Search results for: fracking
15 Economic Evaluation of Bowland Shale Gas Wells Development in the UK
Authors: Elijah Acquah-Andoh
Abstract:
The UK has had its fair share of the shale gas revolutionary waves blowing across the global oil and gas industry at present. Although, its exploitation is widely agreed to have been delayed, shale gas was looked upon favorably by the UK Parliament when they recognized it as genuine energy source and granted licenses to industry to search and extract the resource. This, although a significant progress by industry, there yet remains another test the UK fracking resource must pass in order to render shale gas extraction feasible – it must be economically extractible and sustainably so. Developing unconventional resources is much more expensive and risky, and for shale gas wells, producing in commercial volumes is conditional upon drilling horizontal wells and hydraulic fracturing, techniques which increase CAPEX. Meanwhile, investment in shale gas development projects is sensitive to gas price and technical and geological risks. Using a Two-Factor Model, the economics of the Bowland shale wells were analyzed and the operational conditions under which fracking is profitable in the UK was characterized. We find that there is a great degree of flexibility about Opex spending; hence Opex does not pose much threat to the fracking industry in the UK. However, we discover Bowland shale gas wells fail to add value at gas price of $8/ Mmbtu. A minimum gas price of $12/Mmbtu at Opex of no more than $2/ Mcf and no more than $14.95M Capex are required to create value within the present petroleum tax regime, in the UK fracking industry.Keywords: capex, economical, investment, profitability, shale gas development, sustainable
Procedia PDF Downloads 57914 A Case Study on Management of Coal Seam Gas by-Product Water
Authors: Mojibul Sajjad, Mohammad G. Rasul, Md. Sharif Imam Ibne Amir
Abstract:
The rate of natural gas dissociation from the Coal Matrix depends on depressurization of reservoir through removing of the cleat water from the coal seam. These waters are similar to brine and aged of long years. For improving the connectivity through fracking /fracturing, high pressure liquids are pumped off inside the coal body. A significant quantity of accumulated water, a combined mixture of cleat water and fracking fluids (back flow water) is pumped out through gas well. In Queensland Coal Seam Gas industry is in booming state and estimated of 30,000 wells would be active for CSG production forecasting life span of 30 years. Integrated water management along with water softening programs is practiced for subsequent treatment and later on discharge to nearby surface water catchment. Water treatment is an important part of the CSG industry. A case study on a CSG site and review on the test results are discussed for assessing the Standards & Practices for management of CSG by-product water and their subsequent disposal activities. This study was directed toward (i) water management and softening process in Spring Gully Mine field, (ii) Comparative analysis on experimental study and standards and (iii) Disposal of the treated water. This study also aimed for alternative usages and their impact on vegetation, living species as well as long term effects.Keywords: coal seam gas (CSG), cleat water, hydro-fracking, product water
Procedia PDF Downloads 42013 Waterless Fracking: An Alternative to Conventional Fracking
Authors: Shubham Damke, Md Imtiaz, Sanchita Dei
Abstract:
To stimulate the well and to enhance the production from the shaly formations, fracturing is essential. Presently the chiefly employed technology is Hydraulic Fracturing. However Hydraulic Fracturing accompanies itself with problems like disposing large volumes of fracturing wastewater, removal of water from the pores, formation damage due to injection of large amount of chemicals into underground formations and many more. Therefore embarking on the path of innovation new techniques have been developed which uses different gases such as Nitrogen, Carbon dioxide, Frac Oil, LPG, etc. are used as a base fluid for fracturing formation. However LPG proves to be the most favorable of them which eliminates the use of water and chemicals. When using it as a fracturing fluid, within the surface equipment, it is stored, gelled, and proppant blended at a constant pressure. It is then pressurized with high pressure pumps to the required surface injection pressure With lowering the total cost and increasing the productivity, LPG is also very noteworthy for fracturing shale, where if the hydraulic fracturing is done the water ‘swells’ the formation and creates surface tension, both of which inhibit the flow of oil and gas. Also fracturing with LPG increases the effective fracture length and since propane, butane and pentane is used which are already present in the natural gas therefore there is no problem of back flow because these gases get mixed with the natural gas. LPG Fracturing technology can be a promising substitute of the Hydraulic Fracturing, which could substantially reduce the capital cost of fracturing shale and will also restrict the problems with the disposal of water and on the same hand increasing the fracture length and the productivity from the shale.Keywords: Fracking, Shale, Surface Tension, Viscosity
