Tabrizi, B. , Ghaderi, S. (2015), 'A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering', World Academy of Science, Engineering and Technology, Open Science Index 107, International Journal of Industrial and Manufacturing Engineering, 9(11), 1969 - 1972.