Search results for: Samir Bensaid
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 122

Search results for: Samir Bensaid

2 Factors Affecting Early Antibiotic Delivery in Open Tibial Shaft Fractures

Authors: William Elnemer, Nauman Hussain, Samir Al-Ali, Henry Shu, Diane Ghanem, Babar Shafiq

Abstract:

Introduction: The incidence of infection in open tibial shaft injuries varies depending on the severity of the injury, with rates ranging from 1.8% for Gustilo-Anderson type I to 42.9% for type IIIB fractures. The timely administration of antibiotics upon presentation to the emergency department (ED) is an essential component of fracture management, and evidence indicates that prompt delivery of antibiotics is associated with improved outcomes. The objective of this study is to identify factors that contribute to the expedient administration of antibiotics. Methods: This is a retrospective study of open tibial shaft fractures at an academic Level I trauma center. Current Procedural Terminology (CPT) codes identified all patients treated for open tibial shaft fractures between 2015 and 2021. Open fractures were identified by reviewing ED and provider notes, and with ballistic fractures were considered open. Chart reviews were performed to extract demographics, fracture characteristics, postoperative outcomes, time to operative room, time to antibiotic order, and delivery. Univariate statistical analysis compared patients who received early antibiotics (EA), which were delivered within one hour of ED presentation, and those who received late antibiotics (LA), which were delivered outside of one hour of ED presentation. A multivariate analysis was performed to investigate patient, fracture, and transport/ED characteristics contributing to faster delivery of antibiotics. The multivariate analysis included the dependent variables: ballistic fracture, activation of Delta Trauma, Gustilo-Andersen (Type III vs. Type I and II), AO-OTA Classification (Type C vs. Type A and B), arrival between 7 am and 11 pm, and arrival via Emergency Medical Services (EMS) or walk-in. Results: Seventy ED patients with open tibial shaft fractures were identified. Of these, 39 patients (55.7%) received EA, while 31 patients (44.3%) received LA. Univariate analysis shows that the arrival via EMS as opposed to walk-in (97.4% vs. 74.2%, respectively, p = 0.01) and activation of Delta Trauma (89.7% vs. 51.6%, respectively, p < 0.001) was significantly higher in the EA group vs. the LA group. Additionally, EA cases had significantly shorter intervals between the antibiotic order and delivery when compared to LA cases (0.02 hours vs. 0.35 hours, p = 0.007). No other significant differences were found in terms of postoperative outcomes or fracture characteristics. Multivariate analysis shows that a Delta Trauma Response, arrival via EMS, and presentation between 7 am and 11 pm were independent predictors of a shorter time to antibiotic administration (Odds Ratio = 11.9, 30.7, and 5.4, p = 0.001, 0.016, and 0.013, respectively). Discussion: Earlier antibiotic delivery is associated with arrival to the ED between 7 am and 11 pm, arrival via EMS, and a coordinated Delta Trauma activation. Our findings indicate that in cases where administering antibiotics is critical to achieving positive outcomes, it is advisable to employ a coordinated Delta Trauma response. Hospital personnel should be attentive to the rapid administration of antibiotics to patients with open fractures who arrive via walk-in or during late-night hours.

Keywords: antibiotics, emergency department, fracture management, open tibial shaft fractures, orthopaedic surgery, time to or, trauma fractures

Procedia PDF Downloads 42
1 Electricity Market Reforms Towards Clean Energy Transition andnd Their Impact in India

Authors: Tarun Kumar Dalakoti, Debajyoti Majumder, Aditya Prasad Das, Samir Chandra Saxena

Abstract:

India’s ambitious target to achieve a 50 percent share of energy from non-fossil fuels and the 500-gigawatt (GW) renewable energy capacity before the deadline of 2030, coupled with the global pursuit of sustainable development, will compel the nation to embark on a rapid clean energy transition. As a result, electricity market reforms will emerge as critical policy instruments to facilitate this transition and achieve ambitious environmental targets. This paper will present a comprehensive analysis of the various electricity market reforms to be introduced in the Indian Electricity sector to facilitate the integration of clean energy sources and will assess their impact on the overall energy landscape. The first section of this paper will delve into the policy mechanisms to be introduced by the Government of India and the Central Electricity Regulatory Commission to promote clean energy deployment. These mechanisms include extensive provisions for the integration of renewables in the Indian Electricity Grid Code, 2023. The section will also cover the projection of RE Generation as highlighted in the National Electricity Plan, 2023. It will discuss the introduction of Green Energy Market segments, the waiver of Inter-State Transmission System (ISTS) charges for inter-state sale of solar and wind power, the notification of Promoting Renewable Energy through Green Energy Open Access Rules, and the bundling of conventional generating stations with renewable energy sources. The second section will evaluate the tangible impact of these electricity market reforms. By drawing on empirical studies and real-world case examples, the paper will assess the penetration rate of renewable energy sources in India’s electricity markets, the decline of conventional fuel-based generation, and the consequent reduction in carbon emissions. Furthermore, it will explore the influence of these reforms on electricity prices, the impact on various market segments due to the introduction of green contracts, and grid stability. The paper will also discuss the operational challenges to be faced due to the surge of RE Generation sources as a result of the implementation of the above-mentioned electricity market reforms, including grid integration issues, intermittency concerns with renewable energy sources, and the need for increasing grid resilience for future high RE in generation mix scenarios. In conclusion, this paper will emphasize that electricity market reforms will be pivotal in accelerating the global transition towards clean energy systems. It will underscore the importance of a holistic approach that combines effective policy design, robust regulatory frameworks, and active participation from market actors. Through a comprehensive examination of the impact of these reforms, the paper will shed light on the significance of India’s sustained commitment to a cleaner, more sustainable energy future.

Keywords: renewables, Indian electricity grid code, national electricity plan, green energy market

Procedia PDF Downloads 19