Procedia PDF Downloads 42612 Exploring the Social Health and Well-Being Factors of Hydraulic Fracturing
Authors: S. Grinnell
Abstract:
A PhD Research Project exploring the Social Health and Well-Being Impacts associated with Hydraulic Fracturing, with an aim to produce a Best Practice Support Guidance for those anticipating dealing with planning applications or submitting Environmental Impact Assessments (EIAs). Amid a possible global energy crisis, founded upon a number of factors, including unstable political situations, increasing world population growth, people living longer, it is perhaps inevitable that Hydraulic Fracturing (commonly referred to as ‘fracking’) will become a major player within the global long-term energy and sustainability agenda. As there is currently no best practice guidance for governing bodies the Best Practice Support Document will be targeted at a number of audiences including, consultants undertaking EIAs, Planning Officers, those commissioning EIAs Industry and interested public stakeholders. It will offer a robust, evidence-based criteria and recommendations which provide a clear narrative and consistent and shared approach to the language used along with containing an understanding of the issues identified. It is proposed that the Best Practice Support Document will also support the mitigation of health impacts identified. The Best Practice Support Document will support the newly amended Environmental Impact Assessment Directive (2011/92/EU), to be transposed into UK law by 2017. A significant amendment introduced focuses on, ‘higher level of protection to the environment and health.’ Methodology: A qualitative research methods approach is being taken with this research. It will have a number of key stages. A literature review has been undertaken and been critically reviewed and analysed. This was followed by a descriptive content analysis of a selection of international and national policies, programmes and strategies along with published Environmental Impact Assessments and associated planning guidance. In terms of data collection, a number of stakeholders were interviewed as well as a number of focus groups of local community groups potentially affected by fracking. These were determined from across the UK. A theme analysis of all the data collected and the literature review will be undertaken, using NVivo. Best Practice Supporting Document will be developed based on the outcomes of the analysis and be tested and piloted in the professional fields, before a live launch. Concluding statement: Whilst fracking is not a new concept, the technology is now driving a new force behind the use of this engineering to supply fuels. A number of countries have pledged moratoria on fracking until further investigation from the impacts on health have been explored, whilst other countries including Poland and the UK are pushing to support the use of fracking. If this should be the case, it will be important that the public’s concerns, perceptions, fears and objections regarding the wider social health and well-being impacts are considered along with the more traditional biomedical health impacts.Keywords: fracking, hydraulic fracturing, socio-economic health, well-being
Procedia PDF Downloads 24311 Microseismics: Application in Hydrocarbon Reservoir Management
Authors: Rahul Kumar Singh, Apurva Sharma, Dilip Kumar Srivastava
Abstract:
Tilting of our interest towards unconventional exploitation of hydrocarbons has raised a serious concern to environmentalists. Emerging technologies like horizontal/multi-lateral drilling with subsequent hydraulic fracturing or fracking etc., for exploitation of different conventional/unconventional hydrocarbon reservoirs, are related to creating micro-level seismic events below the surface of the earth. Monitoring of these micro-level seismic events is not possible by the conventional methodology of the seismic method. So, to tackle this issue, a new technology that is microseismic is very much in discussions around the globe. Multiple researches are being carried out these days around the globe in order to prove microseismic as a new essential in the E & P industry, especially for unconventional reservoir management. Microseismic monitoring is now used for reservoir surveillance, and the best application is checking the integrity of the caprock and containment of fluid in it. In general, in whatever terms we want to use micro-seismic related events monitoring and understanding the effectiveness of stimulation, this technology offers a lot of value in terms of insight into the subsurface characteristics and processes, and this makes it really a good geophysical method to be used in future.Keywords: microseismic, monitoring, hydraulic fracturing or fracking, reservoir surveillance, seismic hazards
