Search results for: lateness%20gene
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8

Search results for: lateness%20gene

8 Heuristic for Scheduling Correlated Parallel Machine to Minimize Maximum Lateness and Total Weighed Completion Time

Authors: Yang-Kuei Lin, Yun-Xi Zhang

Abstract:

This research focuses on the bicriteria correlated parallel machine scheduling problem. The two objective functions considered in this problem are to minimize maximum lateness and total weighted completion time. We first present a mixed integer programming (MIP) model that can find the entire efficient frontier for the studied problem. Next, we have proposed a bicriteria heuristic that can find non-dominated solutions for the studied problem. The performance of the proposed bicriteria heuristic is compared with the efficient frontier generated by solving the MIP model. Computational results indicate that the proposed bicriteria heuristic can solve the problem efficiently and find a set of diverse solutions that are uniformly distributed along the efficient frontier.

Keywords: bicriteria, correlated parallel machines, heuristic, scheduling

Procedia PDF Downloads 102
7 Effects of Lateness Gene on Yield and Related Traits in Indica Rice

Authors: B. B. Rana, M. Yokota, Y. Shimizu, Y. Koide, I. Takamure, T. Kawano, M. Murai

Abstract:

Various genes which control or affect heading time have been found in rice. Out of them, Se1 and E1 loci play important roles in determining heading time by controlling photosensitivity. An isogenic-line pair of late and early lines were developed from progenies of the F1 from Suweon 258 × 36U. A lateness gene tentatively designated as “Ex” was found to control the difference in heading time between the early and late lines mentioned above. The present study was conducted to examine the effect of Ex on yield and related traits. Indica-type variety Suweon 258 was crossed with 36U, which is an Ur1 (Undulate rachis-1) isogenic line of IR36. In the F2 population, comparatively early-heading, late-heading and intermediate-heading plants were segregated. Segregation similar to that by the three types of heading was observed in the F3 and later generations. A late-heading plant and an early-heading plant were selected in the F8 population from an intermediate-heading F7 plant, for developing L and E of the isogenic-line pair, respectively. Experiments for L and E were conducted by randomized block design with three replications. Transplanting was conducted on May 3 at a planting distance of 30 cm × 15 cm with two seedlings per hill to an experimental field of the Faculty of Agriculture, Kochi University. Chemical fertilizers containing N, P2O5 and K2O were applied at the nitrogen levels of 4 g/m2, 9 g/m2 and 18 g/m2 in total being denoted by "N4", "N9" and "N18", respectively. Yield, yield components and other traits were measured. Ex delayed 80%-heading by 17 or 18 days in L as compared with E. In total brown rice yield (g/m2), L was 635, 606 and 590, and E was 577, 548 and 501, respectively, at N18, N9 and N4, indicating that Ex increased this trait by 10% to 18%. Ex increased yield-1.5 mm sieve (g/m2) b 9% to 15% at the three fertilizer levels. Ex increased the spikelet number per panicle by 16% to 22%. As a result, the spikelet number per m2 was increased by 11% to 18% at the three fertilizer levels. Ex decreased 1000-grain weight (g) by 2 to 4%. L was not significantly different from E in ripened-grain percentage, fertilized-spikelet percentage and percentage of ripened grains to fertilized spikelets. Hence, it is inferred that Ex increased yield by increasing spikelet number per panicle. Hence, Ex could be utilized to develop high yielding varieties for warmer districts.

Keywords: heading time, lateness gene, photosensitivity, yield, yield components

Procedia PDF Downloads 174
6 Job Shop Scheduling: Classification, Constraints and Objective Functions

Authors: Majid Abdolrazzagh-Nezhad, Salwani Abdullah

Abstract:

The job-shop scheduling problem (JSSP) is an important decision facing those involved in the fields of industry, economics and management. This problem is a class of combinational optimization problem known as the NP-hard problem. JSSPs deal with a set of machines and a set of jobs with various predetermined routes through the machines, where the objective is to assemble a schedule of jobs that minimizes certain criteria such as makespan, maximum lateness, and total weighted tardiness. Over the past several decades, interest in meta-heuristic approaches to address JSSPs has increased due to the ability of these approaches to generate solutions which are better than those generated from heuristics alone. This article provides the classification, constraints and objective functions imposed on JSSPs that are available in the literature.

