Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Design of Coal Quality Disturbance Free System for Coordinated Control System Based on Gain Scheduling
Authors: Liu Ji-Wei, Pei Yu-Liang, Liu Qian, Han Xiang, Zeng De-Liang
Abstract:
The economic and stable operation was affected seriously by coal quality disturbance for power plants. Based on model analysis, influence of the disturbance can be considered as gain change of control system. Power capability coefficient of coal was constructed to inhibit it. Accuracy of the coefficient was verified by operating data. Then coal quality disturbance free system based on gain scheduling was designed for coordinated control system. Simulation showed that, the strategy improved control quality obviously, and inhibited the coal quality disturbance.Keywords: coordinate control system, coal quality disturbance, energy coefficient of coal quality, gain scheduling
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1079190
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1426References:
[1] Guan Yue. The Study of the Effect of Coal Characteristics on the Economy of Power Plant
[M], North China Electric Power University, 2006
[2] Zhou MaoDe, Shi ZhanShan, Yu ZhiYuan. Effects and Policies of the Change of Coal Quality on Coal-fired Boiler. Shanxi Electric Power. 2005, 02, 9-11+19
[3] Yang TingTing. Research on power saving optimization control of fossil plant based on data. North China Electric Power University, 2010
[4] Zhao Zheng, Liu JiZhen, Tian Liang. Soft Measurement of Fuel Quantity Based on Data Fusion and On-line Calibration of Coal Heat Values. Journal of Engineering for Thermal Energy and Power, 2007,127, 42-45+60+109
[5] Zeng DeLiang, Zhao Zheng, Chen YanQiao. A Practical 500mw Boiler Dynamic Model Analysis. Proceedings of the Csee, 2003,05
[6] Huang ZhuYi. Gain Scheduled and Its Application on the Objects in Thermal System. Tsinghua University,2004
[7] Fu CaiFen, Tan Wen, Liu JiZhen. Robust Gain Scheduling Controller Based on Loop Shaping. Information and Control,2005,02, 152-156+162
[8] Huang ZuYi, Li DongHai, Jiang XueZhi. Gain Scheduled Servo System For Boiler-Turbine Unit. Proceedings of the Csee, 2003,10
[9] Yu DanRen, Xu ZhiQiang, Weng YiWu. A New Understanding of DEB-Gain Scheduling Control. Journal Of Engineering For Thermal Energy And Power, 1999,05, 379-381+396-411
[10] Xie Xie, Liu Jizhen, Zeng Deliang, Wen Tan. Research of Coordinated Control System Based on Robust Control. 2010 The 2nd International Conference on Computer and Automation Engineering, 2010,4,52-56