) in medium enterprises is treated equally in very small enterprises. Building on the concept of social construction, this study aims to explore how envisioning is constructed in a medium enterprise in which stakeholders are involved and how it is influenced. We use a unique case method based on qualitative data collected through 11 interviews representing various members of the organization. Through the discussion of the findings, we were able to confirm the social construction of the EP and to identify three main stakeholders responsible for the construction of the vision, mainly political and social powers, actors of the organization, and financial providers. Moreover, EP is influenced by external factors; in this case, the history of the organization and the value and importance of the art and the culture for Cambodians.Keywords: envisioning process, social constructivism, medium enterprise, legitimacy
Procedia PDF Downloads 1193581 Integrating Virtual Reality and Building Information Model-Based Quantity Takeoffs for Supporting Construction Management
Authors: Chin-Yu Lin, Kun-Chi Wang, Shih-Hsu Wang, Wei-Chih Wang
Abstract:
A construction superintendent needs to know not only the amount of quantities of cost items or materials completed to develop a daily report or calculate the daily progress (earned value) in each day, but also the amount of quantities of materials (e.g., reinforced steel and concrete) to be ordered (or moved into the jobsite) for performing the in-progress or ready-to-start construction activities (e.g., erection of reinforced steel and concrete pouring). These daily construction management tasks require great effort in extracting accurate quantities in a short time (usually must be completed right before getting off work every day). As a result, most superintendents can only provide these quantity data based on either what they see on the site (high inaccuracy) or the extraction of quantities from two-dimension (2D) construction drawings (high time consumption). Hence, the current practice of providing the amount of quantity data completed in each day needs improvement in terms of more accuracy and efficiency. Recently, a three-dimension (3D)-based building information model (BIM) technique has been widely applied to support construction quantity takeoffs (QTO) process. The capability of virtual reality (VR) allows to view a building from the first person's viewpoint. Thus, this study proposes an innovative system by integrating VR (using 'Unity') and BIM (using 'Revit') to extract quantities to support the above daily construction management tasks. The use of VR allows a system user to be present in a virtual building to more objectively assess the construction progress in the office. This VR- and BIM-based system is also facilitated by an integrated database (consisting of the information and data associated with the BIM model, QTO, and costs). In each day, a superintendent can work through a BIM-based virtual building to quickly identify (via a developed VR shooting function) the building components (or objects) that are in-progress or finished in the jobsite. And he then specifies a percentage (e.g., 20%, 50% or 100%) of completion of each identified building object based on his observation on the jobsite. Next, the system will generate the completed quantities that day by multiplying the specified percentage by the full quantities of the cost items (or materials) associated with the identified object. A building construction project located in northern Taiwan is used as a case study to test the benefits (i.e., accuracy and efficiency) of the proposed system in quantity extraction for supporting the development of daily reports and the orders of construction materials.Keywords: building information model, construction management, quantity takeoffs, virtual reality
Procedia PDF Downloads 1323580 Stress and Coping Strategies: A Correlational Analysis to Profiling Maladaptive Behaviors at Work
Authors: Silvia Riva, Ezekiel Chinyio
Abstract:
Introduction: Workers in different sectors are prone to stress at varying levels. They also respond to stress in different ways. An inspiration was to study stress development amongst workers in a work dangerous setting (Construction Industry) as well as how they cope with specific stress incidences. Objective: The overarching objective of the study was to study and correlate between stress and coping strategies. The research was conducted in an organizational industrial setting, and its findings on the coping actions of construction workers are reported in this article. Methods: An online cross-sectional survey was conducted with 80 participants aged 18-62. These were working for three different construction organizations in the West Midland region of the UK. Their coping actions were assessed using the COPE Inventory (Carver, 2013) instrument while the level of stress was assessed by the Perceived Stress Scale (Cohen, 1994). Results: Out of 80 workers (20 female, 25%, mean age 40.66), positive reinterpretation (M=4.15, SD=2.60) and active coping (M=4.18, SD=2.55) were the two most adaptive strategies reported by the workers while the most frequent maladaptive behavior was mental disengagement (M=3.62, SD=2.25). Among the maladaptive tactics, alcohol and drug abuse was a significant moderator in stress reactions (t=6.12, p=.000). Conclusion: Some maladaptive strategies are adopted by construction workers to cope with stress. So, it could be argued that programs of stress prevention and control in the construction industry have a basis to develop solutions that can improve and strengthen effective interventions when workers are stressed or getting stressed.Keywords: coping, organization, strategies, stress
