Implementation Gas Lift Selection Technique and Design in the Wafa Field of Ghadamis Basin, West Libya
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Implementation Gas Lift Selection Technique and Design in the Wafa Field of Ghadamis Basin, West Libya

Authors: E. I. Fandi, E. A. Alfandi, M. A. Alrabib

Abstract:

Implementing of a continues flow gas lift system for one vertical oil well producer in Wafa field was investigated under five reservoir pressures and their dependent parameters. Well 03 producers were responded positively to the gas lift system despite of the high well head operating pressures. However, the flowing bottom hole pressures were reduced by a ratio from 6 to 33 % in the case A3 for example, for the design runs conducted under the existing operating conditions for years 2003, 2006 and 2009. This reduction in FBHP has increased the production rate by a ratio from 12 to 22.5%. The results indicated that continues flow gas lift system is a good candidate as an artificial lift system to be considered for the one vertical producer covered by this study. Most significantly, timing for artificial lift by a gas lift system for this field is highly dependent on the amount of gas available at the time of implementation because of the high gas production rate from the top of the reservoir. 

Keywords: Gas lift, Wafa field, Ghadamis Basin, Artificial lift, Libya.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1090833

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3521

References:


[1] Libia – Wafa Field, Reservoir Study – ENI Agip Division- February 2004.
[2] Libia – Wafa Field – Well Test Interpretation and Performance Analysis- AGIP GAS BV- May 2003.
[3] DLibia – Western Libya Gas Project – NC 169 – Wafa Field – Geological Model – WLGP – February 1997.
[4] Libia – Wafa Field – Multidisciplinary study” – ENI Agip Division June 2001. Libya.
[5] Libia – Wafa Field – Multidisciplinary study” – ENI Agip Division- June 2001.
[6] Libia – Wafa Field – Western Libya Gas Project - WAFA Reservoir Simulation Study –WLGP – October 1997.
[7] Libia – Wafa Field – Well Test Interpretation and Performance Analysis – ENI Agip .Division – May 2003.
[8] Libia – Western Libya Gas Project – NC 169 – Wafa Field - Geological Model – WLGP – February 1997.
[9] Libia – Wafa Field – Cluster Analysis – ENI Agip Division – January 2002.
[10] Aziz, A., Stratigraphy and hydrocarbon potential of the lower Palaeozoic succession of licence NC115, Murzuq Basin, SW Libya., In: Sola, M.A., Worsley, D. (Eds.), Geological Exploration of the Murzuq Basin., Elsevier, Amsterdam, pp. 379–396, 2000.