Search results for: Kari Björn
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 37

Search results for: Kari Björn

7 Optimal Capacitors Placement and Sizing Improvement Based on Voltage Reduction for Energy Efficiency

Authors: Zilaila Zakaria, Muhd Azri Abdul Razak, Muhammad Murtadha Othman, Mohd Ainor Yahya, Ismail Musirin, Mat Nasir Kari, Mohd Fazli Osman, Mohd Zaini Hassan, Baihaki Azraee

Abstract:

Energy efficiency can be realized by minimizing the power loss with a sufficient amount of energy used in an electrical distribution system. In this report, a detailed analysis of the energy efficiency of an electric distribution system was carried out with an implementation of the optimal capacitor placement and sizing (OCPS). The particle swarm optimization (PSO) will be used to determine optimal location and sizing for the capacitors whereas energy consumption and power losses minimization will improve the energy efficiency. In addition, a certain number of busbars or locations are identified in advance before the PSO is performed to solve OCPS. In this case study, three techniques are performed for the pre-selection of busbar or locations which are the power-loss-index (PLI). The particle swarm optimization (PSO) is designed to provide a new population with improved sizing and location of capacitors. The total cost of power losses, energy consumption and capacitor installation are the components considered in the objective and fitness functions of the proposed optimization technique. Voltage magnitude limit, total harmonic distortion (THD) limit, power factor limit and capacitor size limit are the parameters considered as the constraints for the proposed of optimization technique. In this research, the proposed methodologies implemented in the MATLAB® software will transfer the information, execute the three-phase unbalanced load flow solution and retrieve then collect the results or data from the three-phase unbalanced electrical distribution systems modeled in the SIMULINK® software. Effectiveness of the proposed methods used to improve the energy efficiency has been verified through several case studies and the results are obtained from the test systems of IEEE 13-bus unbalanced electrical distribution system and also the practical electrical distribution system model of Sultan Salahuddin Abdul Aziz Shah (SSAAS) government building in Shah Alam, Selangor.

Keywords: particle swarm optimization, pre-determine of capacitor locations, optimal capacitors placement and sizing, unbalanced electrical distribution system

Procedia PDF Downloads 402
6 Design and Manufacture of Removable Nosecone Tips with Integrated Pitot Tubes for High Power Sounding Rocketry

Authors: Bjorn Kierulf, Arun Chundru

Abstract:

Over the past decade, collegiate rocketry teams have emerged across the country with various goals: space, liquid-fueled flight, etc. A critical piece of the development of knowledge within a club is the use of so-called "sounding rockets," whose goal is to take in-flight measurements that inform future rocket design. Common measurements include acceleration from inertial measurement units (IMU's), and altitude from barometers. With a properly tuned filter, these measurements can be used to find velocity, but are susceptible to noise, offset, and filter settings. Instead, velocity can be measured more directly and more instantaneously using a pitot tube, which operates by measuring the stagnation pressure. At supersonic speeds, an additional thermodynamic property is necessary to constrain the upstream state. One possibility is the stagnation temperature, measured by a thermocouple in the pitot tube. The routing of the pitot tube from the nosecone tip down to a pressure transducer is complicated by the nosecone's structure. Commercial-off-the-shelf (COTS) nosecones come with a removable metal tip (without a pitot tube). This provides the opportunity to make custom tips with integrated measurement systems without making the nosecone from scratch. The main design constraint is how the nosecone tip is held down onto the nosecone, using the tension in a threaded rod anchored to a bulkhead below. Because the threaded rod connects into a threaded hole in the center of the nosecone tip, the pitot tube follows a winding path, and the pressure fitting is off-center. Two designs will be presented in the paper, one with a curved pitot tube and a coaxial design that eliminates the need for the winding path by routing pressure through a structural tube. Additionally, three manufacturing methods will be presented for these designs: bound powder filament metal 3D printing, stereo-lithography (SLA) 3D printing, and traditional machining. These will employ three different materials, copper, steel, and proprietary resin. These manufacturing methods and materials are relatively low cost, thus accessible to student researchers. These designs and materials cover multiple use cases, based on how fast the sounding rocket is expected to travel and how important heating effects are - to measure and to avoid melting. This paper will include drawings showing key features and an overview of the design changes necessitated by the manufacture. It will also include a look at the successful use of these nosecone tips and the data they have gathered to date.