Procedia PDF Downloads 18210 Magnetic Investigation and 2½D Gravity Profile Modelling across the Beattie Magnetic Anomaly in the Southeastern Karoo Basin, South Africa
Authors: Christopher Baiyegunhi, Oswald Gwavava
Abstract:
The location/source of the Beattie magnetic anomaly (BMA) and interconnectivity of geologic structures at depth have been a topic of investigation for over 30 years. Up to now, no relationship between geological structures (interconnectivity of dolerite intrusions) at depth has been established. Therefore, the environmental impact of fracking the Karoo for shale gas could not be assessed despite the fact that dolerite dykes are groundwater localizers in the Karoo. In this paper, we shed more light to the unanswered questions concerning the possible location of the source of the BMA, the connectivity of geologic structures like dolerite dykes and sills at depth and this relationship needs to be established before the tectonic evolution of the Karoo basin can be fully understood and related to fracking of the Karoo for shale gas. The result of the magnetic investigation and modelling of four gravity profiles that crosses the BMA in the study area reveals that the anomaly, which is part of the Beattie magnetic anomaly tends to divide into two anomalies and continue to trend in an NE-SW direction, the dominant gravity signatures is of long wavelength that is due to a deep source/interface inland and shallows towards the coast, the average depth to the top of the shallow and deep magnetic sources was estimated to be approximately 0.6 km and 15 km, respectively. The BMA become stronger with depth which could be an indication that the source(s) is deep possibly a buried body in the basement. The bean-shaped anomaly also behaves in a similar manner like the BMA thus it could possibly share the same source(s) with the BMA.Keywords: Beattie magnetic anomaly, magnetic sources, modelling, Karoo Basin
Procedia PDF Downloads 5549 Puerto Rico and Pittsburg: A Social Psychology Perspective on How Perceived Infringement on Job and Cultural Identity Unite Racially Different Working-Class Groups
Authors: Reagan Rodriguez
Abstract:
With a growing divide between political echo chambers in the United States, exacerbated by race and income inequality, it might seem to be unfathomable to draw connections that tie working class in an industrial city and a U.S. territory. Yet, in regions where either the economy has been hit due to dwindling job infrastructure or natural disasters have left indelible marks on an island already once marked by colonial imperialism, a larger social shared identity is at play. Fracking has long been an intergenerational and stable work opportunity for many in the Pittsburg PA, yet the rising severity of global climate change may soon impact the policy and even presidential elections which could result in the reduction of jobs in the industry. Cock-fighting, considered a cultural mainstay within the island of Puerto Rico, has already had legislation banning activity and thus cutting out one of the most lucrative aspects of a severely injured economy. Insecurity, infringement, and isolation while being tied to a working-class bracket with no other opportunities in proximity have left both groups expressing similar frustration and while another larger shared identity politic is giving little other options to develop social mobility. This paper utilizes a thematic analysis and compares convergent and divergent themes on internet forums amongst unionized fracking workers in Pittsburg and cockfighters in Puerto Rico. This research examines how group identity in relation to job and cultural identity is most strong and at which points its most malleable; when intergenerational job identity becomes a part of one’s cultural identity, its override may be strongest when it is perceived as threatened. Final findings and limitations were comprehensively outlined.Keywords: identity threat, social psychology, group identity, culture and social mobility
Procedia PDF Downloads 1508 Fracking the UK's Shale Gas Regulatory Regime
Authors: Yanal Abul Failat
Abstract:
