2 Modeling and Simulation Analysis and Design of Components of the Microgrid Prototype System

Authors: Draou Azeddine, Mazin Alahmadi, Abdulrahmane Alkassem, Alamri Abdullah

Abstract:

The demand for electric power in Saudi Arabia is steadily increasing with economic growth. More power plants should be installed to increase generation capacity and meet demand. Electricity in Saudi Arabia is mainly dependent on fossil fuels, which are a major problem as they deplete natural resources and increase CO₂ emissions. In this research work, performance and techno-economic analyzes are conducted to evaluate a microgrid system based on hybrid PV/wind diesel power sources as a stand-alone system for rural electrification in Saudi Arabia. The total power flow, maximum power point tracking (MPPT) efficiency, effectiveness of the proposed control strategy, and total harmonic distortion (THD) are analyzed in MATLAB/Simulink environment. Various simulation studies have been carried out under different irradiation conditions. The sizing, optimization, and economic feasibility analysis were performed using Homer energy software.

Keywords: WIND, solar, microgrid, energy

Procedia PDF Downloads 76
1 Techno-Economic Assessment of Aluminum Waste Management

Authors: Hamad Almohamadi, Abdulrahman AlKassem, Majed Alamoudi

Abstract:

Dumping Aluminum (Al) waste into landfills causes several health and environmental problems. The pyrolysis process could treat Al waste to produce AlCl₃ and H₂. Using the Aspen Plus software, a techno-economic and feasibility assessment has been performed for Al waste pyrolysis. The Aspen Plus simulation was employed to estimate the plant's mass and energy balance, which was assumed to process 100 dry metric tons of Al waste per day. This study looked at two cases of Al waste treatment. The first case produces 355 tons of AlCl₃ per day and 9 tons of H₂ per day without recycling. The conversion rate must be greater than 50% in case 1 to make a profit. In this case, the MSP for AlCl₃ is $768/ton. The plant would generate $25 million annually if the AlCl₃ were sold at $1000 per ton. In case 2 with recycling, the conversion has less impact on the plant's profitability than in case 1. Moreover, compared to case 1, the MSP of AlCl₃ has no significant influence on process profitability. In this scenario, if AlCl₃ were sold at $1000/ton, the process profit would be $58 million annually. Case 2 is better than case 1 because recycling Al generates a higher yield than converting it to AlCl₃ and H₂.

Keywords: aluminum waste, aspen plus, process modelling, fast pyrolysis, techno-economic assessment