Search results for: assembly code
1932 Computer Aided Assembly Attributes Retrieval Methods for Automated Assembly Sequence Generation
Authors: M. V. A. Raju Bahubalendruni, Bibhuti Bhusan Biswal, B. B. V. L. Deepak
Abstract:
Achieving an appropriate assembly sequence needs deep verification for its physical feasibility. For this purpose, industrial engineers use several assembly predicates; namely, liaison, geometric feasibility, stability and mechanical feasibility. However, testing an assembly sequence for these predicates requires huge assembly information. Extracting such assembly information from an assembled product is a time consuming and highly skillful task with complex reasoning methods. In this paper, computer aided methods are proposed to extract all the necessary assembly information from computer aided design (CAD) environment in order to perform the assembly sequence planning efficiently. These methods use preliminary capabilities of three-dimensional solid modelling and assembly modelling methods used in CAD software considering equilibrium laws of physical bodies.Keywords: assembly automation, assembly attributes, assembly, CAD
Procedia PDF Downloads 3031931 Code-Switching and Code Mixing among Ogba-English Bilingual Conversations
Authors: Ben-Fred Ohia
Abstract:
Code-switching and code-mixing are linguistic behaviours that arise in a bilingual situation. They limit speakers in a conversation to decide which code they should use to utter particular phrases or words in the course of carrying out their utterance. Every human society is characterized by the existence of diverse linguistic varieties. The speakers of these varieties at some points have various degrees of contact with the non-speakers of their variety, which one of the outcomes of the linguistic contact is code-switching or code-mixing. The work discusses the nature of code-switching and code-mixing in Ogba-English bilinguals’ speeches. It provides a detailed explanation of the concept of code-switching and code-mixing and explains the typology of code-switching and code-mixing and their manifestation in Ogba-English bilingual speakers’ speeches. The findings reveal that code-switching and code-mixing are functionally motivated and being triggered by various conversational contexts.Keywords: bilinguals, code-mixing, code-switching, Ogba
Procedia PDF Downloads 1791930 Analysis and Improvement of Efficiency for Food Processing Assembly Lines
Authors: Mehmet Savsar
Abstract:
Several factors affect productivity of Food Processing Assembly Lines (FPAL). Engineers and line managers usually do not recognize some of these factors and underutilize their production/assembly lines. In this paper, a special food processing assembly line is studied in detail, and procedures are presented to illustrate how productivity and efficiency of such lines can be increased. The assembly line considered produces ten different types of freshly prepared salads on the same line, which is called mixed model assembly line. Problems causing delays and inefficiencies on the line are identified. Line balancing and related tools are used to increase line efficiency and minimize balance delays. The procedure and the approach utilized in this paper can be useful for the operation managers and industrial engineers dealing with similar assembly lines in food processing industry.Keywords: assembly lines, line balancing, production efficiency, bottleneck
Procedia PDF Downloads 3851929 An Automated Optimal Robotic Assembly Sequence Planning Using Artificial Bee Colony Algorithm
Authors: Balamurali Gunji, B. B. V. L. Deepak, B. B. Biswal, Amrutha Rout, Golak Bihari Mohanta
Abstract:
Robots play an important role in the operations like pick and place, assembly, spot welding and much more in manufacturing industries. Out of those, assembly is a very important process in manufacturing, where 20% of manufacturing cost is wholly occupied by the assembly process. To do the assembly task effectively, Assembly Sequences Planning (ASP) is required. ASP is one of the multi-objective non-deterministic optimization problems, achieving the optimal assembly sequence involves huge search space and highly complex in nature. Many researchers have followed different algorithms to solve ASP problem, which they have several limitations like the local optimal solution, huge search space, and execution time is more, complexity in applying the algorithm, etc. By keeping the above limitations in mind, in this paper, a new automated optimal robotic assembly sequence planning using Artificial Bee Colony (ABC) Algorithm is proposed. In this algorithm, automatic extraction of assembly predicates is done using Computer Aided Design (CAD) interface instead of extracting the assembly predicates manually. Due to this, the time of extraction of assembly predicates to obtain the feasible assembly sequence is reduced. The fitness evaluation of the obtained feasible sequence is carried out using ABC algorithm to generate the optimal assembly sequence. The proposed methodology is applied to different industrial products and compared the results with past literature.Keywords: assembly sequence planning, CAD, artificial Bee colony algorithm, assembly predicates
