Search results for: validity indexes.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 482

Search results for: validity indexes.

2 Mental Health Surveys on Community and Organizational Levels: Challenges, Issues, Conclusions and Possibilities

Authors: László L. Lippai

Abstract:

In addition to the fact that mental health bears great significance to a particular individual, it can also be regarded as an organizational, community and societal resource. Within the Szeged Health Promotion Research Group, we conducted mental health surveys on two levels: The inhabitants of a medium-sized Hungarian town and students of a Hungarian university with a relatively big headcount were requested to participate in surveys whose goals were to define local government priorities and organization-level health promotion programmes, respectively. To facilitate professional decision-making, we defined three, pragmatically relevant, groups of the target population: the mentally healthy, the vulnerable and the endangered. In order to determine which group a person actually belongs to, we designed a simple and quick measurement tool, which could even be utilised as a smoothing method, the Mental State Questionnaire validity of the above three categories was verified by analysis of variance against psychological quality of life variables. We demonstrate the pragmatic significance of our method via the analyses of the scores of our two mental health surveys. On town level, during our representative survey in Hódmezővásárhely (N=1839), we found that 38.7% of the participants was mentally healthy, 35.3% was vulnerable, while 16.3% was considered as endangered. We were able to identify groups that were in a dramatic state in terms of mental health. For example, such a group consisted of men aged 45 to 64 with only primary education qualification and the ratios of the mentally healthy, vulnerable and endangered were 4.5, 45.5 and 50%, respectively. It was also astonishing to see to what a little extent qualification prevailed as a protective factor in the case of women. Based on our data, the female group aged 18 to 44 with primary education—of whom 20.3% was mentally healthy, 42.4% vulnerable and 37.3% was endangered—as well as the female group aged 45 to 64 with university or college degree—of whom 25% was mentally healthy, 51.3 vulnerable and 23.8% endangered—are to be handled as priority intervention target groups in a similarly difficult position. On organizational level, our survey involving the students of the University of Szeged, N=1565, provided data to prepare a strategy of mental health promotion for a university with a headcount exceeding 20,000. When developing an organizational strategy, it was important to gather information to estimate the proportions of target groups in which mental health promotion methods; for example, life management skills development, detection, psychological consultancy, psychotherapy, would be applied. Our scores show that 46.8% of the student participants were mentally healthy, 42.1% were vulnerable and 11.1% were endangered. These data convey relevant information as to the allocation of organizational resources within a university with a considerable headcount. In conclusion, The Mental State Questionnaire, as a valid smoothing method, is adequate to describe a community in a plain and informative way in the terms of mental health. The application of the method can promote the preparation, design and implementation of mental health promotion interventions. 

Keywords: Health promotion, mental health promotion, mental state questionnaire, psychological well-being.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1199
1 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: Causes of construction project delays, construction industry, construction management, power distance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3070