Search results for: Zareen Tabassum
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33

Search results for: Zareen Tabassum

3 Rainwater Harvesting is an Effective Tool for City’s Storm Water Management and People’s Willingness to Install Rainwater Harvesting System in Buildings: A Case Study in Kazipara, Dhaka, Bangladesh

Authors: M. Abu Hanif, Anika Tabassum, Fuad Hasan Ovi, Ishrat Islam

Abstract:

Water is essential for life. Enormous quantities of water are cycled each year through hydrologic cycle but only a fraction of circulated water is available each year for human use. Dhaka, the capital of Bangladesh is the 19th mega city in the world with a population of over 14 million (World City Information, 2011). As a result the growth of urban population is increasing rapidly; the city is not able to manage with altering situations due to resource limitations and management capacity. Water crisis has become an acute problem faced by the inhabitants of Dhaka city. It is found that total water demand in Dhaka city is 2,240 million liter per day (MLD) whereas supply is 2,150 (MLD). According to Dhaka Water Supply and Sewerage Authority about 87 percent of this supply comes from groundwater resources and rest 13 percent from surface water. According to Dhaka Water Supply and Sewerage Authority it has been found that the current groundwater depletion rate is 3.52 meter per year. Such a fast depletion of the water table will result in intrusion of southern saline water into the groundwater reservoir, depriving this mega city of pure drinking water. This study mainly focus on the potential of Rainwater Harvesting System(RWHS) in Kazipara area of Dhaka city, determine the perception level of local people in installation of rainwater harvesting system in their building and identify the factors regarding willingness of owner in installing rainwater harvesting system. As most of the residential area of Dhaka city is unplanned with small plots, Kazipara area has been chosen as study area which depicts similar characteristics. In this study only roof top area is considered as catchment area and potential of rainwater harvesting has been calculated. From the calculation it is found that harvested rainwater can serve the 66% of demand of water for toilet flushing and cleaning purposes for the people of Kazipara. It is also observed that if only rooftop rainwater harvesting applied to all the structures of the study area then two third of surface runoff would be reduced than present surface runoff. In determining the perception of local people only owners of the buildings were. surveyed. From the questionnaire survey it is found that around 75% people have no idea about the rainwater harvesting system. About 83% people are not willing to install rainwater harvesting system in their dwelling. The reasons behind the unwillingness are high cost of installation, inadequate space, ignorance about the system, etc. Among 16% of the willing respondents who are interested in installing RWHS system, it was found that higher income, bigger size of buildings are important factors in willingness of installing rainwater harvesting system. Majority of the respondents demanded for both technical and economical support to install the system in their buildings. Government of Bangladesh has taken some initiatives to promote rainwater harvesting in urban areas. It is very much necessary to incorporate rainwater harvesting device and artificial recharge system in every building of Dhaka city to make Dhaka city self sufficient in water supply management and to solve water crisis problem of megacity like as Dhaka city.

Keywords: rainwater harvesting, water table, willingness, storm water

Procedia PDF Downloads 217
2 Improving the Budget Distribution Procedure to Ensure Smooth and Efficient Public Service Delivery

Authors: Rizwana Tabassum

Abstract:

Introductive Statement: Delay in budget releases is often cited as one of the biggest bottlenecks to smooth and efficient service delivery. While budget release from the ministry of finance to the line ministries has been expedited by simplifying the procedure, budget distribution within the line ministries remains one of the major causes of slow budget utilization. While the budget preparation is a bottom-up process where all DDOs submit their proposals to their controlling officers (such as Upazila Civil Surgeon sends it to Director General Health), who consolidate the budget proposals in iBAS++ budget preparation module, the approved budget is not disaggregated by all DDOs. Instead, it is left to the discretion of the controlling officers to distribute the approved budget to their sub-ordinate offices over the course of the year. Though there are some need-based criteria/formulae to distribute the approved budget among DDOs in some sectors, there is little evidence that these criteria are actually used. This means that majority of the DDOs don’t know their yearly allocations upfront to enable yearly planning of activities and expenditures. This delays the implementation of critical activities and the payment to the suppliers of goods and services and sometimes leads to undocumented arrears to suppliers for essential goods/services. In addition, social sector budgets are fragmented because of the vertical programs and externally financed interventions that pose several management challenges at the level of the budget holders and frontline service providers. Slow procurement processes further delay the provision of necessary goods and services. For example, it takes an average of 15–18 months for drugs to reach the Upazila Health Complex and below, while it should not take more than 9 months in procuring and distributing these. Aim of the Study: This paper aims to investigate the budget distribution practices of an emerging economy, Bangladesh. The paper identifies challenges of timely distribution and ways to deal with problems as well. Methodology: The study draws conclusions on the basis of document analysis which is a branch of the qualitative research method. Major Findings: Upon approval of the National Budget, the Ministry of Finance is required to distribute the budget to budget holders at the department level; however, budget is distributed to drawing and disbursing officers much later. Conclusions: Timely and predictable budget releases assist completion of development schemes on time and on budget, with sufficient recurrent resources for effective operation. ADP implementation is usually very low at the beginning of the fiscal year and expedited dramatically during the last few months, leading to inefficient use of resources. The timely budget release will resolve this issue and deliver economic benefits faster, better, and more reliably. This will also give the project directors/DDOs the freedom to think and plan the budget execution in a predictable manner, thereby ensuring value for money by reducing time overrun and expediting the completion of capital investments, and improving infrastructure utilization through timely payment of recurrent costs.