Procedia PDF Downloads 2351928 An Assembly Line Designing Study for a Refrigeration Industry
Authors: Emin Gundogar, Burak Erkayman, Aysegul Yilmaz, Nusret Sazak
Abstract:
When considering current competition conditions on the world, satisfying customer demands on time has become an important factor that enables the firms take a step further. Therefore, production process must be completed faster to take the competitive advantage. A balanced assembly line is the one of most important factors affecting the speed of production lines. The aim of this study is to build an assembly line to balance the assembly line and to simulate it for different scenarios through a refrigerator factory. The times of the operations is analyzed and grouped by the priorities. First, a Kilbridge & Wester heuristics is put to the model then a simulation approach is implemented to the model and the differences are observed.Keywords: assembly line design, assembly line balancing, simulation modelling, refrigeration industry
Procedia PDF Downloads 4461927 Multi Objective Simultaneous Assembly Line Balancing and Buffer Sizing
Authors: Saif Ullah, Guan Zailin, Xu Xianhao, He Zongdong, Wang Baoxi
Abstract:
Assembly line balancing problem is aimed to divide the tasks among the stations in assembly lines and optimize some objectives. In assembly lines the workload on stations is different from each other due to different tasks times and the difference in workloads between stations can cause blockage or starvation in some stations in assembly lines. Buffers are used to store the semi-finished parts between the stations and can help to smooth the assembly production. The assembly line balancing and buffer sizing problem can affect the throughput of the assembly lines. Assembly line balancing and buffer sizing problems have been studied separately in literature and due to their collective contribution in throughput rate of assembly lines, balancing and buffer sizing problem are desired to study simultaneously and therefore they are considered concurrently in current research. Current research is aimed to maximize throughput, minimize total size of buffers in assembly line and minimize workload variations in assembly line simultaneously. A multi objective optimization objective is designed which can give better Pareto solutions from the Pareto front and a simple example problem is solved for assembly line balancing and buffer sizing simultaneously. Current research is significant for assembly line balancing research and it can be significant to introduce optimization approaches which can optimize current multi objective problem in future.Keywords: assembly line balancing, buffer sizing, Pareto solutions
Procedia PDF Downloads 4871926 A Rapid Code Acquisition Scheme in OOC-Based CDMA Systems
Authors: Keunhong Chae, Seokho Yoon
Abstract:
We propose a code acquisition scheme called improved multiple-shift (IMS) for optical code division multiple access systems, where the optical orthogonal code is used instead of the pseudo noise code. Although the IMS algorithm has a similar process to that of the conventional MS algorithm, it has a better code acquisition performance than the conventional MS algorithm. We analyze the code acquisition performance of the IMS algorithm and compare the code acquisition performances of the MS and the IMS algorithms in single-user and multi-user environments.Keywords: code acquisition, optical CDMA, optical orthogonal code, serial algorithm
Procedia PDF Downloads 5371925 Automated Buffer Box Assembly Cell Concept for the Canadian Used Fuel Packing Plant
Authors: Dimitrie Marinceu, Alan Murchison
Abstract:
The Canadian Used Fuel Container (UFC) is a mid-size hemispherical headed copper coated steel container measuring 2.5 meters in length and 0.5 meters in diameter containing 48 used fuel bundles. The contained used fuel produces significant gamma radiation requiring automated assembly processes to complete the assembly. The design throughput of 2,500 UFCs per year places constraints on equipment and hot cell design for repeatability, speed of processing, robustness and recovery from upset conditions. After UFC assembly, the UFC is inserted into a Buffer Box (BB). The BB is made from adequately pre-shaped blocks (lower and upper block) and Highly Compacted Bentonite (HCB) material. The blocks are practically ‘sandwiching’ the UFC between them after assembly. This paper identifies one possible approach for the BB automatic assembly cell and processes. Automation of the BB assembly will have a significant positive impact on nuclear safety, quality, productivity, and reliability.Keywords: used fuel packing plant, automatic assembly cell, used fuel container, buffer box, deep geological repository
Procedia PDF Downloads 2731924 WEMax: Virtual Manned Assembly Line Generation
Authors: Won Kyung Ham, Kang Hoon Cho, Sang C. Park
Abstract:
