15839 Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework

Authors: Faris Elghaish, Sepehr Abrishami, Mark Gaterell, Richard Wise

Abstract:

The collaboration and integration between all building information management (BIM) processes and tasks are necessary to ensure that all project objectives can be delivered. The literature review has been used to explore the state of the art BIM technologies to manage construction materials as well as the challenges which have faced the construction process using traditional methods. Thus, this paper aims to articulate a framework to integrate traditional material planning methods such as ABC analysis theory (Pareto principle) to analyse and categorise the project materials, as well as using independent material planning methods such as Economic Order Quantity (EOQ) and Fixed Order Point (FOP) into the BIM 4D, and 5D capabilities in order to articulate a dependent material planning cycle into BIM, which relies on the constructability method. Moreover, we build a model to connect between the material planning outputs and the BIM 4D and 5D data to ensure that all project information will be accurately presented throughout integrated and complementary BIM reporting formats. Furthermore, this paper will present a method to integrate between the risk management output and the material management process to ensure that all critical materials are monitored and managed under the all project stages. The paper includes browsers which are proposed to be embedded in any 4D BIM platform in order to predict the EOQ as well as FOP and alarm the user during the construction stage. This enables the planner to check the status of the materials on the site as well as to get alarm when the new order will be requested. Therefore, this will lead to manage all the project information in a single context and avoid missing any information at early design stage. Subsequently, the planner will be capable of building a more reliable 4D schedule by allocating the categorised material with the required EOQ to check the optimum locations for inventory and the temporary construction facilitates.

Keywords: building information management, BIM, economic order quantity, EOQ, fixed order point, FOP, BIM 4D, BIM 5D

Procedia PDF Downloads 160
15838 The Tourism Management: The Case of Kingdom of Cambodia

Authors: Chanpen Meenakorn

Abstract:

The purpose of this study are (1) development plan and management strategy of Virachey Natioanl Park, (2) to study stakeholders’ perception on tourism development for sustainable tourism planning and management. The data was collected through 28 sets of questionnaires with the total population of international visitors who were interested in Ecotourism in northeast Cambodia and traveled to Virachey National Park. The SPSS programme was used to analyze the level of visitors’ satisfaction and perception on tourism development. The results of the study indicated that moderate potentiality to be developed as tourist attraction for sustainable tourism development in the park. The components with moderate potential are physical condition, management, activities and process of natural and cultural tourism, and organization and participation of the local community. The study also found that most local communities satisfy with tourism development in the park as well as in their community.

Keywords: Kingdom of Cambodia, stakeholders’ perception, tourism management, Virachey National Park

Procedia PDF Downloads 350
15837 Integration of LCA and BIM for Sustainable Construction

Authors: Laura Álvarez Antón, Joaquín Díaz

Abstract:

The construction industry is turning towards sustainability. It is a well-known fact that sustainability is based on a balance between environmental, social and economic aspects. In order to achieve sustainability efficiently, these three criteria should be taken into account in the initial project phases, since that is when a project can be influenced most effectively. Thus the aim must be to integrate important tools like BIM and LCA at an early stage in order to make full use of their potential. With the synergies resulting from the integration of BIM and LCA, a wider approach to sustainability becomes possible, covering the three pillars of sustainability.

Keywords: building information modeling (BIM), construction industry, design phase, life cycle assessment (LCA), sustainability

Procedia PDF Downloads 435
15836 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 44
15835 Review and Analysis of Sustainable-Based Risk Management in Humanitarian Supply Chains

Authors: Marinko Maslaric, Maja Jokic

Abstract:

When searching for fast and long term responses, sustainable logistics and supply chain applications have developed irrefutable theories and hypotheses towards market requirements. Nevertheless, there are certain misunderstandings on how the implementation of sustainability principles (social, economical, and environmental) and concepts should work in practice, more specifically, within a humanitarian supply chain management context. This paper will focus on the review and analysis of risk management concepts in humanitarian supply chain in order to identify their compliance with sustainable principles. In this direction, the study will look for strategies that suggest: minimization of environmental impacts throughout the reduction of resources consumption, depreciation of logistics costs, including supply chain ones, minimization of transportation and service costs, elaboration of quality performance of supply chain and logistics, and reduction of supply chain delivery time. On the side of meeting all defense, trades and humanitarian logistics needs, the research will be aligned to UN Sustainable Development Goals, standards, and performances. It will start with relevant strategies for identification of risk indicators and it will end with suggestion of valuable strategic approaches for their minimization or total prevention. Finally, a content analysis will propose a suitable methodological structure for the creation of most sustainable strategy in risk management of humanitarian supply chain. Content analysis will accompany thorough, consistent and methodical approach of literature review for potential disaster risk management plan. Thereupon, the propositions of this research will look for contemporary literature gaps, with respect to operate the literature analysis and to suggest the appropriate sustained risk low master plan. The indicated is here to secure the high quality of logistics practices in hazardous events.

