Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33087
Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective

Authors: Charles Mothobiso

Abstract:

This study attempts to identify the client’s main priority when delivering green projects. The aim is to compare whether clients’ interests are similar when delivering conventional buildings as compared to green buildings. Private clients invest more in green buildings as compared to government and parastatal entities. Private clients prioritize on maximizing a return on investment and they mainly invest in energy-saving buildings that have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building projects as compared to government and parastatal clients. A shortage of expertise and managerial skill leads to the low adaptation of green buildings in government and parastatal projects. Other factors that seem to prevent the adoption of green buildings are the preparedness of the supply chain within the industry and inappropriate procurement strategies adopted by clients.

Keywords: Construction clients, design team, green buildings procurement.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1128211

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1206

References:


[1] Higgin, G., and Jessop, N. (1965) Communications in the Building Industry. The Tavistock Institute of Human Relations, Tavistock Publications. London.
[2] Bowen PA., Pearl, RG. and Ewards PJ. (1999) “Client briefing processes and procurement method selection: A South African study.” Engineering, Construction and Architectural Management. Vol.6, No 2, pp 91–104.
[3] Love JS, (2001). “Adapting to clients’ needs in construction – a dialogue.” Facilities. Vol. 19 Iss, No1/2, pp. 71.
[4] Murray, JP., Hudson, J., Gameson, RN., and Toft, B. (1990) “An expert systems approach to client briefing, in Proceedings of the C.I.B.” W-55/65 International Conference on `Building Economics and Construction Management', Sydney.Vol.2, pp 538-548.
[5] Spencer, N., and Winch, G. (2002) How Buildings Add Value for Clients. Construction Industry Council, Thomas Telford, London.
[6] Eriksson, PE. and Laan, A. (2007). “Procurement effects on trust and control in client-contractor relationships.” Engineering, Construction and Architectural Management. Vol. 14, pp, 387-99.
[7] Bresnen, M., and Marshall, N. (2000) “Partnering in construction: a critical review of issues, problems and dilemmas.” Construction Management and Economics. Vol.18, pp 229–237.
[8] Vennstrom, A. (2008) The construction client as a change agent: contextual support and, obstacle. Doctoral thesis, Department of Civil, Mining and Environmental Engineering, University of Technology, Lulea.
[9] Psilander, K. (2004) “Hur Sma Byggherrar Lyckas: Arbets och Forhallningssa¨ tt, Department of Construction and Facilities Management.” Royal Institute of Technology, Stockholm.
[10] Kadefors, A., Bjo¨rlingson, E., and Karlsson, A. (2007) “Procuring service innovations: contractor selection for partnering projects.” International Journal of Project Management. Vol. 25, pp, 375-85.
[11] BCA. (2012) Public sector projects to sustain construction demand in 2012. Available at http://www.bca.gov.sg/Newsroom/pr11012012_CD.html. (Unpublished). Last accessed 25 July 2015.
[12] Ning, Y., and Ling FY. (2013) “Comparative study of drivers of and barriers to relational transactions faced by public clients, private contractors and consultants in public projects.” Habitat International. Vol.40, pp 91-99.
[13] Puerto, C.L., Gransberg, DD., and Shane, JS. (2008) “Comparative analysis of owner goals for design/build projects.” Journal of Management in Engineering. Vol 24, No1, pp 32-39.
[14] Rahman, M M., and Kumaraswamy, MM. (2004b) “Contracting relationship trends and transitions.” Journal of Management in Engineering. Vol.20, No 4, pp 147-161.
[15] Crowley, LG., and Karim, MA. (1995) “Conceptual model of partnering”. Journal of Management in Engineering.” Vol .11, No5, pp 33-39.
