A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering
Authors: Babak H. Tabrizi, Seyed Farid Ghaderi
Abstract:
Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the E-constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.Keywords: E-constraint method, material ordering, project management, project scheduling.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1110347
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2019References:
[1] N. J. Aquilano, and D. E. Smith, "A formal set of algorithms for project scheduling with critical path method-material requirements planning," J. Oper. Manage., vol. 1, no. 2, pp. 57-67, 1980.
[2] D. E. Smith-Daniels, and N. J, Aquilano, "Constrained resource project scheduling subject to material constraints," J. Oper. Manage., vol. 4, no. 4, pp. 369-388, 1984.
[3] D. E. Smith-Daniels, and V. L. Smith-Daniels, "Optimal project scheduling with materials ordering," IIE Trans., vol. 19, no. 4, pp. 122- 129, 1987.
[4] B. Dodin, and A. A. Elimam, "Integrated project scheduling and material planning with variable activity duration and rewards," IIE Trans., vol. 33, pp. 1005-1018, 2001.
[5] T. Schmitt, and B. Faaland, "Scheduling recurrent construction," Naval Res. Logist., vol. 51, no. 8, pp. 1102-1128, 2004.
[6] M. Sheikh Sajadieh, Sh. Shadrokh, and F. Hassanzadeh, "Concurrent Project Scheduling and Material Planning: A Genetic Algorithm Approach," Scientia Iranica- Transaction E: Ind. Eng., vol. 16, no. 2, pp. 91-99, 2009.
[7] O¨. Hazır, E. Erel, and Y. G¨ unalay, "Robust optimization models for the discrete time/cost trade-off problem," Int. J. Prod. Econ., vol. 130, pp. 87–95, 2011.
[8] S. H. Amin, and G. Zhang, "An integrated model for closed-loop supply chain configuration and supplier selection: Multi-objective approach," Expert Sys. Appl., vol. 39, pp. 6782-6791, 2012.