Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33090
A Simulation-Optimization Approach to Control Production, Subcontracting and Maintenance Decisions for a Deteriorating Production System
Authors: Héctor Rivera-Gómez, Eva Selene Hernández-Gress, Oscar Montaño-Arango, Jose Ramon Corona-Armenta
Abstract:
This research studies the joint production, maintenance and subcontracting control policy for an unreliable deteriorating manufacturing system. Production activities are controlled by a derivation of the Hedging Point Policy, and given that the system is subject to deterioration, it reduces progressively its capacity to satisfy product demand. Multiple deterioration effects are considered, reflected mainly in the quality of the parts produced and the reliability of the machine. Subcontracting is available as support to satisfy product demand; also, overhaul maintenance can be conducted to reduce the effects of deterioration. The main objective of the research is to determine simultaneously the production, maintenance and subcontracting rate, which minimize the total, incurred cost. A stochastic dynamic programming model is developed and solved through a simulation-based approach composed of statistical analysis and optimization with the response surface methodology. The obtained results highlight the strong interactions between production, deterioration and quality, which justify the development of an integrated model. A numerical example and a sensitivity analysis are presented to validate our results.Keywords: Deterioration, simulation, subcontracting, production planning.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1109159
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1900References:
[1] Olsder, G. J. and Suri, R., “Time-Optimal Control of Parts-Routing in a Manufacturing System with Failure-Prone Machines”, IEEE, pp. 722- 727, 1980.
[2] Gerhswin, S. B., “Design and Operation of Manufacturing Systems: The Control–Point Policy”, IIE Transaction 32, pp. 891-906, 2000.
[3] Kim, J. and Gershwin, S., “Integrated Quality and Quantity Modeling of a Production Line”, OR Spectrum 27, pp. 287-314.2005.
[4] Kim J. and Gershwin S., “Analysis of Long Flow Lines with Quality and Operational Failures”, IIE Transactions, 40, pp. 284-296, 2008.
[5] Radhoui, M., Rezg, N. and Chelbi, A., “Joint Quality Control and Preventive Maintenance Strategy for Imperfect Production Processes”, Journal of Intelligent Manufacturing, 21, pp. 205-212, 2010.
[6] Bouslah, B., Gharbi, A., and Pellerin, R., “Joint Production and Quality Control of Unreliable Batch Manufacturing Systems with Rectifying Inspection”, International Journal of Production Research, vol. 1, no. 15, pp. 1-15, 2013.
[7] Love, C. E., Zhang, Z. G., Zitron, M.A., Guo, R., “A Discrete Semi- Markov Decision Model to Determine the Optimal Repair/Replacement Policy under General Repairs”, European Journal of Operational Research, 125 pp. 398-409, 2000.
[8] Soro, I.W., Nourelfath, M. and Ait-Kadi, D., “Performance Evaluation of Multi-State Degraded Systems with Minimal Repairs and Imperfect Preventive Maintenance”, Reliability Engineering and System Safety, 65, pp. 65-69, 2010.
[9] Khatab, A., Ait-Kadi, D., Rezg, N., “Availability Optimization for Stochastic Degrading Systems under Imperfect Preventive Maintenance”, International Journal of Production Research, 52:14, pp. 4132-4141, 2014.
[10] Colledani, M., and Tolio, T., “Integrated Quality, Production Logistics and Maintenance Analysis of Multi-Stage Asynchronous Manufacturing Systems with Degrading Machines”, CIRP Annals–Manufacturing Technology, Vol. 61, No. 1, pp. 455-458, 2012.
[11] Tan, B. and Gershwin, S.B., “Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand”, Annals of Operations Research, 125, 205-232, 2004.
[12] Dahane, M., Clementz, C., and Rezg, N., “Effects of Extension of Subcontracting on a Production System in a Joint Maintenance and Production Context”, Computers & Industrial Engineering, 58, pp. 88- 96, 2010.
[13] Gharbi A., Hajji, A., and Dhouib, K., “Production Rate Control of an Unreliable Manufacturing Cell with Adjustable Capacity”, International Journal of Production Research, 49:21, 6539-6557, 2011.
[14] Assid, M., Gharbi, A., Dhouib. K., “Joint Production and Subcontracting Planning of Unreliable Multi-Facility Multi-Product Production Systems”, Omega: The International Journal of Management Science, to be published, 2014.
[15] Dror, M., Smith, K. R., and Yano, C. A., “Deux Chemicals Inc. Goes Just–in-Time, Interfaces”, Vol. 39, No. 6, pp. 503-515, 2009.
[16] Rivera-Gómez, H., Gharbi, A. and Kenne, J.P., “Joint Production and Major Maintenance Planning Policy of a Manufacturing System with Deteriorating Quality”, International Journal of Production Economics, 146, pp. 575-587, 2013.
[17] Dehayem-Nodem, F.I., Kenne, J.P., and Gharbi, A., “Simultaneous Control of Production, Repair/Replacement and Preventive Maintenance of Deteriorating Manufacturing Systems”, International Journal of Production Economics, 134, pp. 271-282, 2011.
[18] Kushner, H.J. and Dupuis, P.G., Numerical Methods for Stochastic Control Problems in Continuous Time, Springer, New York, NY, 1992.
[19] Boukas, E.K. and Hauire, A., “Manufacturing Flow Control and Preventive Maintenance: A Stochastic Control Approach”, IEEE Transactions on Automatic Control, 33, pp. 1024-1031, 1990.
[20] Gharbi, A., and Kenne, J. P., “Production and Preventive Maintenance Rates Control for a Manufacturing System: An Experimental Design Approach”, International Journal of Production Economics, 65, pp. 275-287, 2000.