Search results for: Moqbil S. Alenazi
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3

Search results for: Moqbil S. Alenazi

3 A Holistic Study of the Beta Lyrae Systems V0487 Lac, V0566 Hya and V0666 Lac

Authors: Moqbil S. Alenazi, Magdy. M. Elkhateeb

Abstract:

A comprehensive photometric study and evolutionary state for the newly discovered Beta Lyr systems V0487 Lac, V0566 Hya, and V0666 Lac were carried out by means of their first photometric observations. New times of minima were estimated from the observed light curves, and first (O-C) curves were established for all systems. A windows interface version of the Wilson and Devinney code (W-D) based on model atmospheres and a pass band prescription have been used for the radiative treatment. The accepted models reveal some absolute parameters for the studied systems, which are used in adopting the spectral type of the system's components and their evolutionary status. Distances to each system were calculated, and physical properties were estimated. Locations of the systems on the theoreticalmass–luminosity and mass–radius relations revealed a good fit for all systems components except for the secondary component of the system V0487 Lac.

Keywords: eclipsing binaries, light curve modelling, evolutionary state

Procedia PDF Downloads 44
2 Analyzing Factors Influencing Citizen Utilization and Adoption of E-Government Services in Saudi Arabia: A Citizen’s Perspective

Authors: Abdulqader Almasabe, Stephanie Ludi, Mohammed Alenazi

Abstract:

Governments around the world have been increasingly introducing e-government services in order to make processes more efficient and accessible for their citizens. The government of Saudi Arabia has adopted E-Government for the effective delivery of services. However, the adoption rate of these services remains low in many countries. This paper aims to explore the determinants of citizens' intention to adopt and use e-government services, focusing on a model of factors influencing the adoption and utilization of e-government services (MFIAUEGS) that has been specially developed for this purpose. By analyzing the factors that influence citizens' decisions to use e-government services we hope to provide insights that help to increase adoption rates and improve the overall effectiveness of these services. In this paper, 562 valid responses were collected and analyzed to shed light on the issue. The results of the research showed that each of the proposed factors in the MFIAUEGS model played a significant role in influencing citizens' intentions to adopt and use e-government services.

Keywords: e-government, model acceptance, influencing factors, TAM

Procedia PDF Downloads 38
1 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 293