Keywords: additive manufacturing, machining, pitot tube, sounding rocketry

Procedia PDF Downloads 137
5 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 126
4 Good Functional Outcome after Late Surgical Treatment for Traumatic Rotator Cuff Tear, a Retrospective Cohort Study

Authors: Soheila Zhaeentan, Anders Von Heijne, Elisabet Hagert, André Stark, Björn Salomonsson

Abstract:

Recommended treatment for traumatic rotator cuff tear (TRCT) is surgery within a few weeks after injury if the diagnosis is made early, especially if a functional impairment of the shoulder exists. This may lead to the assumption that a poor outcome then can be expected in delayed surgical treatment, when the patient is diagnosed at a later stage. The aim of this study was to investigate if a surgical repair later than three months after injury may result in successful outcomes and patient satisfaction. There is evidence in literature that good results of treatment can be expected up to three months after the injury, but little is known of later treatment with cuff repair. 73 patients (75 shoulders), 58 males/17 females, mean age 59 (range 34-­‐72), who had undergone surgical intervention for TRCT between January 1999 to December 2011 at our clinic, were included in this study. Patients were assessed by MRI investigation, clinical examination, Western Ontario Rotator Cuff index (WORC), Oxford Shoulder Score, Constant-­‐Murley Score, EQ-­‐5D and patient subjective satisfaction at follow-­‐up. The patients treated surgically within three months ( < 12 weeks) after injury (39 cases) were compared with patients treated more than three months ( ≥ 12 weeks) after injury (36 cases). WORC was used as the primary outcome measure and the other variables as secondary. A senior consultant radiologist, blinded to patient category and clinical outcome, evaluated all MRI-­‐images. Rotator cuff integrity, presence of arthritis, fatty degeneration and muscle atrophy was evaluated in all cases. The average follow-­‐up time was 56 months (range 14-­‐149) and the average time from injury to repair was 16 weeks (range 3-­‐104). No statistically significant differences were found for any of the assessed parameters or scores between the two groups. The mean WORC score was 77 (early group, range 25-­‐ 100 and late group, range 27-­‐100) for both groups (p= 0.86), Constant-­‐Murley Score (p= 0.91), Oxford Shoulder Score (p= 0.79), EQ-­‐5D index (p= 0.86). Re-­‐tear frequency was 24% for both groups, and the patients with re-­‐tear reported less satisfaction with outcome. Discussion and conclusion: This study shows that surgical repair of TRCT performed later than three months after injury may result in good functional outcomes and patient satisfaction. However, this does not motivate an intentional delay in surgery when there is an indication for surgical repair as that delay may adversely affect the possibility to perform a repair. Our results show that surgeons may safely consider surgical repair even if a delay in diagnosis has occurred. A retrospective cohort study on 75 shoulders shows good functional result after traumatic rotator cuff tear (TRCT) treated surgically up to one year after the injury.

Keywords: traumatic rotator cuff injury, time to surgery, surgical outcome, retrospective cohort study

Procedia PDF Downloads 196
3 Development and Preliminary Testing of the Dutch Version of the Program for the Education and Enrichment of Relational Skills

Authors: Sakinah Idris, Gabrine Jagersma, Bjorn Jaime Van Pelt, Kirstin Greaves-Lord

Abstract:

Background: The PEERS (Program for the Education and Enrichment of Relational Skills) intervention can be considered a well-established, evidence-based intervention in the USA. However, testing the efficacy of cultural adaptations of PEERS is still ongoing. More and more, the involvement of all stakeholders in the development and evaluation of interventions is acknowledged as crucial for the longer term implementation of interventions across settings. Therefore, in the current project, teens with ASD (Autism Spectrum Disorder), their neurotypical peers, parents, teachers, as well as clinicians were involved in the development and evaluation of the Dutch version of PEERS. Objectives: The current presentation covers (1) the formative phase and (2) the preliminary adaptation test phase of the cultural adaptation of evidence-based interventions. In the formative phase, we aim to describe the process of adaptation of the PEERS program to the Dutch culture and care system. In the preliminary adaptation phase, we will present results from the preliminary adaptation test among 32 adolescents with ASD. Methods: In phase 1, a group discussion on common vocabulary was conducted among 70 teenagers (and their teachers) from special and regular education aged 12-18 years old. This inventory concerned 14 key constructs from PEERS, e.g., areas of interests, locations for making friends, common peer groups and crowds inside and outside of school, activities with friends, commonly used ways for electronic communication, ways for handling disagreements, and common teasing comebacks. Also, 15 clinicians were involved in the translation and cultural adaptation process. The translation and cultural adaptation process were guided by the research team, and who included input and feedback from all stakeholders through an iterative feedback incorporation procedure. In phase 2, The parent-reported Social Responsiveness Scale (SRS), the Test of Adolescent Social Skills Knowledge (TASSK), and the Quality of Socialization Questionnaire (QSQ) were assessed pre- and post-intervention to evaluate potential treatment outcome. Results: The most striking cultural adaptation - reflecting the standpoints of all stakeholders - concerned the strategies for handling rumors and gossip, which were suggested to be taught using a similar approach as the teasing comebacks, more in line with ‘down-to-earth’ Dutch standards. The preliminary testing of this adapted version indicated that the adolescents with ASD significantly improved their social knowledge (TASSK; t₃₁ = -10.9, p < .01), social experience (QSQ-Parent; t₃₁ = -4.2, p < .01 and QSQ-Adolescent; t₃₂ = -3.8, p < .01), and in parent-reported social responsiveness (SRS; t₃₃ = 3.9, p < .01). In addition, subjective evaluations of teens with ASD, their parents and clinicians were positive. Conclusions: In order to further scrutinize the effectiveness of the Dutch version of the PEERS intervention, we recommended performing a larger scale randomized control trial (RCT) design, for which we provide several methodological considerations.

Keywords: cultural adaptation, PEERS, preliminary testing, translation

Procedia PDF Downloads 133
2 Personality, Coping, Quality of Life, and Distress in Persons with Hearing Loss: A Cross-Sectional Study of Patients Referred to an Audiological Service

Authors: Oyvind Nordvik, Peder O. L. Heggdal, Jonas Brannstrom, Flemming Vassbotn, Anne Kari Aarstad, Hans Jorgen Aarstad

Abstract:

Background: Hearing Loss (HL) is a condition that may affect people in all stages of life, but the prevalence increases with age, mostly because of age-related HL, generally referred to as presbyacusis. As human speech is related to relatively high frequencies, even a limited hearing loss at high frequencies may cause impaired speech intelligibility. Being diagnosed with, treated for and living with a chronic condition such as HL, must for many be a disabling and stressful condition that put ones coping resources to test. Stress is a natural part of life and most people will experience stressful events or periods. Chronic diseases, such as HL, are risk factor for distress in individuals, causing anxiety and lowered mood. How an individual cope with HL may be closely connected to the level of distress he or she is experiencing and to personality, which can be defined as those characteristics of a person that account for consistent patterns of feelings, thinking, and behavior. Thus, as to distress in life, such as illness or disease, available coping strategies may be more important than the challenge itself. The same line of arguments applies to level of experienced health-related quality of life (HRQoL). Aim: The aim of this study was to investigate the relationship between distress, HRQoL, reported hearing loss, personality and coping in patients with HL. Method: 158 adult (aged 18-78 years) patients with HL, referred for hearing aid (HA) fitting at Haukeland University Hospital in western Norway, participated in the study. Both first-time users, as well as patients referred for HA renewals were included. First-time users had been pre-examined by an ENT-specialist. The questionnaires were answered before the actual HA fitting procedure. The pure-tone average (PTA; frequencies 0.5, 1, 2, and 4 kHz) was determined for each ear. The Eysenck personality inventory, neuroticism and lie scales, the Theoretically Originated Measure of the Cognitive Activation Theory of Stress (TOMCATS) measuring active coping, hopelessness and helplessness, as well as distress (General Health Questionnaire (GHQ) - 12 items) and the EORTC Quality of Life Questionnaire general part were answered. In addition, we used a revised and shortened version of the Abbreviated Profile of Hearing Aid Benefit (APHAB) as a measure of patient-reported hearing loss. Results: Significant correlations were determined between APHAB (weak), HRQoL scores (strong), distress scores (strong) on the one side and personality and choice of coping scores on the other side. As measured by stepwise regression analyses, the distress and HRQoL scores were scored secondary to the obtained personality and coping scores. The APHAB scores were as determined by regression analyses scored secondary to PTA (best ear), level of neuroticism and lie score. Conclusion: We found that reported employed coping style, distress/HRQoL and personality are closely connected to each other in this patient group. Patient-reported HL was associated to hearing level and personality. There is need for further investigations on these questions, and how these associations may influence the clinical context.