Presented in this paper is a framework of a software ‘WEMax’. The WEMax is invented for analysis and simulation for manned assembly lines to sustain and improve performance of manufacturing systems. In a manufacturing system, performance, such as productivity, is a key of competitiveness for output products. However, the manned assembly lines are difficult to forecast performance, because human labors are not expectable factors by computer simulation models or mathematical models. Existing approaches to performance forecasting of the manned assembly lines are limited to matters of the human itself, such as ergonomic and workload design, and non-human-factor-relevant simulation. Consequently, an approach for the forecasting and improvement of manned assembly line performance is needed to research. As a solution of the current problem, this study proposes a framework that is for generation and simulation of virtual manned assembly lines, and the framework has been implemented as a software.Keywords: performance forecasting, simulation, virtual manned assembly line, WEMax
Procedia PDF Downloads 3241923 Product Feature Modelling for Integrating Product Design and Assembly Process Planning
Authors: Baha Hasan, Jan Wikander
Abstract:
This paper describes a part of the integrating work between assembly design and assembly process planning domains (APP). The work is based, in its first stage, on modelling assembly features to support APP. A multi-layer architecture, based on feature-based modelling, is proposed to establish a dynamic and adaptable link between product design using CAD tools and APP. The proposed approach is based on deriving “specific function” features from the “generic” assembly and form features extracted from the CAD tools. A hierarchal structure from “generic” to “specific” and from “high level geometrical entities” to “low level geometrical entities” is proposed in order to integrate geometrical and assembly data extracted from geometrical and assembly modelers to the required processes and resources in APP. The feature concept, feature-based modelling, and feature recognition techniques are reviewed.Keywords: assembly feature, assembly process planning, feature, feature-based modelling, form feature, ontology
Procedia PDF Downloads 3071922 Design for Error-Proofing Assembly: A Systematic Approach to Prevent Assembly Issues since Early Design Stages, an Industrial Case Study
Authors: Gabriela Estrada, Joaquim Lloveras
Abstract:
Design for error-proofing assembly is a new DFX approach to prevent assembly issues since early design stages. Assembly issues that can happen during the life phases of a system such as: production, installation, operation, and replacement phases. This prevention is possible by designing the product with poka-yoke or error-proofing characteristics. This approach guide designers to make decisions based on poka-yoke assembly design requirements. As a result of applying these requirements designers are able to create solutions to prevent assembly issues for the product in development stage. This paper integrates the needs to design products in an error proofing way into the systematic approach of design process by Pahl and Beitz. A case study is presented applying this approach.Keywords: poka-yoke, error-proofing, assembly issues, design process, life phases of a system
Procedia PDF Downloads 3741921 Design for Error-Proofing Assembly: A Systematic Approach to Prevent Assembly Issues since Early Design Stages. An Industry Case Study
Authors: Gabriela Estrada, Joaquim Lloveras
Abstract:
Design for error-proofing assembly is a new DFX approach to prevent assembly issues since early design stages. Assembly issues that can happen during the life phases of a system such as: production, installation, operation and replacement phases. This prevention is possible by designing the product with poka-yoke or error-proofing characteristics. This approach guide designers to make decisions based on poka-yoke assembly design requirements. As a result of applying these requirements designers are able to create solutions to prevent assembly issues for the product in development stage. This paper integrates the needs to design products in an error proofing way into the systematic approach of design process by Pahl and Beitz. A case study is presented applying this approach.Keywords: poka-yoke, error-proofing, assembly issues, design process, life phases of a system
Procedia PDF Downloads 3211920 Development of Lead-Bismuth Eutectic Sub-Channel Code Available for Wire Spacer
Authors: Qi Lu, Jian Deng, Daishun Huang, Chao Guo
Abstract:
The lead cooled fast reactor is considered as one of the most potential Generation IV nuclear systems due to the low working pressure, the appreciable neutron economy, and the considerable passive characteristics. Meanwhile, the lead bismuth eutectic (LBE) has the related advantages of lead with the weaker corrosiveness, which has been paid much attention by recent decades. Moreover, the sub-channel code is a necessary analysis tool for the reactor thermal-hydraulic design and safety analysis, which has been developed combined with the accumulation of LBE experimental data and the understanding of physical phenomena. In this study, a sub-channel code available for LBE was developed, and the corresponding geometric characterization method of typical sub-channels was described in detail, especially for for the fuel assembly with wire spacer. As for this sub-channel code, the transversal thermal conduction through gap was taken into account. In addition, the physical properties, the heat transfer model, the flow resistance model and the turbulent mixing model were analyzed. Finally, the thermal-hydraulic experiments of LBE conducted on THEADES (THErmal-hydraulics and Ads DESign) were selected as the evaluation data of this sub-channel code, including 19 rods with wire spacer, and the calculated results were in good agreement with the experimental results.Keywords: lead bismuth eutectic, sub-channel code, wire spacer, transversal thermal conduction