The production of oil and natural gas from shale formations is becoming a trend, and many countries with technically and economically recoverable unconventional resources are endeavoring to explore how shale formations may benefit the economy and achieve energy security. The trajectory of shale gas development in the UK is highly supported by the government; in the Gas Generation Strategy Paper published by the UK government on 5 December 2013, it is recognized that the shale gas production would decrease reliance on imports and thus enhance the UK’s energy security. Moreover, the UK Institute of Directors report on UK Shale Gas Potential explains that in the UK there is a potential of production peaking at around 1.13 trillion cubic feet (“tcf”) and a sector that could support around 70,000 jobs and secure net benefit to the Treasury in tax revenues. On this basis, there has been a growing interest in the benefits of exploring the UK’s shale gas but a combination of technical challenges faced in shale gas operations, a stern opposition by environmentalists and concerns on the adequacy of the legal framework have slowed the progress of the emerging UK shale industry.Keywords: shale gas, UK, legal, oil and gas, energy
Procedia PDF Downloads 7117 Gas Injection Transport Mechanism for Shale Oil Recovery
Authors: Chinedu Ejike
Abstract:
The United States is now energy self-sufficient due to the production of shale oil reserves. With more than half of it being tapped daily in the United States, these unconventional reserves are massive and provide immense potential for future energy demands. Drilling horizontal wells and fracking are the primary methods for developing these reserves. Regrettably, recovery efficiency is rarely greater than 10%. As a result, optimizing recuperation offers a significant benefit. Huff and puff gas flooding and cyclic gas injection have all been demonstrated to be more successful than tapping the remaining oil in place. Methane, nitrogen, and carbon (IV) oxide, among other high-pressure gases, can be injected. Operators use Darcy's law to assess a reservoir's productive capacity, but they are unaware that the law may not apply to shale oil reserves. This is due to the fact that, unlike pressure differences alone, diffusion, concentration, and gas selection all play a role in the flow of gas injected into the wellbore. The reservoir drainage and oil sweep efficiency rates are determined by the transport method. This research assesses the parameters that influence the gas injection transport mechanism. Understanding the process causing these factors could accelerate recovery by two to three times, according to peer-reviewed studies and effective field testing.Keywords: enhanced oil recovery, gas injection, shale oil, transport mechanism, unconventional reserve
Procedia PDF Downloads 1736 Water-Controlled Fracturing with Fuzzy-Ball Fluid in Tight Gas Reservoirs of Deep Coal Measures in Sulige
Authors: Xiangchun Wang, Lihui Zheng, Maozong Gan, Peng Zhang, Tong Wu, An Chang
Abstract:
The deep coal measure tight gas reservoir in Sulige is usually reformed by fracturing, because the reservoir thickness is small, the water layers can be easily communicated during fracturing, which will lead to water production of gas wells and lower production of gas wells. Therefore, it is necessary to control water during fracturing in deep coal measure tight gas reservoir. Using fuzzy-ball fluid to control water fracturing can not only increase the output but also reduce the water output. The fuzzy-ball fluid was prepared indoors to carry out evaluation experiments. The fuzzy ball fluid was mixed in equal volume with the pre-fluid and formation water to test its compatibility. The core displacement device was used to test the gas and water breaking through the matrix and fractured cores blocked by fuzzy-ball fluid. The breakthrough pressure of the plunger tests its water blocking performance. The experimental results show that there is no precipitation after the fuzzy-ball fluid is mixed with the pad fluid and the formation water, respectively. The breakthrough pressure gradients of gas and water after the fuzzy-ball fluid plugged the cracks were 0.02MPa/cm and 0.04MPa/cm, respectively, and the breakthrough pressure gradients of gas and water after the matrix was plugged were 0.03MPa/cm and 0.2MPa/cm, respectively, which meet the requirements of field operation. Two wells A and B in the Sulige Gas Field were used on site to implement water control fracturing. After the pre-fluid was injected into the two wells, 50m3 of fuzzy-ball fluid was pumped to plug the water. The construction went smoothly. After water control and fracturing, the average daily output in 161 days was increased by 13.71% and 6.99% compared with that of adjacent wells in the same layer. The adjacent wells were bubbled for 3 times and 63 times respectively, while there was no effusion in A and B construction wells. The results show that fuzzy-ball fluid is a water plugging material suitable for water control fracturing in tight gas wells, and its water control mechanism can also provide a new idea for the development of water control fracturing materials.Keywords: coal seam, deep layer, fracking, fuzzy-ball fluid, reservoir reconstruction