Keywords: budget distribution, challenges, digitization, emerging economy, service delivery

Procedia PDF Downloads 57
1 Human-Carnivore Interaction: Patterns, Causes and Perceptions of Local Herders of Hoper Valley in Central Karakoram National Park, Pakistan

Authors: Saeed Abbas, Rahilla Tabassum, Haider Abbas, Babar Khan, Shahid Hussain, Muhammad Zafar Khan, Fazal Karim, Yawar Abbas, Rizwan Karim

Abstract:

Human–carnivore conflict is considered to be a major conservation and rural livelihood concern because many carnivore species have been heavily victimized due to elevated conflict levels with communities. Like other snow leopard range countries, this situation prevails in Pakistan, where WWF is currently working under Asia High Mountain Project (AHMP) in Gilgit-Baltistan of Pakistan. To mitigate such conflicts requires a firm understanding of grazing and predation pattern including human-carnivore interaction. For this purpose we conducted a survey in Hoper valley (one of the AHMP project sites in Pakistan), during August, 2013 through a questionnaire based survey and unstructured interviews covering 647 households, permanently residing in the project area out of the total 900 households. The valley, spread over 409 km2 between 36°7'46" N and 74°49'2"E, at 2900m asl in Karakoram ranges is considered to be one of an important habitat of snow leopard and associated prey species such as Himalayan ibex. The valley is home of 8100 Brusho people (ancient tribe of Northern Pakistan) dependent on agro-pastoral livelihoods including farming and livestock rearing. The total number of livestock reported were (N=15,481) out of which 8346 (53.91%) were sheep, 3546 (22.91%) goats, 2193 (14.16%) cows, 903 (5.83%) yaks, 508 (3.28%) bulls, 28 (0.18%) donkeys, 27 (0.17%) zo/zomo (cross breed of yak and cow), and 4 (0.03%) horses. 83 percent respondent (n=542 households) confirmed loss of their livestock during the last one year July, 2012 to June, 2013 which account for 2246 (14.51%) animals. The major reason of livestock loss include predation by large carnivores such as snow leopards and wolf (1710, 76.14%) followed by diseases (536, 23.86%). Of the total predation cases snow leopard is suspected to kill 1478 animals (86.43%). Among livestock sheep were found to be the major prey of snow leopard (810, 55%) followed by goats (484, 32.7%) cows (151, 10.21%), yaks (15, 1.015%), zo/zomo (7, 0.5%) and donkey (1, 0.07%). The reason for the mass depredation of sheep and goats is that they tend to browse on twigs of bushes and graze on soft grass near cliffs. They are also considered to be very active as compared to other species in moving quickly and covering more grazing area. This makes them more vulnerable to snow leopard attack. The majority (1283, 75%) of livestock killed by predators occurred during the warm season (May-September) in alpine and sub-alpine pastures and remaining (427, 25%) occurred in the winter season near settlements in valley. It was evident from the recent study that Snow leopard kills outside the pen were (1351, 79.76%) as compared to inside pen (359, 20.24%). Assessing the economic loss of livestock predation we found that the total loss of livestock predation in the study area is equal to PKR 11,230,000 (USD 105,797), which is about PRK 17, 357 (USD 163.51) per household per year. Economic loss incurred by the locals due to predation is quite significant where the average cash income per household per year is PKR 85,000 (USD 800.75).

Keywords: carnivores, conflict, predation, livelihood, conservation, rural, snow leopard, livestock

Procedia PDF Downloads 315