The Performance of Disbursement Procedure of Public Works in Thailand
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32799
The Performance of Disbursement Procedure of Public Works in Thailand

Authors: Israngkura Na Ayudhya B, Kunishima M.

Abstract:

This paper analysis performance of disbursement procedure of public works project in Thailand. The results of research were summarised based on contracts, submitted invoice, inspection dated, copies of disbursement dated between client and their main contractor and interviewed with persons involved in central and local government projects during 1994-2008 in Thailand. The data collection was to investigate the disbursement procedure related to performance in disbursement during construction period (Planned duration of contract against Actual execution date in each month). A graphical presentation of a duration analysis of the projects illustrated significant disbursement formation in each project. It was established that the shortage of staff, the financial stability of clients, bureaucratic, method of disbursement and economics situation has play major role on performance of disbursement to their main contractors.

Keywords: Construction disbursement, Payment procedure, Public works

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1085149

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1447

References:


[1] D. Greenwood, "Subcontract procurement: Are relationship changing?" Construction Management and Economics., vol.19, 2000, pp.5-7
[2] C. Gray. and R. Flanagan , "The changing role of specialist and trade contractors", Chartered Institute of Building, Ascot.
[3] N.F. Mansfeild, O.O Ugwu, T. Doran, "Causes of delay and cost of overruns in Nigerian construction projects. International Journal of Project Management., vol.12(4), pp. 254-260.
[4] H.A Odeyinka, A. Yusif, "The causes and effects of construction delays on completion cost of housing projects in Nigeria" Journal of Financial Management of Property and Construction., vol.2(3), 1997, pp.31-44.
[5] Ayudhya Israngkura. B, Kunishima M, "Study of Payment Procedures of Public Works in Thailand" Proceeding of Annual Forum on Construction Management., vol.23, 2005, pp.147-150.
[6] S. Love, ÔÇÿSubcontractor partnering: I-ll believe it when I see it" Journal of Management in Engineering., vol.13(5), 1997, pp. 29-31.
[7] D.A. Bordoli, A.N. Balwin, "A methodology for assessing construction project delays" Construction Management and Economics., vol.16, 1998, pp.327-337.
[8] D.W.M. Chan, and M.M. Kumaraswamy, "A comparative study of causes of time overrun in Hong Kong construction projects" International Journal of Project Management., vol.15(1), 1997, pp.55-63.
[9] A.M. Elazouni and Metwally F.G, "Factor-based path analysis to support subcontractor management" International Journal of Project Management., vol.23(2), 2000, pp.109-120.
[10]
[D. Arditi, G.T. Akan and S. Gurdamar, "Reasons for delays in public projects in Turkey" Construction Management and Economics., vol.3, 1985, pp.171-181.
[11] S.A. Assaf, M. Alkhalil and M. Al-Hazmi, "Cause of delay in large building construction projects" Journal of Management in Engineer, ASCE., vol.11(2), 1995, pp.45-50.
[12] D.E. Hancher, J.E. Rowing, "Setting highway construction contract duration" Journal of the Construction Division, ASCE., vol.107(2), 1981, pp.169-79.
[13] F.A Chalabi and D. Camp, "Causes of delay and overruns of construction projects in developing countries". CIB Proc, W-65; vol.2, 1984, pp.273-734.
[14] R.N. Nkado, "A model for predicting and planning construction times at largely design stages" Proceedings of eleventh Annual ARCOM Conference, ARCOM., September, 2005, pp.298-307.
[15] S.G. Naoum and F.H. Mustapha, "Relationship between the building team, procurement methods and project performance" Journal of Construction Procurement., vol.1(1), pp.38-49.
[16] D.H.T. Walker, "An investigation into construction time performance" Construction Management and Economics.,vol.13(3), pp.263-74.
[17] D.H.T. Walker, "The influence of client and project team relationship upon construction time performance". Journal of Construction Procurement., vol.1(1),pp. 4-20.
[18] International Federation of Consulting Engineers (FIDIC)., Condition of contract (contract agreement), 2006.
[19] International Federation of Consulting Engineers (FIDIC)., Conditions of contract (construction), 2006.
[20] J.G. Perry JG and R.W. Hayes, "Risk and its management in construction projects" Proceedings of Institution of Civil Engineers., vol.78, 1985, pp. 499-521.
[21] I.A. Khalil and A.A. Ghafly, "Delay in public utility projects in Saudi Arabia" International Journal of Project Management., vol.17(2), 1999, pp.101-106.
[22] A.A. Aibinu and G. O. Jagboro, "The effects of construction delays on project delivery in Nigerian" International Journal of Project Management., vol.20, 2002, pp.593- 599.
[23] Ayudhya Borvorn Israngkura, Ph.D "Study of Payment Procedures of Public Works in Thailand" thesis, University of Tokyo. 2006.