Procedia PDF Downloads 2275 Best Practical Technique to Drain Recoverable Oil from Unconventional Deep Libyan Oil Reservoir
Authors: Tarek Duzan, Walid Esayed
Abstract:
Fluid flow in porous media is attributed fundamentally to parameters that are controlled by depositional and post-depositional environments. After deposition, digenetic events can act negatively on the reservoir and reduce the effective porosity, thereby making the rock less permeable. Therefore, exploiting hydrocarbons from such resources requires partially altering the rock properties to improve the long-term production rate and enhance the recovery efficiency. In this study, we try to address, firstly, the phenomena of permeability reduction in tight sandstone reservoirs and illustrate the implemented procedures to investigate the problem roots; finally, benchmark the candidate solutions at the field scale and recommend the mitigation strategy for the field development plan. During the study, two investigations have been considered: subsurface analysis using ( PLT ) and Laboratory tests for four candidate wells of the interested reservoir. Based on the above investigations, it was obvious that the Production logging tool (PLT) has shown areas of contribution in the reservoir, which is considered very limited, considering the total reservoir thickness. Also, Alcohol treatment was the first choice to go with for the AA9 well. The well productivity has been relatively restored but not to its initial productivity. Furthermore, Alcohol treatment in the lab was effective and restored permeability in some plugs by 98%, but operationally, the challenge would be the ability to distribute enough alcohol in a wellbore to attain the sweep Efficiency obtained within a laboratory core plug. However, the Second solution, which is based on fracking wells, has shown excellent results, especially for those wells that suffered a high drop in oil production. It is suggested to frac and pack the wells that are already damaged in the Waha field to mitigate the damage and restore productivity back as much as possible. In addition, Critical fluid velocity and its effect on fine sand migration in the reservoir have to be well studied on core samples, and therefore, suitable pressure drawdown will be applied in the reservoir to limit fine sand migration.Keywords: alcohol treatment, post-depositional environments, permeability, tight sandstone
Procedia PDF Downloads 684 Small Community’s Proactive Thinking to Move from Zero to 100 Percent Water Reuse
Authors: Raj Chavan
Abstract:
The City of Jal serves a population of approximately 3,500 people, including 2,100 permanent inhabitants and 1,400 oil and gas sector workers and RV park occupants. Over the past three years, Jal's population has increased by about 70 percent, mostly due to the oil and gas industry. The City anticipates that the population will exceed 4,200 by 2020, necessitating the construction of a new wastewater treatment plant (WWTP) because the old plant (aerated lagoon system) cannot accommodate such rapid population expansion without major renovations or replacement. Adhering to discharge permit restrictions has been challenging due to aging infrastructure and equipment replacement needs, as well as increasing nutrient loading to the wastewater collecting system from the additional oil and gas residents' recreational vehicles. The WWTP has not been able to maintain permit discharge standards for total nitrogen of less than 20 mg N/L and other characteristics in recent years. Based on discussions with the state's environmental department, it is likely that the future permit renewal would impose stricter conditions. Given its location in the dry, western part of the country, the City must rely on its meager groundwater supplies and scant annual precipitation. The city's groundwater supplies will be depleted sooner than predicted due to rising demand from the growing population for drinking, leisure, and other industrial uses (fracking). The sole type of reuse the city was engaging in (recreational reuse for a golf course) had to be put on hold because of an effluent water compliance issue. As of right now, all treated effluent is evaporated. The city's long-term goal is to become a zero-waste community that sends all of its treated wastewater effluent either to the golf course, Jal Lake, or the oil and gas industry for reuse. Hydraulic fracturing uses a lot of water, but if the oil and gas industry can use recycled water, it can reduce its impact on freshwater supplies. The City's goal of 100% reuse has been delayed by the difficulties of meeting the constraints of the regular discharge permit due to the large rise in influent loads and the aging infrastructure. The City of Jal plans to build a new WWTP that can keep up with the city's rapid population increase due to the oil and gas industry. Several treatment methods were considered in light of the City's needs and its long-term goals, but MBR was ultimately chosen recommended since it meets all of the permit's requirements while also providing 100 percent beneficial reuse. This talk will lay out the plan for the city to reach its goal of 100 percent reuse, as well as the various avenues for funding the small community that have been considered.Keywords: membrane bioreactor, nitrogent, reuse, small community