Keywords: humanitarian logistics, sustainability, supply chain risk, risk management plan

Procedia PDF Downloads 220
15834 Decommissioning of Nuclear Power Plants: The Current Position and Requirements

Authors: A. Stifi, S. Gentes

Abstract:

Undoubtedly from construction's perspective, the use of explosives will remove a large facility such as a 40-storey building , that took almost 3 to 4 years for construction, in few minutes. Usually, the reconstruction or decommissioning, the last phase of life cycle of any facility, is considered to be the shortest. However, this is proved to be wrong in the case of nuclear power plant. Statistics says that in the last 30 years, the construction of a nuclear power plant took an average time of 6 years whereas it is estimated that decommissioning of such plants may take even a decade or more. This paper is all about the decommissioning phase of a nuclear power plant which needs to be given more attention and encouragement from the research institutes as well as the nuclear industry. Currently, there are 437 nuclear power reactors in operation and 70 reactors in construction. With around 139 nuclear facilities already been shut down and are in different decommissioning stages and approximately 347 nuclear reactors will be in decommissioning phase in the next 20 years (assuming the operation time of a reactor as 40 years), This fact raises the following two questions (1) How far is the nuclear and construction Industry ready to face the challenges of decommissioning project? (2) What is required for a safety and reliable decommissioning project delivery? The decommissioning of nuclear facilities across the global have severe time and budget overruns. Largely the decommissioning processes are being executed by the force of manual labour where the change in regulations is respectively observed. In term of research and development, some research projects and activities are being carried out in this area, but the requirement seems to be much more. The near future of decommissioning shall be better through a sustainable development strategy where all stakeholders agree to implement innovative technologies especially for dismantling and decontamination processes and to deliever a reliable and safety decommissioning. The scope of technology transfer from other industries shall be explored. For example, remotery operated robotic technologies used in automobile and production industry to reduce time and improve effecincy and saftey shall be tried here. However, the innovative technologies are highly requested but they are alone not enough, the implementation of creative and innovative management methodologies should be also investigated and applied. Lean Management with it main concept "elimination of waste within process", is a suitable example here. Thus, the cooperation between international organisations and related industries and the knowledge-sharing may serve as a key factor for the successful decommissioning projects.

Keywords: decommissioning of nuclear facilities, innovative technology, innovative management, sustainable development

Procedia PDF Downloads 458
15833 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 233
15832 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 295
15831 Management of Religious Endowment Properties for Sustainable Development: A Case Study of Region of Kinniya, Sri Lanka

Authors: Muhammed Buhary Muhammed Thabith, Nor Asiah Mohamad

Abstract:

Religious Endowment (RE) (Waqf) has played an essential role in Islamic history and made a significant impact on the society, particularly in terms of socioeconomics. This has been made possible by having appropriate management of the RE propertiesin order to achieve the Sustainable Development Goals (SDGs), and the region of Kinniya, Sri Lanka, is not an exception. However, since the last Religious Endowment Act of 1982, a considerable deterioration has taken place, and cases of dormant properties have increased. This study proposes a conceptual model based on the SDGs initiatives to fill in the gaps. It analyses the application of the current RE properties management and identifies the issues as well as the challenges in the implementation of the RE Act. It adopts a doctrinal analysis involving the primary and secondary data, including statutes, practices, case law, and reports. The findings show that there are various management modes adopted by the stakeholders of RE. Some approaches are in tandem with the rules and practices of the SDGs with emphasis on support and cooperation from the community, private sector, and the government. Several initiatives such as awareness on RE, legal enforcements without fears and favours, as well as accounting and auditing, are recommended to minimize problems in managing the RE towards attaining the SDGs.

Keywords: sustainable development goals (SDGs), management, endowment, Sri Lanka

Procedia PDF Downloads 85
15830 Forest Polices and Management in Nigeria: Are Households Willing to Pay for Forest Management?

