Search results for: Transactional leadership.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 152

Search results for: Transactional leadership.

2 Strategic Entrepreneurship: Model Proposal for Post-Troika Sustainable Cultural Organizations

Authors: Maria InĂªs Pinho

Abstract:

Recent literature on issues of Cultural Management (also called Strategic Management for cultural organizations) systematically seeks for models that allow such equipment to adapt to the constant change that occurs in contemporary societies. In the last decade, the world, and in particular Europe has experienced a serious financial problem that has triggered defensive mechanisms, both in the direction of promoting the balance of public accounts and in the sense of the anonymous loss of the democratic and cultural values of each nation. If in the first case emerged the Troika that led to strong cuts in funding for Culture, deeply affecting those organizations; in the second case, the commonplace citizen is seen fighting for the non-closure of cultural equipment. Despite this, the cultural manager argues that there is no single formula capable of solving the need to adapt to change. In another way, it is up to this agent to know the existing scientific models and to adapt them in the best way to the reality of the institution he coordinates. These actions, as a rule, are concerned with the best performance vis-à-vis external audiences or with the financial sustainability of cultural organizations. They forget, therefore, that all this mechanics cannot function without its internal public, without its Human Resources. The employees of the cultural organization must then have an entrepreneurial posture - must be intrapreneurial. This paper intends to break this form of action and lead the cultural manager to understand that his role should be in the sense of creating value for society, through a good organizational performance. This is only possible with a posture of strategic entrepreneurship. In other words, with a link between: Cultural Management, Cultural Entrepreneurship and Cultural Intrapreneurship. In order to prove this assumption, the case study methodology was used with the symbol of the European Capital of Culture (Casa da Música) as well as qualitative and quantitative techniques. The qualitative techniques included the procedure of in-depth interviews to managers, founders and patrons and focus groups to public with and without experience in managing cultural facilities. The quantitative techniques involved the application of a questionnaire to middle management and employees of Casa da Música. After the triangulation of the data, it was proved that contemporary management of cultural organizations must implement among its practices, the concept of Strategic Entrepreneurship and its variables. Also, the topics which characterize the Cultural Intrapreneurship notion (job satisfaction, the quality in organizational performance, the leadership and the employee engagement and autonomy) emerged. The findings show then that to be sustainable, a cultural organization should meet the concerns of both external and internal forum. In other words, it should have an attitude of citizenship to the communities, visible on a social responsibility and a participatory management, only possible with the implementation of the concept of Strategic Entrepreneurship and its variable of Cultural Intrapreneurship.

Keywords: Cultural entrepreneurship, cultural intrapreneurship, cultural organizations, strategic management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1151
1 Effects of the In-Situ Upgrading Project in Afghanistan: A Case Study on the Formally and Informally Developed Areas in Kabul

Authors: Maisam Rafiee, Chikashi Deguchi, Akio Odake, Minoru Matsui, Takanori Sata

Abstract:

Cities in Afghanistan have been rapidly urbanized; however, many parts of these cities have been developed with no detailed land use plan or infrastructure. In other words, they have been informally developed without any government leadership. The new government started the In-situ Upgrading Project in Kabul to upgrade roads, the water supply network system, and the surface water drainage system on the existing street layout in 2002, with the financial support of international agencies. This project is an appropriate emergency improvement for living life, but not an essential improvement of living conditions and infrastructure problems because the life expectancies of the improved facilities are as short as 10–15 years, and residents cannot obtain land tenure in the unplanned areas. The Land Readjustment System (LRS) conducted in Japan has good advantages that rearrange irregularly shaped land lots and develop the infrastructure effectively. This study investigates the effects of the In-situ Upgrading Project on private investment, land prices, and residents’ satisfaction with projects in Kart-e-Char, where properties are registered, and in Afshar-e-Silo Lot 1, where properties are unregistered. These projects are located 5 km and 7 km from the CBD area of Kabul, respectively. This study discusses whether LRS should be applied to the unplanned area based on the questionnaire and interview responses of experts experienced in the In-situ Upgrading Project who have knowledge of LRS. The analysis results reveal that, in Kart-e-Char, a lot of private investment has been made in the construction of medium-rise (five- to nine-story) buildings for commercial and residential purposes. Land values have also incrementally increased since the project, and residents are commonly satisfied with the road pavement, drainage systems, and water supplies, but dissatisfied with the poor delivery of electricity as well as the lack of public facilities (e.g., parks and sport facilities). In Afshar-e-Silo Lot 1, basic infrastructures like paved roads and surface water drainage systems have improved from the project. After the project, a few four- and five-story residential buildings were built with very low-level private investments, but significant increases in land prices were not evident. The residents are satisfied with the contribution ratio, drainage system, and small increase in land price, but there is still no drinking water supply system or tenure security; moreover, there are substandard paved roads and a lack of public facilities, such as parks, sport facilities, mosques, and schools. The results of the questionnaire and interviews with the four engineers highlight the problems that remain to be solved in the unplanned areas if LRS is applied—namely, land use differences, types and conditions of the infrastructure still to be installed by the project, and time spent for positive consensus building among the residents, given the project’s budget limitation.

Keywords: In-Situ Upgrading, Kabul, Land Readjustment, Land value, Planned areas, Private investment, Resident satisfaction, Unplanned areas.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1091