Procedia PDF Downloads 2173579 Aerodynamic Investigation of Baseline-IV Bird-Inspired BWB Aircraft Design: Improvements over Baseline-III BWB
Authors: C. M. Nur Syazwani, M. K. Ahmad Imran, Rizal E. M. Nasir
Abstract:
The study on BWB UV begins in UiTM since 2005 and three designs have been studied and published. The latest designs are Baseline-III and inspired by birds that have features and aerodynamics behaviour of cruising birds without flapping capability. The aircraft featuring planform and configuration are similar to the bird. Baseline-III has major flaws particularly in its low lift-to-drag ratio, stability and issues regarding limited controllability. New design known as Baseline-IV replaces straight, swept wing to delta wing and have a broader tail compares to the Baseline-III’s. The objective of the study is to investigate aerodynamics of Baseline-IV bird-inspired BWB aircraft. This will be achieved by theoretical calculation and wind tunnel experiments. The result shows that both theoretical and wind tunnel experiments of Baseline-IV graph of CL and CD versus alpha are quite similar to each other in term of pattern of graph slopes and values. Baseline-IV has higher lift coefficient values at wide range of angle of attack compares to Baseline-III. Baseline-IV also has higher maximum lift coefficient, higher maximum lift-to-drag and lower parasite drag. It has stable pitch moment versus lift slope but negative moment at zero lift for zero angle-of-attack tail setting. At high angle of attack, Baseline-IV does not have stability reversal as shown in Baseline-III. Baseline-IV is proven to have improvements over Baseline-III in terms of lift, lift-to-drag ratio and pitch moment stability at high angle-of-attack.Keywords: blended wing-body, bird-inspired blended wing-body, aerodynamic, stability
Procedia PDF Downloads 5083578 A Techno-Economic Simulation Model to Reveal the Relevance of Construction Process Impact Factors for External Thermal Insulation Composite System (ETICS)
Authors: Virgo Sulakatko
Abstract:
The reduction of energy consumption of the built environment has been one of the topics tackled by European Commission during the last decade. Increased energy efficiency requirements have increased the renovation rate of apartment buildings covered with External Thermal Insulation Composite System (ETICS). Due to fast and optimized application process, a large extent of quality assurance is depending on the specific activities of artisans and are often not controlled. The on-site degradation factors (DF) have the technical influence to the façade and cause future costs to the owner. Besides the thermal conductivity, the building envelope needs to ensure the mechanical resistance and stability, fire-, noise-, corrosion and weather protection, and long-term durability. As the shortcomings of the construction phase become problematic after some years, the common value of the renovation is reduced. Previous work on the subject has identified and rated the relevance of DF to the technical requirements and developed a method to reveal the economic value of repair works. The future costs can be traded off to increased the quality assurance during the construction process. The proposed framework is describing the joint simulation of the technical importance and economic value of the on-site DFs of ETICS. The model is providing new knowledge to improve the resource allocation during the construction process by enabling to identify and diminish the most relevant degradation factors and increase economic value to the owner.Keywords: ETICS, construction technology, construction management, life cycle costing
Procedia PDF Downloads 4193577 The Analysis of New Town Hillside Development Pattern Guided by Low-Intensity Damage
Authors: Shan Zhou, Wenju Li, Kehui Chai
Abstract:
Along with economic globalization, marketization and regional development, strengthen planning and construction of the New Town, which is always the main way to optimize the structure and function of metropolitan spatial configuration. But, the new town is often of high-intensity development, bringing a series of natural, ecological and environmental issues, so it is difficult to achieve sustainable development. In this paper, taking the administrative center of Jiangping in Dongxing as an example. It is analyzed from the following three aspects:Vertical design of road traffic,Space layout of mountain buildings,and the design of landscape. The purpose is to elaborate the hillside design methods guided by low-intensity damage, and explore the guiding significance of sustainable development of the hillside construction in the future.Keywords: low-intensity damage, new town construction,hillside,sustainable development, natural, ecology
Procedia PDF Downloads 4703576 Building Information Modeling Applied for the Measurement of Water Footprint of Construction Supplies
Authors: Julio Franco
Abstract:
