WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/15495,
	  title     = {The Performance of Disbursement Procedure of Public Works in Thailand},
	  author    = {Israngkura Na Ayudhya B and  Kunishima M.},
	  country	= {},
	  institution	= {},
	  abstract     = {This paper analysis performance of disbursement
procedure of public works project in Thailand. The results of
research were summarised based on contracts, submitted invoice,
inspection dated, copies of disbursement dated between client and
their main contractor and interviewed with persons involved in
central and local government projects during 1994-2008 in Thailand.
The data collection was to investigate the disbursement procedure
related to performance in disbursement during construction period
(Planned duration of contract against Actual execution date in each
month). A graphical presentation of a duration analysis of the
projects illustrated significant disbursement formation in each
project. It was established that the shortage of staff, the financial
stability of clients, bureaucratic, method of disbursement and
economics situation has play major role on performance of
disbursement to their main contractors.},
	    journal   = {International Journal of Civil and Environmental Engineering},
	  volume    = {4},
	  number    = {1},
	  year      = {2010},
	  pages     = {9 - 16},
	  ee        = {https://publications.waset.org/pdf/15495},
	  url   	= {https://publications.waset.org/vol/37},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 37, 2010},
	}