Procedia PDF Downloads 1291919 An Overview of Evaluations Using Augmented Reality for Assembly Training Tasks
Authors: S. Werrlich, E. Eichstetter, K. Nitsche, G. Notni
Abstract:
Augmented Reality (AR) is a strong growing research topic in different training domains such as medicine, sports, military, education and industrial use cases like assembly and maintenance tasks. AR claims to improve the efficiency and skill-transfer of training tasks. This paper gives a comprehensive overview of evaluations using AR for assembly and maintenance training tasks published between 1992 and 2017. We search in a structured way in four different online databases and get 862 results. We select 17 relevant articles focusing on evaluating AR-based training applications for assembly and maintenance tasks. This paper also indicates design guidelines which are necessary for creating a successful application for an AR-based training. We also present five scientific limitations in the field of AR-based training for assembly tasks. Finally, we show our approach to solve current research problems using Design Science Research (DSR).Keywords: assembly, augmented reality, survey, training
Procedia PDF Downloads 2771918 Electrochemical Layer by Layer Assembly
Authors: Mao Li, Yuguang Ma, Katsuhiko Ariga
Abstract:
The performance of functional materials is governed by their ability to interact with surrounding environments in a well-defined and controlled manner. Layer-by-Layer (LbL) assembly is one of the most widely used technologies for coating both planar and particulate substrates in a diverse range of fields, including optics, energy, catalysis, separations, and biomedicine. Herein, we introduce electrochemical-coupling layer-by-layer assembly as a novel fabrication methodology for preparing layered thin films. This assembly method not only determines the process properties (such as the time, scalability, and manual intervention) but also directly control the physicochemical properties of the films (such as the thickness, homogeneity, and inter- and intra-layer film organization), with both sets of properties linked to application-specific performance.Keywords: layer by layer assembly, electropolymerization, carbazole, optical thin film, electronics
Procedia PDF Downloads 3801917 3D Linear and Cyclic Homo-Peptide Crystals Forged by Supramolecular Swelling Self-Assembly
Authors: Wenliang Song, Yu Zhang, Hua Jin, Il Kim
Abstract:
The self-assembly of the polypeptide (PP) into well-defined structures at different length scales is both biomimetic relevant and fundamentally interesting. Although there are various reports of nanostructures fabricated by the self-assembly of various PPs, directed self-assembly of PP into three-dimensional (3D) hierarchical structure has proven to be difficult, despite their importance for biological applications. Herein, an efficient method has been developed through living polymerization of phenylalanine N-Carboxy anhydride (NCA) towards the linear and cyclic polyphenylalanine, and the new invented swelling methodology can form diverse hierarchical polypeptide crystals. The solvent-dependent self-assembly behaviors of these homopolymers were characterized by high-resolution imaging tools such as atomic force microscopy, transmission electron microscopy, scanning electron microscope. The linear and cyclic polypeptide formed 3D nano hierarchical shapes, such as a sphere, cubic, stratiform and hexagonal star in different solvents. Notably, a crystalline packing model was proposed to explain the formation of 3D nanostructures based on the various diffraction patterns, looking forward to give an insight for their dissimilar shape inflection during the self-assembly process.Keywords: self-assembly, polypeptide, bio-polymer, crystalline polymer
Procedia PDF Downloads 2381916 Characterization of Onboard Reliable Error Correction Code FORSDRAM Controller
Authors: N. Pitcheswara Rao
Abstract:
In the process of conveying the information there may be a chance of signal being corrupted which leads to the erroneous bits in the message. The message may consist of single, double and multiple bit errors. In high-reliability applications, memory can sustain multiple soft errors due to single or multiple event upsets caused by environmental factors. The traditional hamming code with SEC-DED capability cannot be address these types of errors. It is possible to use powerful non-binary BCH code such as Reed-Solomon code to address multiple errors. However, it could take at least a couple dozen cycles of latency to complete first correction and run at a relatively slow speed. In order to overcome this drawback i.e., to increase speed and latency we are using reed-Muller code.Keywords: SEC-DED, BCH code, Reed-Solomon code, Reed-Muller code