[16] Gerth, R., Boqvist, A., Bjelkemy, M., and Lindberd, B. (2013) “Design for construction: utilizing production experiences in development.” Construction Management and Economics. Vol.31, Iss 2, pp 135-150.
[17] Chen, L., and Mohamed, S. (2007) “Empirical study of interactions between knowledge management activities.” Engineering, Construction and Architectural Management. Vol.14, No3, pp 242–60.
[18] Dai, J., Goodrum, P.M. and Maloney, W.F. (2007) “Analysis of craft workers’ and foremen’s perceptions of the factors affecting construction labour productivity.” Construction Management and Economics. Vol.25, No11, pp 1139–52.
[19] Lam, P., and Wong, F. (2009) “Improving building project performance. How buildability benchmarking can help.” Construction Management and Economics. Vol. 27, No1, pp 41–52.
[20] Ofori, G., Briffed, C., Gay, G., and Ranasingle, M. (2000) “Impact of ISO 14000 on construction enterprises in Singapore.” Construction Management and Economics. Vol.18, pp 935–947.
[21] Josephson, PE., Larsson, B., and Li, H. (2002) “Illustrative benchmarking rework and rework costs in Swedish construction industry.” Journal of Management in Engineering. Vol. 18. No 2, pp 76–83.
[22] Bakti, ES., Majid, A., Zin, RM. and Trigunarsyah, B. (2011) “Constructability improvement in seawater intake structure.” Engineering, Construction and Architectural Management.Vol.18, No 6, pp 595–608.
[23] Schade, J., Olofsson, T., and Schreyer, M. (2011) “Decision‐making in a model‐based design process.” Construction Management and Economics. Vol.29, No 4, pp 371-382.
[24] Sacks, R., Whyte, J., Swissa, D., Raviv, G., Zhou, W., and Shapira, A. (2015) “Safety by design: dialogues between designers and builders using virtual reality.” Construction Management and Economics. Vol. 33, No 1, pp 55-72.
[25] Love PE., Mandal, P., Smith, J., and Li, H. (2000), “Modelling the dynamics of design error induced rework in construction.” Construction Management and Economics. Vol.18, pp 567–574.
[26] Trigunarsyah, B. (2007) “Project designers' role in improving constructability of Indonesian construction projects.” Construction Management and Economics. Vol 25, No2, pp 207-215.
[27] Fabrício, M., Melhado, SB., and Baía, JL. (1999) Brief reflection on the improvement of the design process efficiency in Brazilian building projects. IGLC-7, University. of California, Berkeley, CA.
[28] Brace, C., Gibb, A., Pendlebury, M. and Bust, P. (2009) Health and Safety in the Construction Industry: Underlying Causes of construction Fatal Accidents – External Research. Secretary of State for Work and Pensions, Inquiry into the underlying causes of construction fatal accidents.
[29] Windapo, AO and Goulding, JS. (2015) “Understanding the gap between green building practice and legislation requirements in South Africa.” Smart and Sustainable Built Environment, Vol. 4 Iss 1 pp. 67-96.
[30] Raviv, G., Shapira, A. and Sacks, R. (2012) “Relationships between Methods for Constructability Analysis during Design and Constructability Failures in Projects.” ASCE Construction Research Congress. Reston VA, West Lafayette IN, pp 515–524.
[31] National Building Regulations and Building Act No. 103 OF 1977. Downloaded at www.thedti.gov.za/business_regulation/acts/building_standards_act.pdf (Unpublished). Last accessed 29 December 2015.
[32] Riemanm, S., and Spang, K. (2014) “Application of contractor’s knowledge in public financed infrastructure projects in Germany.” Procedia - Social and Behavioral Sciences. Vol. 119, pp 202 – 209.
[33] Assaf, S.A. and Al-Heiji, S. (2006), Causes of Delay in Large Construction Projects. Journals of Project Management, 24, 349-307.
[34] Mitchell, A., Frame, I., Coday, A., and Hoxley, M. (2011) “A conceptual framework of the interface between the design and construction processes.” Engineering, Construction and Architectural Management. Vol. 18, No 3, pp. 297 – 311.
