Search results for: Shambhu Kallolikar
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3

Search results for: Shambhu Kallolikar

3 Transforming Ganges to be a Living River through Waste Water Management

Authors: P. M. Natarajan, Shambhu Kallolikar, S. Ganesh

Abstract:

By size and volume of water, Ganges River basin is the biggest among the fourteen major river basins in India. By Hindu’s faith, it is the main ‘holy river’ in this nation. But, of late, the pollution load, both domestic and industrial sources are deteriorating the surface and groundwater as well as land resources and hence the environment of the Ganges River basin is under threat. Seeing this scenario, the Indian government began to reclaim this river by two Ganges Action Plans I and II since 1986 by spending Rs. 2,747.52 crores ($457.92 million). But the result was no improvement in the water quality of the river and groundwater and environment even after almost three decades of reclamation, and hence now the New Indian Government is taking extra care to rejuvenate this river and allotted Rs. 2,037 cores ($339.50 million) in 2014 and Rs. 20,000 crores ($3,333.33 million) in 2015. The reasons for the poor water quality and stinking environment even after three decades of reclamation of the river are either no treatment/partial treatment of the sewage. Hence, now the authors are suggesting a tertiary level treatment standard of sewages of all sources and origins of the Ganges River basin and recycling the entire treated water for nondomestic uses. At 20million litres per day (MLD) capacity of each sewage treatment plant (STP), this basin needs about 2020 plants to treat the entire sewage load. Cost of the STPs is Rs. 3,43,400 million ($5,723.33 million) and the annual maintenance cost is Rs. 15,352 million ($255.87 million). The advantages of the proposed exercise are: we can produce a volume of 1,769.52 million m3 of biogas. Since biogas is energy, can be used as a fuel, for any heating purpose, such as cooking. It can also be used in a gas engine to convert the energy in the gas into electricity and heat. It is possible to generate about 3,539.04 million kilowatt electricity per annum from the biogas generated in the process of wastewater treatment in Ganges basin. The income generation from electricity works out to Rs 10,617.12million ($176.95million). This power can be used to bridge the supply and demand gap of energy in the power hungry villages where 300million people are without electricity in India even today, and to run these STPs as well. The 664.18 million tonnes of sludge generated by the treatment plants per annum can be used in agriculture as manure with suitable amendments. By arresting the pollution load the 187.42 cubic kilometer (km3) of groundwater potential of the Ganges River basin could be protected from deterioration. Since we can recycle the sewage for non-domestic purposes, about 14.75km3 of fresh water per annum can be conserved for future use. The total value of the water saving per annum is Rs.22,11,916million ($36,865.27million) and each citizen of Ganges River basin can save Rs. 4,423.83/ ($73.73) per annum and Rs. 12.12 ($0.202) per day by recycling the treated water for nondomestic uses. Further the environment of this basin could be kept clean by arresting the foul smell as well as the 3% of greenhouse gages emission from the stinking waterways and land. These are the ways to reclaim the waterways of Ganges River basin from deterioration.

Keywords: Holy Ganges River, lifeline of India, wastewater treatment and management, making Ganges permanently holy

Procedia PDF Downloads 256
2 Extension of D Blast Furnace Campaign Life at Tata Steel Ltd

Authors: Biswajit Seal, Dushyant Kumar, Shambhu Nath, A. B. Raju

Abstract:

Extension of blast furnace campaign life is highly desired for blast furnace operators mainly because of reduction of operating cost and to avoid capital expenditure cost. Tata Steel Ltd, Jamshedpur plant operates seven blast furnaces with combination of old and new technologies. The focus of Tata Steel Ltd is to push for increasing productivity with good quality product and increasing campaign life. This has been challenging for older furnaces because older furnaces are generally equipped with less automation, old design and old equipment. Good operational practices, appropriate remedial measures, and regular planned maintenance helps to achieve long campaign life of old furnaces. Good operating practices like stable and consistent productivity, control of burden distribution, remedial measures like stack gunning and shotcreting for protection of stack wall, enhanced cooling system, and intermediate stack repair helps to achieve long campaign life of old blast furnaces. This paper describes experiences with the current old equipment and design of Tata Steel’s D Blast Furnace for campaign life extension.

Keywords: blast furnace, burden distribution, campaign life, productivity

Procedia PDF Downloads 233
1 Exploring the Number, Type and Level of Disability among Victims of Nepal Earthquake 2015

Authors: Inosha Bimali, Shambhu P. Adhikari, Sumana Baidya, Nishchal R. Shakya

Abstract:

Background: An earthquake of 7.8 magnitudes with an epicenter in Gorkha on 25th April 2015 and second earthquake of 6.5 magnitudes with an epicenter at Sindhupalchwok on 12th May 2015 struck the beautiful country of Nepal, killing more than 8,500 people and over 18,500 individuals were left injured with various forms of disabilities. Objectives: To explore number, type and level of disability among post earthquake victims. A door to door physiotherapy rehabilitation program will be conducted at the community level as a continuation of this study. Methods: A survey was carried out in the catchment area of Bahunepati and Manekharka outreach centers of Sindhupalchowk district and Gaurishankar outreach center of Dolakha district of Dhulikhel Hospital. Physical disability was identified using a disability survey form given by Ministry of women, children and social welfare Nepal Government. World health organization disability assessment schedule-2 was used to identify the level of disability. Results: Twenty-nine person with disabilities at Bahunepati, four person with disabilities at Manekharkha and two person with disabilities at Gaurishankar and its catchment area were identified. Level of disability was an average of 56% with majority of survivors having upper extremities fractures followed by lower extremities fractures and miscellaneous injury. Few spinal cord injuries and head injuries were also identified. Conclusion: Though number of person with disabilities was found relatively less, disability level is high; hence an urgent need of physiotherapy rehabilitation is reflected to improve the quality of life of the affected people.

Keywords: community, disability, Nepal earthquake, physiotherapy

Procedia PDF Downloads 268