Authors: A. O. Arowolo, M. U. Agbonlahor, P. A. Okuneye, A. E. Obayelu

Abstract:

Nigeria is rich with abundant resources with an immense contribution of the forest resource to her economic development and to the livelihood of the rural populace over the years. However, this important resource has continued to shrink because it is not sustainably used, managed or conserved. The loss of forest cover has far reaching consequences on regional, national and global economy as well as the environment. This paper reviewed the Nigeria forest management policies, the challenges and willingness to pay (WTP) for management of the community forests in Ogun State, Nigeria. Data for the empirical investigation were obtained using a cross-section survey of 160 rural households by multistage sampling technique. The WTP was assessed by the Dichotomous Choice Contingent Valuation. One major findings is that, the Nigerian forest reserves is established in order to conserve and manage forest resources but has since been neglected while the management plans are either non-existent or abandoned. Also, the free areas termed the community forests where people have unrestricted access to exploit are fast diminishing in both contents and scale. The mean WTP for sustainable management of community forests in the study area was positive with a value of ₦389.04/month. The study recommends policy measures aimed at participatory forest management plan which will include the rural communities in the management of community forests. This will help ensure sustainable management of forest resources as well as improve the welfare of the rural households.

Keywords: forests, management, WTP, Nigeria

Procedia PDF Downloads 374
15829 Sustainable Development as a Part of Development and Foreign Trade in Turkey

Authors: Sadife Güngör, Sevilay Konya

Abstract:

Sustainable development is an economic development scope which covers the economic growth included environmental factors. With the help of economic development, the needs of the future generations are going to be met the needs. As it is aimed the environmental conscious, sustainable development focuses on decreasing the damage of natural sources. From this point of view, while sustainable development is environmentally conscious, it also improving the life standards of individuals. The relationship between development and foreign trade on sustainable development is theoretically searched in this study. In the second part, sustainable development at world and EU is searched and in the last part, the sustainability of trade and development in Turkey is stated.

Keywords: development, sustainable development, foreign trade, Turkey

Procedia PDF Downloads 439
15828 The Analysis on Leadership Skills in UK Automobile Manufacturing Enterprises

Authors: Yanting Cao

Abstract:

The UK has strong economic growth, which attracts other countries to invest there through globalization. This research process will be based on quantitative and qualitative descriptive analysis using interviews. The secondary analysis will involve a case study approach to understand the important aspects of leadership skills. The research outcomes will be identifying the strength and weaknesses of the leadership skills of UK automobile manufacturing enterprises and suggest the best practices adopted by the respective countries for better results.

Keywords: engineering management, leadership, Industrial project management, Project managers, automobile manufacturing

Procedia PDF Downloads 177
15827 The Efects of Viable Marketing on Sustainable Development

Authors: Gabriela Tutuanu

Abstract:

The economic, social and environmental undesirable impact of the existing development pattern pushes to the adoption and use of a new development paradigm that of sustainable development. This paper intends to substantiate how the marketing can help the sustainable development. It begins with the subjects of sustainable development and sustainable marketing as they are discussed in literature. The sustainable development is a three dimensional concept which embeds the economic dimension, the social dimension and the environmental dimension that ask to have in view the simultaneous pursuit of economic prosperity, social equity and environmental quality. A major challenge to achieve these goals at business level and to integrate all three dimensions of sustainability is the sustainable marketing. The sustainable marketing is a relationship marketing that aims at building lasting relationships with the social and natural environment on a long-term thinking and futurity and this philosophy allows helping all three dimensions of sustainability. As marketing solutions that could contribute to the sustainable development. We advance the stimulation of sustainable demand, the constant innovation and improvement of sustainable products, the design and use of customized communication, a multichannel distribution network and the sale of sustainable products and services at fair prices. Their implementation will increase the economic, social and environmental sustainability at a large extent in the future if they are supported by political, governmental and legal authorities.

Keywords: sustainable development, sustainable marketing, sustainable demand, sustainable product, credible communication, multi-channel distribution network, fair price

Procedia PDF Downloads 461
15826 Solid Waste Landfilling Practices, Related Problems and Sustainable Solutions in Turkey

Authors: Nükhet Konuk, N. Gamze Turan, Yüksel Ardalı

Abstract:

Solid waste management is the most environmental problem in Turkey as a result of the rapid increase in solid waste generation caused by the rapid population growth, urbanization, rapid industrialization and economic development. The large quantity of waste generated necessitates system of collection, transportation and disposal. The landfill method for the ultimate disposal of solid waste continues to be widely accepted and used due to its economic advantages. In Turkey, most of the disposal sites open dump areas. Open dump sites may result in serious urban, sanitary and environmental problems such as an unpleasant odor and the risk of explosion as well as groundwater contamination because of leachate percolation. Unsuitable management practices also result in the loss of resources and energy, which could be recycled and produced from a large part of the solid waste. Therefore, over the past few decades, particular attention has been drawn to the sustainable solid waste management as a response to the increase in environmental problems related to the disposal of waste. The objective of this paper is to assess the situation of landfilling practices in Turkey as a developing country and to identify any gaps in the system as currently applied. The results show that approximately 25 million tons of MSW are generated annually in Turkey. The percentage of MSW disposed to sanitary landfill is only 45% whereas more than 50% of MSW is disposed without any control.

