Noise Source Identification on Urban Construction Sites Using Signal Time Delay Analysis
Authors: Balgaisha G. Mukanova, Yelbek B. Utepov, Aida G. Nazarova, Alisher Z. Imanov
Abstract:
The problem of identifying local noise sources on a construction site using a sensor system is considered. Mathematical modeling of detected signals on sensors was carried out, considering signal decay and signal delay time between the source and detector. Recordings of noises produced by construction tools were used as a dependence of noise on time. Synthetic sensor data was constructed based on these data, and a model of the propagation of acoustic waves from a point source in the three-dimensional space was applied. All sensors and sources are assumed to be located in the same plane. A source localization method is checked based on the signal time delay between two adjacent detectors and plotting the direction of the source. Based on the two direct lines' crossline, the noise source's position is determined. Cases of one dominant source and the case of two sources in the presence of several other sources of lower intensity are considered. The number of detectors varies from three to eight detectors. The intensity of the noise field in the assessed area is plotted. The signal of a two-second duration is considered. The source is located for subsequent parts of the signal with a duration above 0.04 sec; the final result is obtained by computing the average value.
Keywords: Acoustic model, direction of arrival, inverse source problem, sound localization, urban noises.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 146References:
[1] V. Yu. Filimonov, O. V. Lovtskaya, A. T. Zinoviev, “Calculation of dissolved pollutants mass flow according to the data of their concentration spatial distribution in the sites of small plaint rivers,” Eurasian Journal of Mathematical and Computer Applications, vol. 11, no. 4, pp. 14-28, 2023.
[2] C. Sebu, “Identification of a space- and time-dependent source in a variable coefficient advection-diffusion equation from Dirichlet and Neumann boundary measured outputs,” Journal of Inverse and Ill-Posed Problems, vol. 30, no 2, pp. 239 – 250, 2022.
[3] M. Kulbay, B. Mukanova, C. Sebu, “Identification of separable sources for advection-diffusion equations with variable diffusion coefficient from boundary measured data,” Inverse Problems in Science and Engineering, vol. 25, no. 2, pp. 279-308, 2017.
[4] A. Hasanoglu, V. Romanov, Introduction to Inverse Problems for Differential Equations, Second Edition, Springer, 2021.
[5] A. Hasanov, B. Mukanova, “Fourier Collocation Algorithm for identification of a space-wise dependent source in wave equation from Neumann-type measured data,” 2017 Applied Numerical Mathematics, vol. 111, pp. 49-63
[6] B. G. Mukanova, K. T. Iskakov, A. S. Kembay, S. A. Boranbaev, “Inverse source identification problem for the wave equation: An application for interpreting GPR data,” Eurasian Journal of Mathematical and Computer Applications, vol. 8, no.3, pp. 78-91. 2019.
[7] B. G. Mukanova, V. G. Romanov, “Inverse source problem for the wave equation and GPR data interpretation problem,” Eurasian Journal of Mathematical and Computer Applications, vol. 4, no.3, pp. 15-28, 2016.
[8] V. G. Romanov, “An inverse problem for a nonlinear wave equation with damping,” Eurasian Journal of Mathematical and Computer Applications, vol. 11, no.2, pp. 99-115, 2023.
[9] V. G. Romanov, “Ray Statement of the Acoustic Tomography Problem,” Doklady Mathematics, vol. 106, no.1, pp. 254-258, 2022.
[10] Don J. Torrieri, “Statistical Theory of Passive Location Systems,” IEEE Transactions on Aerospace and Electronic Systems vol. Aes-20, no. 2 March 1984.
[11] R. Schmidt, “Multiple Emitter Location and Signal Parameter Estimation,” IEEE Transactions on Antennas and Propagation, vol. AP-34(3), 1986.
[12] P. Svaizer, M. Matassoni and M. Omologo, Acoustic source location in a three-dimensional space using crosspower spectrum phase, IEEE International Conference on Acoustics, Speech, and Signal Processing, Munich, Germany, 1997, vol.1, pp. 231-234, 1997.
[13] M. Omologo and P. Svaizer, "Use of the crosspower-spectrum phase in acoustic event location," in IEEE Transactions on Speech and Audio Processing, vol. 5, no. 3, pp. 288-292, May 1997.
[14] M. Omologo and P. Svaizer, "Acoustic source location in noisy and reverberant environment using CSP analysis," 1996 IEEE International Conference on Acoustics, Speech, and Signal Processing Conference Proceedings, Atlanta, GA, USA, vol. 2, pp. 921-924, 1996.
[15] E. D. Di Claudio, R. Parisi, and G. Orlandi, “Multi-Source Localization in Reverberant Environments by Root-Music and Clustering,” 2000 IEEE International Conference on Acoustics, Speech, and Signal Processing. Proceedings (Cat. No.00CH37100), Istanbul, Turkey, pp. II921-II924 vol.2, 2000.
[16] B. D. Rao, K. V. S. Hari, “Performance Analysis of Root-Music,” IEEE Transactions On Acoustics, Speech, And Signal Processing, vol. 37. no. 12, 1989.
[17] M. Swartling, B. Sällberg, N. Grbic. “Source localization for multiple speech sources using low complexity non-parametric source separation and clustering.” Signal processing, vol. 9, no.8, pp. 1781-1788, 2011
[18] H. Akaike, “Information theory and an extension of the maximum likelihood principle,” in Proc. 2nd Int. Symp. Inform., Theory, suppl. Problems of Control and Inform. Theory, 1973, p. 267-281.
[19] Ch. H. Knapp, G. C. Carter, “The Generalized Correlation Method of Estimation of Time Delay,” IEEE Transactions on Acoustics, Speech, And Signal Processing, vol. ASSP-24, no. 4, 1976.
[20] M. Wax and T. Kailath, “Detection of Signals by Information Theoretic Criteria,” IEEE Transactions on Acoustics, Speech, And Signal Processing, Vol. ASSP-33, No. 2,1985.
[21] J. D. Kraus, R. J. Marhefka, A. S. Kahn, Antennas, 1st edition, McGraw-Hill, 1950.
[22] R. Roy and T. Kailath, "ESPRIT-estimation of signal parameters via rotational invariance techniques," in IEEE Transactions on Acoustics, Speech, and Signal Processing, vol. 37, no. 7, pp. 984-995, July 1989.
[23] T. Padois, A. Berry, “Two and Three-Dimensional Sound Source Localization with Beamforming and Several Deconvolution Techniques,” Acta Acustica united with Acustica, vol 103, no 3, pp. 392-400, 2017.
[24] M. Brandstein and D. Ward, “Microphone Arrays: Signal Manufacturing Techniques and Applications,” Digital Signal Processing, Springer, 2001.
[25] M. U. Liaquat, H. S. Munawar, A. Rahman, Z. Qadir, A. Z. Kouzani, M.A.P. Mahmud, “Localization of Sound Sources: A Systematic Review,” Energies, 14(13), 3910, 2021.
[26] B. A. George, J. W. Hans, & E. H. Frank, Mathematical Methods for Physicists. Elsevier, 2012.
[27] V. S. Vladimirov, Equations of Mathematical Physics, 418 p., 1971.