The computation of the effectiveness of turbulence enhancement surface features, such as ribs as means of promoting mixing and hence heat transfer, has attracted the continued attention of the engineering community. In this study, the simulation of a three-dimensional cooling passage is carried out employing a number of turbulence models including Durbin model. The cooling passage consists of a square section duct whose upper and lower surfaces feature staggered cuboid ribs. The main objective of this paper is to provide comparisons of the performance of the v2-f model against other established turbulence models as implemented in the commercial CFD code Ansys Fluent. The present study demonstrates that the v2-f model can successfully capture the isothermal air flow phenomena in flow over obstacles.

Keywords: CFD, cooling passage, Durbin model, turbulence model

Procedia PDF Downloads 482
3 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 368
2 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 221
1 Proof of Concept of Video Laryngoscopy Intubation: Potential Utility in the Pre-Hospital Environment by Emergency Medical Technicians

Authors: A. Al Hajeri, M. E. Minton, B. Haskins, F. H. Cummins

Abstract:

The pre-hospital endotracheal intubation is fraught with difficulties; one solution offered has been video laryngoscopy (VL) which permits better visualization of the glottis than the standard method of direct laryngoscopy (DL). This method has resulted in a higher first attempt success rate and fewer failed intubations. However, VL has mainly been evaluated by experienced providers (experienced anesthetists), and as such the utility of this device for those whom infrequently intubate has not been thoroughly assessed. We sought to evaluate this equipment to determine whether in the hands of novice providers this equipment could prove an effective airway management adjunct. DL and two VL methods (C-Mac with distal screen/C-Mac with attached screen) were evaluated by simulating practice on a Laerdal airway management trainer manikin. Twenty Emergency Medical Technicians (basics) were recruited as novice practitioners. This group was used to eliminate bias, as these clinicians had no pre-hospital experience of intubation (although they did have basic airway skills). The following areas were assessed: Time taken to intubate, number of attempts required to successfully intubate, ease of use of equipment VL (attached screen) took on average longer for novice clinicians to successfully intubate and had a lower success rate and reported higher rating of difficulty compared to DL. However, VL (with distal screen) and DL were comparable on intubation times, success rate, gastric inflation rate and rating of difficulty by the user. This study highlights the routine use of VL by inexperienced clinicians would be of no added benefit over DL. Further studies are required to determine whether Emergency Medical Technicians (Paramedics) would benefit from this airway adjunct, and ascertain whether after initial mastery of VL (with a distal screen), lower intubation times and difficulty rating may be achievable.

Keywords: direct laryngoscopy, endotracheal intubation, pre-hospital, video laryngoscopy

Procedia PDF Downloads 380