[35] Yustisia, H. (2014) “The evaluation of constructability towards construction safety (Case study: Kelok-9 Bridge project, West Sumatera).” In 2nd International Conference on Sustainable Civil Engineering Structures and Construction Materials (SCESCM). Procedia Engineering. Vol. 95, pp 552 – 559.
[36] Griffiths, F. (1992) Alliance Partnership Sourcing –A Major Tool for strategic. Procurement Frank Griffiths Associates Limited.
[37] Griffith, A., and Sidwell, AC. (1997) “Development of constructability concepts, principles and practices engineering.” Construction and Architectural Management.Vol.4, No 4, pp 295-310.
[38] Zuo, J., Zillante, G., Wilson, L., Davidson, K., and Pullen, S. (2012) Sustainability policy of construction contractors: A review. Renewable and Sustainability.
[39] Tan, Y., Shen, L., and Yao, H. (2011) “Sustainable construction practice and contractors’ competitiveness: A preliminary study.” Habitat International. Vol 35, No 2, pp 225-230
[40] Yan, H., Shen, Q., Fan, L.C.H., Wang, Y., and Zhang, L. (2010) “Greenhouse gas emissions in building construction: a case study of One Peking in Hong Kong.” Building and Environment. Vol.45, No 4, pp 949–955.
[41] Wong, P S P., Thomas, ST., and Shahidi, M. (2012), “Towards understanding the contractor's response to carbon reduction policies in the construction projects.” International Journal of Project Management. Vol.31, No 7, pp 1042-1056
[42] Mathonsi, MD., and Thwala, WD. (2012) “Factors influencing the selection of procurement systems in the South African construction industry.” African Journal of Business Management. Vol. 6, No10, pp. 3583-3594.
[43] Rose, M. (2014) The client satisfaction of Green Building Procurement System. Master Degree Thesis, School of Construction Economics and Management University of the Witwatersrand. (Unpublished).
[44] Holton, I., Glass, J., and Price, ADF. (2010) “Managing for sustainability: findings from four company case studies in the UK precast concrete industry.” Journal of Cleaner Production. Vol.18, pp152-160.
[45] Abidin, NZ. (2010) “Investigating the awareness and application of sustainable construction concept by Malaysian developers.” Habitat International. Vol.34, pp421-426.
[46] Addis, B., and Talbot, R. (2001) Sustainable construction procurement: A guide to delivering environmentally responsible projects. CIRIAC571.London: CIRIA. Available from http://www.tandf.co.uk/journals/titles/01446193.asp Last accessed 26 August 2015.
[47] Majdalani, Z., Ajam, M., and Mezher, T. (2006) “Sustainability in the construction industry: A Lebanese case study”. Construction Innovation. Vol.6 No 1, pp 33-46.
[48] Yitmen, I. (2007) “The challenge of change for innovation in construction: A North Cyprus perspective”. Building and Environment. Vol.42 No 3, pp 1319-1328.
[49] Shen, L., Wu, Y., and Zhang, X. (2011). “Key Assessment Indicators for the Sustainability of Infrastructure Projects”, Journal of Construction Engineering Management.Vol.137, No 6, pp 441- 451
[50] Meryman, H., and Silman, R. (2004) “Sustainable engineering - using specifications to make it happen”. Structural Engineering International. Vol. 14, No 3, pp 216-219.
[51] Qian, Q K., and Chan, EHW. (2008) “Informational policy instruments for environmentally sustainable buildings: a comparative study on HK-BEAM and LEED. ”The CRIOCM International Research Symposium 2008 on Advancement of Construction Management and Real Estate, Vol.31, November, Beijing, China
[52] Bowen, P., Pearl, R., Cattell, K., Hunter, K. and Kelly, J. (2007), “The role of value management in achieving best value in public sector service delivery in South Africa: a research agenda”, Acta Structilia. Vol. 14, No. 2, pp. 58-75.
[53] Shi, Q., Zuo, J. Huang, R., Huang, J., and Pullen, S. (2013) “Identifying the critical factors for green construction - An empirical study in China.” Habitat International. Vol. 40, pp, 1-8.