Keywords: job-shop scheduling, classification, constraints, objective functions

Procedia PDF Downloads 411
5 Supplier Selection in a Scenario Based Stochastic Model with Uncertain Defectiveness and Delivery Lateness Rates

Authors: Abeer Amayri, Akif A. Bulgak

Abstract:

Due to today’s globalization as well as outsourcing practices of the companies, the Supply Chain (SC) performances have become more dependent on the efficient movement of material among places that are geographically dispersed, where there is more chance for disruptions. One such disruption is the quality and delivery uncertainties of outsourcing. These uncertainties could lead the products to be unsafe and, as is the case in a number of recent examples, companies may have to end up in recalling their products. As a result of these problems, there is a need to develop a methodology for selecting suppliers globally in view of risks associated with low quality and late delivery. Accordingly, we developed a two-stage stochastic model that captures the risks associated with uncertainty in quality and delivery as well as a solution procedure for the model. The stochastic model developed simultaneously optimizes supplier selection and purchase quantities under price discounts over a time horizon. In particular, our target is the study of global organizations with multiple sites and multiple overseas suppliers, where the pricing is offered in suppliers’ local currencies. Our proposed methodology is applied to a case study for a US automotive company having two assembly plants and four potential global suppliers to illustrate how the proposed model works in practice.

Keywords: global supply chains, quality, stochastic programming, supplier selection

Procedia PDF Downloads 430
4 AHP and TOPSIS Methods for Supplier Selection Problem in Medical Devices Company

Authors: Sevde D. Karayel, Ediz Atmaca

Abstract:

Supplier selection subject is vital because of development competitiveness and performance of firms which have right, rapid and with low cost procurement. Considering the fact that competition between firms is no longer on their supply chains, hence it is very clear that performance of the firms’ not only depend on their own success but also success of all departments in supply chain. For this purpose, firms want to work with suppliers which are cost effective, flexible in terms of demand and high quality level for customer satisfaction. However, diversification and redundancy of their expectations from suppliers, supplier selection problems need to be solved as a hard problem. In this study, supplier selection problem is discussed for critical piece, which is using almost all production of products in and has troubles with lead time from supplier, in a firm that produces medical devices. Analyzing policy in the current situation of the firm in the supplier selection indicates that supplier selection is made based on the purchasing department experience and other authorized persons’ general judgments. Because selection do not make based on the analytical methods, it is caused disruptions in production, lateness and extra cost. To solve the problem, AHP and TOPSIS which are multi-criteria decision making techniques, which are effective, easy to implement and can analyze many criteria simultaneously, are used to make a selection among alternative suppliers.

Keywords: AHP-TOPSIS methods, multi-criteria decision making, supplier selection problem, supply chain management

Procedia PDF Downloads 234
3 Combat Capability Improvement Using Sleep Analysis

Authors: Gabriela Kloudova, Miloslav Stehlik, Peter Sos

Abstract:

The quality of sleep can affect combat performance where the vigilance, accuracy and reaction time are a decisive factor. In the present study, airborne and special units are measured on duty using actigraphy fingerprint scoring algorithm and QEEG (quantitative EEG). Actigraphic variables of interest will be: mean nightly sleep duration, mean napping duration, mean 24-h sleep duration, mean sleep latency, mean sleep maintenance efficiency, mean sleep fragmentation index, mean sleep onset time, mean sleep offset time and mean midpoint time. In an attempt to determine the individual somnotype of each subject, the data like sleep pattern, chronotype (morning and evening lateness), biological need for sleep (daytime and anytime sleepability) and trototype (daytime and anytime wakeability) will be extracted. Subsequently, a series of recommendations will be included in the training plan based on daily routine, timing of the day and night activities, duration of sleep and the number of sleeping blocks in a defined time. The aim of these modifications in the training plan is to reduce day-time sleepiness, improve vigilance, attention, accuracy, speed of the conducted tasks and to optimize energy supplies. Regular improvement of the training supposed to have long-term neurobiological consequences including neuronal activity changes measured by QEEG. Subsequently, that should enhance cognitive functioning in subjects assessed by the digital cognitive test batteries and improve their overall performance.

