Interactive Planning of Suburban Apartment Buildings
Authors: J. Koiso-Kanttila, A. Soikkeli, A. Aapaoja
Abstract:
Construction in Finland is focusing increasingly on renovation instead of conventional new construction, and this trend will continue to grow in the coming years and decades. Renovation of the large number of suburban residential apartment buildings built in the 1960s and 1970s poses a particular challenge. However, renovation projects are demanding for the residents of these buildings, since they usually are uninitiated in construction issues. On the other hand, renovation projects generally apply the operating models of new construction. Nevertheless, the residents of an existing residential apartment building are some of the best experts on the site. Thus, in this research project we applied a relational model in developing and testing at case sites a planning process that employs interactive planning methods. Current residents, housing company managers, the city zoning manager, the contractor’s and prefab element supplier’s representatives, professional designers and researchers all took part in the planning. The entire interactive planning process progressed phase by phase as the participants’ and designers’ concerted discussion and ideation process, so that the end result was a renovation plan desired by the residents.
Keywords: Apartment building renovation, interactive planning, project alliance, user-orientedness.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1096177
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2713References:
[1] European Union Directive 2010/31/EU. http://eur-lex.europa.eu/ LexUriServ/LexUriServ.do?uri=OJ:L:2010:153:0013:0035:FI:PDF
[2] I. Kouhia, J. Nieminen, S. Pulakka, Rakennuksen ulkovaipan energiakorjaukset. Tutkimusraportti VTT-R-04017-10, Helsinki 2010, pp. 5-6.
[3] L. Lukkarinen, S. Kärki, A. Saari and J.-M. Junnonen, Lisärakentaminen osana korjaushanketta, Ympäristöministeriön raportteja 27, http://www.ymparisto.fi/download.asp?contentid=130987&lan=fi, 2011, pp. 42.
[4] W. Swan, C. Abbott and C. Barlow. "ApRemodel: A Study of Non- Technical Innovations in Multi-Occupancy Sustainable Retrofit Housing Projects,” 'Retrofit 2012' Conference, University of Salford, Salford, UK, 24. -26.1. 2012.
[5] IDEAL EPBD. Deliverable 3.1. Appendix I. Barriers Reported by the Member States. IDEAL EPBD, Improving Dwellings by Enhancing Actions on Labelling for the EPBD. http://www.ideal-epbd.eu/ download/D3-1_appendix_I_barriers.pdf, 2009, p. 16.
[6] J. Pekkanen, Asiakkuuden menestys- ja uhkatekijät rakennushankkeessa. Research reports5. Doctoral dissertation, Tampere: University of Technology, 2005.
[7] B. K. Baiden, A. D. F. Price & A. R. J. Dainty, "The extent of team integration within construction projects,” International Journal of Project
[8] Management 24(2): 2006, pp. 13–23.
[9] P. Lahdenperä, "Making sense of the multi-party contractual arrangements of projectpartnering, project alliancing and integrated project delivery,” Construction Management and Economics 30: 2012, pp. 57–79.
[10] S. Olander, and S. Landin, ”Evaluation of stakeholder influence in the implementation of construction projects,” International Journal of Project Management, Vol. 23, 2005, pp. 321-328,.
[11] A. Aapaoja, Enhancing value creation of construction projects through early stakeholder involvement and integration. Doctoral dissertation, Industrial Engineering and Management, University of Oulu, 2014.
[12] P. Söderström, Integroituprojektitoimituslisä- ja korjausrakentamisessa, Master thesis, University of Oulu, Department of Industrial Engineering and Management, 2013.
[13] P. Mitropoulos & G. A. Howell, "Renovation projects: design process problems and improvement mechanisms,” Journal of Management in Engineering 18(4): 2002, pp. 179–185,
[14] T. Arola. Vuorovaikutteinen kaavoitus ja kuntalaisten vaikuttaminen. Kansalaisyhteiskunnan, suunnittelun ja päätöksenteon kohtaaminen maankäytön suunnittelussa.Helsinki: Kuntaliitto, 2002, pp. 6-19, 49.
[15] U. Räihä, ”Vuorovaikutteinen suunnittelu vauhdittaa suunnittelua ja päätöksentekoa,” Maankäyttö 4/2009, 16-17
[16] T. Brady & A. Davies, "Learning to deliver a mega-project: the case of Heathrow Terminal 5,” Howard M & Caldwell N (eds) Procuring complex performance: studies of innovation in product-service management. Routledge, 2011.
[17] A. R. J. Dainty, G. H. Briscoe and S. J. Millett, "Subcontractor perspectives on supply chain alliances,” Construction Management and Economics 19: 2001, pp. 841–848.
[18] B. Jørgensen and S. Emmitt, "Investigating the integration of design and construction from a "Lean” perspective,” Construction Innovation 9(2): 2009, pp. 225–240,.
[19] American Institute of Architects. Integrated project delivery: a guide. Washington DC: The American Institute of Architects, 2007.
[20] J. Ross "Introduction to project alliancing (on engineering and construction projects),” Alliance contracting conference. Sydney: Australia, 2003.
[21] A. Aapaoja, M. Herrala, A. Pekuri and H. Haapasalo, "Characteristics of and cornerstones for creating integrated teams,”International Journal of Managing Projects in Business, Vol. 6, No. 4, 2013.