Search results for: LHDs
2 Construction of Space-Filling Designs for Three Input Variables Computer Experiments
Authors: Kazeem A. Osuolale, Waheed B. Yahya, Babatunde L. Adeleke
Abstract:
Latin hypercube designs (LHDs) have been applied in many computer experiments among the space-filling designs found in the literature. A LHD can be randomly generated but a randomly chosen LHD may have bad properties and thus act poorly in estimation and prediction. There is a connection between Latin squares and orthogonal arrays (OAs). A Latin square of order s involves an arrangement of s symbols in s rows and s columns, such that every symbol occurs once in each row and once in each column and this exists for every non-negative integer s. In this paper, a computer program was written to construct orthogonal array-based Latin hypercube designs (OA-LHDs). Orthogonal arrays (OAs) were constructed from Latin square of order s and the OAs constructed were afterward used to construct the desired Latin hypercube designs for three input variables for use in computer experiments. The LHDs constructed have better space-filling properties and they can be used in computer experiments that involve only three input factors. MATLAB 2012a computer package (www.mathworks.com/) was used for the development of the program that constructs the designs.Keywords: Computer Experiments, Latin Squares, Latin Hypercube Designs, Orthogonal Array, Space-filling Designs.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 17231 Risk Based Maintenance Planning for Loading Equipment in Underground Hard Rock Mine: Case Study
Authors: Sidharth Talan, Devendra Kumar Yadav, Yuvraj Singh Rajput, Subhajit Bhattacharjee
Abstract:
Mining industry is known for its appetite to spend sizeable capital on mine equipment. However, in the current scenario, the mining industry is challenged by daunting factors of non-uniform geological conditions, uneven ore grade, uncontrollable and volatile mineral commodity prices and the ever increasing quest to optimize the capital and operational costs. Thus, the role of equipment reliability and maintenance planning inherits a significant role in augmenting the equipment availability for the operation and in turn boosting the mine productivity. This paper presents the Risk Based Maintenance (RBM) planning conducted on mine loading equipment namely Load Haul Dumpers (LHDs) at Vedanta Resources Ltd subsidiary Hindustan Zinc Limited operated Sindesar Khurd Mines, an underground zinc and lead mine situated in Dariba, Rajasthan, India. The mining equipment at the location is maintained by the Original Equipment Manufacturers (OEMs) namely Sandvik and Atlas Copco, who carry out the maintenance and inspection operations for the equipment. Based on the downtime data extracted for the equipment fleet over the period of 6 months spanning from 1st January 2017 until 30th June 2017, it was revealed that significant contribution of three downtime issues related to namely Engine, Hydraulics, and Transmission to be common among all the loading equipment fleet and substantiated by Pareto Analysis. Further scrutiny through Bubble Matrix Analysis of the given factors revealed the major influence of selective factors namely Overheating, No Load Taken (NTL) issues, Gear Changing issues and Hose Puncture and leakage issues. Utilizing the equipment wise analysis of all the downtime factors obtained, spares consumed, and the alarm logs extracted from the machines, technical design changes in the equipment and pre shift critical alarms checklist were proposed for the equipment maintenance. The given analysis is beneficial to allow OEMs or mine management to focus on the critical issues hampering the reliability of mine equipment and design necessary maintenance strategies to mitigate them.
Keywords: Bubble matrix analysis, LHDs, OEMs, pareto chart analysis, spares consumption matrix, critical alarms checklist.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1091