Keywords: sleep quality, combat performance, actigraph, somnotype

Procedia PDF Downloads 137
2 Robust Batch Process Scheduling in Pharmaceutical Industries: A Case Study

Authors: Tommaso Adamo, Gianpaolo Ghiani, Antonio Domenico Grieco, Emanuela Guerriero

Abstract:

Batch production plants provide a wide range of scheduling problems. In pharmaceutical industries a batch process is usually described by a recipe, consisting of an ordering of tasks to produce the desired product. In this research work we focused on pharmaceutical production processes requiring the culture of a microorganism population (i.e. bacteria, yeasts or antibiotics). Several sources of uncertainty may influence the yield of the culture processes, including (i) low performance and quality of the cultured microorganism population or (ii) microbial contamination. For these reasons, robustness is a valuable property for the considered application context. In particular, a robust schedule will not collapse immediately when a cell of microorganisms has to be thrown away due to a microbial contamination. Indeed, a robust schedule should change locally in small proportions and the overall performance measure (i.e. makespan, lateness) should change a little if at all. In this research work we formulated a constraint programming optimization (COP) model for the robust planning of antibiotics production. We developed a discrete-time model with a multi-criteria objective, ordering the different criteria and performing a lexicographic optimization. A feasible solution of the proposed COP model is a schedule of a given set of tasks onto available resources. The schedule has to satisfy tasks precedence constraints, resource capacity constraints and time constraints. In particular time constraints model tasks duedates and resource availability time windows constraints. To improve the schedule robustness, we modeled the concept of (a, b) super-solutions, where (a, b) are input parameters of the COP model. An (a, b) super-solution is one in which if a variables (i.e. the completion times of a culture tasks) lose their values (i.e. cultures are contaminated), the solution can be repaired by assigning these variables values with a new values (i.e. the completion times of a backup culture tasks) and at most b other variables (i.e. delaying the completion of at most b other tasks). The efficiency and applicability of the proposed model is demonstrated by solving instances taken from Sanofi Aventis, a French pharmaceutical company. Computational results showed that the determined super-solutions are near-optimal.

Keywords: constraint programming, super-solutions, robust scheduling, batch process, pharmaceutical industries

Procedia PDF Downloads 590
1 School Refusal Behaviours: The Roles of Adolescent and Parental Factors

Authors: Junwen Chen, Celina Feleppa, Tingyue Sun, Satoko Sasagawa, Michael Smithson

Abstract:

School refusal behaviours refer to behaviours to avoid school attendance, chronic lateness in arriving at school, or regular early dismissal. Poor attendance in schools is highly correlated with anxiety, depression, suicide attempts, delinquency, violence, and substance use and abuse. Poor attendance is also a strong indicator of lower achievement in school, as well as problematic social-emotional development. Long-term consequences of school refusal behaviours include fewer opportunities for higher education, employment, and social difficulties, and high risks of later psychiatric illness. Given its negative impacts on youth educational outcomes and well-being, a thorough understanding of factors that are involved in the development of this phenomenon is warranted for developing effective management approaches. This study investigated parental and adolescent factors that may contribute to school refusal behaviours by specifically focusing on the role of parental and adolescents’ anxiety and depression, emotion dysregulation, and parental rearing style. Findings are expected to inform the identification of both parental and adolescents’ factors that may contribute to school refusal behaviours. This knowledge will enable novel and effective approaches that incorporate these factors to managing school refusal behaviours in adolescents, which in turn improve their school and daily functioning. Results are important for an integrative understanding of school refusal behaviours. Furthermore, findings will also provide information for policymakers to weigh the benefits of interventions targeting school refusal behaviours in adolescents. One-hundred-and-six adolescents aged 12-18 years (mean age = 14.79 years old, SD = 1.78, males = 44) and their parents (mean age = 47.49 years old, SD = 5.61, males = 27) completed an online questionnaire measuring both parental and adolescents’ anxiety, depression, emotion dysregulation, parental rearing styles, and adolescents’ school refusal behaviours. Adolescents with school refusal behaviours reported greater anxiety and depression, with their parents showing greater emotion dysregulation. Parental emotion dysregulation and adolescents’ anxiety and depression predicted school refusal behaviours independently. To date, only limited studies have investigated the interplay between parental and youth factors in relation to youth school refusal behaviours. Although parental emotion dysregulation has been investigated in relation to youth emotion dysregulation, little is known about its role in the context of school refusal. This study is one of the very few that investigated both parental and adolescent factors in relation to school refusal behaviours in adolescents. The findings support the theoretical models that emphasise the role of youth and parental psychopathology in school refusal behaviours. Future management of school refusal behaviours should target adolescents’ anxiety and depression while incorporating training for parental emotion regulation skills.

Keywords: adolescents, school refusal behaviors, parental factors, anxiety and depression, emotion dysregulation

Procedia PDF Downloads 93