Development of Manufacturing Simulation Model for Semiconductor Fabrication
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32794
Development of Manufacturing Simulation Model for Semiconductor Fabrication

Authors: Syahril Ridzuan Ab Rahim, Ibrahim Ahmad, Mohd Azizi Chik, Ahmad Zafir Md. Rejab, and U. Hashim

Abstract:

This research presents the development of simulation modeling for WIP management in semiconductor fabrication. Manufacturing simulation modeling is needed for productivity optimization analysis due to the complex process flows involved more than 35 percent re-entrance processing steps more than 15 times at same equipment. Furthermore, semiconductor fabrication required to produce high product mixed with total processing steps varies from 300 to 800 steps and cycle time between 30 to 70 days. Besides the complexity, expansive wafer cost that potentially impact the company profits margin once miss due date is another motivation to explore options to experiment any analysis using simulation modeling. In this paper, the simulation model is developed using existing commercial software platform AutoSched AP, with customized integration with Manufacturing Execution Systems (MES) and Advanced Productivity Family (APF) for data collections used to configure the model parameters and data source. Model parameters such as processing steps cycle time, equipment performance, handling time, efficiency of operator are collected through this customization. Once the parameters are validated, few customizations are made to ensure the prior model is executed. The accuracy for the simulation model is validated with the actual output per day for all equipments. The comparison analysis from result of the simulation model compared to actual for achieved 95 percent accuracy for 30 days. This model later was used to perform various what if analysis to understand impacts on cycle time and overall output. By using this simulation model, complex manufacturing environment like semiconductor fabrication (fab) now have alternative source of validation for any new requirements impact analysis.

Keywords: Advanced Productivity Family (APF), Complementary Metal Oxide Semiconductor (CMOS), Manufacturing Execution Systems (MES), Work In Progress (WIP).

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1074984

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3133

References:


[1] Moti Klein and Adar Kalir," A Full Factory transient Simulation model For The Analysis of Expected Performance in A Transition Period," in Proc. winter simulation Conf .Israel, 2006.
[2] Boon Ping Gan, Peter Lendermann, Malcolm Yoke Hean Low, Stephen J. Turner, Xiaoguang Wang and Simon J.E. Taylor "Interoperating AutoSched AP Using The High Level Architecture," in Proc. Winter Simulation Conf. Singapore, 2005.
[3] Tyler Philips, "AutoSched AP by AutoSimulations," in Proc. Winter Simulation Conf. U.S.A, 1998.
[4] Ingy A. El-Khouly, Khaled S. El-Kilany, and Aziz E.-Sayed, "Effective Scheduling of Semiconductor Manufacturing", World Academy of Science, Engineering and Technology, vol. 79, 2011.
[5] Kader Ibrahim, Mohd Azizi Chik and UdaHashim, "Variability Due to Tool Configurations That Impacts Overall Capacity in Wafer Fabrication Facility" The 11th Asia Pacific Industrial Engineering and Management Systems Conference, Melaka, 2010.
[6] YudhaAndrianSaputra&StefanusEkoW.,"Combination of MAPE, MedAPE, and Skewness of APE", Industrial Engineering And Service Science (IESS) International Conferenc, SOLO.2011.
[7] Ben H. Thacker, Scott W. Doebling, Francois M. Hemez, Mark C. Anderson, Jason E. Pepin and Edward A. Rodriguez, Concepts of Model Verification and Validation. California, CA: United States Department of Energy, 2004, pp.17-21.
[8] Applied AutoSched AP. 2011. AutoSched AP Release Note v 10.0.1.
[9] Global Semiconductor Alliance (GSA), Semiconductor Market Overview, April 2011.
[10] Mohd Azizi Chik, Mohd Hazmuni bin Saidin, and Uda bin Hashim, "Industrial Engineering Roles in Semiconductor Fabrication", APIEM 11th Conf. December 2010.
[11] R. C. Leachman, D. A. Hodges, "Benchmarking Semiconductor Manufacturing," IEEE Trans. on Semiconductor Manufacturing, TSM-9 (May 1996), pp. 158-169.
[12] Mohd Azizi Chik, Yeo EngTeck, Mahalil Amin AbdMalek, and Mohd HafidzSaidi, "Comprehensive Sequencing Dispatching Method for Identified Bottleneck Tool - Photolithography Process", NSM, Perlis, Malaysia, pp.19-21. 2003.