Procedia PDF Downloads 873 Impacts of Climate Change and Natural Gas Operations on the Hydrology of Northeastern BC, Canada: Quantifying the Water Budget for Coles Lake
Authors: Sina Abadzadesahraei, Stephen Déry, John Rex
Abstract:
Climate research has repeatedly identified strong associations between anthropogenic emissions of ‘greenhouses gases’ and observed increases of global mean surface air temperature over the past century. Studies have also demonstrated that the degree of warming varies regionally. Canada is not exempt from this situation, and evidence is mounting that climate change is beginning to cause diverse impacts in both environmental and socio-economic spheres of interest. For example, northeastern British Columbia (BC), whose climate is controlled by a combination of maritime, continental and arctic influences, is warming at a greater rate than the remainder of the province. There are indications that these changing conditions are already leading to shifting patterns in the region’s hydrological cycle, and thus its available water resources. Coincident with these changes, northeastern BC is undergoing rapid development for oil and gas extraction: This depends largely on subsurface hydraulic fracturing (‘fracking’), which uses enormous amounts of freshwater. While this industrial activity has made substantial contributions to regional and provincial economies, it is important to ensure that sufficient and sustainable water supplies are available for all those dependent on the resource, including ecological systems. In this turn demands a comprehensive understanding of how water in all its forms interacts with landscapes, the atmosphere, and of the potential impacts of changing climatic conditions on these processes. The aim of this study is therefore to characterize and quantify all components of the water budget in the small watershed of Coles Lake (141.8 km², 100 km north of Fort Nelson, BC), through a combination of field observations and numerical modelling. Baseline information will aid the assessment of the sustainability of current and future plans for freshwater extraction by the oil and gas industry, and will help to maintain the precarious balance between economic and environmental well-being. This project is a perfect example of interdisciplinary research, in that it not only examines the hydrology of the region but also investigates how natural gas operations and growth can affect water resources. Therefore, a fruitful collaboration between academia, government and industry has been established to fulfill the objectives of this research in a meaningful manner. This project aims to provide numerous benefits to BC communities. Further, the outcome and detailed information of this research can be a huge asset to researchers examining the effect of climate change on water resources worldwide.Keywords: northeastern British Columbia, water resources, climate change, oil and gas extraction
Procedia PDF Downloads 2642 Mature Field Rejuvenation Using Hydraulic Fracturing: A Case Study of Tight Mature Oilfield with Reveal Simulator
Authors: Amir Gharavi, Mohamed Hassan, Amjad Shah
Abstract:
The main characteristics of unconventional reservoirs include low-to ultra low permeability and low-to-moderate porosity. As a result, hydrocarbon production from these reservoirs requires different extraction technologies than from conventional resources. An unconventional reservoir must be stimulated to produce hydrocarbons at an acceptable flow rate to recover commercial quantities of hydrocarbons. Permeability for unconventional reservoirs is mostly below 0.1 mD, and reservoirs with permeability above 0.1 mD are generally considered to be conventional. The hydrocarbon held in these formations naturally will not move towards producing wells at economic rates without aid from hydraulic fracturing which is the only technique to assess these tight reservoir productions. Horizontal well with multi-stage fracking is the key technique to maximize stimulated reservoir volume and achieve commercial production. The main objective of this research paper is to investigate development options for a tight mature oilfield. This includes multistage hydraulic fracturing and spacing by building of reservoir models in the Reveal simulator to model potential development options based on sidetracking the existing vertical well. To simulate potential options, reservoir models have been built in the Reveal. An existing Petrel geological model was used to build the static parts of these models. A FBHP limit of 40bars was assumed to take into account pump operating limits and to maintain the reservoir pressure above the bubble point. 