Water is used, directly and indirectly, in all activities of the construction productive chain, making it a subject of worldwide relevance for sustainable development. The ongoing expansion of urban areas leads to a high demand for natural resources, which in turn cause significant environmental impacts. The present work proposes the application of BIM tools to assist the measurement of the water footprint (WF) of civil construction supplies. Data was inserted into the model as element properties, allowing them to be analyzed by element or in the whole model. The WF calculation was automated using parameterization in Autodesk Revit software. Parameterization was associated to the materials of each element in the model so that any changes in these elements directly alter the results of WF calculations. As a case study, we applied into a building project model to test the parameterized calculus of WF. Results show that the proposed parameterization successfully automated WF calculations according to design changes. We envision this tool to assist the measurement and rationalization of the environmental impact in terms of WF of construction projects.Keywords: building information modeling, BIM, sustainable development, water footprint
Procedia PDF Downloads 1473575 Numerical Simulation for a Shallow Braced Excavation of Campus Building
Authors: Sao-Jeng Chao, Wen-Cheng Chen, Wei-Humg Lu
Abstract:
In order to prevent encountering unpredictable factors, geotechnical engineers always conduct numerical analysis for braced excavation design. Simulation work in advance can predict the response of subsequent excavation and thus will be designed to increase the security coefficient of construction. The parameters that are considered include geological conditions, soil properties, soil distributions, loading types, and the analysis and design methods. National Ilan University is located on the LanYang plain, mainly deposited by clayey soil and loose sand, and thus is vulnerable to external influence displacement. National Ilan University experienced a construction of braced excavation with a complete program of monitoring excavation. This study takes advantage of a one-dimensional finite element method RIDO to simulate the excavation process. The predicted results from numerical simulation analysis are compared with the monitored results of construction to explore the differences between them. Numerical simulation analysis of the excavation process can be used to analyze retaining structures for the purpose of understanding the relationship between the displacement and supporting system. The resulting deformation and stress distribution from the braced excavation cab then be understand in advance. The problems can be prevented prior to the construction process, and thus acquire all the affected important factors during design and construction.Keywords: excavation, numerical simulation, RIDO, retaining structure
Procedia PDF Downloads 2623574 Impact of the Currency Devaluation on Contractors in Egypt
Authors: Mariam Zahwy, Waleed El Nemr, A. Samer Ezeldin
Abstract:
In 2016, the depreciation of the Egyptian pound (EGP) had a substantial impact on Egypt's construction industry. Studies assessing this influence are scarce, though. The impact of devaluation on contractors is measured in this study using empirical data. The difficulties contractors have as a result of rising import material costs, limited financing alternatives, and inflationary pressures are also determined by analyzing survey responses from contractors and industry experts. The approaches contractors utilize to lessen the impact of devaluation are also examined in the research. The survey results show how currency depreciation directly affects contractors in the Egyptian construction industry in terms of financial consequences. Inflationary pressures, fewer financing alternatives, and rising expenses have all affected contractors. To minimize losses, contractors have, nonetheless, put a number of tactics into practice. These findings highlight the importance of understanding and managing the impact of devaluation on the construction industry to ensure its resilience and development.Keywords: construction, devaluation, contractors, material costs, inflationary pressures, empirical data, quantitative research
Procedia PDF Downloads 213573 Research Methodology and Mixed Methods (Qualitative and Quantitative) for Ph.D. Construction Management – Post-Disaster Reconstruction
Authors: Samuel Quashie
Abstract:
Ph.D. Construction Management methodology and mixed methods are organized to guide the researcher to assemble and assess data in the research activities. Construction management research is close to business management and social science research. It also contributes to researching the phenomenon and answering the research question, generating an integrated management system for post-disaster reconstruction in construction and related industries. Research methodology and methods drive the research to achieve the goal or goals, contribute to knowledge, or increase knowledge. This statement means the research methodology, mixed methods, aim, objectives, and processes address the research question, facilitate its achievement and foundation to conduct the study. Mixed methods use project-based case studies, interviews, observations, literature and archival document reviews, research questionnaires, and surveys, and evaluation of integrated systems used in the construction industry and related industries to address the research work. The research mixed methods (qualitative, quantitative) define the research topic and establish a more in-depth study. The research methodology is action research, which involves the collaboration of participants and service users to collect and evaluate data, studying the phenomenon, research question(s) to improve the situation in post-disaster reconstruction phase management.Keywords: methodology, Ph.D. research, post-disaster reconstruction, mixed-methods qualitative and quantitative
Procedia PDF Downloads 231