Procedia PDF Downloads 4251915 Characterization of Onboard Reliable Error Correction Code for SDRAM Controller
Authors: Pitcheswara Rao Nelapati
Abstract:
In the process of conveying the information there may be a chance of signal being corrupted which leads to the erroneous bits in the message. The message may consist of single, double and multiple bit errors. In high-reliability applications, memory can sustain multiple soft errors due to single or multiple event upsets caused by environmental factors. The traditional hamming code with SEC-DED capability cannot be address these types of errors. It is possible to use powerful non-binary BCH code such as Reed-Solomon code to address multiple errors. However, it could take at least a couple dozen cycles of latency to complete first correction and run at a relatively slow speed. In order to overcome this drawback i.e., to increase speed and latency we are using reed-Muller code.Keywords: SEC-DED, BCH code, Reed-Solomon code, Reed-Muller code
Procedia PDF Downloads 4261914 Effect of Interference and Form Defect on the Cohesion of the Shrink-Fit Assembly
Authors: Allal Bedlaoui, Hamid Boutoutaou
Abstract:
Due to its superior economics, shrink-fit assembly is one of the best mechanical assembly methods. There are simply two components, the axis and hub. It is used in many different industries, including the production of trains, cars, and airplanes. The outer radius of the inner cylinder must be greater than the inner radius of the outer cylinder for this operation; this difference is referred to as the "interference" between the two cylinders. There are three ways to accomplish this: heating the outer cylinder to cause it to expand; cooling the cylinder's inside to cause it to contract; and third, finishing the fitting under a press. At the intersection of the two matched parts, a contact pressure and friction force are generated. We consider interference and form defects in this article because they prevent the connection between the axis and the hub from having a perfect form surface and because we will be looking at how they affect the assembly. Numerical simulation is used to ascertain if interference and form defects have a beneficial or negative influence in the distribution of stresses, assembly resistance, and plasticity.Keywords: shrink-fit, interference, form defect, plasticity, extraction force
Procedia PDF Downloads 761913 Modern Technologies and Equipment for Modular-Aggregate Installation of Shipborne Equipment
Authors: A. O. Mikhailov, N. I. Gerasimov, K. N. Morozov, I. V. Grachev
Abstract:
The most advanced method of onboard equipment installation on the world shipbuilding practice is modular method, or modularization. The main idea of this is assembly of equipment, pipelines and hull structures in so called assembly units yet at the shopfloor. Those assembly units are thereafter loaded and installed inside the ship's hull. This allows to reduce labour intensiveness and significantly improve assembly quality, due to the fact that a good part of installation work is performed in the shops, instead of restricted onboard premises. Also, this method allows performing equipment installation at very early stages of hull erection. This practice is widely spread in naval submarines building. However, in merchant shipbuilding, equipment is installed mostly individually. To implement modular principles of equipment installation in designing and construction of civil ships and marine rigs, some new technologies are being developed in the following areas. The paper contains main principles and already achieved results in the above mentioned areas.Keywords: assembly and installation technology, onboard equipment installation, large-scale assembly units, modular method
Procedia PDF Downloads 6581912 A Resistant-Based Comparative Study between Iranian Concrete Design Code and Some Worldwide Ones
Authors: Seyed Sadegh Naseralavi, Najmeh Bemani
Abstract:
The design in most counties should be inevitably carried out by their native code such as Iran. Since the Iranian concrete code does not exist in structural design software, most engineers in this country analyze the structures using commercial software but design the structural members manually. This point motivated us to make a communication between Iranian code and some other well-known ones to create facility for the engineers. Finally, this paper proposes the so-called interpretation charts which help specify the position of Iranian code in comparison of some worldwide ones.Keywords: beam, concrete code, strength, interpretation charts
Procedia PDF Downloads 5231911 Trends in Solving Assembly Job Shop Scheduling Problem: A Review
Authors: Midhun Paul, T. Radha Ramanan
Abstract:
The objective of this work is to present a state-of-the-art literature review highlighting the challenges in the research of the scheduling of assembly job shop problem and providing an insight on how the future directions of the research would be. The number of work has been substantial that it requires a review to enable one to understand the origin of the research and how it is getting evolved. This review paper presents a comprehensive review of the literature dealing with various studies carried on assembly job shop scheduling. The review details the evolution of the AJS from the perspective of other scheduling problems and also presents a classification scheme. The work also identifies the potential directions for future research, which we believe to be worthwhile considering.Keywords: assembly job shop, future directions, manufacturing, scheduling
Procedia PDF Downloads 4101910 Optimization Model for Identification of Assembly Alternatives of Large-Scale, Make-to-Order Products
Authors: Henrik Prinzhorn, Peter Nyhuis, Johannes Wagner, Peter Burggräf, Torben Schmitz, Christina Reuter
Abstract:
Assembling large-scale products, such as airplanes, locomotives, or wind turbines, involves frequent process interruptions induced by e.g. delayed material deliveries or missing availability of resources. This leads to a negative impact on the logistical performance of a producer of xxl-products. In industrial practice, in case of interruptions, the identification, evaluation and eventually the selection of an alternative order of assembly activities (‘assembly alternative’) leads to an enormous challenge, especially if an optimized logistical decision should be reached. Therefore, in this paper, an innovative, optimization model for the identification of assembly alternatives that addresses the given problem is presented. It describes make-to-order, large-scale product assembly processes as a resource constrained project scheduling (RCPS) problem which follows given restrictions in practice. For the evaluation of the assembly alternative, a cost-based definition of the logistical objectives (delivery reliability, inventory, make-span and workload) is presented.Keywords: assembly scheduling, large-scale products, make-to-order, optimization, rescheduling
Procedia PDF Downloads 4571909 Flexible Mixed Model Assembly Line Design: A Strategy to Respond for Demand Uncertainty at Automotive Part Manufacturer in Indonesia
Authors: T. Yuri, M. Zagloel, Inaki M. Hakim, Tegu Bintang Nugraha
Abstract:
In an era of customer centricity, automotive parts manufacturer in Indonesia must be able to keep up with the uncertainty and fluctuation of consumer demand. Flexible Manufacturing System (FMS) is a strategy to react to predicted and unpredicted changes of demand in automotive industry. This research is about flexible mixed model assembly line design through Value Stream Mapping (VSM) and Line Balancing in mixed model assembly line prior to simulation. It uses value stream mapping to identify and reduce waste while finding the best position to add or reduce manpower. Line balancing is conducted to minimize or maximize production rate while increasing assembly line productivity and efficiency. Results of this research is a recommendation of standard work combination for specifics demand scenario which can enhance assembly line efficiency and productivity.Keywords: automotive industry, demand uncertainty, flexible assembly system, line balancing, value stream mapping
Procedia PDF Downloads 3261908 Determination of the Economic Planning Depth for Assembly Process Planning
Authors: A. Kampker, P. Burggräf, Y. Bäumers
Abstract:
In order to be competitive, companies have to reduce their production costs while meeting increasing quality requirements. Therefore, companies try to plan their assembly processes as detailed as possible. However, increasing product individualization leading to a higher number of variants, smaller batch sizes and shorter product life cycles raise the question to what extent the effort of detailed planning is still justified. An important approach in this field of research is the concept of determining the economic planning depth for assembly process planning based on production specific influencing factors. In this paper, first solution hypotheses as well as a first draft of the resulting method will be presented.Keywords: assembly process planning, economic planning depth, planning benefit, planning effort
Procedia PDF Downloads 5021907 Code-Switching in Facebook Chatting Among Maldivian Teenagers
Authors: Aaidha Hammad
Abstract:
This study examines the phenomenon of code switching among teenagers in the Maldives while they carry out conversations through Facebook in the form of “Facebook Chatting”. The current study aims at evaluating the frequency of code-switching and it investigates between what languages code-switching occurs. Besides the study identifies the types of words that are often codeswitched and the triggers for code switching. The methodology used in this study is mixed method of qualitative and quantitative approach. In this regard, the chat log of a group conversation between 10 teenagers was collected and analyzed. A questionnaire was also administered through online to 24 different teenagers from different corners of the Maldives. The age of teenagers ranged between 16 and 19 years. The findings of the current study revealed that while Maldivian teenagers chat in Facebook they very often code switch and these switches are most commonly between Dhivehi and English, but some other languages are also used to some extent. It also identified the different types of words that are being often code switched among the teenagers. Most importantly it explored different reasons behind code switching among the Maldivian teenagers in Facebook chatting.Keywords: code-switching, Facebook, Facebook chatting Maldivian teenagers