Keywords: developing countries, open dumping, solid waste management, sustainable landfilling, sustainable solid waste management

Procedia PDF Downloads 285
15825 The Assessment of Forest Wood Biomass Potential in Terms of Sustainable Development

Authors: Julija Konstantinavičienė, Vlada Vitunskienė

Abstract:

The role of sustainable biomass, including wood biomass, is becoming more important because of European Green Deal. The New EU Forest strategy is a flagship element of the European Green Deal and a key action on the EU biodiversity strategy for 2030. The first measure of this strategy is promoting sustainable forest management, including encouraging the sustainable use of wood-based resources. The first aim of this research was to develop and present a new approach to the concept of forest wood biomass potential in terms of sustainable development, distinguishing theoretical, technical and sustainable potential and detailing its constraints. The second aim was to prepare the methodology outline of sustainable forest wood biomass potential assessment and empirically check this methodology, considering economic, social and ecological constraints. The basic methodologies of the research: the review of research (with a combination of semi-systematic and integrative review methodologies), rapid assessment method and statistical data analysis. The developed methodology of assessment of forest wood potential in terms of sustainable development can be used in Lithuania and in other countries and will let us compare this potential a different time and spatial levels. The application of the methodology will be able to serve the development of new national strategies for the wood sector.

Keywords: assessment, constraints, forest wood biomass, methodology, potential, sustainability

Procedia PDF Downloads 107
15824 Data Management System for Environmental Remediation

Authors: Elizaveta Petelina, Anton Sizo

Abstract:

Environmental remediation projects deal with a wide spectrum of data, including data collected during site assessment, execution of remediation activities, and environmental monitoring. Therefore, an appropriate data management is required as a key factor for well-grounded decision making. The Environmental Data Management System (EDMS) was developed to address all necessary data management aspects, including efficient data handling and data interoperability, access to historical and current data, spatial and temporal analysis, 2D and 3D data visualization, mapping, and data sharing. The system focuses on support of well-grounded decision making in relation to required mitigation measures and assessment of remediation success. The EDMS is a combination of enterprise and desktop level data management and Geographic Information System (GIS) tools assembled to assist to environmental remediation, project planning, and evaluation, and environmental monitoring of mine sites. EDMS consists of seven main components: a Geodatabase that contains spatial database to store and query spatially distributed data; a GIS and Web GIS component that combines desktop and server-based GIS solutions; a Field Data Collection component that contains tools for field work; a Quality Assurance (QA)/Quality Control (QC) component that combines operational procedures for QA and measures for QC; Data Import and Export component that includes tools and templates to support project data flow; a Lab Data component that provides connection between EDMS and laboratory information management systems; and a Reporting component that includes server-based services for real-time report generation. The EDMS has been successfully implemented for the Project CLEANS (Clean-up of Abandoned Northern Mines). Project CLEANS is a multi-year, multimillion-dollar project aimed at assessing and reclaiming 37 uranium mine sites in northern Saskatchewan, Canada. The EDMS has effectively facilitated integrated decision-making for CLEANS project managers and transparency amongst stakeholders.

Keywords: data management, environmental remediation, geographic information system, GIS, decision making

Procedia PDF Downloads 141
15823 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 284
15822 A Transition Towards Sustainable Feed Production Using Algae: The Development of Algae Biotechnology in the Kingdom of Saudi Arabia (DAB-KSA Project)

Authors: Emna Mhedhbi, Claudio Fuentes Grunewald

Abstract:

According to preliminary results of DAB-KSA project and considering the current 0.09-ha microalgae pilot plant facilities, we can produce 2.6 tons/year of microalgae biomass for proteins applications in animal feeds in KSA. By 2030, our projections are to reach 65,940,593.4 tons deploying 100.000 ha's production plants. We also have assessed the energy cost (industrial) in KSA (€0.061/kWh) and compared to (€0.32/kWh)in Germany, we can argue a clear lower OPEX for microalgae biomass production cost in KSA.

