Search results for: Astari Indarsari
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2

Search results for: Astari Indarsari

2 Beneficiation of Dye Sensitized Solar Cell as Energy Saving from Apple Skin with TiO2 Electrolysis

Authors: Astari Indarsari, Bastian B. Purba, Muhammad Fadlilah

Abstract:

In Indonesian climates that have the tropic climate, one of the potential energy sources is coming from solar energy. From the solar energy, we can convert it into the others energy, such as electrical energy. In this topic, we want to do the research about Dye Sensitized Solar Cell (DSSC). The materials that we use as sensitizer is anthocyanin that we extract from apple skin, because the anthocyanin is one of the most effective as a sensitizer for DSSC. The variable in this research is pH. The pH that we used are pH 0,5; pH 1; pH 1,5; pH 2; pH 2,5. The method is electrolysis, and we use TiO2 as sensitized material. The hypothesis from this research is the smaller pH can make higher the efficiency of the absorbent of the solar energy.

Keywords: anthocyanin, TiO2, DSSC, apple skin

Procedia PDF Downloads 290
1 Framework Study on Single Assembly Line to Improve Productivity with Six Sigma and Line Balancing Approach

Authors: Inaki Maulida Hakim, T. Yuri M. Zagloel, Astari Wulandari

Abstract:

Six sigma is a framework that is used to identify inefficiency so that the cause of inefficiency will be known and right improvement to overcome cause of inefficiency can be conducted. This paper presents result of implementing six sigma to improve piston assembly line in Manufacturing Laboratory, Universitas Indonesia. Six sigma framework will be used to analyze the significant factor of inefficiency that needs to be improved which causes bottleneck in assembly line. After analysis based on six sigma framework conducted, line balancing method was chosen for improvement to overcome causative factor of inefficiency which is differences time between workstation that causes bottleneck in assembly line. Then after line balancing conducted in piston assembly line, the result is increase in efficiency. Efficiency is shown in the decreasing of Defects per Million Opportunities (DPMO) from 900,000 to 700,000, the increasing of level of labor productivity from 0.0041 to 0.00742, the decreasing of idle time from 121.3 seconds to 12.1 seconds, and the increasing of output, which is from 1 piston in 5 minutes become 3 pistons in 5 minutes.

Keywords: assembly line, line balancing, productivity, six sigma

Procedia PDF Downloads 299