Comparison of Double Unit Tunnel Form Building before and after Repair and Retrofit under in-Plane Cyclic Loading
Authors: S. A. Anuar, N. H. Hamid, M. H. Hashim, S. M. D. Salleh
Abstract:
This paper present the experimental work of double unit tunnel form building (TFB) subjected to in-plane lateral cyclic loading. A one third scale of 3-storey double unit of TFB is tested until its strength degradation. Then, the TFB is repaired and retrofitted using additional shear wall, steel angle and CFRP sheet. The crack patterns, lateral strength, stiffness, ductility and equivalent viscous damping (EVD) were analyzed and compared before and after repair and retrofit. The result indicates that the lateral strength increases by 22% in pushing and 27% in pulling direction. Moreover, the stiffness and ductility obtained before and after retrofit increase tremendously by 87.87% and 39.66%, respectively. Meanwhile, the energy absorption measured by equivalent viscous damping obtained after retrofit increase by 12.34% in pulling direction. It can be concluded that the proposed retrofit method is capable to increase the lateral strength capacity, stiffness and energy absorption of double unit TFB.
Keywords: Crack pattern, stiffness, ductility, equivalent viscous damping.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1097172
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2377References:
[1] H. Kaplani, S. Yilmazi, N. Centinkaya and E. Atimtay “Seismic strengthening of RC structures with exterior shear walls”, Sadhana Vol. 36, Part 1, February 2011, pp. 17-34, © Indian Academy of Sciences
[2] S. Altin, U. Ersoyand T. Tankut, “Hysteretic response of reinforce concrete infilled frames”, ASCE J. Struct. Eng., 1992, 118(8): 2133– 2150.
[3] N. H. Hamid, N. D. Hadi, and K. D. Ghani, “Retrofitting of beamcolumn joint using CFRP and steel plate”, International Journal of Civil, Architectural Science and Engineering, 7, 542-548, 2013.
[4] K. D. Ghani and N. H. Hamid, “Seismic performance of SFRC beamcolumn joint with corbel under reversible lateral cyclic loading”, International Journal of Engineering and Technology (IACSIT), 4(1), 76-80, 2012.
[5] C. Balkaya and E. Kalkan, “Nonlinear seismic response evaluation of tunnel form building structures”, Computational Structural Journal, 81, pp 153-165, (2002).
[6] S. Bahadir Yuksel, and E. Kalkan, “Behaviour of tunnel form building under quasi-static cyclic lateral loading”, Structural Engineering and Mechanics, Vol. 4, No. 1, 26-33, 2012.
[7] A. Abdul Razzaq Nasser Al-Aghabari, S.H. Hamzah, N.H. Hamid, and N. Rahman, “Structural performance of two types wall slab connection under out-of-plane lateral cyclic loading”, Journal of Engineering Science and Technology, Vol. 7, No. 2, 177-194, 2012.
[8] S.A Anuar, N.H Hamid, and M.H. Hashim, “Comparison of seismic behaviour for a single unit tunnel form RC building before and after repaired”, Advanced Material Research, Vol. 905, pp 254-258, 2014.