Effect of Pre-Construction on Construction Schedule and Client Loyalty
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33363
Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: Client loyalty, NPS, pre-construction, schedule reduction.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1125321

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3314

References:


[1] A. Laufer et al, “Prebid and Preconstruction Planning Process,” in Journal of Construction Engineering Management. Vol.119, no.3, pp. 426-444, 1993.
[2] A. Subbiah, “An Investigation of the Factors Influencing the Success of Construction Planning for the 2012 Olympic Stadium: An Ethnographic Study,” in Proceedings 28th Annual ARCOM Conference, Sept.2012
[3] A. Wit, “Measurement of Project Success,” in Project Management. vol. 6, no.3, pp. 164–170, Aug.1988.
[4] B.C. Lines et al, “Planning in Construction: Longitudinal Study of Pre-Contract Planning Model Demonstrates Reduction in Project Cost and Schedule Growth,” in International Journal of Construction Education and Research, vol.1.no.19, pp. 1-19, Apr.2014.
[5] C.L. Menches, A.S. Hanna, J.S. Russell, “Effect of Pre-construction Planning on Project Outcomes,” in Construction Research Congress 2005, pp. 1-10, 2005
[6] F.F .Reichheld, “The One Number you Need to Grow,” in Harvard Business Review, vol.81, no.12, pp.46-54, Dec.2003.
[7] J. Reginato, T.C.L. Alves, “Management of Preconstruction using Lean: An Exploratory Study of the Bidding Process,” in Proceedings for the 20th Annual Conference of the International Group for Lean Construction.
[8] M. Lepech, G. Griggs, “Enhancing Pre-Construction Decision-Making on Sustainable Commercial Building Projects,” in CIFE Seed Proposal Summary Page 2013-14 Projects. Vol.31.no.5. Sept.2015
[9] M. Jung, G. Lee, “Quantitative Model for Predicting the Referential Intention of Construction Management Services,” in Journal of Management Engineering,
[10] R. Sacks, R. Partouche, “Empire State Building Project: Archetype of Mass Construction,” in Journal of Construction Engineering and Management, vol.136, no.6, pp. 702-710, Jun.2010.
[11] S. Karna, “Analysing Customer Satisfaction and Quality in Construction – the Case of Public and Private Customers,” in Nordic Journal of Surveying and Real Estate Research, vol. 2, 2004.
[12] S. Karna, J.M. Junnonen, J. Kankainen, “Customer Satisfaction in Construction,”
[13] S.Z.S. Tabish, K.N. Jha, “Success Traits for a Construction Project,” in Journal of Construction Engineering and Management, vol.138, no.10, pp.1131-1138, Oct.2012.
[14] S.W. Hughes, D.D. Tippett, W.K. Thomas, “Measuring Project Success in the Construction Industry,” in Engineering Management Journal. Vol.16, no.3, pp. 31-37, Sept.2004.