Keywords: coping, distress, hearing loss, personality

Procedia PDF Downloads 120
1 Techno-Economic Assessment of Distributed Heat Pumps Integration within a Swedish Neighborhood: A Cosimulation Approach

Authors: Monica Arnaudo, Monika Topel, Bjorn Laumert

Abstract:

Within the Swedish context, the current trend of relatively low electricity prices promotes the electrification of the energy infrastructure. The residential heating sector takes part in this transition by proposing a switch from a centralized district heating system towards a distributed heat pumps-based setting. When it comes to urban environments, two issues arise. The first, seen from an electricity-sector perspective, is related to the fact that existing networks are limited with regards to their installed capacities. Additional electric loads, such as heat pumps, can cause severe overloads on crucial network elements. The second, seen from a heating-sector perspective, has to do with the fact that the indoor comfort conditions can become difficult to handle when the operation of the heat pumps is limited by a risk of overloading on the distribution grid. Furthermore, the uncertainty of the electricity market prices in the future introduces an additional variable. This study aims at assessing the extent to which distributed heat pumps can penetrate an existing heat energy network while respecting the technical limitations of the electricity grid and the thermal comfort levels in the buildings. In order to account for the multi-disciplinary nature of this research question, a cosimulation modeling approach was adopted. In this way, each energy technology is modeled in its customized simulation environment. As part of the cosimulation methodology: a steady-state power flow analysis in pandapower was used for modeling the electrical distribution grid, a thermal balance model of a reference building was implemented in EnergyPlus to account for space heating and a fluid-cycle model of a heat pump was implemented in JModelica to account for the actual heating technology. With the models set in place, different scenarios based on forecasted electricity market prices were developed both for present and future conditions of Hammarby Sjöstad, a neighborhood located in the south-east of Stockholm (Sweden). For each scenario, the technical and the comfort conditions were assessed. Additionally, the average cost of heat generation was estimated in terms of levelized cost of heat. This indicator enables a techno-economic comparison study among the different scenarios. In order to evaluate the levelized cost of heat, a yearly performance simulation of the energy infrastructure was implemented. The scenarios related to the current electricity prices show that distributed heat pumps can replace the district heating system by covering up to 30% of the heating demand. By lowering of 2°C, the minimum accepted indoor temperature of the apartments, this level of penetration can increase up to 40%. Within the future scenarios, if the electricity prices will increase, as most likely expected within the next decade, the penetration of distributed heat pumps can be limited to 15%. In terms of levelized cost of heat, a residential heat pump technology becomes competitive only within a scenario of decreasing electricity prices. In this case, a district heating system is characterized by an average cost of heat generation 7% higher compared to a distributed heat pumps option.

Keywords: cosimulation, distributed heat pumps, district heating, electrical distribution grid, integrated energy systems

Procedia PDF Downloads 120