Search results for: lost sale
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 782

Search results for: lost sale

2 Criminal Attitude vs Transparency in the Arab World

Authors: Keroles Akram Saed Ghatas

Abstract:

The political violence that characterized 1992 continued into 1993, creating a major security crisis for President Hosni Mubarak's government as the death toll and human rights abuses soared. Increasingly sensitive to criticism of 's human rights activities, the government established human rights departments in key ministries, beginning with the Foreign Office in February. Similar offices have been set up in the Justice and Agriculture Ministries, and plans to set up an office in the Home Office have been announced. It turned out that the main task of the law unit was to overturn the conclusions of international human rights organizations.President Mubarak was elected in a national referendum on October 4 for a third six-year term after being appointed on July 21 by the People's Assembly, an elected parliament overwhelmingly dominated by the in-power National Democratic Party will Mr. Mubarak ran unhindered. The Interior Ministry announced that nearly 16 million people cast their votes (84% of eligible voters), of which 96.28%. voted for presidential re-election.In 1993, armed Islamic extremists escalated their attacks on Christian citizens, government officials, police officers and senior security officials, resulting in casualties among the intended victims and bystanders. Sporadic attacks on buses, boats and tourist attractions also occurred throughout the year. From March 1992 to October 28, 1993, a total of 222 people lost their lives in the riots: 36 Coptic Christians and 38 other citizens; If one is a foreigner; sixty-six members of the Security Forces; and seventy-six known or suspected activists who were killed while resisting arrest. The latter was killed in airstrikes and firefights with security forces and at the site of planned attacks. On March 9-10, a series of airstrikes in Cairo, Giza, Qalyubiya province north of the capital and Aswan killed fifteen suspected militants and five members of the security forces.One of the airstrikes in Giza, part of Greater Cairo, killed the wife and son of Khalifa Mahmoud Ramadan, a suspected militant who was himself killed. The government agency Middle East News Agency reported on March 10 that the raids were part of a "broad confrontational plan aimed at ofterrorist elements"The state of emergency declared in October 1981 after the assassination of President Anwar el-Sadat was still in force in Egypt. The law, previously in effect continuously from June 1967 to May 1980, continued to grant the executive branch unique legal powers that effectively overrode the human rights guarantees of the Egyptian constitution. These provisions included wide discretionary powers in arresting and detaining individuals, as well as the ability to try civilians in military courts. The Cairo-based Independent Organization for Human Rights said so in a document sent to the United Nations in July 1993The human rights committee said the continued imposition of the state of emergency had resulted in "another constitution for the country" and "led to widespread misconduct by the security apparatus".

Keywords: constitution, human rights, legal power, president, anwar, el-sadat, assassination, state of emergency, middle east, news, agency, confrontational, arresting, fugitive, leaders, terrorist, elements, armed islamic extremists.

Procedia PDF Downloads 18
1 Using the UK as a Case Study to Assess the Current State of Large Woody Debris Restoration as a Tool for Improving the Ecological Status of Natural Watercourses Globally

Authors: Isabelle Barrett

Abstract:

Natural watercourses provide a range of vital ecosystem services, notably freshwater provision. They also offer highly heterogeneous habitat which supports an extreme diversity of aquatic life. Exploitation of rivers, changing land use and flood prevention measures have led to habitat degradation and subsequent biodiversity loss; indeed, freshwater species currently face a disproportionate rate of extinction compared to their terrestrial and marine counterparts. Large woody debris (LWD) encompasses the trees, large branches and logs which fall into watercourses, and is responsible for important habitat characteristics. Historically, natural LWD has been removed from streams under the assumption that it is not aesthetically pleasing and is thus ecologically unfavourable, despite extensive evidence contradicting this. Restoration efforts aim to replace lost LWD in order to reinstate habitat heterogeneity. This paper aims to assess the current state of such restoration schemes for improving fluvial ecological health in the UK. A detailed review of the scientific literature was conducted alongside a meta-analysis of 25 UK-based projects involving LWD restoration. Projects were chosen for which sufficient information was attainable for analysis, covering a broad range of budgets and scales. The most effective strategies for river restoration encompass ecological success, stakeholder engagement and scientific advancement, however few projects surveyed showed sensitivity to all three; for example, only 32% of projects stated biological aims. Focus tended to be on stakeholder engagement and public approval, since this is often a key funding driver. Consequently, there is a tendency to focus on the aesthetic outcomes of a project, however physical habitat restoration does not necessarily lead to direct biodiversity increases. This highlights the significance of rivers as highly heterogeneous environments with multiple interlinked processes, and emphasises a need for a stronger scientific presence in project planning. Poor scientific rigour means monitoring is often lacking, with varying, if any, definitions of success which are rarely pre-determined. A tendency to overlook negative or neutral results was apparent, with unjustified focus often put on qualitative results. The temporal scale of monitoring is typically inadequate to facilitate scientific conclusions, with only 20% of projects surveyed reporting any pre-restoration monitoring. Furthermore, monitoring is often limited to a few variables, with biotic monitoring often fish-focussed. Due to their longer life cycles and dispersal capability, fish are usually poor indicators of environmental change, making it difficult to attribute any changes in ecological health to restoration efforts. Although the potential impact of LWD restoration may be positive, this method of restoration could simply be making short-term, small-scale improvements; without addressing the underlying symptoms of degradation, for example water quality, the issue cannot be fully resolved. Promotion of standardised monitoring for LWD projects could help establish a deeper understanding of the ecology surrounding the practice, supporting movement towards adaptive management in which scientific evidence feeds back to practitioners, enabling the design of more efficient projects with greater ecological success. By highlighting LWD, this study hopes to address the difficulties faced within river management, and emphasise the need for a more holistic international and inter-institutional approach to tackling problems associated with degradation.

Keywords: biological monitoring, ecological health, large woody debris, river management, river restoration

Procedia PDF Downloads 189