Search results for: Yasaman Ashrafi
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33

Search results for: Yasaman Ashrafi

3 Comparison of Depth of Cure and Degree of Conversion between Opus Bulk Fill and X-Tra Fill Bulk Fill Composites

Authors: Yasaman Samani, Ali Golmohammadi

Abstract:

Introduction: The degree of conversion and depth of cure affects the clinical success of resin composite restorations directly. One of the main challenges in achieving a successful composite restoration is the achievement of sufficient depth of cure. The insufficient polymerization may lead to a decrease in the physical/mechanical and biological properties of resin composites and, as a result of that, unsuccessful composite restoration. Thus, because of the importance of studying and evaluating the depth of cure and degree of conversion in bulk-fill composites, we decided to evaluate and compare the degree of conversion and depth of cure in two bulk-fill composites; x-tra fill (Voco, Germany) and Opus Bulk fill APS (FGM, Brazil). Materials and Methods: Composite resin specimens (n=10) per group were prepared as cylinder blocks (4×8 mm) with bulk-fill composites, x-tra fil (Voco, Germany) designated as Group A, and Opus Bulk fill APS (FGM, Brazil) designated as Group B. Depth of cure was determined according to “ISO 4049; Depth of Cure” method, In which each specimen were cured (iLED, Woodpecker, China) 40 seconds and FTIR spectroscopy method was used to estimate the degree of conversion of both the bulk-fill composites. The degree of conversion of monomer to polymer was estimated individually in the coronal half (Group A1 and B1) and pulpal half (Group A2 and Group B2) by dividing each specimen into two halves. The data were analyzed using a Student’s t-test and one-way ANOVA at a 5% level of significance. Results: The mean depth of cure in x-tra fil (Voco, Germany) was 3.99 (±0.16), and for Opus Bulk fill, APS (FGM, Brazil) was 2.14 (±0.3). The degree of conversion percentage in Group A1 was 82.7 (±6.1), in group A2 was 73.4 (±5.2), in group B1 was 63.3 (±4.7) and in Group B2 was 56.5 (±7.7). Statistical analysis revealed a significant difference in the depth of cure between the two bulk-fill composites with x-tra fil (Voco, Germany) higher than Opus Bulk fill APS (FGM, Brazil) (P<0.001). The degree of conversion percentage also showed a significant difference, Group A1 being higher than A2 (P=0.0085), B1, and B2 (P<0.001). Group A2 was also higher than B1 (P=0.003) and B2 (P<0.001). There was no significant difference between B1 and B2 (P=0.072). Conclusion: The results indicate that x-tra fill has more depth of cure and a higher percentage of the degree of conversion than Opus Bulk fill APS. The coronal half of x-tra fil had the highest depth of cure percentage (82.66%), and the pulpal half of Opus Bulk fill APS had the lowest percentage (56.45%). Even though both bulk-fill composite materials had an acceptable degree of conversion (55% and higher), x-tra fill has shown better results.

Keywords: depth of cure, degree of conversion, bulk-fill composite, FTIR

Procedia PDF Downloads 76
2 Fungal Profile and Antifungal Susceptibility Patterns among Symptomatic Pediatrics Patients Attending Aboozar Children’s Hospital, Ahvaz, Iran

Authors: Nasrin Amirrajab, Yasaman Razavi Ghahfarokhi, Zahra Tootak, Maryam Hadian, Fatemeh Abooali Shamshiri

Abstract:

Urinary tract infections (UTIs) have been reported in children with nephrotic syndrome. However, the only causes for the infection reported to date are bacteria, but not many prior reported occurrences of fungi or yeast as causative organisms. Hence, the present study aimed to describe the epidemiology of urinary tract fungal infections in a tertiary care pediatric. A single-center cross-sectional study was conducted at the nephrology ward of Aboozar Pediatric Hospital between March 21, 2021, and April 28, 2022. Urine was collected aseptically from children, inoculated onto culture media, and incubated at 37 °C for 18–48 hours. Yeast was identified following standard procedures. Antifungal susceptibility testing was determined by the disk diffusion method according to the CLSI guideline. Descriptive statistics and logistical regressions were used to estimate the crude ratio with a 95% confidence interval. P-value < 0.05 was considered significant. Among 68 individuals referred to the mycology lab, the result of direct examination and culture of all patients approved for C.albicans. Of these, 38 individuals (55.8%) were male, and 30 (44.2%) were female. The patients' age ranges were between one month and an 18-year-old. In the study of infection intensity, the patients were classified into three levels such as few (73.5%), moderate (20.6%), and many (5.9%). In the present study, all the patients were sensitive to Posaconazole. Also, the eagle effect was found in Amphotericin B, Voriconazole, and Fluconazole with frequencies of 91.7%, 91.7%, and 83%, respectively. In addition, just 8.3% of isolates were resistant to Itraconazole. It has not shown resistance in other mentioned medicine. The patients showed an intermediate response to Itraconazole (91.7%), Fluconazole (17%), Voriconazole (8.3%), and Amphotericin B (8.3%). There is a high prevalence of yeast infections in children with suspected UTIs. Also, boys are more likely to get yeast infections, and the severity of the infection is higher than girls. The present study demonstrated the importance of diagnosing and selecting the appropriate drug for urinary tract fungal infections in hospitalized children.

Keywords: urinary tract infections, children, fungal infections, yeast, antifungal susceptibility

Procedia PDF Downloads 64
1 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 81