Keywords: microalgae, feed production, bioprocess, fishmeal

Procedia PDF Downloads 167
15821 Farmers Perception on the Level of Participation in Agricultural Project: The Case of a Community Garden Project in Imphendhle Municipality of Kwazulu-Natal Province, South Africa

Authors: Jorine T. Ndoro, Marietjie Van Der Merwe

Abstract:

Rural poverty remains a critical challenge in most developing countries and the participation of farmers in agricultural projects has taken a key role in development initiatives. Farmers’ participation in agricultural initiatives is crucial towards poverty alleviation and food security. Farmers’ involvement directly contributes towards sustainable agricultural development and livelihoods. This study focuses on investigating the perceptions of farmers’ participation in a community garden project. The study involved farmers belonging to community garden project in Imphendhle municipality in Mgungundlvu district of KwaZulu-Natal in South Africa. The study followed a qualitative research design using an interpretive research paradigm. The data was collected through conducting in-depth semi-structured interviews and a focus group was conducted with the eight farmers belonging to the community garden project. The findings show that the farmers are not involved in decision makings in the project. The farmers are passive participants. Participation of the farmers was mainly to carry out the activities from the extension officers. The study recommends that farmers be actively involved in projects and programmes introduced in their communities. Farmers’ active participation contributes to the sustainability of the projects through a sense of ownership.

Keywords: farmers, participation, agricultural extension, community garden

Procedia PDF Downloads 242
15820 Assessing Environmental Urban Sustainability Using Multivariate Analysis: A Case of Nagpur, India

Authors: Anusha Vaddiraj Pallapu

Abstract:

Measuring urban sustainable development is at the forefront in contributing to overall sustainability, and it refers to attaining social equity, environmental protection and minimizing the impacts of urbanization. Assessing performance of urban issues ranging from larger consumption of natural resources by humans in terms of lifestyle to creating a polluted nearby environment, social and even economic dimensions of sustainability major issues observed such as water quality, transportation, management of solid waste and traffic pollution. However, relying on the framework of the project to do the goals of sustainable development or minimization of urban impacts through management practices is not enough to deal with the present urban issues. The aim of the sustainability is to know how severely the resources are depleted because of human consumption and how issues are characterized. The paper aims to assign benchmarks for the selected sustainability indicators for research, and analysis is done through multivariate analysis in Indian context a case of Nagpur city to identify the play role of each urban issues in the overall sustainability. The main objectives of this paper are to examine the indicators over by time basis on various scenarios and how benchmarking is used, what and which categories of values should be considered as the performance of indicators function.

Keywords: environmental sustainability indicators, principal component analysis, urban sustainability, urban clusters, benchmarking

Procedia PDF Downloads 326
15819 Sustainable Campus Assessment Tool: Case Study of Engineering Faculty, Alexandria University

Authors: Faten Fares

Abstract:

Undoubtedly, the world today faces difficult environmental, financial, and social challenges. In order to change people’s lifestyle to be more sustainable, one must change people’s culture then spaces by focusing on education. Further, the higher education has a key role to play in the move toward a more sustainable world. In the overall analysis, the true sustainable university will make a significant effect. Since the sustainable campus is not only a green built environment, which aims at energy efficiency, water efficiency, waste management, and conserving resources but also it is how to implement green built environment. This implementation takes place while engaging the campus stakeholders (students, academic staff, assistants, workers, and administrators) through educating for sustainability. The main purpose of the research is to develop a tool to assess the sustainable campus and to be a framework for achieving more sustainable campuses. In the case study, the data were analyzed to know existing efforts and capabilities then measure the sustainability performance using the proposal framework at Alexandria University Engineering Campus. Finally, the findings of the research explain that campus is partially adherence with the proposal tool and need to be more sustainable in a formally implemented.