Procedia PDF Downloads 2431906 Framework Study on Single Assembly Line to Improve Productivity with Six Sigma and Line Balancing Approach
Authors: Inaki Maulida Hakim, T. Yuri M. Zagloel, Astari Wulandari
Abstract:
Six sigma is a framework that is used to identify inefficiency so that the cause of inefficiency will be known and right improvement to overcome cause of inefficiency can be conducted. This paper presents result of implementing six sigma to improve piston assembly line in Manufacturing Laboratory, Universitas Indonesia. Six sigma framework will be used to analyze the significant factor of inefficiency that needs to be improved which causes bottleneck in assembly line. After analysis based on six sigma framework conducted, line balancing method was chosen for improvement to overcome causative factor of inefficiency which is differences time between workstation that causes bottleneck in assembly line. Then after line balancing conducted in piston assembly line, the result is increase in efficiency. Efficiency is shown in the decreasing of Defects per Million Opportunities (DPMO) from 900,000 to 700,000, the increasing of level of labor productivity from 0.0041 to 0.00742, the decreasing of idle time from 121.3 seconds to 12.1 seconds, and the increasing of output, which is from 1 piston in 5 minutes become 3 pistons in 5 minutes.Keywords: assembly line, line balancing, productivity, six sigma
Procedia PDF Downloads 2981905 Information Technologies in Automotive Assembly Industry in Thailand
Authors: Jirarat Teeravaraprug, Usawadee Inklay
Abstract:
This paper gave an attempt in prioritizing information technologies that organizations should give concentration. The case study was organizations in the automotive assembly industry in Thailand. Data were first collected to gather all information technologies known and used in the automotive assembly industry in Thailand. Five experts from the industries were surveyed based on the concept of fuzzy DEMATEL. The information technologies were categorized into six groups, which were communication, transaction, planning, organization management, warehouse management, and transportation. The cause groups of information technologies for each group were analysed and presented. Moreover, the relationship between the used and the significant information technologies was given. Discussions based on the used information technologies and the research results are given.Keywords: information technology, automotive assembly industry, fuzzy DEMATEL
Procedia PDF Downloads 3441904 Multi Objective Optimization for Two-Sided Assembly Line Balancing
Authors: Srushti Bhatt, M. B. Kiran
Abstract:
Two-sided assembly line balancing problem is yet to be addressed simply to compete for the global market for manufacturers. The task assigned in an ordered sequence to get optimum performance of the system is known as assembly line balancing problem mainly classified as single and two sided. It is very challenging in manufacturing industries to balance two-sided assembly line, wherein the set of sequential workstations the task operations are performed in two sides of the line. The conflicting major objective in two-sided assembly line balancing problem is either to maximize /minimize the performance parameters. The present study emphases on combining different evolutionary algorithm; ant colony, Tabu search and petri net method; and compares their results of an algorithm for solving two-sided assembly line balancing problem. The concept of multi objective optimization of performance parameters is now a day adopted to make a decision involving more than one objective function to be simultaneously optimized. The optimum result can be expected among the selected methods using multi-objective optimization. The performance parameters considered in the present study are a number of workstation, slickness and smoothness index. The simulation of the assembly line balancing problem provides optimal results of classical and practical problems.Keywords: Ant colony, petri net, tabu search, two sided ALBP
Procedia PDF Downloads 2761903 An Architecture Framework for Design of Assembly Expert System
Authors: Chee Fai Tan, L. S. Wahidin, S. N. Khalil
Abstract:
Nowadays, manufacturing cost is one of the important factors that will affect the product cost as well as company profit. There are many methods that have been used to reduce the manufacturing cost in order for a company to stay competitive. One of the factors that effect manufacturing cost is the time. Expert system can be used as a method to reduce the manufacturing time. The purpose of the expert system is to diagnose and solve the problem of design of assembly. The paper describes an architecture framework for design of assembly expert system that focuses on commercial vehicle seat manufacturing industry.Keywords: design of assembly, expert system, vehicle seat, mechanical engineering
Procedia PDF Downloads 434