Search results for: Ismaeel bin-Jaliah
4 Antibacterial Activity of Libyan Seaweed Extracts
Authors: Salmin K. Alshalmani, Nada H. Zobi, Ismaeel H. Bozakouk
Abstract:
Marine organisms are potentially prolific sources of highly bio active secondary metabolites that might represent useful leads in the development of new pharmaceutical agents. The Libyan marine biodiversity including macroalgae remains partially unexplored in term of their potential bio activities. The phytochemical analysis of the alcoholic extracts of some commonly occurring seaweed Cystoseira compressa, enteromorpha intestinals, corallina, and Ulva lactuca and their evaluated for antibacterial activity by well diffusion assay were studied. Four different solvents namely water, ethanol 99 %, methanol 99 %, and methylated spirit 95 % were used for extraction. The phytochemical analysis revealed the presence of carbohydrates, steroids, tannin & phenols, saponins, proteins, and glycosides. The extracts were subjected for study of antibacterial activity. The zone of inhibition ranged between 8 to 16 mm in aqueous extract and up to 16 mm in methanol extract. The maximum activity (16 mm) was recorded from methanol extract of Ulva lactuca against Staphylococcus aureus and, minimum activity (8mm) recorded by Cystoseira compressa against S. aureus.Keywords: macroalgae, phytochemicals, antibacterial activity, methanolic extract
Procedia PDF Downloads 4683 Reversal of Testicular Damage and Subfertility by Resveratrol
Authors: Samy S. Eleawa, Mahmoud A. Alkhateeb, Fahaid H. Alhashem, Ismaeel bin-Jaliah, Hussein F. Sakr, Hesham M. Elrefaey, Abbas O. Elkarib, Mohammad A. Haidara, Abdullah S. Shatoor, Mohammad A. Khalil
Abstract:
This effect of Resveratrol (RES) against CdCl2- induced toxicity in the rat testes was investigated. Seven experimental groups of adult male rats were formulated as follows: A) Controls + NS, B) Control+ vehicle (saline solution of hydroxypropyl cyclodextrin), C) RES treated, D) CdCl2 +NS, E) CdCl2+ vehicle, F) RES followed by CdCl2 and M) CdCl2 followed by RES. At the end of the protocol, serum levels of FSH, LH, and testosterone were measured in all groups. Testicular levels of TBARS and Super Oxide Dismutase (SOD) activity were also measured. Epidydidimal semen analysis was performed and testicular expression of Bcl-2, p53 and Bax were assessed by RT-PCR. Also, histopathological changes of testes were examined microscopically and described. Pre and Post administration of RES in cadmium chloride-intoxicated rats improved semen parameters including count, motility, daily sperm production and morphology, increased serum concentrations of gonadotropins and testosterone, decreased testicular lipid peroxidation and increased SOD activity. Not only RES attenuated cadmium chloride induced testicular histopathology but was also able to protect against the onset of cadmium chloride testicular toxicity. Cadmium chloride downregulated the anti-apoptotic gene Bcl2 and upregulated the expression of both pro-apoptotic genes p53 and Bax. Resveratrol protected from and partially reversed cadmium chloride testicular via upregulation of Bcl2 and down regulation of p53 and Bax gene expression. Antioxidant activity of RES protects against cadmium chloride testicular toxicity and partially reverses its effect via upregulation of BCl2 and downregulation of p53 and Bax expression. These findings have far reaching implications on subfertility and impotency frequently seen in hypertensive as well as metabolic syndrome patients.Keywords: resveratrol, cadmium, infertility, sperm, testis, metabolic syndrome
Procedia PDF Downloads 5352 Resolving Increased Water-Cut in South and East Kuwait Areas through Water Knock-Out Facility Project
Authors: Sunaitan Al Mutairi, Kumar Vallatharasu, Batool Ismaeel
Abstract:
The Water Knock-Out (WKO) facility project is to handle the undesirable impact of the increasing water production rate in South and East Kuwait (S&EK) areas and break the emulsions and ensure sufficient separation of water at the new upstream facility, to reduce the load on the existing separation equipment in the Gathering Centers (GC). As the existing separation equipment in the Gathering Centers are not efficient to separate the emulsions, the Compact Electrostatic Coalescer (CEC) and Vessel Internal Electrostatic Coalescer (VIEC) technologies have been selected for enhancing the liquid-liquid separation by using the alternating voltage/frequency on electrical fields, to handle the increasing water-cut in S&EK. In the Compact Electrostatic Coalescer (CEC) technology method, the CEC equipment is installed downstream of the inlet separator externally, whereas in the Vessel Internal Electrostatic Coalescer (VIEC) technology method, the VIEC is built inside the treater vessel, downstream of the inlet separator with advanced internals for implementing electrocoalescence of water particles and hence enhancing liquids separation. The CEC and VIEC technologies used in the Water Knockout Facility project has the ability to resolve the increasing water cut in the S&EK area and able to enhance the liquid-liquid separation in the WKO facility separation equipment. In addition, the WKO facility is minimizing the load on the existing Gathering Center’s separation equipment, by tackling the high water-cut wells, upstream of each GC. The required performances at the outlet of the WKO facility are Oil in Water 100ppmv, Water in Oil 15% volume, liquid carryover in gas 0.1 US gal/MMSCFD, for the water cut ranging from 37.5 to 75% volume. The WKO facility project is used to sustain, support and maintain Greater Burgan production at 1.7 Million Barrels of Oil Per Day (MMBOPD), by handling the increasing water production rate.Keywords: emulsion, increasing water-cut, production, separation equipment
Procedia PDF Downloads 2451 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry
Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq
Abstract:
Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.Keywords: construction, project completion, risk management, uncertainties
Procedia PDF Downloads 153