300m, 600m and 900m lateral length wells were modelled, in conjunction with 4, 6 and 8 stages of fracs. Simulation results indicate that higher initial recoveries and peak oil rates are obtained with longer well lengths and also with more fracs and spacing. For a 25year forecast, the ultimate recovery ranging from 0.4% to 2.56% for 300m and 1000m laterals respectively. The 900m lateral with 8 fracs 100m spacing gave the highest peak rate of 120m3/day, with the 600m and 300m cases giving initial peak rates of 110m3/day. Similarly, recovery factor for the 900m lateral with 8 fracs and 100m spacing was the highest at 2.65% after 25 years. The corresponding values for the 300m and 600m laterals were 2.37% and 2.42%. Therefore, the study suggests that longer laterals with 8 fracs and 100m spacing provided the optimal recovery, and this design is recommended as the basis for further study.Keywords: unconventional, resource, hydraulic, fracturing
Procedia PDF Downloads 2981 An Evaluation of a Prototype System for Harvesting Energy from Pressurized Pipeline Networks
Authors: Nicholas Aerne, John P. Parmigiani
Abstract:
There is an increasing desire for renewable and sustainable energy sources to replace fossil fuels. This desire is the result of several factors. First, is the role of fossil fuels in climate change. Scientific data clearly shows that global warming is occurring. It has also been concluded that it is highly likely human activity; specifically, the combustion of fossil fuels, is a major cause of this warming. Second, despite the current surplus of petroleum, fossil fuels are a finite resource and will eventually become scarce and alternatives, such as clean or renewable energy will be needed. Third, operations to obtain fossil fuels such as fracking, off-shore oil drilling, and strip mining are expensive and harmful to the environment. Given these environmental impacts, there is a need to replace fossil fuels with renewable energy sources as a primary energy source. Various sources of renewable energy exist. Many familiar sources obtain renewable energy from the sun and natural environments of the earth. Common examples include solar, hydropower, geothermal heat, ocean waves and tides, and wind energy. Often obtaining significant energy from these sources requires physically-large, sophisticated, and expensive equipment (e.g., wind turbines, dams, solar panels, etc.). Other sources of renewable energy are from the man-made environment. An example is municipal water distribution systems. The movement of water through the pipelines of these systems typically requires the reduction of hydraulic pressure through the use of pressure reducing valves. These valves are needed to reduce upstream supply-line pressures to levels suitable downstream users. The energy associated with this reduction of pressure is significant but is currently not harvested and is simply lost. While the integrity of municipal water supplies is of paramount importance, one can certainly envision means by which this lost energy source could be safely accessed. This paper provides a technical description and analysis of one such means by the technology company InPipe Energy to generate hydroelectricity by harvesting energy from municipal water distribution pressure reducing valve stations. Specifically, InPipe Energy proposes to install hydropower turbines in parallel with existing pressure reducing valves in municipal water distribution systems. InPipe Energy in partnership with Oregon State University has evaluated this approach and built a prototype system at the O. H. Hinsdale Wave Research Lab. The Oregon State University evaluation showed that the prototype system rapidly and safely initiates, maintains, and ceases power production as directed. The outgoing water pressure remained constant at the specified set point throughout all testing. The system replicates the functionality of the pressure reducing valve and ensures accurate control of down-stream pressure. At a typical water-distribution-system pressure drop of 60 psi the prototype, operating at an efficiency 64%, produced approximately 5 kW of electricity. Based on the results of this study, this proposed method appears to offer a viable means of producing significant amounts of clean renewable energy from existing pressure reducing valves.Keywords: pressure reducing valve, renewable energy, sustainable energy, water supply
Procedia PDF Downloads 204