Search results for: workarounds
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3

Search results for: workarounds

3 Parents, Carers and Young Persons’ Views Regarding Nursing ‘Workarounds’ Within Clinical Electronic Patient Record Systems

Authors: Patrick Nurse, Professor Neil Sebire, Polly Livermore

Abstract:

The use of digital systems in healthcare is now highly prevalent. With further advancement of technology, these systems will become increasingly utilised within the healthcare sector. Therefore understanding how clinicians (for example, doctors, nurses) interact with technology and digital systems is critical to making care safer. Seven members from the Parent/Carers’ Research Advisory Group and the Young-Persons’ Research Group at a healthcare Trust in London and three staff members contributed to an engagement workshop to assess the impact of digital systems on the practice of nurses. The group also advised on the viability of a research study to investigate this further. A wide range of issues within digital system implementation in healthcare were raised, such as ‘workarounds’, system’s training, and upkeep and regulation of usage, which all emerged as early themes during the discussion. Further discussion focused on the subject of escalation of issues, ‘workarounds’, and problem solving. While challenging to implement, digital systems are hugely beneficial to healthcare providers. The workshop indicated that there is scope for investigation of the prevalence, nature, and escalation of ‘workarounds’, this was of key interest to the advisory group. An interesting concern of the group was their worry from a patient and parental perspective regarding how nurses might feel when needing to complete a ‘workaround’ during a busy shift. This is especially relevant if the reasons to complete the ‘workaround’ were outside the nurse’s control, driven by clinical need and urgency of care. This showed the level of insight that those using healthcare services have into the reality of workflows of those providing care. Additionally, it reflects the desire for patients and families to understand more about the administration and methodology of their care. Future study should be dedicated to understanding why nurses deploy ‘workarounds’, as well as their perspective and experience of them and subsequent escalation through leadership hierarchies

Keywords: patient engagement/involvement, workarounds, medication-administration, digital systems

Procedia PDF Downloads 91
2 Experiences of Timing Analysis of Parallel Embedded Software

Authors: Muhammad Waqar Aziz, Syed Abdul Baqi Shah

Abstract:

The execution time analysis is fundamental to the successful design and execution of real-time embedded software. In such analysis, the Worst-Case Execution Time (WCET) of a program is a key measure, on the basis of which system tasks are scheduled. The WCET analysis of embedded software is also needed for system understanding and to guarantee its behavior. WCET analysis can be performed statically (without executing the program) or dynamically (through measurement). Traditionally, research on the WCET analysis assumes sequential code running on single-core platforms. However, as computation is steadily moving towards using a combination of parallel programs and multi-core hardware, new challenges in WCET analysis need to be addressed. In this article, we report our experiences of performing the WCET analysis of Parallel Embedded Software (PES) running on multi-core platform. The primary purpose was to investigate how WCET estimates of PES can be computed statically, and how they can be derived dynamically. Our experiences, as reported in this article, include the challenges we faced, possible suggestions to these challenges and the workarounds that were developed. This article also provides observations on the benefits and drawbacks of deriving the WCET estimates using the said methods and provides useful recommendations for further research in this area.

Keywords: embedded software, worst-case execution-time analysis, static flow analysis, measurement-based analysis, parallel computing

Procedia PDF Downloads 324
1 Integration of Building Information Modeling Framework for 4D Constructability Review and Clash Detection Management of a Sewage Treatment Plant

Authors: Malla Vijayeta, Y. Vijaya Kumar, N. Ramakrishna Raju, K. Satyanarayana

Abstract:

Global AEC (architecture, engineering, and construction) industry has been coined as one of the most resistive domains in embracing technology. Although this digital era has been inundated with software tools like CAD, STADD, CANDY, Microsoft Project, Primavera etc. the key stakeholders have been working in siloes and processes remain fragmented. Unlike the yesteryears’ simpler project delivery methods, the current projects are of fast-track, complex, risky, multidisciplinary, stakeholder’s influential, statutorily regulative etc. pose extensive bottlenecks in preventing timely completion of projects. At this juncture, a paradigm shift surfaced in construction industry, and Building Information Modeling, aka BIM, has been a panacea to bolster the multidisciplinary teams’ cooperative and collaborative work leading to productive, sustainable and leaner project outcome. Building information modeling has been integrative, stakeholder engaging and centralized approach in providing a common platform of communication. A common misconception that BIM can be used for building/high rise projects in Indian Construction Industry, while this paper discusses of the implementation of BIM processes/methodologies in water and waste water industry. It elucidates about BIM 4D planning and constructability reviews of a Sewage Treatment Plant in India. Conventional construction planning and logistics management involves a blend of experience coupled with imagination. Even though the excerpts or judgments or lessons learnt gained from veterans might be predictive and helpful, but the uncertainty factor persists. This paper shall delve about the case study of real time implementation of BIM 4D planning protocols for one of the Sewage Treatment Plant of Dravyavati River Rejuvenation Project in India and develops a Time Liner to identify logistics planning and clash detection. With this BIM processes, we shall find that there will be significant reduction of duplication of tasks and reworks. Also another benefit achieved will be better visualization and workarounds during conception stage and enables for early involvement of the stakeholders in the Project Life cycle of Sewage Treatment Plant construction. Moreover, we have also taken an opinion poll of the benefits accrued utilizing BIM processes versus traditional paper based communication like 2D and 3D CAD tools. Thus this paper concludes with BIM framework for Sewage Treatment Plant construction which will achieve optimal construction co-ordination advantages like 4D construction sequencing, interference checking, clash detection checking and resolutions by primary engagement of all key stakeholders thereby identifying potential risks and subsequent creation of risk response strategies. However, certain hiccups like hesitancy in adoption of BIM technology by naïve users and availability of proficient BIM trainers in India poses a phenomenal impediment. Hence the nurture of BIM processes from conception, construction and till commissioning, operation and maintenance along with deconstruction of a project’s life cycle is highly essential for Indian Construction Industry in this digital era.

Keywords: integrated BIM workflow, 4D planning with BIM, building information modeling, clash detection and visualization, constructability reviews, project life cycle

Procedia PDF Downloads 122