Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33104
Assessment of Reliability and Quality Measures in Power Systems
Authors: Badr M. Alshammari, Mohamed A. El-Kady
Abstract:
The paper presents new results of a recent industry supported research and development study in which an efficient framework for evaluating practical and meaningful power system reliability and quality indices was applied. The system-wide integrated performance indices are capable of addressing and revealing areas of deficiencies and bottlenecks as well as redundancies in the composite generation-transmission-demand structure of large-scale power grids. The technique utilizes a linear programming formulation, which simulates practical operating actions and offers a general and comprehensive framework to assess the harmony and compatibility of generation, transmission and demand in a power system. Practical applications to a reduced system model as well as a portion of the Saudi power grid are also presented in the paper for demonstration purposes.Keywords: Power systems, Linear programming, Quality assessment, Reliability.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1077233
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1557References:
[1] S.D Torre, A.J. Conejo, and J. Contreras, "Transmission Expansion Planning in Electricity Markets", IEEE Transactions on Power Systems, vol. 23, no. 1, pp. 238-248, February 2008.
[2] M.A. El-Kady, M.S. El-Sobki and N.K. Sinha, "Reliability evaluation for optimally operated large electric power systems", IEEE Transactions on Reliability, vol. R-35, no. 1, pp. 41-47, 1986.
[3] M.A. El-Kady, M.S. El-Sobki and N.K. Sinha, "Loss of load probability evaluation based on real time emergency dispatch", Canadian Electrical Engineering Journal, vol. 10, pp. 57-61, 1985.
[4] C. Qiming, L. Yan Lin and J.D. McCalley, "The Risk of High-Order Transmission Contingencies", Proc. IEEE Power Engineering Society General Meeting, pp. 1-7, June 2007.
[5] M.A. El-Kady, B. A. Alaskar, A.M. Shaalan and B.M. Al-Shammri, "Composite reliability and quality assessment of interconnected power systems", International Journal for Computation and Mathematic in Electrical and Electronic Engineering (COMPEL), vol. 26, no. 1, Paper SSD05-PES-12, 2007.
[6] B.M. Alshammari, M.A. El-Kady and Y.A. Al-Turki, "Computer-Aided Optimization of Power System Performance Quality Indices", Proc. 3rd Global Conference on Power Control and Optimization, Gold Coast, Australia, 2010, Paper 51.
[7] J.Choi, T.D. Mount and R.J. Thomas, "Transmission Expansion Planning Using Contingency Criteria", IEEE Transactions on Power Systems, vol. 22, no. 4, pp. 2249-2261, November 2007.
[8] P. Jirutitijaroen and C. Singh,"Reliability Constrained Multi-Area Adequacy Planning Using Stochastic Programming With Sample- Average Approximations", IEEE Transactions on Power Systems, vol. 23, no. 2, pp. 405-513, May 2008.
[9] N. Maruejouls, V. Sermanson, S.T. Lee. And P. Zhang. "A practical probabilistic reliability assessment using contingency simulation", Proc. IEEE Power Systems Conference and Exposition, vol.3, pp. 1312-1318, October 2004
[10] P.E. Gill, W. Murray and M.H. Wright, Practical Optimization, Academic Press, 1981.