Keywords: sustainability, higher education, sustainable campus, sustainability teaching and research, campus participation culture, environmental improvement

Procedia PDF Downloads 401
15818 Study on the Key Stakeholders' Perception and Establishment of Sustainability Goals in the Green Building Projects: The Case of Malaysia

Authors: Nor Kalsum M. Isa, Mohd Yazid M. Yunos, Anuar Alias, Mazdi Marzuki, Kamarul Ismail, Mohd H. Ibrahim

Abstract:

Green building is an emerging concept with the ultimate target to achieve sustainable development by integrating sustainability goals and principles into project development. Basically, a green building is a building that is designed, constructed and operated to boost environmental, economic, health and productivity performance over conventional buildings. The buildings have been proven to be successful in contributing towards sustainability and project success. The purpose of this study was to determine the benefits of sustainability application in building projects, looking towards project success from the perspective of Malaysian key project stakeholders. The study also aimed to explore the establishment of sustainability goals in the green building projects in Malaysia. The Triple Bottom Line (TBL) Concept of Sustainability was used as the foundation theoretical framework. Surveys, interviews and multiple case study methods were employed. A sample of 188 Malaysian building project stakeholders was selected for questionnaire surveys, and 15 stakeholders from three award-winning green building projects in Malaysia were involved in the interviews. The study found that the majority of the respondents were less aware that the sustainability integration in the building project can significantly affect cost reduction, schedule effectiveness and stakeholders’ satisfaction with the performance of buildings as at the same level as the quality performance. Of the four sustainability goals, the environmental aspect was given more priority than others in the development of the green building projects.

Keywords: green building, sustainability, project stakeholders, Malaysia

Procedia PDF Downloads 546
15817 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: critical success factors, procurement phase, project life cycle, project performance

Procedia PDF Downloads 170
15816 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 332
15815 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 79
15814 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 387
15813 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 318
15812 Connecting the Dots: Bridging Academia and National Community Partnerships When Delivering Healthy Relationships Programming

Authors: Nicole Vlasman, Karamjeet Dhillon

Abstract:

Over the past four years, the Healthy Relationships Program has been delivered in community organizations and schools across Canada. More than 240 groups have been facilitated in collaboration with 33 organizations. As a result, 2157 youth have been engaged in the programming. The purpose and scope of the Healthy Relationships Program are to offer sustainable, evidence-based skills through small group implementation to prevent violence and promote positive, healthy relationships in youth. The program development has included extensive networking at regional and national levels. The Healthy Relationships Program is currently being implemented, adapted, and researched within the Resilience and Inclusion through Strengthening and Enhancing Relationships (RISE-R) project. Alongside the project’s research objectives, the RISE-R team has worked to virtually share the ongoing findings of the project through a slow ontology approach. Slow ontology is a practice integrated into project systems and structures whereby slowing the pace and volume of outputs offers creative opportunities. Creative production reveals different layers of success and complements the project, the building blocks for sustainability. As a result of integrating a slow ontology approach, the RISE-R team has developed a Geographic Information System (GIS) that documents local landscapes through a Story Map feature, and more specifically, video installations. Video installations capture the cartography of space and place within the context of singular diverse community spaces (case studies). By documenting spaces via human connections, the project captures narratives, which further enhance the voices and faces of the community within the larger project scope. This GIS project aims to create a visual and interactive flow of information that complements the project's mixed-method research approach. Conclusively, creative project development in the form of a geographic information system can provide learning and engagement opportunities at many levels (i.e., within community organizations and educational spaces or with the general public). In each of these disconnected spaces, fragmented stories are connected through a visual display of project outputs. A slow ontology practice within the context of the RISE-R project documents activities on the fringes and within internal structures; primarily through documenting project successes as further contributions to the Centre for School Mental Health framework (philosophy, recruitment techniques, allocation of resources and time, and a shared commitment to evidence-based products).

Keywords: community programming, geographic information system, project development, project management, qualitative, slow ontology

Procedia PDF Downloads 142
15811 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 343
15810 Engaging Local Communities on Large-Scale Construction Project

Authors: Melissa Teo

Abstract:

It is increasingly important that project managers develop greater capabilities to better manage the social, cultural, political, environmental and economic impacts on proposed construction projects. These challenges are best resolved in consultation with communities rather than in conflict with them. This is particularly important on controversial projects which are projects that have obtained government sanctioned ‘development approval’ but not ‘community approval’. While a rich body of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects, current theoretical frameworks guiding community engagement in project management are inadequate. A new and innovative research agenda is needed to guide thinking about the role of local communities in the construction process and is an important research gap that needs to be filled. Within this context, this research aims to assess the effectiveness of strategies adopted by project teams to engage with local communities so as to capture lessons learnt to apply to future projects. This paper reports a research methodology which uses Arnstein’s model of participation to better understand how power differentials between the project team and local communities can influence the adoption of community engagement strategies. A case study approach is utilizing interviews and documentary analysis of a large-scale controversial construction project in Queensland, Australia is presented. The findings will result in a number of recommendations to guide community engagement practices on future projects.

Keywords: community engagement, construction, case study, project management