Search results for: Heavy OWA operator.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 723

Search results for: Heavy OWA operator.

3 Current Deflecting Wall: A Promising Structure for Minimising Siltation in Semi-Enclosed Docks

Authors: A. A. Purohit, A. Basu, K. A. Chavan, M. D. Kudale

Abstract:

Many estuarine harbours in the world are facing the problem of siltation in docks, channel entrances, etc. The harbours in India are not an exception and require maintenance dredging to achieve navigable depths for keeping them operable. Hence, dredging is inevitable and is a costly affair. The heavy siltation in docks in well mixed tide dominated estuaries is mainly due to settlement of cohesive sediments in suspension. As such there is a need to have a permanent solution for minimising the siltation in such docks to alter the hydrodynamic flow field responsible for siltation by constructing structures outside the dock. One of such docks on the west coast of India, wherein siltation of about 2.5-3 m/annum prevails, was considered to understand the hydrodynamic flow field responsible for siltation. The dock is situated in such a region where macro type of semi-diurnal tide (range of about 5m) prevails. In order to change the flow field responsible for siltation inside the dock, suitability of Current Deflecting Wall (CDW) outside the dock was studied, which will minimise the sediment exchange rate and siltation in the dock. The well calibrated physical tidal model was used to understand the flow field during various phases of tide for the existing dock in Mumbai harbour. At the harbour entrance where the tidal flux exchanges in/out of the dock, measurements on water level and current were made to estimate the sediment transport capacity. The distorted scaled model (1:400 (H) & 1:80 (V)) of Mumbai area was used to study the tidal flow phenomenon, wherein tides are generated by automatic tide generator. Hydraulic model studies carried out under the existing condition (without CDW) reveal that, during initial hours of flood tide, flow hugs the docks breakwater and part of flow which enters the dock forms number of eddies of varying sizes inside the basin, while remaining part of flow bypasses the entrance of dock. During ebb, flow direction reverses, and part of the flow re-enters the dock from outside and creates eddies at its entrance. These eddies do not allow water/sediment-mass to come out and result in settlement of sediments in dock both due to eddies and more retention of sediment. At latter hours, current strength outside the dock entrance reduces and allows the water-mass of dock to come out. In order to improve flow field inside the dockyard, two CDWs of length 300 m and 40 m were proposed outside the dock breakwater and inline to Pier-wall at dock entrance. Model studies reveal that, during flood, major flow gets deflected away from the entrance and no eddies are formed inside the dock, while during ebb flow does not re-enter the dock, and sediment flux immediately starts emptying it during initial hours of ebb. This reduces not only the entry of sediment in dock by about 40% but also the deposition by about 42% due to less retention. Thus, CDW is a promising solution to significantly reduce siltation in dock.

Keywords: Current deflecting wall, eddies, hydraulic model, macro tide, siltation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1221
2 Small and Medium-Sized Enterprises, Flash Flooding and Organisational Resilience Capacity: Qualitative Findings on Implications of the Catastrophic 2017 Flash Flood Event in Mandra, Greece

Authors: Antonis Skouloudis, Georgios Deligiannakis, Panagiotis Vouros, Konstantinos Evangelinos, Ioannis Nikolaou

Abstract:

On November 15th, 2017, a catastrophic flash flood devastated the city of Mandra in Central Greece, resulting in 24 fatalities and extensive damages to the built environment and infrastructure. It was Greece’s deadliest and most destructive flood event for the past 40 years. In this paper, we examine the consequences of this event to small and medium-sized enterprises (SMEs) operating in Mandra during the flood event, which were affected by the floodwaters to varying extents. In this context, we conducted semi-structured interviews with business owners-managers of 45 SMEs located in flood inundated areas and are still active nowadays, based on an interview guide that spanned 27 topics. The topics pertained to the disaster experience of the business and business owners-managers, knowledge and attitudes towards climate change and extreme weather, aspects of disaster preparedness and related assistance needs. Our findings reveal that the vast majority of the affected businesses experienced heavy damages in equipment and infrastructure or total destruction, which resulted in business interruption from several weeks up to several months. Assistance from relatives or friends helped for the damage repairs and business recovery, while state compensations were deemed insufficient compared to the extent of the damages. Most interviewees pinpoint flooding as one of the most critical risks, and many connect it with the climate crisis. However, they are either not willing or unable to apply property-level prevention measures in their businesses due to cost considerations or complex and cumbersome bureaucratic processes. In all cases, the business owners are fully aware of the flood hazard implications, and since the recovery from the event, they have engaged in basic mitigation measures and contingency plans in case of future flood events. Such plans include insurance contracts whenever possible (as the vast majority of the affected SMEs were uninsured at the time of the 2017 event) as well as simple relocations of critical equipment within their property. The study offers fruitful insights on latent drivers and barriers of SMEs’ resilience capacity to flash flooding. In this respect, findings such as ours, highlighting tensions that underpin behavioural responses and experiences, can feed into: a) bottom-up approaches for devising actionable and practical guidelines, manuals and/or standards on business preparedness to flooding, and, ultimately, b) policy-making for an enabling environment towards a flood-resilient SME sector.

Keywords: Flash flood, small and medium-sized enterprises, organisational resilience capacity, disaster preparedness, qualitative study.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 407
1 Construction Port Requirements for Floating Offshore Wind Turbines

Authors: Alan Crowle, Philpp Thies

Abstract:

s the floating offshore wind turbine industry continues to develop and grow, the capabilities of established port facilities need to be assessed as to their ability to support the expanding construction and installation requirements. This paper assesses current infrastructure requirements and projected changes to port facilities that may be required to support the floating offshore wind industry. Understanding the infrastructure needs of the floating offshore renewable industry will help to identify the port-related requirements. Floating offshore wind turbines can be installed further out to sea and in deeper waters than traditional fixed offshore wind arrays, meaning it can take advantage of stronger winds. Separate ports are required for substructure construction, fit-out of the turbines, moorings, subsea cables and maintenance. Large areas are required for the laydown of mooring equipment, inter array cables, turbine blades and nacelles. The capabilities of established port facilities to support floating wind farms are assessed by evaluation of size of substructures, height of wind turbine with regards to the cranes for fitting of blades, distance to offshore site and offshore installation vessel characteristics. The paper will discuss the advantages and disadvantages of using large land based cranes, inshore floating crane vessels or offshore crane vessels at the fit-out port for the installation of the turbine. Water depths requirements for import of materials and export of the completed structures will be considered. There are additional costs associated with any emerging technology. However, part of the popularity of Floating Offshore Wind Turbines stems from the cost savings against permanent structures like fixed wind turbines. Floating Offshore Wind Turbine developers can benefit from lighter, more cost effective equipment which can be assembled in port and towed to site rather than relying on large, expensive installation vessels to transport and erect fixed bottom turbines. The ability to assemble Floating Offshore Wind Turbines equipment on shore means minimising highly weather dependent operations like offshore heavy lifts and assembly, saving time and costs and reducing safety risks for offshore workers. Maintenance might take place in safer onshore conditions for barges and semi submersibles. Offshore renewables, such as floating wind, can take advantage of this wealth of experience, while oil and gas operators can deploy this experience at the same time as entering the renewables space. The floating offshore wind industry is in the early stages of development and port facilities are required for substructure fabrication, turbine manufacture, turbine construction and maintenance support. The paper discusses the potential floating wind substructures as this provides a snapshot of the requirements at the present time, and potential technological developments required for commercial development. Scaling effects of demonstration-scale projects will be addressed; however the primary focus will be on commercial-scale (30+ units) device floating wind energy farms.

Keywords: Floating offshore wind turbine, port logistics, installation, construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 427